Temporary stringing supporting structure for electric power engineering construction Download PDF

Info

Publication number
CN218182920U
CN218182920U CN202222097569.7U CN202222097569U CN218182920U CN 218182920 U CN218182920 U CN 218182920U CN 202222097569 U CN202222097569 U CN 202222097569U CN 218182920 U CN218182920 U CN 218182920U
Authority
CN
China
Prior art keywords
rod
push rod
rectangular sleeve
electro
electric power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202222097569.7U
Other languages
Chinese (zh)
Inventor
陈均溢
白一龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222097569.7U priority Critical patent/CN218182920U/en
Application granted granted Critical
Publication of CN218182920U publication Critical patent/CN218182920U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model belongs to the technical field of the electric power engineering construction, especially, be an electric power engineering construction is with interim overhead line bearing structure, including the base and install the electro-hydraulic push rod that the upper surface of the base is close to intermediate position department and set up the mobile device above the electro-hydraulic push rod, still include the setting in the electro-hydraulic push rod with the auxiliary assembly between the mobile device, the auxiliary assembly includes rectangular sleeve, bayonet rod, connection rope and stopper, rectangular sleeve fixed connection is in the tip of electro-hydraulic push rod output shaft, bayonet rod and the connection rope all are located the rectangular sleeve is kept away from the slot that electro-hydraulic push rod one side was seted up; the height that is favorable to increasing the wire rod and rises, the phenomenon emergence of the unable staff of arriving of wire rod that avoids electric liquid push rod to rise the elasticity fastener centre gripping carries out the stringing position is favorable to finely tuning the height of centre gripping wire rod in the elasticity fastener, improves this stringing bearing structure's result of use.

Description

Temporary stringing supporting structure for electric power engineering construction
Technical Field
The utility model belongs to the technical field of the electric power engineering construction, concretely relates to electric power engineering construction is with interim overhead line bearing structure.
Background
Electric power engineering, i.e. engineering related to the production, transmission and distribution of electric energy, and also engineering applying electricity as power and energy in various fields in a broad sense, wherein in the construction process of the electric power engineering, electric wires are often required to be erected;
via review publication (bulletin) number: CN216564379U discloses an electric power engineering construction is with interim overhead line bearing structure, has disclosed "through setting up elasticity fastener, connecting plate, inserted bar, connecting seat, removal seat and electric liquid push rod, make the wire rod of waiting to erect can be by convenient fixed, and can follow the convenient getting of elastic wire fastener and put, the wire rod can be risen by bearing structure to be taken by the overhead line staff, can improve the overhead line convenience in the electric power engineering work progress";
although this design can make the wire rod of elasticity fastener centre gripping rise at the electric liquid push rod during operation to the wire rod is taken to the stringing staff of eminence, but, when the staff carries out the stringing in higher position, only through the wire rod of electric liquid push rod rising elasticity fastener centre gripping, lead to the scope that the wire rod risees to be limited, easily take place that the wire rod that risees the centre gripping of elasticity fastener through electric liquid push rod can't reach the position that the staff carries out the stringing.
Therefore, the temporary stringing support structure for power engineering construction is designed to solve the problems.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides an electric power engineering construction is with interim stringing bearing structure is favorable to increasing the height that the wire rod rises, avoids the electric liquid push rod to rise the phenomenon that the wire rod of elasticity fastener centre gripping can't reach the staff and carry out the stringing position to take place, is favorable to highly finely tuning of centre gripping wire rod in the elasticity fastener, improves this stringing bearing structure's result of use.
In order to achieve the above object, the utility model provides a following technical scheme: a temporary stringing support structure for electric power engineering construction comprises a base, an electro-hydraulic push rod and a moving device, wherein the electro-hydraulic push rod is installed on the upper surface of the base and close to the middle position, the moving device is arranged above the electro-hydraulic push rod, and an auxiliary assembly is arranged between the electro-hydraulic push rod and the moving device;
the auxiliary assembly comprises a rectangular sleeve, an inserting rod, a connecting rope and a limiting block, the rectangular sleeve is fixedly connected to the end portion of the output shaft of the electro-hydraulic push rod, the inserting rod and the connecting rope are located in a slot formed in the side, far away from the electro-hydraulic push rod, of the rectangular sleeve, the inserting rod is far away from one end, connected with the moving device, of the inserting rod and inserted into the rectangular sleeve, the connecting rope is attached to the connecting rope, one end of the connecting rope is fixedly connected to the limiting block on the upper surface of the rectangular sleeve, and the other end of the connecting rope is arranged on the surface of the base.
As the utility model relates to an electric power engineering construction is with interim overhead line bearing structure is preferred, the telescopic last fixed surface of rectangle is connected with the cover and is established connect the rope U type fixture block on the surface.
As the utility model relates to an electric power engineering construction is with interim overhead line bearing structure is preferred, the bilateral symmetry fixedly connected with direction of grafting pole is inserted the strip, just the direction is inserted the strip and is established in the direction slot that the inside symmetry of rectangular sleeve was seted up.
As the utility model relates to an electric power engineering construction is with interim overhead line bearing structure preferred, the peg graft pole is kept away from two cylinders of the square inslot symmetry fixedly connected with that mobile device one end was seted up, just connect rope and two the surface of cylinder is laminated mutually.
The temporary stringing support structure for electric power engineering construction is preferable, and further comprises an adjusting component arranged on the right surface of the base;
the adjusting component comprises a rectangular inserting plate and L-shaped clamping plates, the L-shaped clamping plates are symmetrically and fixedly connected to the right surface of the base, one end of the connecting rope, which is far away from the limiting block, penetrates through two L-shaped clamping plates and is inserted between the two L-shaped clamping plates, and the L-shaped clamping plates and the rectangular inserting plate in the base forming space are connected.
Compared with the prior art, the beneficial effects of the utility model are that: add auxiliary assembly in this application, be favorable to increasing the height that the wire rod rises, the phenomenon that the wire rod of avoiding electric liquid push rod rising elasticity fastener centre gripping can't reach the staff and carry out the overhead line position takes place, meanwhile has added adjusting part, is favorable to finely tuning the height of centre gripping wire rod in the elasticity fastener, improves this overhead line bearing structure's result of use.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a cross-sectional view of the present invention;
FIG. 3 is an enlarged view of the invention at A in FIG. 2;
FIG. 4 is an enlarged view of the present invention at B in FIG. 2;
FIG. 5 is a schematic view of the structure of the guiding insert and the insert rod of the present invention;
FIG. 6 is a schematic structural view of the U-shaped fixture block and the rectangular sleeve of the present invention;
in the figure:
1. a base; 2. an electro-hydraulic push rod; 3. a mobile device;
4. an auxiliary component; 41. a rectangular sleeve; 42. a plug rod; 43. a connecting rope; 44. a limiting block; 45. a U-shaped fixture block; 46. guiding the inserting strips; 47. a guide slot; 48. a drum;
5. an adjustment assembly; 51. a rectangular plug board; 52. an L-shaped clamping plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in FIG. 1;
the utility model provides an electric power engineering construction is with interim overhead line bearing structure, includes base 1 and installs the electro-hydraulic push rod 2 and the mobile device 3 of setting in 2 tops of electro-hydraulic push rod that are close to intermediate position department on base 1 upper surface.
In this embodiment: subject to public (bulletin) number: CN216564379U discloses a temporary stringing support structure for electric power engineering construction, although this design can make the wire rod clamped by the elastic wire clamp rise when the electro-hydraulic push rod 2 works, so as to be convenient for the stringing staff at high position to take the wire rod, when the staff carries out stringing at a higher position, the wire rod clamped by the elastic wire clamp is only lifted by the electro-hydraulic push rod 2, which results in a limited range of wire rod rising, and it is easy to happen that the wire rod clamped by the elastic wire clamp lifted by the electro-hydraulic push rod 2 cannot reach the position where the staff carries out stringing, thereby adding the auxiliary component 4 and the adjusting component 5 on the basis.
In this embodiment: the moving device 3 mainly comprises a connecting seat, a stepping motor, a transmission screw rod, a moving seat, an inserting rod, a connecting plate and an elastic wire clamp, wherein the stepping motor can drive the transmission screw rod to rotate during working, so that the transmission screw rod can drive the moving seat to move along the transmission screw rod under the driving of threads, the moving seat can move through the inserting rod and the connecting plate at a high position through the elastic wire clamp, and the position of the wire rod can be adjusted when a worker takes the wire rod inconveniently.
Further, the method comprises the following steps:
as shown in fig. 1 to 6:
in combination with the above: auxiliary assembly 4 includes rectangular sleeve 41, peg rod 42, connect rope 43 and stopper 44, rectangular sleeve 41 fixed connection is at the tip of the 2 output shafts of electricity liquid push rod, peg rod 42 and connection rope 43 all are located rectangular sleeve 41 and keep away from the slot that electricity liquid push rod 2 one side was seted up, peg rod 42 is kept away from the one end that is connected with mobile device 3 and is inserted the inside of establishing rectangular sleeve 41, and laminate mutually with connection rope 43, the one end of connecting rope 43 is connected with the stopper 44 of fixed connection at rectangular sleeve 41 upper surface, the other end setting of connecting rope 43 is on the surface of base 1.
In this embodiment: the vertical rebound of operation promotion rectangle sleeve 41 of electricity liquid push rod 2, because the one end of connecting rope 43 is fixed on base 1, rectangle sleeve 41 is at the in-process of rebound, rope 43 pulling insertion rod 42 removal is connected to the accessible, can make insertion rod 42 upwards slide in rectangle sleeve 41's inside, thereby increase the high scope that the wire rod removed, be favorable to increasing the height that the wire rod rises, the phenomenon that the wire rod of avoiding electricity liquid push rod 2 rising elasticity fastener centre gripping can't reach the staff and carry out the overhead line position takes place.
It should be noted that: rectangular sleeve 41 and inserted link 42 are longer, and when electric liquid push rod 2 operation extended to the limit, inserted link 42 can not follow the inside roll-off of rectangular sleeve 41, and when the limit of electric liquid push rod 2 extension, if the wire rod still did not reach the required height, can pull connecting rope 43 and make inserted link 42 continue to slide in rectangular sleeve 41's inside to drive the wire rod and continue to remove, improve stringing support structure's application scope.
Further, the method comprises the following steps:
in an alternative embodiment, a U-shaped latch 45 is fixedly connected to the upper surface of the rectangular sleeve 41 and is sleeved on the surface of the connecting rope 43.
In this embodiment: so that the connecting rope 43 slides inside the U-shaped catching block 45 to limit the moving range of the connecting rope 43.
Further, the method comprises the following steps:
in an alternative embodiment, the two sides of the insertion rod 42 are symmetrically and fixedly connected with guide insertion strips 46, and the guide insertion strips 46 are inserted into guide insertion grooves 47 symmetrically formed in the rectangular sleeve 41.
In this embodiment: when the inserting rod 42 slides in the rectangular sleeve 41, the moving of the inserting rod 42 drives the guiding inserting strip 46 to slide in the guiding slot 47, so that the inserting rod 42 is ensured to vertically slide along the rectangular sleeve 41, and the phenomenon of shaking during the lifting process of the wire rod is avoided.
Further, the method comprises the following steps:
in an alternative embodiment, two rollers 48 are symmetrically and fixedly connected to the insertion rod 42 in a square groove formed at an end away from the moving device 3, and the connecting rope 43 is attached to surfaces of the two rollers 48.
In this embodiment: during the process that the connecting cable 43 pulls the plug rod 42 to slide in the rectangular sleeve 41, the connecting cable 43 can slide on the surface of the roller 48, so as to reduce the friction force generated between the plug rod 42 and the connecting cable 43 during the moving process.
It should be noted that: the roller 48 is formed of a shaft and a sleeve rotatably coupled to the shaft.
Further, the following steps:
in an alternative embodiment, the adjusting device further comprises an adjusting assembly 5 arranged on the right surface of the base 1, the adjusting assembly 5 comprises a rectangular inserting plate 51 and L-shaped clamping plates 52, the L-shaped clamping plates 52 are symmetrically and fixedly connected to the right surface of the base 1, and one end of the connecting rope 43, which is far away from the limiting block 44, penetrates between the two L-shaped clamping plates 52 and is connected with the rectangular inserting plate 51 inserted in a space formed by the two L-shaped clamping plates 52 and the base 1.
In this embodiment: when the height of the wire rod needs to be finely adjusted, the rectangular inserting plate 51 is taken down from the inside of the L-shaped clamping plate 52, the connecting rope 43 can be pulled to finely adjust the height of the wire rod clamped in the elastic wire clamp, when the height adjustment of the wire rod is proper, the connecting rope 43 is wound on the surface of the rectangular inserting plate 51, the rectangular inserting plate 51 is inserted in the L-shaped clamping plate 52, the height of the wire rod after adjustment is fixed, the fine adjustment of the height of the wire rod clamped in the elastic wire clamp is facilitated, and the using effect of the stringing support structure is improved.
It should be noted that: the arrangement of the two L-shaped clamping plates 52 avoids the phenomenon that the rectangular inserting plate 51 inclines when the L-shaped clamping plates 52 are arranged, and the rectangular inserting plate 51 is inserted into a space formed by the L-shaped clamping plates 52 and the base 1, so that the position of the rectangular inserting plate 51 is fixed.
The working principle is as follows: when the wire is erected, the inserted bar is taken down, the wire to be erected can be clamped and fixed conveniently and fast in the elastic wire clamp, then the inserted bar is inserted into the moving seat, when the height of the wire is required to be adjusted, the connecting wire of the electro-hydraulic push rod 2 is connected with an external power supply, the electro-hydraulic push rod 2 is started by the operation controller, the operation of the electro-hydraulic push rod 2 pushes the rectangular sleeve 41 to vertically move upwards, as one end of the connecting rope 43 is fixed on the base 1, the rectangular sleeve 41 can pull the inserted bar 42 to move through the connecting rope 43 in the upward moving process, the inserted bar 42 can slide upwards in the rectangular sleeve 41, so that the height range of the wire is increased, when the height of the moving device 3 is reduced, the electro-hydraulic push rod 2 drives the rectangular sleeve 41 to move downwards, under the action of gravity, the inserted link 42 can be in the inside lapse of rectangle sleeve 41, be favorable to increasing the height that the wire rod rises, the phenomenon that the wire rod of avoiding electric liquid push rod 2 to rise the centre gripping of elastic wire clamp can't reach the staff and carry out the stringing position takes place, when the height to the wire rod needs to be finely tuned, make rectangle picture peg 51 take off from the inside of L type cardboard 52, can pull the wire rod height of connecting rope 43 centre gripping in to the elastic wire clamp and finely tune, when the altitude mixture control of wire rod is suitable, make the surface of connecting rope 43 winding at rectangle picture peg 51, and make rectangle picture peg 51 insert the inside of establishing at L type cardboard 52, highly fixing the wire rod after the regulation, be favorable to highly finely tuning to centre gripping wire rod in the elastic wire clamp, improve this stringing bearing structure's result of use.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. The utility model provides an electric power engineering construction is with interim overhead line bearing structure, includes base (1) and installs base (1) upper surface is close to electric liquid push rod (2) and the setting of intermediate position department and is in mobile device (3) of electric liquid push rod (2) top, its characterized in that: the device also comprises an auxiliary component (4) arranged between the electro-hydraulic push rod (2) and the moving device (3);
the auxiliary assembly (4) comprises a rectangular sleeve (41), an inserting rod (42), a connecting rope (43) and a limiting block (44), the rectangular sleeve (41) is fixedly connected to the end portion of an output shaft of the electro-hydraulic push rod (2), the inserting rod (42) and the connecting rope (43) are located in a slot formed in one face, away from the electro-hydraulic push rod (2), of the rectangular sleeve (41), one end, away from the inserting rod (42), connected with the moving device (3) is inserted into the rectangular sleeve (41) and attached to the connecting rope (43), one end of the connecting rope (43) is fixedly connected to the limiting block (44) on the upper surface of the rectangular sleeve (41), and the other end of the connecting rope (43) is arranged on the surface of the base (1).
2. The temporary stringing support structure for electric power engineering construction as claimed in claim 1, wherein: the upper surface of the rectangular sleeve (41) is fixedly connected with a U-shaped clamping block (45) which is sleeved on the surface of the connecting rope (43).
3. The temporary stringing support structure for electric power engineering construction as claimed in claim 1, wherein: the two sides of the insertion rod (42) are symmetrically and fixedly connected with guide insertion strips (46), and the guide insertion strips (46) are inserted into guide slots (47) symmetrically formed in the rectangular sleeve (41).
4. The temporary stringing support structure for electric power engineering construction according to claim 1, wherein: the plug-in rod (42) is far away from two rollers (48) symmetrically and fixedly connected in a square groove formed in one end of the moving device (3), and the connecting rope (43) is attached to the surfaces of the two rollers (48).
5. The temporary stringing support structure for electric power engineering construction according to claim 1, wherein: the adjusting component (5) is arranged on the right surface of the base (1);
adjusting part (5) include rectangle picture peg (51) and L type cardboard (52), L type cardboard (52) symmetry fixed connection be in the right surface of base (1), it keeps away from to connect rope (43) the one end of stopper (44) runs through two between L type cardboard (52), and with insert and establish two L type cardboard (52) with in base (1) formation space rectangle picture peg (51) are connected.
CN202222097569.7U 2022-08-10 2022-08-10 Temporary stringing supporting structure for electric power engineering construction Expired - Fee Related CN218182920U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222097569.7U CN218182920U (en) 2022-08-10 2022-08-10 Temporary stringing supporting structure for electric power engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222097569.7U CN218182920U (en) 2022-08-10 2022-08-10 Temporary stringing supporting structure for electric power engineering construction

Publications (1)

Publication Number Publication Date
CN218182920U true CN218182920U (en) 2022-12-30

Family

ID=84618096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222097569.7U Expired - Fee Related CN218182920U (en) 2022-08-10 2022-08-10 Temporary stringing supporting structure for electric power engineering construction

Country Status (1)

Country Link
CN (1) CN218182920U (en)

Similar Documents

Publication Publication Date Title
CN218182920U (en) Temporary stringing supporting structure for electric power engineering construction
CN222602001U (en) A cable laying device for building mechanical and electrical installation
CN214031174U (en) An automatic pay-off device for drawing copper cores of cables
CN210012539U (en) Transformer installation elevating gear
CN217642413U (en) Adjusting bracket for cable installation
CN218826496U (en) Transformer device for power production equipment
CN221900542U (en) Power transmission line for building engineering
CN216980324U (en) Wire pulling mechanism of automatic wire hanging machine for vertically winding flat wire
CN217965498U (en) Adjustable roller carrier for supporting automatic welding equipment special for wind power
CN111009382B (en) Intelligent transformer convenient to dismouting
CN218070813U (en) A cable laying device
CN212578016U (en) Drilling and milling machine support is used in valve production
CN224077628U (en) A thread twisting machine wiring device
CN208738029U (en) A kind of closed assembly platform for silicon steel sheet
CN214518599U (en) Leveling device for storage battery pole base
CN217267099U (en) High-stability lifting device for intelligent gate
CN217823827U (en) Distribution box capable of being adjusted in lifting mode for building construction
CN116388059A (en) A high-voltage transmission cable erection device
CN221739756U (en) Assembled steel construction hoist device
CN218274165U (en) Auxiliary power transformer
CN221066213U (en) Transformer clamping tool
CN218482741U (en) Linear actuator
CN217882540U (en) Transformer substation installs fixing device
CN222127987U (en) Photovoltaic panel convenient to install for high-rise building
CN224198992U (en) Transformer installation hanging device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221230