CN218149641U - Lifting integrated scaffold - Google Patents
Lifting integrated scaffold Download PDFInfo
- Publication number
- CN218149641U CN218149641U CN202222248701.XU CN202222248701U CN218149641U CN 218149641 U CN218149641 U CN 218149641U CN 202222248701 U CN202222248701 U CN 202222248701U CN 218149641 U CN218149641 U CN 218149641U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- shielding plate
- groove
- built
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000001681 protective effect Effects 0.000 claims 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 22
- 229910052742 iron Inorganic materials 0.000 description 11
- 230000003028 elevating effect Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 230000001174 ascending effect Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000011469 building brick Substances 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model relates to a scaffold frame technical field discloses a integrative scaffold frame goes up and down, its structure includes the scaffold frame platform, be provided with rail guard and backup pad on the scaffold frame platform, rail guard fixed connection is at the upper surface of scaffold frame platform, backup pad fixed connection is in the one end of scaffold frame platform, the backup pad is connected with the threaded rod through the thread groove, the other end of threaded rod is connected with the shielding plate through linking the bearing, be provided with on the shielding plate and hold the pole, built-in groove and screw hole, hold pole fixed connection in one side of shielding plate bottom, built-in groove is located the inside of shielding plate, the screw hole is located the inside opposite side of shielding plate. The utility model discloses a shelter from sunshine or shelter from the debris that drop to operating personnel when letting operating personnel platform scaffold go up the operation, avoided operating personnel to be shone or injure by a crashing object by the debris that drop by sunshine insolate at outdoor operating personnel during operation, improved the travelling comfort and the security of operating personnel station during operation on the scaffold.
Description
Technical Field
The utility model relates to a scaffold frame technical field specifically is a lift integrative scaffold frame.
Background
The scaffold is an essential temporary facility in building construction, and the scaffold is required to be erected nearby when building brick walls, pouring concrete, plastering, decorating and painting on wall surfaces, installing structural members and the like.
According to patent 202122198242.4, can know, an integrative scaffold device goes up and down, including the scaffold platform, scaffold platform bottom fixed connection elevating system, elevating system includes rectangle iron stand an, rectangle iron stand b, rectangle iron stand c, one side sliding connection of rectangle iron stand an and rectangle iron stand b, rectangle iron stand b's opposite side and rectangle iron stand c sliding connection, rectangle iron stand c's upper end fixed mounting pulley a, rectangle iron stand b's upper end fixed connection pulley b.
At present, in the existing patent 202122198242.4, a pinion can be output through a starting device, the pinion is meshed with a large gear, the effect that the ascending speed is slowed down is achieved, a spoon-shaped switch is movably connected to a long iron block, one end of a spring is fixedly connected to the lower end of the spoon-shaped switch, the other end of the spring is fixedly connected to the long iron block, the spring and a rack are on the same plane, and the rack is clamped by the spring, so that a scaffold can be stopped at a proper position, construction is more convenient, but the operation staff is not required to shield sunlight or falling sundries when operating on a platform scaffold, the operator is easily exposed to the sun or injured by falling sundries when working, and the comfort and the safety of the operator standing on the scaffold during working are reduced. For this reason, new technical solutions need to be designed to solve the problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an integrative scaffold frame goes up and down has solved the problem that proposes in the background art.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides an integrative scaffold frame goes up and down, includes the scaffold platform, be provided with rail guard and backup pad on the scaffold platform, rail guard fixed connection is in the upper surface of scaffold platform, backup pad fixed connection is in the one end of scaffold platform, the backup pad is connected with the threaded rod through the thread groove, the other end of threaded rod is connected with the shielding plate through linking up the bearing, be provided with holding rod, built-in groove and screw hole on the shielding plate, holding rod fixed connection is in one side of shielding plate bottom, built-in groove is located the inside of shielding plate, the screw hole is located the inside opposite side of shielding plate, the inside in built-in groove is provided with the extension baffle, the inside of screw hole is provided with the locking bolt.
As an alternative of the technical solution of the present application, the locking bolt is connected with the inside of the threaded hole through a thread and abuts against the outer surface of the extension baffle.
As an alternative scheme of the technical scheme, the size of the extension baffle is matched with that of the built-in groove and movably connected with the inside of the built-in groove.
As an alternative of the technical scheme of the application, the outer ring of the connecting bearing is fixedly connected to the bottom of the shielding plate and is close to one side of the holding rod.
As an alternative scheme of this application technical scheme, the inside of thread groove is connected through to the one end of threaded rod, the other end fixed connection of threaded rod is in link up the inner ring department of bearing.
Compared with the prior art, the technical scheme of the application has the following beneficial effects:
the utility model discloses a backup pad, thread groove, threaded rod, linking bearing, shielding plate, holding rod, built-in groove, screw hole, the combination of extension baffle and locking bolt, effectual realized letting operating personnel platform scaffold go up to the operation time shelter from sunshine or shelter from the debris that drop, avoided operating personnel to be insolated by sunshine or injure by the debris that drop at the outdoor operations personnel during operation, improved the travelling comfort and the security of operating personnel station during operation on the scaffold.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a front view of a lifting integrated scaffold of the present invention;
fig. 2 is a partial sectional view of a lifting integrated scaffold of the present invention;
fig. 3 is the utility model relates to a local enlargements of integrative scaffold frame goes up and down.
In the figure: scaffold platform 1, rail guard 2, backup pad 3, thread groove 4, threaded rod 5, linking bearing 6, shielding plate 7, handheld pole 8, built-in groove 9, screw hole 10, extension baffle 11, locking bolt 12.
Detailed Description
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides an integrative scaffold frame goes up and down, including scaffold platform 1, be provided with rail guard 2 and backup pad 3 on scaffold platform 1, 2 fixed connection of rail guard are at scaffold platform 1's upper surface, 3 fixed connection in scaffold platform 1's one end of backup pad, backup pad 3 is connected with threaded rod 5 through thread groove 4, the other end of threaded rod 5 is connected with shielding plate 7 through linking up bearing 6, be provided with on shielding plate 7 and hold the pole 8, built-in groove 9 and screw hole 10, hold the pole 8 fixed connection in one side of shielding plate 7 bottom, built-in groove 9 is located shielding plate 7's inside, screw hole 10 is located shielding plate 7 inside opposite side, the inside of built-in groove 9 is provided with extension baffle 11, the inside of screw hole 10 is provided with locking bolt 12.
In the technical scheme, through the support plate 3, the thread groove 4, the threaded rod 5, the linking bearing 6, the shielding plate 7, the holding rod 8, the built-in groove 9, the threaded hole 10, the extending baffle 11 and the locking bolt 12, when the scaffold needs to be used, an operator can firstly draw the extending baffle 11 out of the built-in groove 9 and then tighten the locking bolt 12 in the threaded hole 10 so as to limit the position of the extending baffle 11, the operator holds the holding rod 8 with one hand and rotates the threaded rod 5 with the other hand, at the moment, the threaded rod 5 can lift in the threaded groove 4, meanwhile, the other end of the threaded rod 5 can rotate at the inner ring part of the linking bearing 6 so as to lift the position of the shielding plate 7, the sunlight shielding or falling sundries shielding of the operator during operation on the scaffold of the platform scaffold of the operator is effectively realized, and the comfort and safety of the operator when the operator stands on the scaffold are improved.
In some embodiments, the locking bolt 12 is threadedly coupled to the inside of the threaded hole 10 and abuts against the outer surface of the extension block 11.
In this solution, it is convenient to screw the locking bolt 12 inside the threaded hole 10 so as to limit the position of the extension flap 11.
In some technical schemes, the size of the extension baffle 11 is matched with the size of the built-in groove 9 and is movably connected with the inside of the built-in groove 9.
In this kind of technical scheme, conveniently let extension baffle 11 stretch out and draw back in the inside of built-in groove 9 to adjust the whole length of extension baffle 11 and shielding plate 7.
In some embodiments, the outer ring of the engaging bearing 6 is fixedly connected to the bottom of the shielding plate 7 and is close to one side of the holding rod 8.
In this solution, the firmness of the engagement between the bearing 6 and the shutter 7 is improved.
In some technical schemes, one end of the threaded rod 5 is connected with the inside of the thread groove 4, and the other end of the threaded rod 5 is fixedly connected with the inner ring of the linking bearing 6.
In this solution, it is convenient to let the threaded rod 5 rotate inside the threaded groove 4, so as to adjust the height of the shielding plate 7.
The working principle is as follows: when the scaffold needs to be used, an operator can firstly draw the extension baffle 11 out of the inner part of the built-in groove 9 and then screw the locking bolt 12 in the threaded hole 10, so that the position of the extension baffle 11 is limited, the operator holds the holding rod 8 with one hand and rotates the threaded rod 5 with the other hand, at the moment, the threaded rod 5 can lift in the threaded groove 4, and meanwhile, the other end of the threaded rod 5 can rotate at the inner ring position of the connecting bearing 6, so that the position of the shielding plate 7 can be lifted.
It should be noted that, the utility model relates to a lifting integrated scaffold frame includes scaffold platform 1, rail guard 2, backup pad 3, thread groove 4, threaded rod 5, link up bearing 6, shielding plate 7, holding rod 8, built-in groove 9, screw hole 10, extension baffle 11, locking bolt 12 etc. parts are general standard component or the part that technical staff in this field knows, its structure and principle all can learn through the technical manual or through conventional experimental method for this technical staff, in this device spare department, all electrical parts in the above-mentioned, it indicates power component, the control computer and the power of electrical part and adaptation and connects through the wire, concrete connecting means, should refer to among the above-mentioned theory of operation, electric connection is accomplished to the precedence working order between each electrical part, its detailed connecting means, for the well-known technique in this field, above-mentioned main theory of operation and process of introduction, no longer explain electrical control.
Claims (5)
1. The utility model provides an integrative scaffold frame goes up and down, includes scaffold platform (1), its characterized in that: the scaffold platform is provided with a protective guard (2) and a support plate (3) on the scaffold platform (1), the protective guard (2) is fixedly connected to the upper surface of the scaffold platform (1), the support plate (3) is fixedly connected to one end of the scaffold platform (1), the support plate (3) is connected with a threaded rod (5) through a threaded groove (4), the other end of the threaded rod (5) is connected with a shielding plate (7) through a linking bearing (6), a holding rod (8), a built-in groove (9) and a threaded hole (10) are arranged on the shielding plate (7), the holding rod (8) is fixedly connected to one side of the bottom of the shielding plate (7), the built-in groove (9) is located inside the shielding plate (7), the threaded hole (10) is located on the other side of the inside of the shielding plate (7), an extension baffle (11) is arranged inside the built-in groove (9), and a locking bolt (12) is arranged inside the threaded hole (10).
2. A lifting integrated scaffold according to claim 1 wherein: the locking bolt (12) is connected with the inner part of the threaded hole (10) through threads and abuts against the outer surface of the extension baffle (11).
3. A lifting integrated scaffold according to claim 1 wherein: the size of the extension baffle (11) is matched with that of the built-in groove (9) and is movably connected with the inside of the built-in groove (9).
4. A lifting integrated scaffold according to claim 1 wherein: the outer ring of the engaging bearing (6) is fixedly connected to the bottom of the shielding plate (7) and is close to one side of the holding rod (8).
5. A lifting integrated scaffold according to claim 1 wherein: one end of the threaded rod (5) is connected with the inside of the thread groove (4), and the other end of the threaded rod (5) is fixedly connected with the inner ring of the linking bearing (6).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222248701.XU CN218149641U (en) | 2022-08-25 | 2022-08-25 | Lifting integrated scaffold |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222248701.XU CN218149641U (en) | 2022-08-25 | 2022-08-25 | Lifting integrated scaffold |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218149641U true CN218149641U (en) | 2022-12-27 |
Family
ID=84554798
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202222248701.XU Active CN218149641U (en) | 2022-08-25 | 2022-08-25 | Lifting integrated scaffold |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218149641U (en) |
-
2022
- 2022-08-25 CN CN202222248701.XU patent/CN218149641U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN209740643U (en) | Lifting device for building | |
| CN215569495U (en) | Real-time monitoring device for mine safety management | |
| CN105350901B (en) | A kind of electric power overhaul multistage climbing ladder | |
| CN115811272A (en) | Splicing type photovoltaic panel convenient for adjusting supporting angle | |
| CN218149641U (en) | Lifting integrated scaffold | |
| CN108609552B (en) | Intelligent machining operation frame | |
| CN211393540U (en) | Steel member hoist and mount auxiliary device | |
| CN112850459A (en) | Hoisting equipment for efficient assembly type building prefabricated part | |
| CN220098464U (en) | Installation lifting mechanism for photovoltaic power generation | |
| CN213512947U (en) | Solar monitoring all-in-one machine | |
| CN211201101U (en) | Movable construction platform for bridge foundation construction | |
| CN213602588U (en) | Outdoor adjustable angle integration support of photovoltaic power generation system | |
| CN212248943U (en) | Support tool for construction of green building energy-saving roof | |
| CN210628908U (en) | Special frame of vertical integrated installation of 10kV cubical switchboard | |
| CN212687494U (en) | Electric power pylon convenient to overhaul | |
| CN213231434U (en) | Transformer with auxiliary mounting mechanism | |
| CN212864029U (en) | Safety protection device for electric power grid construction | |
| CN116425096A (en) | Overhead working suspension platform for architectural decoration engineering | |
| CN211428805U (en) | Cable erecting device for building electromechanical installation | |
| CN221321714U (en) | Balance-weight-free ground anchor-free parapet hanging basket wall riding frame | |
| CN218406379U (en) | Bridge construction support | |
| CN221277217U (en) | Highway bridge construction hanging basket | |
| CN220401823U (en) | Wisdom campus security protection equipment | |
| CN220364314U (en) | Anti-shaking lifting device | |
| CN220745301U (en) | Lifting device for maintenance |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |