CN218205589U - Height-adjustable scaffolding for house construction - Google Patents

Height-adjustable scaffolding for house construction Download PDF

Info

Publication number
CN218205589U
CN218205589U CN202222339689.3U CN202222339689U CN218205589U CN 218205589 U CN218205589 U CN 218205589U CN 202222339689 U CN202222339689 U CN 202222339689U CN 218205589 U CN218205589 U CN 218205589U
Authority
CN
China
Prior art keywords
plate
supporting
scaffold
scaffolding
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222339689.3U
Other languages
Chinese (zh)
Inventor
方建国
李海红
金雄伟
毛祖伟
张苑艺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chemchina Shuguang Construction Co ltd
Original Assignee
Chemchina Shuguang Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chemchina Shuguang Construction Co ltd filed Critical Chemchina Shuguang Construction Co ltd
Priority to CN202222339689.3U priority Critical patent/CN218205589U/en
Application granted granted Critical
Publication of CN218205589U publication Critical patent/CN218205589U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

本实用新型公开了一种可调节高度的房屋建设用脚手架,包括两个相对设置的侧支撑板,两个侧支撑板的上端均装配有顶支撑板,顶支撑板的上端装配有脚手架板;侧支撑板的内部开设有调节腔,调节腔的内部底端装配有轴承,轴承内安装有螺旋支杆;侧支撑板的内部开设有调节腔,调节腔的内部底端装配有轴承,轴承内安装有螺旋支杆;脚手架板的下端装配有滑轨,顶支撑板的上端装配有顶滑块,顶滑块安装在滑轨内;该可调节高度的房屋建设用脚手架,便于脚手架的长度大小进行调节,从而进一步为该脚手架的使用带来了便利。

Figure 202222339689

The utility model discloses a height-adjustable scaffolding for building construction, which comprises two oppositely arranged side support plates, the upper ends of the two side support plates are equipped with a top support plate, and the upper ends of the top support plate are equipped with a scaffold plate; The inside of the side support plate is provided with an adjustment chamber, and the inner bottom of the adjustment chamber is equipped with a bearing, and a spiral strut is installed in the bearing; the inside of the side support plate is provided with an adjustment chamber, and the inner bottom of the adjustment chamber is equipped with a bearing, and the inner bottom of the adjustment chamber is equipped with a bearing. Screw rods are installed; the lower end of the scaffold plate is equipped with a slide rail, and the upper end of the top support plate is equipped with a top slider, which is installed in the slide rail; the height-adjustable scaffold for house construction is convenient for the length of the scaffold. Adjustment, thereby further bringing convenience for the use of this scaffold.

Figure 202222339689

Description

一种可调节高度的房屋建设用脚手架Height-adjustable scaffolding for house construction

技术领域technical field

本实用新型涉及脚手架技术领域,具体为一种可调节高度的房屋建设用脚手架。The utility model relates to the technical field of scaffolding, in particular to a height-adjustable scaffolding for house construction.

背景技术Background technique

脚手架是为了保证各房屋建设顺利进行而搭设的工作平台,按搭设的位置分为外脚手架、里脚手架;按材料不同可分为木脚手架、竹脚手架、钢管脚手架;按构造形式分为立杆式脚手架、桥式脚手架、门式脚手架、悬吊式脚手架、挂式脚手架、挑式脚手架、爬式脚手架,但是现有技术中在房屋建设时用的脚手架还存一些不足之处,比如,现有的可调节高度的脚手架,多为大量的钢管支撑柱组装而成,其组装繁杂,不便于根据施工作业的要求对脚手架的高度大小进行调节,从而为脚手架的使用带来了不便,因此需要对现有技术加以改进。Scaffolding is a work platform set up to ensure the smooth progress of the construction of each house. It can be divided into outer scaffolding and inner scaffolding according to the erection position; it can be divided into wooden scaffolding, bamboo scaffolding, and steel pipe scaffolding according to different materials; it can be divided into vertical pole type according to the structure. Scaffolding, bridge scaffolding, portal scaffolding, suspended scaffolding, hanging scaffolding, pick-up scaffolding, climbing scaffolding, but the scaffolding used in house construction in the prior art also has some deficiencies, such as existing The height-adjustable scaffolds are mostly assembled from a large number of steel pipe support columns. The assembly is complicated and it is not convenient to adjust the height of the scaffold according to the requirements of the construction work, which brings inconvenience to the use of the scaffold. Therefore, it is necessary to Existing technology is improved.

实用新型内容Utility model content

本实用新型的目的在于提供一种可调节高度的房屋建设用脚手架,以解决上述背景技术中提出的问题。The purpose of this utility model is to provide a height-adjustable scaffolding for building construction, so as to solve the problems raised in the above-mentioned background technology.

为实现上述目的,本实用新型提供如下技术方案:一种可调节高度的房屋建设用脚手架,包括两个相对设置的侧支撑板,两个所述侧支撑板的上端均装配有顶支撑板,所述顶支撑板的上端装配有脚手架板;In order to achieve the above purpose, the utility model provides the following technical solutions: a height-adjustable scaffolding for building construction, including two opposite side support plates, the upper ends of the two side support plates are equipped with a top support plate, The upper end of the top support plate is equipped with a scaffold plate;

所述侧支撑板的内部开设有调节腔,所述调节腔的内部底端装配有轴承,所述轴承内安装有螺旋支杆;The inside of the side support plate is provided with an adjustment cavity, and the inner bottom of the adjustment cavity is equipped with a bearing, and a spiral strut is installed in the bearing;

所述螺旋支杆的外部螺接有内螺支筒,所述内螺支筒的顶部连接顶支撑板,所述内螺支筒的外侧壁安装有侧滑块,所述调节腔的内壁开设有滑槽,所述侧滑块安装在滑槽内;The outside of the spiral rod is screwed with an inner screw support tube, the top of the inner screw support tube is connected to the top support plate, the outer wall of the inner screw support tube is equipped with a side slider, and the inner wall of the adjustment cavity is opened. There is a chute, and the side slider is installed in the chute;

所述脚手架板的下端装配有滑轨,所述顶支撑板的上端装配有顶滑块,所述顶滑块安装在滑轨内;The lower end of the scaffold plate is equipped with a slide rail, and the upper end of the top support plate is equipped with a top slider, and the top slider is installed in the slide rail;

所述螺旋支杆的外部靠近轴承的一端安装有从动齿轮,所述调节腔的内壁开设有通孔,且通孔内安装有转筒,所述转筒内安装有转轴;The outer end of the spiral strut close to the bearing is equipped with a driven gear, the inner wall of the adjustment cavity is provided with a through hole, and a rotating drum is installed in the through hole, and a rotating shaft is installed in the rotating drum;

所述转轴的端部安装有主动齿轮,且主动齿轮与从动齿轮相啮合。A driving gear is installed at the end of the rotating shaft, and the driving gear is meshed with the driven gear.

优选的,两个所述侧支撑板和两个顶支撑板的侧壁均安装有承重体,所述承重体的侧壁开设有收纳腔,且收纳腔内安装有调节板。Preferably, load-bearing bodies are installed on the side walls of the two side support plates and the two top support plates, and a storage cavity is opened on the side walls of the load-bearing body, and an adjustment plate is installed in the storage cavity.

优选的,所述调节板的侧壁均匀开设有调节螺槽,所述承重体的侧壁开设有调节螺孔,且调节螺孔和调节螺槽内螺接有固定螺杆。Preferably, the side wall of the adjustment plate is evenly provided with an adjustment screw groove, the side wall of the load-bearing body is provided with an adjustment screw hole, and a fixed screw is screwed in the adjustment screw hole and the adjustment screw groove.

优选的,所述转轴的端部延伸至侧支撑板的外部后安装有辅助转杆,所述辅助转杆的侧壁装配有L形转杆;Preferably, after the end of the rotating shaft extends to the outside of the side support plate, an auxiliary rotating rod is installed, and the side wall of the auxiliary rotating rod is equipped with an L-shaped rotating rod;

所述辅助转杆的侧壁开设有转槽,所述L形转杆的侧壁安装有转柱,所述转柱安装在转槽内,且转柱的外壁与转槽的内壁为过盈配合。The side wall of the auxiliary rotating rod is provided with a rotating groove, the side wall of the L-shaped rotating rod is equipped with a rotating column, and the rotating column is installed in the rotating groove, and the outer wall of the rotating column and the inner wall of the rotating groove are interference Cooperate.

优选的,所述L形转杆的外部套装有橡胶筒。Preferably, a rubber tube is sheathed on the outside of the L-shaped rotating rod.

优选的,所述侧支撑板的底端安装有承载底板,所述承载底板的下端装配有驱动轮,所述承载底板的上表面开设有支撑螺孔,所述支撑螺孔内螺接有支撑螺杆,所述支撑螺杆的下端安装有支撑体。Preferably, the bottom end of the side support plate is equipped with a bearing base plate, the lower end of the bearing base plate is equipped with a driving wheel, the upper surface of the bearing base plate is provided with a support screw hole, and a support screw hole is screwed inside the support screw hole. A screw rod, the lower end of the supporting screw rod is installed with a support body.

优选的,所述支撑体的两侧壁开设有收纳口,所述收纳口内安装有平衡板,所述平衡板的端部安装有平衡块,且平衡块的底端和支撑体的底端在同一直线上。Preferably, the two side walls of the support body are provided with storage openings, a balance board is installed in the storage opening, a balance weight is installed at the end of the balance board, and the bottom end of the balance weight and the bottom end of the support body are in the on the same line.

优选的,所述支撑体的内部安装有双向气缸,所述平衡板的端部延伸至支撑体的内部后安装有抵板,所述双向气缸的驱动端连接抵板。Preferably, a two-way air cylinder is installed inside the support body, an end of the balance plate is extended to the inside of the support body and a back plate is installed, and the driving end of the two-way air cylinder is connected to the back plate.

与现有技术相比,本实用新型的有益效果是:该可调节高度的房屋建设用脚手架,结构简单,操作方便,通过设置两个侧支撑板和脚手架板,组成房屋建设用的脚手架,并在两者之间设置螺旋支杆和内螺支筒,从而通过需要调整脚手架板的高度,便于使用不同高度的工作,并在两个侧支撑板之间设置可调节的承重体和调节板,从而提高脚手架的稳固性,并可房屋建设中,便于根据施工人员的数量多少对承重机构的总体长度进行调节,即对该脚手架的长度大小进行调节,从而进一步为该脚手架的使用带来了便利。Compared with the prior art, the beneficial effect of the utility model is that the height-adjustable scaffolding for house construction has a simple structure and is easy to operate. By setting two side support boards and scaffold boards, the scaffolding for house construction is formed, and A spiral strut and an internal screw support are set between the two, so that the height of the scaffold plate needs to be adjusted to facilitate the use of work at different heights, and an adjustable load-bearing body and an adjustment plate are set between the two side support plates. Thereby improving the stability of the scaffold, and during the construction of the house, it is convenient to adjust the overall length of the load-bearing mechanism according to the number of construction workers, that is, to adjust the length of the scaffold, thereby further bringing convenience to the use of the scaffold .

附图说明Description of drawings

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型的支撑体内部示意图;Fig. 2 is the internal schematic diagram of the support body of the present utility model;

图3为本实用新型的A部分结构示意图。Fig. 3 is a structural schematic diagram of part A of the present invention.

图中:1侧支撑板、2顶支撑板、3脚手架板、4螺旋支杆、5内螺支筒、6调节腔、8滑轨、9顶滑块、10支撑螺杆、11支撑螺孔、12支撑体、13承载底板、14承重体、15调节板、16调节螺槽、17调节螺孔、18驱动轮、19双向气缸、20抵板、21收纳口、22平衡板、23平衡块、24滑槽、25侧滑块、26从动齿轮、27轴承、28主动齿轮、29转轴、30转筒、31辅助转杆、32转槽、33转柱、34L形转杆、35橡胶筒。In the figure: 1 side support plate, 2 top support plate, 3 scaffolding plate, 4 spiral support rod, 5 inner screw support tube, 6 adjustment cavity, 8 slide rail, 9 top slider, 10 support screw rod, 11 support screw hole, 12 Supporting body, 13 Loading bottom plate, 14 Load bearing body, 15 Adjusting plate, 16 Adjusting screw groove, 17 Adjusting screw hole, 18 Driving wheel, 19 Two-way cylinder, 20 Arrival plate, 21 Storage port, 22 Balance plate, 23 Balance block, 24 chutes, 25 side sliders, 26 driven gears, 27 bearings, 28 driving gears, 29 rotating shafts, 30 rotating drums, 31 auxiliary rotating rods, 32 rotating slots, 33 rotating columns, 34 L-shaped rotating rods, 35 rubber cylinders.

具体实施方式detailed description

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

请参阅图1、图2和图3,本实用新型提供一种技术方案:一种可调节高度的房屋建设用脚手架,包括两个相对设置的侧支撑板1,所述两个侧支撑板1的上端均装配有顶支撑板2,顶支撑板2的上端装配有脚手架板3,从而组成现有技术中房屋建设用的脚手架;Please refer to Fig. 1, Fig. 2 and Fig. 3, the utility model provides a kind of technical solution: a kind of height-adjustable scaffolding for building construction, including two side supporting boards 1 arranged oppositely, and the two side supporting boards 1 The upper end of each is equipped with a top support plate 2, and the upper end of the top support plate 2 is equipped with a scaffold plate 3, thereby forming a scaffold used for house construction in the prior art;

所述侧支撑板1的内部开设有调节腔6,调节腔6的内部底端装配有轴承27,轴承27内安装有螺旋支杆5,螺旋支杆5通过轴承27可在侧支撑板1的内部转动;The inside of the side support plate 1 is provided with an adjustment cavity 6, and the inner bottom end of the adjustment cavity 6 is equipped with a bearing 27, and a spiral strut 5 is installed in the bearing 27, and the spiral strut 5 can be mounted on the side support plate 1 through the bearing 27. internal rotation;

所述螺旋支杆5的外部螺接有内螺支筒4,内螺支筒4为圆柱形筒,且内部设置内螺纹,与螺旋支杆5的外螺纹相配合,从而通过螺旋支杆5的正反转,驱动内螺支筒4在螺旋支杆5的外部升降,内螺支筒4的顶部连接顶支撑板2,从而驱动顶支撑板2升降,内螺支筒4的外侧壁安装有侧滑块25,调节腔6的内壁开设有滑槽24,侧滑块25安装在滑槽24内,侧滑块25安装在内螺支筒4的外部下端,通过在滑槽24内的滑动,从而保证内螺支筒4可升降;The outside of the spiral rod 5 is screwed with an internal screw support tube 4, the internal screw support tube 4 is a cylindrical tube, and an internal thread is arranged inside to match the external thread of the spiral support rod 5, so that the screw support rod 5 The positive and negative rotation of the inner screw support tube 4 is driven to rise and fall outside the spiral support rod 5, and the top of the inner screw support tube 4 is connected to the top support plate 2, thereby driving the top support plate 2 to rise and fall, and the outer wall of the internal screw support tube 4 is installed There is a side slider 25, the inner wall of the adjustment chamber 6 is provided with a chute 24, the side slider 25 is installed in the chute 24, and the side slider 25 is installed at the outer lower end of the inner screw support tube 4, through the chute 24 Sliding, so as to ensure that the inner screw support tube 4 can be lifted;

所述脚手架板3的下端装配有滑轨8,顶支撑板2的上端装配有顶滑块9,顶滑块9安装在滑轨8内,从而实现顶支撑板2和侧支撑板1在脚手架板3下端的相对或者相向移动;The lower end of the scaffold plate 3 is equipped with a slide rail 8, and the upper end of the top support plate 2 is equipped with a top slide block 9, and the top slide block 9 is installed in the slide rail 8, thereby realizing that the top support plate 2 and the side support plate 1 are aligned on the scaffold. The relative or relative movement of the lower end of the plate 3;

所述螺旋支杆5的外部靠近轴承27的一端安装有从动齿轮26,调节腔6的内壁开设有通孔,且通孔内安装有转筒30,转筒30内安装有转轴29;A driven gear 26 is installed on the outside of the spiral rod 5 close to the end of the bearing 27, and the inner wall of the adjustment chamber 6 is provided with a through hole, and a rotating drum 30 is installed in the through hole, and a rotating shaft 29 is installed in the rotating drum 30;

所述转轴29的端部安装有主动齿轮28,且主动齿轮28与从动齿轮26相啮合,通过两个齿轮的啮合,从而在转动转轴29的情况下,即可驱动螺旋支杆5转动。The end of the rotating shaft 29 is equipped with a driving gear 28, and the driving gear 28 is meshed with the driven gear 26. Through the engagement of the two gears, the screw rod 5 can be driven to rotate when the rotating shaft 29 is rotated.

两个所述侧支撑板1和两个顶支撑板2的侧壁均安装有承重体14,承重体14的侧壁开设有收纳腔,且收纳腔内安装有调节板15,调节板15的左端进入左端的承重体14的收纳腔内,调节板15的右端进入右端的承重体14的收纳腔内。The side walls of the two side support plates 1 and the two top support plates 2 are all equipped with a load bearing body 14, and the side walls of the load bearing body 14 are provided with a storage cavity, and an adjustment plate 15 is installed in the storage cavity, and the adjustment plate 15 The left end enters the receiving cavity of the load bearing body 14 at the left end, and the right end of the adjustment plate 15 enters the receiving cavity of the load bearing body 14 at the right end.

所述调节板15的侧壁均匀开设有调节螺槽16,承重体14的侧壁开设有调节螺孔17,且调节螺孔17和调节螺槽16内螺接有固定螺杆。The side wall of the adjustment plate 15 is evenly provided with an adjustment screw groove 16, and the side wall of the load bearing body 14 is provided with an adjustment screw hole 17, and the adjustment screw hole 17 and the adjustment screw groove 16 are screwed with a fixed screw.

所述转轴29的端部延伸至侧支撑板1的外部后安装有辅助转杆31,辅助转杆31的侧壁装配有L形转杆34;The end of the rotating shaft 29 is extended to the outside of the side support plate 1 and an auxiliary rotating rod 31 is installed, and the side wall of the auxiliary rotating rod 31 is equipped with an L-shaped rotating rod 34;

所述辅助转杆31的侧壁开设有转槽32,L形转杆34的侧壁安装有转柱33,转柱33安装在转槽32内,且转柱33的外壁与转槽32的内壁为过盈配合,L形转杆34可转动支与辅助转杆31的侧壁收纳,且通过过盈配合,L形转杆34和辅助转杆31在不受外力的情况下,两者不动,收到外力时才可收纳。The side wall of described auxiliary rotating rod 31 is provided with rotating groove 32, and the side wall of L-shaped rotating rod 34 is equipped with rotating column 33, and rotating column 33 is installed in rotating groove 32, and the outer wall of rotating column 33 and rotating groove 32 The inner wall is an interference fit, and the L-shaped rotating rod 34 can be rotatably accommodated with the side wall of the auxiliary rotating rod 31, and through the interference fit, the L-shaped rotating rod 34 and the auxiliary rotating rod 31 can be connected without external force. It can only be stored when receiving external force.

所述L形转杆34的外部套装有橡胶筒35。A rubber tube 35 is sheathed on the outside of the L-shaped rotating rod 34 .

所述侧支撑板1的底端安装有承载底板13,承载底板13的下端装配有驱动轮18,侧支撑板1的下端设置的驱动轮18为四个,承载底板13的上表面开设有支撑螺孔11,支撑螺孔11内螺接有支撑螺杆10,支撑螺杆10的下端安装有支撑体12,通过支撑螺杆10在支撑螺孔11内的上下移动,从而将支撑体12与地面接触,从而提高整体的稳定性。The bottom end of the side support plate 1 is equipped with a load-bearing base plate 13, and the lower end of the load-bearing base plate 13 is equipped with a drive wheel 18. There are four drive wheels 18 provided at the lower end of the side support plate 1, and the upper surface of the load-bearing base plate 13 is provided with a support Screw hole 11, support screw 11 is screwed with support screw 10, the lower end of support screw 10 is equipped with support body 12, moves up and down in support screw hole 11 by support screw 10, thereby support body 12 is contacted with the ground, Thereby improving the overall stability.

所述支撑体12的两侧壁开设有收纳口21,收纳口21内安装有平衡板22,平衡板22的端部安装有平衡块23,且平衡块23的底端和支撑体12的底端在同一直线上,通过平衡板22从支撑体12内移除,从而增大支撑体12与地面的接触棉结。The two side walls of the support body 12 are provided with a storage port 21, a balance board 22 is installed in the storage port 21, a balance weight 23 is installed on the end of the balance board 22, and the bottom of the balance weight 23 and the bottom of the support body 12 The ends are on the same straight line, and the balance plate 22 is removed from the support body 12, thereby increasing the contact neps between the support body 12 and the ground.

所述支撑体12的内部安装有双向气缸19,双向气缸19的型号为:TCL50X50-BW001C,可双向驱动平衡板22在支撑体12的内部进出,平衡板22的端部延伸至支撑体12的内部后安装有抵板20,双向气缸19的驱动端连接抵板20。The inside of the support body 12 is equipped with a two-way cylinder 19. The model of the two-way cylinder 19 is: TCL50X50-BW001C, which can drive the balance plate 22 in and out of the support body 12 in both directions. The end of the balance plate 22 extends to the bottom of the support body 12. An abutment plate 20 is installed behind the interior, and the driving end of the two-way cylinder 19 is connected to the abutment plate 20 .

工作过程及原理:在使用时,首先,在脚手架板3的下端向两侧移动侧支撑板1,此时承重体14与调节板15之间的长度随之调整,然后,将平衡板22向外拉出,然后向下转动支撑螺杆10将支撑体12与地面接触,然后同步顺时针转动两个侧支撑板1上的转轴,通过L形转筒34即可转动,此时螺旋支杆5顺时针转动,此时的内螺支筒4向上移动,从而将脚手架板3抬升,即可。Working process and principle: When in use, firstly, move the side support plate 1 to both sides at the lower end of the scaffold plate 3, at this time, the length between the load-bearing body 14 and the adjustment plate 15 is adjusted accordingly, and then, move the balance plate 22 to the Pull it out, then turn the support screw 10 downwards to contact the support body 12 with the ground, then rotate the shafts on the two side support plates 1 synchronously clockwise, and then rotate through the L-shaped drum 34. At this time, the screw rod 5 Turn clockwise, at this time, the inner screw support tube 4 moves upwards, thereby lifting the scaffolding board 3, and that's it.

对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, no matter from all points of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, so it is intended to be included in the claims All changes within the meaning and range of equivalents of the required elements are included in the present invention. Any reference sign in a claim should not be construed as limiting the claim concerned.

此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described according to implementation modes, not each implementation mode only contains an independent technical solution, and this description in the specification is only for clarity, and those skilled in the art should take the specification as a whole , the technical solutions in the various embodiments can also be properly combined to form other implementations that can be understood by those skilled in the art.

Claims (8)

1. The utility model provides a but height-adjusting's scaffold frame for house construction, includes two relative side faggings (1) that set up, its characterized in that: the upper ends of the two side supporting plates (1) are respectively provided with a top supporting plate (2), and the upper end of the top supporting plate (2) is provided with a scaffold plate (3);
an adjusting cavity (6) is formed in the side supporting plate (1), a bearing (27) is assembled at the bottom end of the adjusting cavity (6), and a spiral supporting rod (5) is installed in the bearing (27);
an inner spiral supporting cylinder (4) is screwed outside the spiral supporting rod (5), the top of the inner spiral supporting cylinder (4) is connected with a top supporting plate (2), a side sliding block (25) is installed on the outer side wall of the inner spiral supporting cylinder (4), a sliding groove (24) is formed in the inner wall of the adjusting cavity (6), and the side sliding block (25) is installed in the sliding groove (24);
the lower end of the scaffold plate (3) is provided with a slide rail (8), the upper end of the top supporting plate (2) is provided with a top slide block (9), and the top slide block (9) is arranged in the slide rail (8);
a driven gear (26) is mounted at one end, close to a bearing (27), of the outer portion of the spiral support rod (5), a through hole is formed in the inner wall of the adjusting cavity (6), a rotating cylinder (30) is mounted in the through hole, and a rotating shaft (29) is mounted in the rotating cylinder (30);
and a driving gear (28) is arranged at the end part of the rotating shaft (29), and the driving gear (28) is meshed with the driven gear (26).
2. The scaffolding for building construction of adjustable height according to claim 1, wherein: two bearing body (14) are all installed to the lateral wall of collateral branch fagging (1) and two top fagging (2), the chamber of accomodating has been seted up to the lateral wall of bearing body (14), and accomodates the intracavity and install regulating plate (15).
3. The scaffolding for building construction of adjustable height according to claim 2, wherein: the side wall of the adjusting plate (15) is uniformly provided with adjusting screw grooves (16), the side wall of the bearing body (14) is provided with adjusting screw holes (17), and fixing screws are screwed in the adjusting screw holes (17) and the adjusting screw grooves (16).
4. The scaffolding for building construction of adjustable height according to claim 1, wherein: the end part of the rotating shaft (29) extends to the outside of the side supporting plate (1) and is provided with an auxiliary rotating rod (31), and the side wall of the auxiliary rotating rod (31) is provided with an L-shaped rotating rod (34);
the rotating groove (32) has been seted up to the lateral wall of supplementary bull stick (31), rotary column (33) are installed to the lateral wall of L shape bull stick (34), install in rotary groove (32) rotary column (33), and the outer wall of rotary column (33) is interference fit with the inner wall of rotary groove (32).
5. The scaffold for building construction with adjustable height according to claim 4, wherein: the outer part of the L-shaped rotating rod (34) is sleeved with a rubber cylinder (35).
6. The scaffolding for building construction of adjustable height according to claim 1, wherein: the bottom mounting of collateral branch fagging (1) bears bottom plate (13), the lower extreme that bears bottom plate (13) is equipped with drive wheel (18), the upper surface that bears bottom plate (13) has been seted up and has been supported screw (11), it has supporting screw (10) to screw joint in support screw (11), supporter (12) are installed to the lower extreme of supporting screw (10).
7. The scaffolding for building construction of adjustable height according to claim 6, wherein: storage openings (21) are formed in two side walls of the supporting body (12), a balance plate (22) is installed in each storage opening (21), balance blocks (23) are installed at the end portions of the balance plates (22), and the bottom ends of the balance blocks (23) and the bottom ends of the supporting body (12) are located on the same straight line.
8. The scaffold for building construction with adjustable height according to claim 7, wherein: the supporting structure is characterized in that a bidirectional cylinder (19) is arranged inside the supporting body (12), a supporting plate (20) is arranged after the end portion of the balance plate (22) extends into the supporting body (12), and the driving end of the bidirectional cylinder (19) is connected with the supporting plate (20).
CN202222339689.3U 2022-09-03 2022-09-03 Height-adjustable scaffolding for house construction Active CN218205589U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222339689.3U CN218205589U (en) 2022-09-03 2022-09-03 Height-adjustable scaffolding for house construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222339689.3U CN218205589U (en) 2022-09-03 2022-09-03 Height-adjustable scaffolding for house construction

Publications (1)

Publication Number Publication Date
CN218205589U true CN218205589U (en) 2023-01-03

Family

ID=84628849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222339689.3U Active CN218205589U (en) 2022-09-03 2022-09-03 Height-adjustable scaffolding for house construction

Country Status (1)

Country Link
CN (1) CN218205589U (en)

Similar Documents

Publication Publication Date Title
CN105798885A (en) Building decoration supporting robot based on three-freedom-degree parallel mechanism
CN209509443U (en) A kind of easy-to-dismount scaffold of civil engineering
CN113417479B (en) Building wall construction device and application method thereof
CN212127317U (en) a gantry crane
CN221878841U (en) Fixed structure of preventing leaning of template
CN209958773U (en) Formwork removing tool for floor aluminum alloy building formwork
CN220866882U (en) Unit curtain wall hoisting trolley
CN209765806U (en) Novel sand table is used in tourism management teaching
CN111576859A (en) Floor laying-out opening template supporting structure
CN210105248U (en) Leveling ruler with tracks
CN208152535U (en) One kind can have enough to meet the need scaffold building pedestal
CN207228591U (en) A kind of architectural engineering scaffold
CN210239082U (en) Temporary hydropower integrated bracket for construction site
CN210392977U (en) Concrete spiral material distributor
CN219931542U (en) City building climbing rack
CN211226163U (en) Liftable support for construction engineering construction
CN217950457U (en) Auxiliary positioning mechanism is used in installation of subway people's air defense door
CN221896167U (en) A safety frame for construction site
CN223293439U (en) A wall crack repair and reinforcement steel structure
CN217859686U (en) Fixing device for processing civil air defense door body part
CN112780073A (en) Prefabricated wallboard strutting arrangement is used in room construction
CN218205579U (en) scaffolding for construction
CN220247531U (en) Lifting scaffold for building construction
CN223853914U (en) Building templates support device
CN223547609U (en) A lifting tool for hot-dip galvanizing steel components of power transmission towers

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20250820

Granted publication date: 20230103

PP01 Preservation of patent right