CN217972279U - Assembled building wallboard hoist device - Google Patents

Assembled building wallboard hoist device Download PDF

Info

Publication number
CN217972279U
CN217972279U CN202221267126.1U CN202221267126U CN217972279U CN 217972279 U CN217972279 U CN 217972279U CN 202221267126 U CN202221267126 U CN 202221267126U CN 217972279 U CN217972279 U CN 217972279U
Authority
CN
China
Prior art keywords
fixedly connected
wall panel
lifting
base
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221267126.1U
Other languages
Chinese (zh)
Inventor
张领雷
安沁丽
王磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jianzhu Institute
Original Assignee
Jiangsu Jianzhu Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Jianzhu Institute filed Critical Jiangsu Jianzhu Institute
Priority to CN202221267126.1U priority Critical patent/CN217972279U/en
Application granted granted Critical
Publication of CN217972279U publication Critical patent/CN217972279U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型涉及建筑相关技术领域,公开了一种装配式建筑墙板吊装装置,包括底座,底座呈“U”,所述底座一侧固定连接有多组移动轮,所述底座尾端固定连接有万向节,万向节上固定连接有把手,还包括:托举组件;间距调整组件;挂钩组件;卷扬组件,本实用新型首先通过间距调整组件控制两组托举组件的间距进行调整,从而对托举组件卡紧至墙板与地面的间隙内,之后通过托举组件带动墙板进行升起,从而使墙板两端脱离地面,之后将挂扣组件安装固定在墙板两端,再通过卷扬组件带动墙板进行升降,从而对墙板进行吊装,本实用新型实现了对墙板的自动提起,无需人工辅助,装置只需工人对装置进行牵引,提升了工人的安全性。

Figure 202221267126

The utility model relates to the technical field related to construction, and discloses a prefabricated building wall panel hoisting device, which includes a base, the base is in the shape of a "U", one side of the base is fixedly connected with multiple groups of moving wheels, and the tail end of the base is fixedly connected There are universal joints, and handles are fixedly connected to the universal joints, and also include: lifting components; spacing adjustment components; hook components; , so that the lifting component is clamped into the gap between the wall panel and the ground, and then the lifting component is used to drive the wall panel to rise, so that the two ends of the wall panel are separated from the ground, and then the hanging buckle component is installed and fixed on both ends of the wall panel , and then drive the wall panel to lift through the winch assembly, so as to hoist the wall panel. The utility model realizes the automatic lifting of the wall panel without manual assistance. The device only needs workers to pull the device, which improves the safety of workers .

Figure 202221267126

Description

一种装配式建筑墙板吊装装置A prefabricated building wall panel hoisting device

技术领域technical field

本实用新型涉及建筑相关技术领域,具体是一种装配式建筑墙板吊装装置。The utility model relates to the technical field related to construction, in particular to an assembled building wall panel hoisting device.

背景技术Background technique

装配式建筑是指把传统建造方式中的大量现场作业工作转移到工厂进行,在工厂加工制作好建筑用构件和配件(如楼板、墙板、楼梯、阳台等),运输到建筑施工现场,通过可靠的连接方式在现场装配安装而成的建筑,装配式建筑主要包括预制装配式混凝土结构、钢结构、现代木结构建筑等,因为采用标准化设计、工厂化生产、装配化施工、信息化管理、智能化应用,是现代工业化生产方式的代表,装配式建筑构件的吊装离不开起重设备,例如预制的墙体以及钢结构等,都需要起重设备进行吊装。Prefabricated building refers to the transfer of a large number of on-site operations in the traditional construction method to the factory, where the building components and accessories (such as floor slabs, wall panels, stairs, balconies, etc.) are processed and manufactured in the factory, and transported to the construction site. Reliable connection methods are assembled and installed on site. Prefabricated buildings mainly include prefabricated concrete structures, steel structures, modern wooden structures, etc., because standardized design, factory production, assembly construction, information management, Intelligent application is the representative of modern industrialized production methods. The hoisting of prefabricated building components is inseparable from hoisting equipment, such as prefabricated walls and steel structures, which all require hoisting equipment.

中国专利:一种装配式建筑墙板吊装装置,授权公告号:CN 215974582 U,授权公告日:2022.03.08,通过在钢索的末端悬挂有吊装架,通过固定座配合弹力绳对吊装架进行限位,防止在吊装的过程中吊装架发生晃动,提高了安全性,但是由于吊装设备的结构较为简单,在使用过程中稍有不慎就会使连接墙板的绳索断裂,这样会对地面行走的路人造成危害,因此本领域技术人员提供了一种装配式建筑墙板吊装装置,以解决上述背景技术中提出的问题。Chinese patent: A hoisting device for prefabricated building wall panels, authorized announcement number: CN 215974582 U, authorized announcement date: 2022.03.08, by hanging a hoisting frame at the end of the steel cable, the hoisting frame is fixed by the fixing seat and the elastic rope. The position limit prevents the hoisting frame from shaking during the hoisting process and improves safety. However, due to the relatively simple structure of the hoisting equipment, a little carelessness during use will break the rope connecting the wall panels, which will damage the ground. Walking passers-by cause harm, so those skilled in the art provide a prefabricated building wall panel hoisting device to solve the problems raised in the above-mentioned background technology.

实用新型内容Utility model content

本实用新型的目的在于提供一种装配式建筑墙板吊装装置,以解决上述背景技术中提出的问题,为实现上述目的,本实用新型提供如下技术方案:一种装配式建筑墙板吊装装置,包括底座,底座呈“U”,所述底座一侧固定连接有多组移动轮,所述底座尾端固定连接有万向节,万向节上固定连接有把手,还包括:设置在底座一侧的两组相互对称设置的托举组件;连接在底座上用于控制两组托举组件的间距进行调整的间距调整组件;设置在托举组件两端的挂钩组件;以及连接在挂钩组件上用于对挂钩组件的高度进行调整的卷扬组件。The purpose of this utility model is to provide a prefabricated building wall panel hoisting device to solve the problems raised in the above background technology. To achieve the above purpose, the utility model provides the following technical solutions: a prefabricated building wall panel hoisting device, It includes a base, the base is "U", one side of the base is fixedly connected with multiple sets of moving wheels, the tail end of the base is fixedly connected with a universal joint, and a handle is fixedly connected with the universal joint, and it also includes: Two groups of lifting components arranged symmetrically on the side; a spacing adjustment component connected to the base to control the distance between the two groups of lifting components; a hook component arranged at both ends of the lifting component; and a hook component connected to the hook component The winch assembly is used to adjust the height of the hook assembly.

本实用新型进一步改进在于:所述间距调整组件包括固定连接在底座上的固定块, 固定块之间固定链接有第一固定杆,第一固定杆一侧设置有转动连接在固定块之间的双头螺杆,双头螺杆两端螺纹连接有第一驱动块,第一驱动块一侧固定连接有升降架,所述固定块一侧固定连接有第一电动机,第一电动机的输出轴穿过固定块固定连接在双头螺杆上。The utility model is further improved in that: the distance adjustment assembly includes fixed blocks fixedly connected on the base, a first fixed rod is fixedly connected between the fixed blocks, and one side of the first fixed rod is provided with a rotating connection between the fixed blocks. A double-ended screw, the two ends of the double-ended screw are threadedly connected with a first drive block, one side of the first drive block is fixedly connected with a lifting frame, one side of the fixed block is fixedly connected with a first motor, and the output shaft of the first motor passes through The fixed block is fixedly connected on the double-ended screw rod.

本实用新型进一步改进在于:所述托举组件包括固定连接在升降架内的第二固定杆,第二固定杆一侧设置有转动连接在升降框内的第二螺杆,第二螺杆上螺纹连接有第二驱动块,第二驱动块两侧滑动连接在第二固定杆上,所述第二驱动块一侧固定连接有铲头,所述升降架一侧固定连接有第二电动机,第二电动机的输出轴穿过升降架固定连接在第二螺杆上。The utility model is further improved in that: the lifting assembly includes a second fixed rod fixedly connected in the lifting frame, one side of the second fixed rod is provided with a second screw rod rotatably connected in the lifting frame, and the second screw rod is threadedly connected There is a second drive block, the two sides of the second drive block are slidingly connected to the second fixed rod, one side of the second drive block is fixedly connected with a shovel head, one side of the lifting frame is fixedly connected with a second motor, and the second The output shaft of the motor passes through the lift frame and is fixedly connected to the second screw rod.

本实用新型进一步改进在于:所述卷扬组件包括固定连接在底座上的侧架,侧架之间转动连接有转轴,转轴上固定连接有收卷筒,收卷筒上收卷缠绕有缆绳,所述侧架一侧固定连接有第三电动机,第三电动机的输出轴穿过侧架固定连接在转轴上。The utility model is further improved in that: the hoisting assembly includes side frames fixedly connected to the base, rotating shafts are rotatably connected between the side frames, and winding drums are fixedly connected to the rotating shafts, and cables are wound around the winding drums. A third motor is fixedly connected to one side of the side frame, and the output shaft of the third motor passes through the side frame and is fixedly connected to the rotating shaft.

本实用新型进一步改进在于:所述挂钩组件包括固定连接在缆绳一端上的升降板,升降板两端固定连接有固定杆,固定杆两端转动连接有转动杆,转动杆上转动连接有挂扣。The utility model is further improved in that: the hook assembly includes a lifting plate fixedly connected to one end of the cable, the two ends of the lifting plate are fixedly connected with a fixed rod, the two ends of the fixed rod are rotatably connected with a rotating rod, and the rotating rod is rotatably connected with a buckle .

有益效果:Beneficial effect:

首先通过间距调整组件控制两组托举组件的间距进行调整,从而对托举组件卡紧至墙板与地面的间隙内,之后通过托举组件带动墙板进行升起,从而使墙板两端脱离地面,之后将挂扣组件安装固定在墙板两端,再通过卷扬组件带动墙板进行升降,从而对墙板进行吊装,本实用新型实现了对墙板的自动提起,无需人工辅助,装置只需工人对装置进行牵引,提升了工人的安全性。Firstly, the distance between the two sets of lifting components is controlled by the spacing adjustment component to adjust, so that the lifting components are clamped into the gap between the wall panel and the ground, and then the lifting component is used to drive the wall panel to rise, so that the two ends of the wall panel After leaving the ground, install and fix the buckle assembly on both ends of the wall panel, and then drive the wall panel to lift through the winch assembly, so as to hoist the wall panel. The utility model realizes the automatic lifting of the wall panel without manual assistance. The device only needs workers to pull the device, which improves the safety of workers.

附图说明Description of drawings

图1为本实用新型中一种装配式建筑墙板吊装装置的结构示意图。Fig. 1 is a structural schematic diagram of a prefabricated building wall panel hoisting device in the present invention.

图2为本实用新型中一种装配式建筑墙板吊装装置的侧视图。Fig. 2 is a side view of a prefabricated building wallboard hoisting device in the utility model.

图3为本实用新型中一种装配式建筑墙板吊装装置的剖面图。Fig. 3 is a cross-sectional view of a prefabricated building wall panel hoisting device in the utility model.

图4为本实用新型中一种装配式建筑墙板吊装装置的断面图。Fig. 4 is a cross-sectional view of a prefabricated building wall panel hoisting device in the utility model.

图中:1-底座、2-移动轮、3-固定块、4-第一固定杆、5-双头螺杆、6-第一电动机、7-第一驱动块、8-升降架、9-第二固定杆、10-第二螺杆、11-第二驱动块、12-铲斗、13-第二电动机、14-万向节、15-把手、16-侧架、17-转轴、18-第三电动机、19-收卷筒、20-缆绳、21-升降板、22-固定杆、23-转动杆、24-挂钩。In the figure: 1-base, 2-moving wheel, 3-fixed block, 4-first fixed rod, 5-double-headed screw, 6-first motor, 7-first driving block, 8-lifting frame, 9- The second fixed rod, 10-the second screw rod, 11-the second drive block, 12-the bucket, 13-the second motor, 14-universal joint, 15-handle, 16-side frame, 17-rotating shaft, 18- The third electric motor, 19-winding reel, 20-cable, 21-lifting plate, 22-fixed rod, 23-rotating rod, 24-hook.

具体实施方式detailed description

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example.

基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围,参阅图 1~4,本实用新型实施例中,一种装配式建筑墙板吊装装置,包括底座1,底座1呈“U”,所述底座1一侧固定连接有多组移动轮2,所述底座1尾端固定连接有万向节14,万向节14上固定连接有把手15,还包括设置在底座1一侧的两组相互对称设置的托举组件;连接在底座1上用于控制两组托举组件的间距进行调整的间距调整组件;设置在托举组件两端的挂钩组件;以及连接在挂钩组件上用于对挂钩组件的高度进行调整的卷扬组件,本实用新型首先通过间距调整组件控制两组托举组件的间距进行调整,从而对托举组件卡紧至墙板与地面的间隙内,之后通过托举组件带动墙板进行升起,从而使墙板两端脱离地面,之后将挂扣组件安装固定在墙板两端,再通过卷扬组件带动墙板进行升降, 从而对墙板进行吊装。Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without creative work belong to the scope of protection of the present utility model. Refer to FIGS. 1 to 4, embodiments of the present utility model Among them, a prefabricated building wall panel hoisting device, including a base 1, the base 1 is "U", one side of the base 1 is fixedly connected with multiple sets of moving wheels 2, and the tail end of the base 1 is fixedly connected with a universal joint 14. The universal joint 14 is fixedly connected with a handle 15, and also includes two sets of lifting components arranged symmetrically on one side of the base 1; it is connected to the base 1 to control the distance between the two sets of lifting components for adjustment. The spacing adjustment assembly; the hook assembly arranged at both ends of the lifting assembly; and the hoisting assembly connected to the hook assembly for adjusting the height of the hook assembly. The utility model first controls the distance between two groups of lifting assemblies through the spacing adjustment assembly Make adjustments so that the lifting component is clamped into the gap between the wall panel and the ground, and then the lifting component is used to drive the wall panel to rise, so that both ends of the wall panel are separated from the ground, and then the hanging buckle component is installed and fixed on the wall panel At both ends, the wall panel is driven up and down by the winch assembly, so that the wall panel is hoisted.

在本实施例的一种情况中,请参阅图 1~4,所述间距调整组件包括固定连接在底座1上的固定块 3,固定块3之间固定链接有第一固定杆4,第一固定杆 4 一侧设置有转动连接在固定块 3 之间的双头螺杆5,双头螺杆 5 两端螺纹连接有第一驱动块7,第一驱动块7一侧固定连接有升降架 8,所述固定块3一侧固定连接有第一电动机 6,第一电动机 6的输出轴穿过固定块3固定连接在双头螺杆5上,所述间距调整组件通过第一电动机6带动双头螺杆5进行旋转,双头螺杆5通过与第一驱动块7的螺纹连接带动第一驱动块7进行移动,第一驱动块7带动两组升降架8进行相对运动,升降架 8 带动铲头进行移动,从而将铲头一侧插入墙板底部。In one case of this embodiment, please refer to Figures 1-4, the distance adjustment assembly includes fixed blocks 3 fixedly connected to the base 1, and first fixed rods 4 are fixedly linked between the fixed blocks 3, the first One side of the fixed rod 4 is provided with a double-ended screw 5 that is rotatably connected between the fixed blocks 3, and the two ends of the double-ended screw 5 are threadedly connected with a first driving block 7, and one side of the first driving block 7 is fixedly connected with a lifting frame 8. One side of the fixed block 3 is fixedly connected with a first motor 6, the output shaft of the first motor 6 passes through the fixed block 3 and is fixedly connected to the double-ended screw 5, and the distance adjustment assembly drives the double-ended screw through the first motor 6 5 rotates, the double-headed screw 5 drives the first drive block 7 to move through the threaded connection with the first drive block 7, the first drive block 7 drives the two groups of lifting frames 8 to move relative to each other, and the lifting frame 8 drives the shovel head to move , so that the side of the spade head is inserted into the bottom of the wall panel.

在本实施例的一种情况中,请参阅图 1~4,所述托举组件包括固定连接在升降架8 内的第二固定杆9,第二固定杆 9 一侧设置有转动连接在升降框内的第二螺杆10,第二螺杆10 上螺纹连接有第二驱动块11,第二驱动块 11 两侧滑动连接在第二固定杆 9 上,所述第二驱动块 11 一侧固定连接有铲头,所述升降架8一侧固定连接有第二电动机13,第二电动机 13 的输出轴穿过升降架 8 固定连接在第二螺杆10上,所述托举组件通过第二电动机13 带动第二螺杆 10 进行旋转,第二螺杆 10 通过与第二驱动块 11 的螺纹连接带动第二驱动块 11 进行移动,第二驱动块 11 带动铲头进行升降,从而通过铲头带动墙板进行升降, 从而使墙板两端脱离地面,便于挂扣对墙板两端进行固定。In one case of this embodiment, please refer to Figures 1-4, the lifting assembly includes a second fixed rod 9 fixedly connected in the lifting frame 8, and one side of the second fixed rod 9 is provided with a rotation connection connected to the lifting frame 8. The second screw rod 10 in the frame, the second screw rod 10 is screwed with a second drive block 11, the two sides of the second drive block 11 are slidingly connected to the second fixed rod 9, and one side of the second drive block 11 is fixedly connected There is a shovel head, and a second motor 13 is fixedly connected to one side of the lifting frame 8. The output shaft of the second motor 13 passes through the lifting frame 8 and is fixedly connected to the second screw rod 10. The lifting assembly is passed through the second motor 13. Drive the second screw rod 10 to rotate, the second screw rod 10 drives the second drive block 11 to move through the threaded connection with the second drive block 11, and the second drive block 11 drives the shovel head to go up and down, so that the shovel head drives the wallboard to move Lifting, so that the two ends of the wall board are separated from the ground, so that the two ends of the wall board can be fixed by hanging buckles.

在本实施例的一种情况中,请参阅图 1~4,所述卷扬组件包括固定连接在底座 1上的侧架 16,侧架 16 之间转动连接有转轴 17,转轴 17 上固定连接有收卷筒 19,收卷筒 19 上收卷缠绕有缆绳 20,所述侧架 16 一侧固定连接有第三电动机 18,第三电动机18 的输出轴穿过侧架 16 固定连接在转轴 17 上,所述卷扬组件通过第三电动机 18 带动转轴 17 进行旋转,转轴 17 带动收卷筒 19 进行旋转,收卷筒 19 带动缆绳 20 进行收卷。In one case of this embodiment, please refer to FIGS. 1-4 , the hoisting assembly includes side frames 16 fixedly connected to the base 1, rotating shafts 17 are connected between the side frames 16, and the rotating shafts 17 are fixedly connected to There is a reel 19, on which a cable 20 is rewound and wound, and a third motor 18 is fixedly connected to one side of the side frame 16, and the output shaft of the third motor 18 passes through the side frame 16 and is fixedly connected to the rotating shaft 17 Above, the hoisting assembly drives the rotating shaft 17 to rotate through the third motor 18, the rotating shaft 17 drives the winding drum 19 to rotate, and the winding drum 19 drives the cable 20 to wind up.

在本实施例的一种情况中,请参阅图 1~4,所述挂钩组件包括固定连接在缆绳20 一端上的升降板 21,升降板 21 两端固定连接有固定杆 22,固定杆 22 两端转动连接有转动杆 23,转动杆 23 上转动连接有挂扣,所述挂钩组件通过转动杆 23 的设置对挂扣进行转动连接固定,同时可实现对两组挂扣的间距进行自由调节,之后通过挂扣对墙板两端进行卡紧固定。In a case of this embodiment, please refer to FIGS. 1 to 4, the hook assembly includes a lifting plate 21 fixedly connected to one end of the cable 20, two ends of the lifting plate 21 are fixedly connected with a fixed rod 22, and the two ends of the fixed rod 22 are fixed. The end is rotatably connected with a rotating rod 23, and the rotating rod 23 is rotatably connected with a hanging buckle. The hook assembly is rotated and connected to the hanging buckle through the setting of the rotating rod 23. At the same time, the distance between the two groups of hanging buckles can be adjusted freely. Then fasten and fix the two ends of the wall panel by hanging buckles.

工作原理:working principle:

本实用新型首先通过第一电动机 6 带动双头螺杆 5 进行旋转,双头螺杆 5 通过与第一驱动块 7 的螺纹连接带动第一驱动块 7 进行移动,第一驱动块7 带动两组升降架 8 进行相对运动,升降架 8 带动铲头进行移动,从而将铲头一侧插入墙板底部,之后通过第二电动机 13 带动第二螺杆 10 进行旋转,第二螺杆 10 通过与第二驱动块 11 的螺纹连接带动第二驱动块 11 进行移动,第二驱动块 11 带动铲头进行升降,从而通过铲头带动墙板进行升降,从而使墙板两端脱离地面,之后通过转动杆 23 的设置对挂扣进行转动连接固定,同时可实现对两组挂扣的间距进行自由调节,之后通过挂扣对墙板两端进行卡紧固定,最终通过第三电动机 18 带动转轴 17 进行旋转,转轴 17 带动收卷筒 19 进行旋转,收卷筒 19 带动缆绳 20 进行收卷,从而对墙板进行吊装。The utility model first drives the double-headed screw 5 to rotate through the first motor 6, and the double-ended screw 5 drives the first driving block 7 to move through the threaded connection with the first driving block 7, and the first driving block 7 drives two sets of lifting frames 8 to carry out relative movement, the lifting frame 8 drives the shovel head to move, so that one side of the shovel head is inserted into the bottom of the wallboard, and then the second screw rod 10 is driven to rotate by the second motor 13, and the second screw rod 10 passes through the second driving block 11 The threaded connection drives the second driving block 11 to move, and the second driving block 11 drives the shovel head to lift, thereby driving the wallboard to lift through the shovel head, so that the two ends of the wallboard are separated from the ground, and then through the setting of the rotating rod 23 The hanging buckles are connected and fixed by rotation, and at the same time, the distance between the two sets of hanging buckles can be adjusted freely, and then the two ends of the wallboard are clamped and fixed by the hanging buckles, and finally the third motor 18 drives the rotating shaft 17 to rotate, and the rotating shaft 17 drives The reel 19 rotates, and the reel 19 drives the cable 20 to rewind, thereby hoisting the wallboard.

以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall be included in the Within the protection scope of the present utility model.

Claims (7)

1.一种装配式建筑墙板吊装装置,其特征在于:包括底座,底座呈“U”,所述底座一侧固定连接有多组移动轮,所述底座尾端固定连接有万向节,所述万向节上固定连接有把手,设置在所述底座一侧的两组相互对称设置的托举组件,连接在所述底座上用于控制两组托举组件的间距进行调整的间距调整组件,所述托举组件两端设置有挂钩组件和连接在挂钩组件上的卷扬组件。1. A prefabricated building wall panel hoisting device, characterized in that: it includes a base, the base is "U", one side of the base is fixedly connected with multiple groups of moving wheels, and the rear end of the base is fixedly connected with a universal joint, A handle is fixedly connected to the universal joint, and two sets of lifting components arranged symmetrically on one side of the base are connected to the base to control the distance between the two sets of lifting components for adjustment. A hook component and a winch component connected to the hook component are arranged at both ends of the lifting component. 2.根据权利要求1所述的一种装配式建筑墙板吊装装置,其特征在于:所述间距调整组件包括固定连接在底座上的固定块,所述固定块之间固定连接有第一固定杆,所述第一固定杆一侧转动连接在所述固定块之间的双头螺杆。2. A prefabricated building wall panel hoisting device according to claim 1, characterized in that: the spacing adjustment assembly includes fixed blocks fixedly connected to the base, and a first fixed block is fixedly connected between the fixed blocks. One side of the first fixed rod is rotatably connected to a double-ended screw rod between the fixed blocks. 3.根据权利要求2所述的一种装配式建筑墙板吊装装置,其特征在于:所述双头螺杆两端通过螺纹方式连接有第一驱动块,所述第一驱动块一侧固定连接有升降架,所述固定块一侧固定连接有第一电动机,所述第一电动机的输出轴穿过固定块固定连接在双头螺杆上。3. A prefabricated building wall panel hoisting device according to claim 2, characterized in that: both ends of the double-ended screw are threadedly connected with a first driving block, and one side of the first driving block is fixedly connected There is a lifting frame, and a first motor is fixedly connected to one side of the fixed block, and the output shaft of the first motor passes through the fixed block and is fixedly connected to a double-ended screw. 4.根据权利要求1所述的一种装配式建筑墙板吊装装置,其特征在于:所述托举组件包括固定连接在升降架内的第二固定杆,所述第二固定杆一侧设置有转动连接在升降框内的第二螺杆,所述第二螺杆上螺纹连接有第二驱动块。4. A prefabricated building wall panel hoisting device according to claim 1, characterized in that: the lifting assembly includes a second fixed rod fixedly connected in the lifting frame, and one side of the second fixed rod is arranged There is a second screw rod rotatably connected in the lifting frame, and a second driving block is threaded on the second screw rod. 5.根据权利要求4所述的一种装配式建筑墙板吊装装置,其特征在于:所述第二驱动块两侧滑动连接在第二固定杆上,所述第二驱动块一侧固定连接有铲头,所述升降架一侧固定连接有第二电动机,第二电动机的输出轴穿过升降架固定连接在第二螺杆上。5. A prefabricated building wall panel hoisting device according to claim 4, characterized in that: both sides of the second driving block are slidably connected to the second fixing rod, and one side of the second driving block is fixedly connected There is a shovel head, a second motor is fixedly connected to one side of the lifting frame, and the output shaft of the second motor passes through the lifting frame and is fixedly connected to the second screw rod. 6.根据权利要求1所述的一种装配式建筑墙板吊装装置,其特征在于:所述卷扬组件包括固定连接在底座上的侧架,所述侧架之间转动连接有转轴,所述转轴上固定连接有收卷筒,所述收卷筒上收卷缠绕有缆绳,所述侧架一侧固定连接有第三电动机,所述第三电动机的输出轴穿过侧架固定连接在转轴上。6. A prefabricated building wall panel hoisting device according to claim 1, characterized in that: the hoisting assembly includes side frames fixedly connected to the base, and rotating shafts are connected between the side frames, so that A reel is fixedly connected to the rotating shaft, and a cable is wound on the reel, and a third motor is fixedly connected to one side of the side frame, and the output shaft of the third motor passes through the side frame and is fixedly connected to the on the reel. 7.根据权利要求1所述的一种装配式建筑墙板吊装装置,其特征在于:所述挂钩组件包括固定连接在缆绳一端上的升降板,所述升降板两端固定连接有固定杆,所述固定杆两端转动连接有转动杆,所述转动杆上转动连接有挂扣。7. A prefabricated building wall panel hoisting device according to claim 1, wherein the hook assembly includes a lifting plate fixedly connected to one end of the cable, and fixed rods are fixedly connected to both ends of the lifting plate, Both ends of the fixed rod are rotatably connected with a rotating rod, and the rotating rod is rotatably connected with a buckle.
CN202221267126.1U 2022-05-25 2022-05-25 Assembled building wallboard hoist device Expired - Fee Related CN217972279U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221267126.1U CN217972279U (en) 2022-05-25 2022-05-25 Assembled building wallboard hoist device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221267126.1U CN217972279U (en) 2022-05-25 2022-05-25 Assembled building wallboard hoist device

Publications (1)

Publication Number Publication Date
CN217972279U true CN217972279U (en) 2022-12-06

Family

ID=84267598

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221267126.1U Expired - Fee Related CN217972279U (en) 2022-05-25 2022-05-25 Assembled building wallboard hoist device

Country Status (1)

Country Link
CN (1) CN217972279U (en)

Similar Documents

Publication Publication Date Title
CN114455487A (en) Template large-span hoisting accessory for construction
CN218261711U (en) A steel structure hoisting device for building construction
CN217972279U (en) Assembled building wallboard hoist device
CN114941411B (en) A BIM-based prefabricated low-carbon building structure and structural connection method
CN118439488B (en) Lifting device of steel bar truss building carrier plate
CN211687924U (en) Assembled wall body hoist and mount auxiliary device
CN212609029U (en) Precast concrete wallboard hoist device
CN217708521U (en) Prefabricated stair hoist and mount system of assembly type structure
CN215711332U (en) Wall panel hoisting frame
CN221440089U (en) Prefabricated stair lifting appliance
CN205816653U (en) A kind of precast stair steel reinforcement cage colligation operating platform
CN204040498U (en) A kind of steel work Multi-section column lifting automatic decoupling device
CN210918153U (en) Scaffold for building
CN221920291U (en) A climbing formwork auxiliary installation device
CN221722341U (en) Auxiliary device for installing assembled wall panel
CN220811724U (en) Lifting device for building engineering
CN219567263U (en) Mounting construction device for prefabricated building concrete precast stairway
CN207597886U (en) Air entrained concrete batten installs equipment
CN222743945U (en) An assembled building hoisting device
CN222614873U (en) A device for assisting installation of ALC wall panels
CN217924702U (en) Lifting device for assembly of assembly type building
CN114920157B (en) Hoisting device and hoisting method for curtain wall glass ribs
CN223268220U (en) Prefabricated plate hoist device for assembled building
CN216711437U (en) People's passageway on attached tower crane
CN217781772U (en) Independent derrick mast equipment for erecting beam slab construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221206