CN218000747U - Pipe connections for building construction - Google Patents

Pipe connections for building construction Download PDF

Info

Publication number
CN218000747U
CN218000747U CN202222031796.XU CN202222031796U CN218000747U CN 218000747 U CN218000747 U CN 218000747U CN 202222031796 U CN202222031796 U CN 202222031796U CN 218000747 U CN218000747 U CN 218000747U
Authority
CN
China
Prior art keywords
chucking
pipeline
groove
half rings
stationary half
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202222031796.XU
Other languages
Chinese (zh)
Inventor
宋迎迎
李倩
王祎明
马子悦
尚明珠
刘超超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Hanliang Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222031796.XU priority Critical patent/CN218000747U/en
Application granted granted Critical
Publication of CN218000747U publication Critical patent/CN218000747U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

The utility model relates to a pipeline connecting device that construction in pipeline connecting device field was used, the inside of body is equipped with the chucking piece, the surface of chucking piece is equipped with the chucking groove that is used for placing the pipeline, the inner wall in chucking groove is equipped with the sealing washer, the periphery of body is equipped with two stationary half rings that are used for fixed body and pipeline, connect through the bolt between two stationary half rings, the surface of body is equipped with the dead lever that is used for fixed two stationary half rings, be equipped with the recess that is used for placing two stationary half rings between dead lever and the body, the side of dead lever is equipped with the opening that is used for two stationary half rings to pass. The inside of body is equipped with the chucking piece, and the surface of chucking piece is equipped with the chucking groove that is used for placing the pipeline, and the inner wall in chucking groove is equipped with the sealing washer, wears into the chucking groove and the sealing washer in proper order with the one end of pipeline from the surface of body, and the pipeline is earlier by the body chucking, is blocked chucking groove and sealing washer chucking again, triple chucking measure for the difficult roll-off body of pipeline.

Description

建筑施工用的管道连接装置Pipe connections for building construction

技术领域technical field

本实用新型涉及管道连接装置领域,具体涉及建筑施工用的管道连接装置。The utility model relates to the field of pipeline connection devices, in particular to a pipeline connection device for building construction.

背景技术Background technique

管道连接是指按照设计图的要求,将已经加工预制好的管段连接成一个完整的系统,在施工中,应根据所用管子的材质选择不同的连接方法,普通钢管有螺纹连接、法兰连接、焊接连接、承插连接、管道黏合连接等方法。Pipeline connection refers to connecting the prefabricated pipe sections into a complete system according to the requirements of the design drawing. During construction, different connection methods should be selected according to the material of the pipes used. Ordinary steel pipes have threaded connections, flange connections, Welding connection, socket connection, pipe bonding connection and other methods.

现有的技术存在以下问题:1)传统的建筑施工用管道连接紧固装置在使用时不方便进行装配作业,操作麻烦,费时费力,安装效率较低;2)传统的建筑施工用管道连接紧固装置在使用时不方便进行紧固作业,紧固效果较差,不方便进行操作。The existing technology has the following problems: 1) The traditional pipeline connection and fastening device for building construction is inconvenient to carry out assembly work during use, the operation is cumbersome, time-consuming and laborious, and the installation efficiency is low; 2) The traditional pipeline connection and fastening device for building construction The fastening device is inconvenient to carry out the fastening operation during use, the fastening effect is poor, and it is inconvenient to operate.

实用新型内容Utility model content

本实用新型的目的是解决以上缺陷,提供建筑施工用的管道连接装置。The purpose of this utility model is to solve the above defects and provide a pipeline connection device for building construction.

本实用新型的目的是通过以下方式实现的:建筑施工用的管道连接装置,包括管体,所述管体的内部设有卡紧块,卡紧块的表面设有用于放置管道的卡紧槽,卡紧槽的内壁设有密封圈,管体的外围设有用于固定管体和管道的两个固定半环,两个固定半环之间通过螺栓进行连接,管体的表面设有用于固定两个固定半环的固定杆,固定杆与管体之间设有用于放置两个固定半环的凹槽,固定杆的侧面设有用于两个固定半环穿过的开口。The purpose of this utility model is achieved in the following way: the pipeline connection device for building construction includes a pipe body, the interior of the pipe body is provided with a clamping block, and the surface of the clamping block is provided with a clamping groove for placing the pipeline , the inner wall of the clamping groove is provided with a sealing ring, and the periphery of the pipe body is provided with two fixed half-rings for fixing the pipe body and the pipe. The two fixed half-rings are connected by bolts, and the surface of the pipe body is equipped with The fixing rod of the two fixing half-rings is provided with a groove for placing the two fixing half-rings between the fixing rod and the pipe body, and the side of the fixing rod is provided with an opening for passing the two fixing half-rings.

上述说明中,作为进一步的方案,所述卡紧槽的内壁设有用于防止管道滑动的防滑纹,防滑纹沿卡紧槽的内壁凸出。In the above description, as a further solution, the inner wall of the clamping groove is provided with anti-slip lines for preventing the pipe from sliding, and the anti-slip lines protrude along the inner wall of the clamping groove.

上述说明中,作为进一步的方案,所述固定杆设有两个,两个固定杆与管体之间均设有用于放置两个固定半环的凹槽,两个固定杆的两端均设有用于两个固定半环穿过的开口。In the above description, as a further solution, two fixed rods are provided, grooves for placing two fixed half-rings are provided between the two fixed rods and the pipe body, and two fixed rods are provided at both ends. There are openings for the two fixing halves to pass through.

上述说明中,作为进一步的方案,所述凹槽的一端距离管体的距离大于凹槽的另一端距离管体的距离,便于将固定杆In the above description, as a further solution, the distance between one end of the groove and the pipe body is greater than the distance between the other end of the groove and the pipe body, so that the fixing rod

上述说明中,作为进一步的方案,所述管体、两个固定半环和固定杆均由橡胶构成。In the above description, as a further solution, the pipe body, the two fixing half-rings and the fixing rod are all made of rubber.

本实用新型所产生的有益效果如下:1.所述管体的内部设有卡紧块,卡紧块的表面设有用于放置管道的卡紧槽,卡紧槽的内壁设有密封圈,将管道的一端从管体的表面依次穿进卡紧槽和密封圈里,管道先被管体卡紧,再被卡紧槽和密封圈卡紧,三重卡紧措施,使得管道不易滑出管体;The beneficial effects produced by the utility model are as follows: 1. The inside of the pipe body is provided with a clamping block, the surface of the clamping block is provided with a clamping groove for placing the pipeline, and the inner wall of the clamping groove is provided with a sealing ring, which will One end of the pipe penetrates into the clamping groove and the sealing ring sequentially from the surface of the pipe body. The pipe is clamped by the pipe body first, then by the clamping groove and the sealing ring. The triple clamping measures make it difficult for the pipe to slip out of the pipe body ;

2.管体的外围设有用于固定管体和管道的两个固定半环,两个固定半环之间通过螺栓进行连接,管体的表面设有用于固定两个固定半环的固定杆,固定杆与管体之间设有用于放置两个固定半环的凹槽,两个固定半环放进凹槽里,固定杆的两端设有用于两个固定半环穿过的开口,两个固定半环的两端穿过开口,再将两个固定半环使用螺钉进行固定,使得两个固定半环固定管道和管体,进一步使得管道被夹紧,同时管体被水冲击时,两个固定半环防护管体,使得管体维持原状,确保管体的使用寿命;2. The periphery of the pipe body is provided with two fixed half-rings for fixing the pipe body and the pipe. The two fixed half-rings are connected by bolts. The surface of the pipe body is provided with a fixing rod for fixing the two fixed half-rings. There is a groove for placing two fixed half-rings between the fixed rod and the pipe body. The two ends of the two fixed half-rings pass through the opening, and then the two fixed half-rings are fixed with screws, so that the two fixed half-rings fix the pipe and the pipe body, and further make the pipe clamped, and when the pipe body is impacted by water, Two fixed half-rings protect the pipe body, so that the pipe body remains in its original state, ensuring the service life of the pipe body;

3.整体结构简单,且便于工作人员进行操作。3. The overall structure is simple and convenient for the staff to operate.

附图说明Description of drawings

图1为本实用新型建筑施工用的管道连接装置中的立体结构示意图;Fig. 1 is the schematic diagram of the three-dimensional structure in the pipe connecting device used for building construction of the present invention;

图2为本实用新型建筑施工用的管道连接装置中的剖面图;Fig. 2 is the sectional view in the pipe connection device of the utility model building construction;

图3为本实用新型建筑施工用的管道连接装置中的爆炸图;Fig. 3 is the exploded view in the pipeline connecting device that the utility model building construction is used;

图中:1-管体,2-卡紧块,3-卡紧槽,4-密封圈,5-固定半环,6-螺栓,7-固定杆,8-凹槽,9-开口,10-防滑纹。In the figure: 1-pipe body, 2-clamping block, 3-clamping groove, 4-sealing ring, 5-fixing half ring, 6-bolt, 7-fixing rod, 8-groove, 9-opening, 10 - Anti-slip texture.

具体实施方式detailed description

为了便于本领域技术人员的理解,下面结合实施例与附图对本实用新型作进一步的说明,实施方式提及的内容并非对本实用新型的限定。以下结合附图对本实用新型进行详细的描述。In order to facilitate the understanding of those skilled in the art, the utility model will be further described below in conjunction with the embodiments and accompanying drawings, and the contents mentioned in the implementation modes are not limitations of the utility model. Below in conjunction with accompanying drawing, the utility model is described in detail.

请参阅图1-3,其具体实施的建筑施工用的管道连接装置,包括管体1。Please refer to FIGS. 1-3 , the concrete implementation of the pipeline connection device for building construction includes a pipe body 1 .

所述管体1的内部设有卡紧块2,卡紧块2的表面设有用于放置管道的卡紧槽3,卡紧槽3的内壁设有密封圈4,管体1的外围设有用于固定管体1和管道的两个固定半环5,两个固定半环5之间通过螺栓6进行连接,管体1的表面设有用于固定两个固定半环5的固定杆7,固定杆7与管体1之间设有用于放置两个固定半环5的凹槽8,固定杆7的两端设有用于两个固定半环5穿过的开口9。卡紧槽3的内壁设有用于防止管道滑动的防滑纹10,防滑纹10沿卡紧槽3的内壁凸出。固定杆7设有两个,两个固定杆7与管体1之间均设有用于放置两个固定半环5的凹槽8,两个固定杆7的两端均设有用于两个固定半环5穿过的开口9。凹槽8的一端与管体1之间的距离大于凹槽8的另一端与管体1之间的距离。管体1、两个固定半环5和固定杆7均由橡胶构成。The inside of the pipe body 1 is provided with a clamping block 2, the surface of the clamping block 2 is provided with a clamping groove 3 for placing a pipeline, the inner wall of the clamping groove 3 is provided with a sealing ring 4, and the periphery of the pipe body 1 is provided with a Two fixed half rings 5 for fixing the pipe body 1 and the pipeline are connected by bolts 6 between the two fixed half rings 5. The surface of the pipe body 1 is provided with a fixing rod 7 for fixing the two fixed half rings 5. Between the rod 7 and the pipe body 1 is provided a groove 8 for placing two fixed half-rings 5 , and two ends of the fixed rod 7 are provided with openings 9 for passing the two fixed half-rings 5 . The inner wall of the clamping groove 3 is provided with anti-slip lines 10 for preventing the pipe from sliding, and the anti-slip lines 10 protrude along the inner wall of the clamping groove 3 . Two fixed rods 7 are provided, and between the two fixed rods 7 and the pipe body 1, grooves 8 for placing two fixed half-rings 5 are provided, and the two ends of the two fixed rods 7 are provided with two fixed rings. The opening 9 through which the half ring 5 passes. The distance between one end of the groove 8 and the pipe body 1 is greater than the distance between the other end of the groove 8 and the pipe body 1 . The pipe body 1, the two fixed half-rings 5 and the fixed rod 7 are all made of rubber.

本实用新型实施例的工作原理为先将管道的一端从管体1的表面依次穿进卡紧槽3和密封圈4里,再将两个固定半环5放进凹槽8里,并将两个固定半环5的两端穿过开口9,再将两个固定半环5使用螺钉进行固定。The working principle of the embodiment of the utility model is that one end of the pipeline is inserted into the clamping groove 3 and the sealing ring 4 successively from the surface of the pipe body 1, and then the two fixed half-rings 5 are put into the groove 8, and the Both ends of the two fixed half-rings 5 pass through the opening 9, and then the two fixed half-rings 5 are fixed with screws.

以上内容是结合具体的进一步实施例对本实用新型所作的进一步详细说明,不能认定本实用新型的具体实施只局限于这些说明。对于本实用新型所属技术领域的普通技术人员来说,在不脱离本实用新型构思的前提下,还可做出若干简单推演或替换,都应视为本实用新型的保护范围。The above content is a further detailed description of the utility model in conjunction with specific further embodiments, and it cannot be determined that the specific implementation of the utility model is only limited to these descriptions. For those of ordinary skill in the technical field to which the utility model belongs, on the premise of not departing from the concept of the utility model, some simple deduction or replacement can also be made, which should be regarded as the protection scope of the utility model.

Claims (5)

1. Pipeline connecting device that construction was used, including the body, its characterized in that, the inside of body is equipped with the chucking piece, and the surface of chucking piece is equipped with the chucking groove that is used for placing the pipeline, and the inner wall in chucking groove is equipped with the sealing washer, and the periphery of body is equipped with two stationary half rings that are used for fixed body and pipeline, connects through the bolt between two stationary half rings, and the surface of body is equipped with the dead lever that is used for two stationary half rings of fixed, is equipped with the recess that is used for placing two stationary half rings between dead lever and the body, and the side of dead lever is equipped with the opening that is used for two stationary half rings to pass.
2. The pipe connecting device for building construction according to claim 1, wherein the inner wall of the clamping groove is provided with anti-slip threads for preventing the pipe from slipping, the anti-slip threads protruding along the inner wall of the clamping groove.
3. The pipe connecting device for construction according to claim 1 or 2, wherein the number of the fixing rods is two, a groove for placing the two stationary half rings is formed between the two fixing rods and the pipe body, and openings for passing the two stationary half rings are formed at both ends of the two fixing rods.
4. The pipe connecting device for construction according to claim 1 or 2, wherein a distance between one end of the groove and the pipe body is greater than a distance between the other end of the groove and the pipe body.
5. The pipe connecting device for construction work according to claim 1 or 2, wherein the pipe body, the two stationary half rings and the fixing lever are formed of rubber.
CN202222031796.XU 2022-08-03 2022-08-03 Pipe connections for building construction Expired - Fee Related CN218000747U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222031796.XU CN218000747U (en) 2022-08-03 2022-08-03 Pipe connections for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222031796.XU CN218000747U (en) 2022-08-03 2022-08-03 Pipe connections for building construction

Publications (1)

Publication Number Publication Date
CN218000747U true CN218000747U (en) 2022-12-09

Family

ID=84317965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222031796.XU Expired - Fee Related CN218000747U (en) 2022-08-03 2022-08-03 Pipe connections for building construction

Country Status (1)

Country Link
CN (1) CN218000747U (en)

Similar Documents

Publication Publication Date Title
CN206738779U (en) Spigot-and-socket metallic conduit erecting device
CN204533915U (en) Fluid pipeline sealing connection device
CN215294024U (en) Mechanical flange with high leakproofness
CN209823385U (en) Cable joint auxiliary reinforcement structure
CN112728223B (en) Water supply wall bushing for indoor decoration project
CN218000747U (en) Pipe connections for building construction
CN210123054U (en) Movable connecting device used between hose and steel pipe
CN205173849U (en) A plugging device for pipeline
CN212004674U (en) A steel mesh PE composite pipe fire pipe flange connection
CN223276593U (en) A device capable of supplying fluid at high pressure
CN102507309B (en) Heavy-caliber elbow pipe fitting water pressure test seal device
CN206669215U (en) Valve is blocked up in a kind of water pressure test
CN201330902Y (en) Rotatable flange connection structure
CN204647621U (en) Reducing pipe flanged connecting structure
CN209213250U (en) A quick connection device for medium and high pressure water pipes
CN205078983U (en) Interim plugging device of large diameter pipeline
CN203189916U (en) A quick-connect combined flange
CN212107327U (en) A quick connection mechanism for pressure-bearing pipelines
CN203517085U (en) Efficient flange for motor
CN221991174U (en) A cement pipe and ductile iron pipe reducer connection repair joint
CN211288908U (en) Flange for ultrahigh-temperature electromagnetic valve
CN211314150U (en) A high-pressure drilling and sealing device
CN211145734U (en) A glass fiber reinforced plastic composite pipe
CN211902047U (en) A component for repairing damaged water supply pipes under pressure
CN221880550U (en) A clamping type high pressure pipe joint

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240322

Address after: 238000, Room 302, Unit 3, Building A12, Lijing Huating Community, Juzhang Neighborhood Committee, Bantang Street, Chaohu Economic Development Zone, Hefei City, Anhui Province

Patentee after: Anhui Hanliang Construction Engineering Co.,Ltd.

Country or region after: China

Address before: No. 102, Zone 1, Zhangqian Street Village, Dayin Town, Xushui District, Baoding City, Hebei Province, 071000

Patentee before: Liu Chaochao

Country or region before: China

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221209

CF01 Termination of patent right due to non-payment of annual fee