CN218090948U - A sloping retaining wall - Google Patents

A sloping retaining wall Download PDF

Info

Publication number
CN218090948U
CN218090948U CN202222172221.XU CN202222172221U CN218090948U CN 218090948 U CN218090948 U CN 218090948U CN 202222172221 U CN202222172221 U CN 202222172221U CN 218090948 U CN218090948 U CN 218090948U
Authority
CN
China
Prior art keywords
concrete
wall
slope
retaining wall
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222172221.XU
Other languages
Chinese (zh)
Inventor
杨志勇
侯梅
文倩
贺永明
蒋锐
张利彬
文新华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Communications Construction Group Co Ltd
Original Assignee
Sichuan Communications Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Communications Construction Group Co Ltd filed Critical Sichuan Communications Construction Group Co Ltd
Priority to CN202222172221.XU priority Critical patent/CN218090948U/en
Application granted granted Critical
Publication of CN218090948U publication Critical patent/CN218090948U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

本实用新型提供了一种倾斜式挡土墙,涉及土木工程技术领域,通过沿边坡的坡脚挖有填埋沟,砼脚板埋设在填埋沟底部,砼墙沿边坡一侧倾斜的设置在砼脚板中部,结合流体作用其板面上的的压力,有利于与边坡密实贴合,同时向边坡一侧倾斜设置,近乎与锚杆护面墙大致平行,有助于提高对锚杆护面墙整体的支撑,砼墙与砼脚板一体浇筑成型,增强了砼挡墙的整体结构强度;砼墙两侧设有主锚杆,用于将砼脚板与填埋沟沟底锚固,进一步增强了砼挡墙的稳定性,同时砼墙顶部与锚杆护面墙连接;解决了汛期较大的流量极易对河岸及堤坝等建筑基础冲蚀破坏,进而导致对河岸边的路基或建筑等构成严重的威胁等问题。

Figure 202222172221

The utility model provides an inclined retaining wall, which relates to the technical field of civil engineering. A landfill ditch is dug along the slope foot of the slope, a concrete foot board is buried at the bottom of the landfill ditch, and the concrete wall is arranged on the slope along one side of the slope. The middle part of the concrete foot slab, combined with the pressure of the fluid acting on its slab surface, is conducive to a close fit with the slope. At the same time, it is inclined to the side of the slope, almost parallel to the anchor wall, which helps to improve the anchor bolt. The overall support of the protective wall, the integral casting of the concrete wall and the concrete footboard enhances the overall structural strength of the concrete retaining wall; there are main anchor rods on both sides of the concrete wall, which are used to anchor the concrete footboard and the bottom of the buried ditch, further The stability of the concrete retaining wall is enhanced, and the top of the concrete wall is connected with the anchor bar wall; it solves the problem that the large flow in the flood season is easy to erode and damage the building foundations such as river banks and dams, which in turn causes damage to the roadbed or buildings on the river bank. and other serious threats.

Figure 202222172221

Description

一种倾斜式挡土墙A sloping retaining wall

技术领域technical field

本实用新型涉及土木工程技术领域,具体而言,涉及一种倾斜式挡土墙。The utility model relates to the technical field of civil engineering, in particular to an inclined retaining wall.

背景技术Background technique

土木工程(Civil Engineering)是建造各类土地工程设施的科学技术的统称。它既指所应用的材料、设备和所进行的勘测、设计、施工、保养、维修等技术活动,也指工程建设的对象。Civil engineering is a general term for the science and technology of constructing various land engineering facilities. It not only refers to the applied materials, equipment and technical activities such as survey, design, construction, maintenance and repair, but also refers to the object of engineering construction.

土木工程作业时,在一些容易发生地质灾害的地区尤为慎重,比如湍急河道的河岸和堤坝、容易发生山体滑坡和泥石流的地区,普遍存在汛期较大的流量极易对河岸及堤坝等建筑基础冲蚀破坏,进而导致对河岸边的路基或建筑等构成严重的威胁等问题。When doing civil engineering work, it is especially prudent in some areas prone to geological disasters, such as the banks and dams of turbulent rivers, areas prone to landslides and debris flows, and the large flow in flood seasons is common, and it is easy to impact the building foundations such as river banks and dams. Corrosion damage, which in turn leads to problems such as serious threats to roadbeds or buildings on the river bank.

实用新型内容Utility model content

本实用新型的目的在于提供一种倾斜式挡土墙,其解决了汛期较大的流量极易对河岸及堤坝等建筑基础冲蚀破坏,进而导致对河岸边的路基或建筑等构成严重的威胁等问题。The purpose of this utility model is to provide an inclined retaining wall, which solves the problem that the large flow in the flood season is very easy to erode and damage the building foundations such as river banks and embankments, which in turn poses a serious threat to the roadbed or buildings on the river bank. And other issues.

本实用新型的实施例通过以下技术方案实现:一种倾斜式挡土墙,设置在河床和肩墙之间的边坡上,用于对边坡进行支护,包括砼挡墙和锚杆护面墙,所述砼挡墙埋设在所述边坡的坡脚,所述锚杆护面墙铺设在所述边坡上,所述锚杆护面墙与所述砼挡墙一体连接;The embodiment of the utility model is realized through the following technical solutions: an inclined retaining wall is set on the slope between the river bed and the shoulder wall, and is used to support the slope, including a concrete retaining wall and an anchor rod protection A face wall, the concrete retaining wall is buried at the slope toe of the slope, the anchor retaining wall is laid on the slope, and the anchor retaining wall is integrally connected with the concrete retaining wall;

所述砼挡墙包括砼脚板和砼墙,沿所述边坡的坡脚设有填埋沟,所述砼脚板埋设在所述填埋沟底部,所述砼墙沿边坡一侧倾斜的设置在所述砼脚板中部,所述砼墙与所述砼脚板一体浇筑成型,所述砼墙顶部与所述锚杆护面墙连接。The concrete retaining wall includes a concrete footboard and a concrete wall, a landfill ditch is provided along the slope foot of the slope, the concrete footboard is buried at the bottom of the landfill ditch, and the concrete wall is arranged inclined along one side of the slope In the middle of the concrete foot plate, the concrete wall and the concrete foot plate are integrally cast and formed, and the top of the concrete wall is connected with the anchor rod protection wall.

进一步的,所述砼墙靠近河床一侧填埋有大块片漂石,所述砼墙靠近边坡一侧填埋有砂砾石。Further, the side of the concrete wall close to the river bed is filled with large pieces of boulders, and the side of the concrete wall close to the slope is filled with sand and gravel.

进一步的,还包括主锚杆,所述砼脚板上阵列设置有若干主锚杆,若干所述主锚杆位于所述砼墙两侧,所述主锚杆用于将砼脚板与填埋沟沟底锚固。Further, it also includes main anchor rods, the concrete foot plate is provided with several main anchor rods in an array, and several of the main anchor rods are located on both sides of the concrete wall, and the main anchor rods are used to connect the concrete foot board to the landfill ditch. Ditch bottom anchoring.

进一步的,所述锚杆护面墙包括若干子护面墙,若干所述子护面墙之间一体设有耳墙。Further, the anchor rod protective wall includes several sub-protective walls, and ear walls are integrated between the several sub-protective walls.

进一步的,若干所述子护面墙上嵌入设置有若干副锚杆,若干所述副锚杆用于将所述子护面墙与所述边坡锚固。Further, several sub-retaining walls are embedded with several auxiliary anchor rods, and the several auxiliary anchor rods are used to anchor the sub-retaining walls and the slope.

进一步的,所述子护面墙内一体浇筑有钢筋网,所述副锚杆与所述钢筋网连接。Further, a reinforcement mesh is integrally poured in the sub-face protection wall, and the auxiliary anchor rod is connected with the reinforcement mesh.

进一步的,所述钢筋网下端与所述砼墙一体浇筑,所述钢筋网上端与所述肩墙一体浇筑。Further, the lower end of the reinforcement mesh is poured integrally with the concrete wall, and the upper end of the reinforcement mesh is poured integrally with the shoulder wall.

本实用新型实施例的技术方案至少具有如下优点和有益效果:The technical solution of the utility model embodiment has at least the following advantages and beneficial effects:

1、本实用新型设计合理、结构简单,一种倾斜式挡土墙,通过沿边坡的坡脚挖有填埋沟,砼脚板埋设在填埋沟底部,砼墙沿边坡一侧倾斜的设置在砼脚板中部,结合流体作用其板面上的的压力,有利于与边坡密实贴合,同时向边坡一侧倾斜设置,近乎与锚杆护面墙大致平行,有助于提高对锚杆护面墙整体的支撑,砼墙与砼脚板一体浇筑成型,增强了砼挡墙的整体结构强度;砼墙两侧设有主锚杆,用于将砼脚板与填埋沟沟底锚固,进一步增强了砼挡墙的稳定性,同时砼墙顶部与锚杆护面墙连接;解决了汛期较大的流量极易对河岸及堤坝等建筑基础冲蚀破坏,进而导致对河岸边的路基或建筑等构成严重的威胁等问题。1. The utility model has reasonable design and simple structure. It is an inclined retaining wall. A landfill ditch is dug along the slope foot of the slope. The concrete foot board is buried at the bottom of the landfill ditch. The middle part of the concrete foot slab, combined with the pressure of the fluid acting on its slab surface, is conducive to a close fit with the slope. At the same time, it is inclined to the side of the slope, almost parallel to the anchor wall, which helps to improve the anchor bolt. The overall support of the protective wall, the integral casting of the concrete wall and the concrete footboard enhances the overall structural strength of the concrete retaining wall; there are main anchor rods on both sides of the concrete wall, which are used to anchor the concrete footboard and the bottom of the buried ditch, further The stability of the concrete retaining wall is enhanced, and the top of the concrete wall is connected with the anchor bar wall; it solves the problem that the large flow in the flood season is easy to erode and damage the building foundations such as river banks and dams, which in turn causes damage to the roadbed or buildings on the river bank. and other serious threats.

2、锚杆护面墙包括若干子护面墙,若干子护面墙之间一体设有耳墙,耳墙垂直于边坡,深埋边坡内部,不仅便于子护面墙的浇筑,同时还能一定程度上,防止相邻耳墙之间水土的流失,同时对子护面墙形成了较好的固定和防护,在锚杆护面墙的两端也设有耳墙,只是两端的耳墙厚度更大,埋入边坡的深度更多,以防止流体对整体边缘处的冲击;同时,若干子护面墙上嵌入设置有若干副锚杆,若干副锚杆用于将子护面墙与边坡锚固;子护面墙内一体浇筑的钢筋网两端分别与砼墙和肩墙一体浇筑,进一步增强了子护面墙的稳定性。2. The anchor bar retaining wall includes several sub-retaining walls, and ear walls are integrated between several sub-retaining walls. The ear walls are perpendicular to the slope and buried deep inside the slope, which not only facilitates the pouring of the sub-retaining walls, but also To a certain extent, it can prevent the loss of water and soil between the adjacent ear walls, and at the same time, it has formed a better fixation and protection for the sub-armor wall. There are also ear walls at both ends of the anchor bar armor wall, but the two ends The thickness of the ear wall is larger, and the depth of embedding in the slope is greater, so as to prevent the impact of the fluid on the edge of the whole; The face wall and the slope are anchored; the two ends of the reinforced mesh poured integrally in the sub-retaining wall are respectively integrally poured with the concrete wall and the shoulder wall, which further enhances the stability of the sub-retaining wall.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,应当理解,以下附图仅示出了本实用新型的某些实施例,因此不应被看作是对范围的限定,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他相关的附图。In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following drawings will be briefly introduced in the embodiments. It should be understood that the following drawings only show some embodiments of the present invention. Therefore, it should not be regarded as a limitation on the scope. For those skilled in the art, other related drawings can also be obtained according to these drawings without creative work.

图1为本实用新型提供的一种倾斜式挡土墙的结构示意图;Fig. 1 is the structural representation of a kind of inclined retaining wall provided by the utility model;

图2为本实用新型提供的一种倾斜式挡土墙的截面示意图;Fig. 2 is a schematic cross-sectional view of an inclined retaining wall provided by the utility model;

图标:1、河床,2、边坡,3、砼挡墙,31、砼脚板,32、砼墙,4、锚杆护面墙,41、子护面墙,42、耳墙,43、副锚杆,44、钢筋网,5、填埋沟,6、大块片漂石,7、砂砾石,8、主锚杆,9、肩墙。Icons: 1. River bed, 2. Slope, 3. Concrete retaining wall, 31. Concrete footboard, 32. Concrete wall, 4. Anchor bar protection wall, 41. Sub-protection wall, 42. Ear wall, 43. Auxiliary Anchor, 44, steel mesh, 5, landfill ditch, 6, large boulders, 7, gravel, 8, main anchor, 9, shoulder wall.

具体实施方式detailed description

为使本实用新型实施例的目的、技术方案和优点更加清楚,下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型一部分实施例,而不是全部的实施例。通常在此处附图中描述和示出的本实用新型实施例的组件可以以各种不同的配置来布置和设计。In order to make the purpose, technical solutions and advantages of the embodiments of the utility model more clear, the technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the utility model. Obviously, the described The embodiments are some embodiments of the present utility model, but not all embodiments. The components of the embodiments of the invention generally described and illustrated in the figures herein may be arranged and designed in a variety of different configurations.

因此,以下对在附图中提供的本实用新型的实施例的详细描述并非旨在限制要求保护的本实用新型的范围,而是仅仅表示本实用新型的选定实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

参照图1至图2所示,本实施例提供一种倾斜式挡土墙,设置在河床1和肩墙9之间的边坡2上,用于对边坡2进行支护,防止泥土崩塌和流失,包括砼挡墙3和锚杆护面墙4,砼挡墙3埋设在边坡2的坡脚,锚杆护面墙4铺设在边坡2上,砼挡墙3主要用于支撑锚杆护面墙4,以及应对河水主要的冲击,锚杆护面墙4与砼挡墙3一体连接进而保护整个河岸的边坡2;Referring to Figures 1 to 2, this embodiment provides an inclined retaining wall, which is installed on the slope 2 between the river bed 1 and the shoulder wall 9, and is used to support the slope 2 and prevent soil from collapsing. and loss, including the concrete retaining wall 3 and the anchor bar wall 4, the concrete retaining wall 3 is buried at the foot of the slope 2, the anchor bar wall 4 is laid on the side slope 2, and the concrete retaining wall 3 is mainly used for supporting Anchor retaining wall 4, and in response to the main impact of river water, anchor retaining wall 4 is integrally connected with concrete retaining wall 3 to protect the entire river bank slope 2;

具体实施时,砼挡墙3包括砼脚板31和砼墙32,沿边坡2的坡脚挖有填埋沟5,砼脚板31埋设在填埋沟5底部,砼墙32沿边坡2一侧倾斜的设置在砼脚板31中部,结合流体作用其板面上的的压力,有利于与边坡密实贴合,同时向边坡2一侧倾斜设置,近乎与锚杆护面墙4大致平行,有助于提高对锚杆护面墙4整体的支撑,砼墙32与砼脚板31一体浇筑成型,增强了砼挡墙3的整体结构强度,砼墙32顶部与锚杆护面墙4连接。During specific implementation, the concrete retaining wall 3 includes a concrete footboard 31 and a concrete wall 32. A landfill ditch 5 is dug along the foot of the slope 2. The concrete footboard 31 is buried at the bottom of the landfill ditch 5. The concrete wall 32 is inclined along one side of the slope 2. It is set in the middle of the concrete foot plate 31, combined with the pressure of the fluid acting on the plate surface, it is beneficial to fit closely with the slope, and at the same time it is inclined to the side of the slope 2, almost parallel to the anchor wall 4, and there is Contribute to improving the overall support to the anchor bar protection wall 4, the concrete wall 32 and the concrete foot plate 31 are integrally poured and formed, which enhances the overall structural strength of the concrete retaining wall 3, and the top of the concrete wall 32 is connected with the anchor bar wall 4.

如图1和2所示,具体实施时,砼墙32靠近河床1一侧填埋有大块片漂石6,用于填筑砼挡墙3与河床1一侧,用以应对大流量河水对砼挡墙3与河床1之间的冲刷,进而避免影响砼挡墙3的稳定性,砼墙32靠近边坡2一侧填埋有砂砾石7,砂砾石7尺寸小密度大,夯实后能形成较好的自实体,用于压实砼挡墙3,结合其上部承载的边坡2和锚杆护面墙4等,对砼挡墙3的稳定起到很好的效果。As shown in Figures 1 and 2, during specific implementation, the side of the concrete wall 32 close to the river bed 1 is filled with large pieces of boulders 6, which are used to fill the side of the concrete retaining wall 3 and the river bed 1 to deal with the large flow of river water. For the scour between the concrete retaining wall 3 and the riverbed 1, thereby avoiding affecting the stability of the concrete retaining wall 3, the side of the concrete wall 32 close to the side slope 2 is filled with sand and gravel 7, and the sand and gravel 7 is small in size and high in density. It can form a better self-body for compacting the concrete retaining wall 3, combined with the side slope 2 and the anchor bar protection wall 4 carried on its upper part, it has a good effect on the stability of the concrete retaining wall 3.

如图2所示,还包括主锚杆8,具体实施时,砼脚板31上阵列设置有若干主锚杆8,若干主锚杆8位于砼墙32两侧,主锚杆8用于将砼脚板31与填埋沟5沟底锚固,进一步增强了砼挡墙3的稳定性。As shown in Figure 2, it also includes main anchor rods 8. During specific implementation, several main anchor rods 8 are arranged in an array on the concrete foot plate 31, and several main anchor rods 8 are located on both sides of the concrete wall 32. The main anchor rods 8 are used to place the concrete The foot plate 31 is anchored to the bottom of the landfill ditch 5, which further enhances the stability of the concrete retaining wall 3.

锚杆护面墙4包括若干子护面墙41,若干子护面墙41之间一体设有耳墙42,如图1和2所示,具体实施时,耳墙42垂直于边坡2,深埋边坡2内部,不仅便于子护面墙41的浇筑,同时还能一定程度上,防止相邻耳墙42之间水土的流失,同时对子护面墙41形成了较好的固定和防护,在锚杆护面墙4的两端也设有耳墙42,只是两端的耳墙厚度更大,埋入边坡2的深度更多,以防止流体对整体边缘处的冲击。The anchor rod protection wall 4 includes several sub-face walls 41, and ear walls 42 are integrally provided between the several sub-face walls 41, as shown in Figures 1 and 2, during specific implementation, the ear walls 42 are perpendicular to the side slope 2, Deeply burying the inside of the slope 2 not only facilitates the pouring of the sub-protection wall 41, but also prevents the loss of water and soil between the adjacent ear walls 42 to a certain extent, and at the same time forms a better fixation and protection for the sub-protection wall 41. For protection, ear walls 42 are also provided at the two ends of the anchor rod protection wall 4, but the thickness of the ear walls at both ends is larger, and the depth of the embedded side slope 2 is more, so as to prevent the impact of the fluid on the overall edge.

如图1和2所示,具体实施时,若干子护面墙41上嵌入设置有若干副锚杆43,若干副锚杆43用于将子护面墙41与边坡2锚固;进一步增强了子护面墙41的稳定性。As shown in Figures 1 and 2, during specific implementation, some auxiliary anchor rods 43 are embedded on some sub-retaining walls 41, and some auxiliary anchor rods 43 are used to anchor the sub-retaining walls 41 and the slope 2; The stability of sub-face wall 41.

如图2所示,子护面墙41内一体浇筑有钢筋网44,用以提高锚杆护面墙4整体的结构强度,同时副锚杆43与钢筋网44连接。钢筋网44下端与砼墙32一体浇筑,钢筋网44上端与肩墙9一体浇筑,进而整体的防护强度更高,防护效果相对更好。As shown in FIG. 2 , a reinforced mesh 44 is poured integrally in the sub-retaining wall 41 to improve the overall structural strength of the anchor wall 4 , and the secondary anchor 43 is connected to the reinforced mesh 44 . The lower end of the reinforcement mesh 44 is poured integrally with the concrete wall 32, and the upper end of the reinforcement mesh 44 is poured integrally with the shoulder wall 9, so that the overall protection strength is higher and the protection effect is relatively better.

以上仅为本实用新型的优选实施例而已,并不用于限制本实用新型,对于本领域的技术人员来说,本实用新型可以有各种更改和变化。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above are only preferred embodiments of the utility model, and are not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.

Claims (7)

1. The utility model provides an inclined retaining wall, sets up on side slope (2) between riverbed (1) and shoulder wall (9) for support side slope (2), its characterized in that: the concrete retaining wall comprises a concrete retaining wall (3) and an anchor rod facing wall (4), wherein the concrete retaining wall (3) is embedded in a slope toe of a side slope (2), the anchor rod facing wall (4) is laid on the side slope (2), and the anchor rod facing wall (4) is integrally connected with the concrete retaining wall (3);
concrete barricade (3) are including concrete sole (31) and concrete wall (32), follow the toe of slope (2) is equipped with to fill out and buries ditch (5), concrete sole (31) are buried underground fill out and bury ditch (5) bottom, concrete wall (32) are in along the setting of slope (2) one side slope concrete sole (31) middle part, concrete wall (32) with the shaping is pour to concrete sole (31) an organic whole, concrete wall (32) top with stock dado wall (4) are connected.
2. A sloped retaining wall according to claim 1, wherein the concrete wall (32) is filled with large floating stones (6) on the side close to the riverbed (1), and the concrete wall (32) is filled with sand and gravel (7) on the side close to the side slope (2).
3. An inclined retaining wall according to claim 2, further comprising main anchor rods (8), wherein a plurality of main anchor rods (8) are arrayed on the concrete foot plate (31), a plurality of main anchor rods (8) are positioned at two sides of the concrete wall (32), and the main anchor rods (8) are used for anchoring the concrete foot plate (31) and the landfill groove (5) at the bottom.
4. An inclined retaining wall according to any one of claims 1 to 3, wherein said anchor facing wall (4) comprises a plurality of sub-facing walls (41), and a plurality of said sub-facing walls (41) are integrally provided with a plurality of stud walls (42) therebetween.
5. A sloping retaining wall according to claim 4, characterised in that a plurality of secondary anchor rods (43) are embedded in a plurality of said sub facing walls (41), said plurality of secondary anchor rods (43) being adapted to anchor said sub facing walls (41) to said side slope (2).
6. A sloped retaining wall according to claim 5, wherein reinforcing mesh (44) is integrally cast in the sub-facing wall (41), and the secondary anchor rods (43) are connected to the reinforcing mesh (44).
7. An inclined retaining wall according to claim 6, wherein the lower ends of said reinforcing meshes (44) are cast integrally with said concrete wall (32) and the upper ends of said reinforcing meshes (44) are cast integrally with said shoulder walls (9).
CN202222172221.XU 2022-08-16 2022-08-16 A sloping retaining wall Active CN218090948U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222172221.XU CN218090948U (en) 2022-08-16 2022-08-16 A sloping retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222172221.XU CN218090948U (en) 2022-08-16 2022-08-16 A sloping retaining wall

Publications (1)

Publication Number Publication Date
CN218090948U true CN218090948U (en) 2022-12-20

Family

ID=84448006

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222172221.XU Active CN218090948U (en) 2022-08-16 2022-08-16 A sloping retaining wall

Country Status (1)

Country Link
CN (1) CN218090948U (en)

Similar Documents

Publication Publication Date Title
CN108193642B (en) Revetment reinforcing facility and construction method thereof
CN111270698A (en) Protective structure for exposed diseases of bridge pile foundation in sand-mining river channel in mountainous area and construction method of protective structure
CN105862659B (en) High-frequency debris flow shore protection and diversion method
CN113818402A (en) Reinforcement and reinforcement structure of clay core rockfill dam and its construction method
CN111455737A (en) A kind of wading railway subgrade structure and construction method thereof
CN216275518U (en) Reinforcing and reinforcing structure of clay core rockfill dam
CN215052663U (en) River course side slope protective structure
CN108930253A (en) Ecological flexible slope protection structure for river channel and construction method
CN108547262A (en) Dam body for blocking mountain channel mountain torrents, mud-rock flow
CN205776070U (en) Ecological revetment is combined retaining wall structure
CN218090948U (en) A sloping retaining wall
Emiroglu Influences on selection of the type of dam
CN207211073U (en) A river anti-scour foot protector
CN113123358B (en) Ship pool deformation prevention and control structure under action of uneven settlement of coal mining and construction method
CN212223936U (en) A protective structure that is used for mountain area to adopt sand river course inner bridge pile foundation to expose disease
CN215252686U (en) Construction structure of earth-rock dam on deep silt layer
CN115110476A (en) Assembled revetment structure of anti erosion toughness reinforcing of soft soil foundation wave-proof
CN209989781U (en) Novel structure of silty-fine sand stratum flood control dam
CN208589025U (en) A kind of anti-scour advance pre-reinforcement device for culvert under riverbed
CN106677216B (en) Access gallery structure and its construction method under deep water
CN114960730B (en) Method and structure for building asphalt core wall dam base without foundation pit
CN219118223U (en) Gravity type anchor rod retaining wall
CN105155478B (en) A kind of new damming dam reinforces Application way
CN220414126U (en) Buried stone concrete retaining wall revetment suitable for water treatment engineering
CN221941229U (en) A dike reinforcement structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 610047 area a and B, 8th floor, Sichuan Expressway Building, No.90, West 1st section of 2nd Ring Road, Wuhou District, Chengdu City, Sichuan Province

Patentee after: Sichuan Communications Construction Group Co.,Ltd.

Address before: 610041 area a and B, 8th floor, Sichuan Expressway Building, No.90, West 1st section of 2nd Ring Road, Wuhou District, Chengdu City, Sichuan Province

Patentee before: Sichuan Communications Construction Group Co.,Ltd.

CP03 Change of name, title or address