- CN218088703U CN218088703U CN202221606263.3U CN202221606263U CN218088703U CN 218088703 U CN218088703 U CN 218088703U CN 202221606263 U CN202221606263 U CN 202221606263U CN 218088703 U CN218088703 U CN 218088703U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- steel bar
- bar truss
- supporting seat
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 43
- 239000010959 steel Substances 0.000 title claims abstract description 43
- 238000009434 installation Methods 0.000 title claims abstract description 17
- 230000000712 assembly Effects 0.000 claims 1
- 238000000429 assembly Methods 0.000 claims 1
- 238000010276 construction Methods 0.000 description 3
- 238000003466 welding Methods 0.000 description 2
- 230000001174 ascending effect Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a steel bar truss building carrier plate installation device, including supporting seat and roof, the equal fixedly connected with mounting panel in both sides of supporting seat, all run through on two mounting panels and be provided with the bolt, fixed two hoists that are provided with on the supporting seat, the output of two hoists all is connected with the rope, the bottom of two ropes all runs through supporting seat and fixedly connected with couple, two pillars of top fixedly connected with of roof, the equal fixedly connected with link in top of two pillars, two links hang respectively on two couples, the equal fixedly connected with backup pad in both sides of roof, the same bottom plate of the bottom fixedly connected with of two backup pads. Install the supporting seat through mounting panel and bolt, make the supporting seat install in the floor top that steel bar truss building carrier plate used, also convenient to detach simultaneously hangs two couples on two couples, and then makes roof and bottom plate be connected with two ropes, also convenient to detach roof and bottom plate simultaneously.
Description
Technical Field
The utility model belongs to the technical field of the construction, especially, relate to a steel bar truss building carrier plate installation device.
Background
The steel bar truss floor bearing plate is manufactured by welding upper and lower layers of longitudinal steel bars (namely, upper and lower chords) with bent small-diameter steel bars (namely, web bars) to form a small truss with certain rigidity and capable of bearing load, welding the small truss with a profiled steel plate, and then casting concrete in situ. The steel bar truss floor support plate has the advantages of large overall rigidity and good anti-seismic performance, and is widely applied to a plurality of projects at home and abroad in recent years due to short construction period and easy control of construction quality.
The patent of current grant number CN214243461U discloses a steel bar truss building carrier plate hoist device convenient to adjust, and the whole volume of hoist device in this patent and weight are great, and inconvenient dismantlement again, and hoist device need change mounted position often when using, and then when leading to needing to dismantle and remove hoist device, very troublesome.
SUMMERY OF THE UTILITY MODEL
To the problem, the utility model provides a steel bar truss building carrier plate installation device.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a steel bar truss building carrier plate installation device, includes supporting seat and roof, the fixed two hoists that are provided with, two on the supporting seat the output of hoist all is connected with the rope, two the bottom of rope all runs through supporting seat and fixedly connected with couple, two pillars of top fixedly connected with of roof, two the equal fixedly connected with link in top of pillar, two the link hangs respectively on two couples, the equal fixedly connected with backup pad in both sides of roof, two the same bottom plate of bottom fixedly connected with of backup pad.
Preferably, the equal fixedly connected with mounting panel in both sides of supporting seat, two all run through on the mounting panel and be provided with the bolt.
Preferably, the supporting seat is provided with two through openings, and the two ropes are arranged in the two through openings in a sliding manner.
Preferably, the top of roof fixed mounting has the cylinder, the output of cylinder runs through roof and fixedly connected with clamp plate, the equal fixedly connected with riser in both sides of clamp plate.
Preferably, two all be connected with the centre gripping subassembly on the riser, the centre gripping subassembly includes threaded rod and splint, threaded rod threaded connection is on the riser, splint are located between two risers and rotate with the one end of threaded rod and are connected, the one end fixed mounting that splint were kept away from to the threaded rod has the hand wheel.
Preferably, lie in the equal fixedly connected with gag lever post in threaded rod both sides on the splint, set up on the riser with two gag lever post sliding fit's spacing hole.
Preferably, two equal fixedly connected with two telescopic sleeves in one side that is close to the splint on the riser, two all slide in the telescopic sleeve and be provided with flexible post.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the support seat is installed above a floor used by the steel bar truss floor bearing plate through the installation plate and the bolts, the support seat is convenient to disassemble, the two hooks are hung on the two hooks, the top plate and the bottom plate are connected with the two ropes, and the top plate and the bottom plate are convenient to disassemble;
2. drive clamp plate downstream through the cylinder, make clamp plate and steel bar truss building carrier plate contact, through rotating the hand wheel, drive the threaded rod and rotate for splint remove, through two splint with steel bar truss building carrier plate both sides centre gripping, and then make steel bar truss building carrier plate fix, make steel bar truss building carrier plate can not take place to turn on one's side when the lifting.
Drawings
Fig. 1 is a schematic structural view of the whole installation device for the steel bar truss floor support plate provided by the utility model;
fig. 2 is an enlarged schematic structural view of a part a in fig. 1 of the device for mounting a steel bar truss floor deck according to the present invention;
fig. 3 is a schematic structural view of another view angle of the whole installation device for the steel bar truss floor support plate provided by the utility model;
fig. 4 is the utility model provides a structural schematic of steel bar truss building carrier plate installation device clamp plate bottom.
In the figure: 1. a supporting seat; 2. a winch; 3. a rope; 4. hooking; 5. a top plate; 6. a support post; 7. hanging a ring; 8. a support plate; 9. a base plate; 10. mounting a plate; 11. a bolt; 12. a cylinder; 13. pressing a plate; 14. a vertical plate; 15. a threaded rod; 16. a splint; 17. a hand wheel; 18. a limiting rod; 19. a telescopic sleeve; 20. a telescopic column.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a steel bar truss building carrier plate installation device, including supporting seat 1 and roof 5, fixed two hoists 2 that are provided with on the supporting seat 1, the output of two hoists 2 all is connected with rope 3, drive two ropes 3 through two hoists 2 and receive and release, the bottom of two ropes 3 all runs through supporting seat 1 and fixedly connected with couple 4, two run-through mouths have been seted up on supporting seat 1, two ropes 3 slide to set up in two run-through mouths, two ropes 3 of being convenient for remove. Two pillars 6 of top fixedly connected with of roof 5, the equal fixedly connected with link 7 in top of two pillars 6, two links 7 hang respectively on two couples 4, hang on two couples 4 through hanging two couples 4, and then make roof 5 be connected with two ropes 3, also be convenient for simultaneously make roof 5 and two ropes 3 separate, and then dismantle roof 5, the equal fixedly connected with backup pad 8 in both sides of roof 5, the same bottom plate 9 of the bottom fixedly connected with of two backup pads 8, arrange steel bar truss building carrier plate in on bottom plate 9, through the ascending of 3 pulling bottom plates 9 of two ropes and steel bar truss building carrier plate.
Referring to fig. 3, the equal fixedly connected with mounting panel 10 in both sides of supporting seat 1 all runs through on two mounting panels 10 and is provided with bolt 11, installs supporting seat 1 through mounting panel 10 and bolt 11, makes supporting seat 1 install the floor top that steel bar truss building carrier plate used.
Referring to fig. 3 and 4, the top fixed mounting of roof 5 has cylinder 12, and roof 5 and fixedly connected with clamp plate 13 are run through to the output of cylinder 12, and the equal fixedly connected with riser 14 in both sides of clamp plate 13 drives clamp plate 13 through cylinder 12 and moves down, makes clamp plate 13 and steel bar truss floor deck contact. All be connected with the centre gripping subassembly on two risers 14, the centre gripping subassembly includes threaded rod 15 and splint 16, and threaded rod 15 threaded connection is on riser 14, and splint 16 is located between two risers 14 and rotates with the one end of threaded rod 15 and is connected, and the one end fixed mounting that splint 16 were kept away from to threaded rod 15 has hand wheel 17, through rotating hand wheel 17, drives threaded rod 15 and rotates for splint 16 removes, through the centre gripping of two splint 16 with steel bar truss building carrier plate both sides.
Referring to fig. 4, the clamping plate 16 is fixedly connected with limiting rods 18 at two sides of the threaded rod 15, the vertical plate 14 is provided with limiting holes in sliding fit with the two limiting rods 18, and the clamping plate 16 can move stably through the sliding fit of the two limiting rods 18 and the limiting holes.
Referring to fig. 4, two expansion sleeves 19 of the equal fixedly connected with in one side that is close to splint 16 on two risers 14 all slide in two expansion sleeves 19 and be provided with flexible post 20, stretch out and draw back through making flexible post 20, and then block steel bar truss building carrier plate both sides, prevent to fall.
Now, the operation principle of the present invention is described as follows: install supporting seat 1 through mounting panel 10 and bolt 11, make supporting seat 1 install in the floor top that steel bar truss building carrier plate used, hang two couples 4 on two couples 4, and then make roof 5 be connected with two ropes 3. Arrange steel bar truss building carrier plate in on bottom plate 9, drive clamp plate 13 downstream through cylinder 12, make clamp plate 13 and steel bar truss building carrier plate contact, through rotating hand wheel 17, drive threaded rod 15 and rotate for splint 16 removes, through two splint 16 with steel bar truss building carrier plate both sides centre gripping, and then make steel bar truss building carrier plate fix. Drive two 3 rolling of rope through two hoist engine 2, through the 3 upwards liftings of 3 pulling bottom plates 9 of two ropes and steel bar truss building carrier plates, make steel bar truss building carrier plate lifting to the floor of using, it can to take off and install.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (7)
1. The utility model provides a steel bar truss building carrier plate installation device, includes supporting seat (1) and roof (5), its characterized in that, fixed two hoist engines (2) that are provided with on supporting seat (1), two the output of hoist engine (2) all is connected with rope (3), two supporting seat (1) and fixedly connected with couple (4) are all run through to the bottom of rope (3), two pillars (6) of top fixedly connected with of roof (5), two the equal fixedly connected with link (7) in top of pillar (6), two link (7) hang respectively on two couples (4), the equal fixedly connected with backup pad (8) in both sides of roof (5), two the same bottom plate (9) of the bottom fixedly connected with of backup pad (8).
2. The steel bar truss floor deck installation device according to claim 1, wherein mounting plates (10) are fixedly connected to two sides of the support base (1), and bolts (11) penetrate through the two mounting plates (10).
3. The installation device for the steel bar truss floor bearing plate is characterized in that the supporting seat (1) is provided with two through openings, and the two ropes (3) are slidably arranged in the two through openings.
4. The steel bar truss floor deck installation device according to claim 1, wherein an air cylinder (12) is fixedly installed at the top of the top plate (5), an output end of the air cylinder (12) penetrates through the top plate (5) and is fixedly connected with a pressing plate (13), and vertical plates (14) are fixedly connected to two sides of the pressing plate (13).
5. The steel bar truss floor deck mounting device according to claim 4, wherein two of the vertical plates (14) are connected with clamping assemblies, each clamping assembly comprises a threaded rod (15) and a clamping plate (16), the threaded rods (15) are in threaded connection with the vertical plates (14), the clamping plates (16) are located between the two vertical plates (14) and are in rotating connection with one ends of the threaded rods (15), and one ends, far away from the clamping plates (16), of the threaded rods (15) are fixedly provided with hand wheels (17).
6. The steel bar truss floor bearing plate installation device according to claim 5, wherein limiting rods (18) are fixedly connected to the clamping plates (16) on two sides of the threaded rod (15), and limiting holes in sliding fit with the two limiting rods (18) are formed in the vertical plates (14).
7. The steel bar truss floor deck installation device according to claim 5, wherein two telescopic sleeves (19) are fixedly connected to one side of each of the two vertical plates (14) close to the clamping plate (16), and telescopic columns (20) are slidably arranged in the two telescopic sleeves (19).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202221606263.3U CN218088703U (en) | 2022-06-25 | 2022-06-25 | Steel bar truss building carrier plate installation device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202221606263.3U CN218088703U (en) | 2022-06-25 | 2022-06-25 | Steel bar truss building carrier plate installation device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218088703U true CN218088703U (en) | 2022-12-20 |
Family
ID=84477034
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202221606263.3U Active CN218088703U (en) | 2022-06-25 | 2022-06-25 | Steel bar truss building carrier plate installation device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218088703U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116517306A (en) * | 2023-06-02 | 2023-08-01 | 中国十七冶集团有限公司 | Installation equipment for large cantilever reinforcing steel bar separation frame building carrier plate and use method thereof |
-
2022
- 2022-06-25 CN CN202221606263.3U patent/CN218088703U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116517306A (en) * | 2023-06-02 | 2023-08-01 | 中国十七冶集团有限公司 | Installation equipment for large cantilever reinforcing steel bar separation frame building carrier plate and use method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201598820U (en) | Single-point suspension external hanging rack | |
| CN218088703U (en) | Steel bar truss building carrier plate installation device | |
| CN214935296U (en) | Lifting device convenient to big inclination steel column does not have support equipment | |
| CN101450766B (en) | Lifting installation method for ultralong workpiece and used fixture cross beam | |
| CN201714057U (en) | Lifting mechanism for adhered electric lifting scaffold | |
| CN109296192B (en) | Lifting frame for assembled building | |
| CN101186273A (en) | The Method of Lowering Overweight Structures by Two Jacks in Series | |
| CN101695984B (en) | The installation method and spreader of longitudinal and transverse beams under the arch of the half-through concrete-filled steel tube concrete arch bridge | |
| CN201635390U (en) | Automatic formwork supporting machine for high-rise building elevator shaft construction | |
| CN201330506Y (en) | Spreader climbing mechanism | |
| CN221854020U (en) | A kind of installation equipment of prestressed jack | |
| CN208732495U (en) | A kind of small gun carriage | |
| CN201485204U (en) | Gas tank hanging device | |
| CN105863280A (en) | Self-elevating unloading platform | |
| CN105060124B (en) | Intra-frame portal crane system and hoisting use method thereof | |
| CN110886225A (en) | Construction method of cable tower stay cable installation system | |
| CN101457516B (en) | Hanging method of multilayer horizontal inhaul cable | |
| CN214302804U (en) | Double-layer hanging basket of riding horse type | |
| CN212336763U (en) | Curtain wall installation guide rail device fixed on roof flower frame beam | |
| CN1987020B (en) | Attached climbing type towering mast structure installation method and construction device | |
| CN109914223B (en) | Hoisting system suitable for suspension bridge steel structure bridge deck system and operation method thereof | |
| CN222665220U (en) | Large beam reinforcement skeleton sinking device | |
| CN216713773U (en) | Novel triangular hanging basket | |
| CN113152687A (en) | Structure and method for improving layering reverse order of hollow steel gallery | |
| CN221216936U (en) | Wall-riding type installation hanging bracket of high-altitude hoisting equipment |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |