CN217924794U - Scaffold for building engineering - Google Patents

Scaffold for building engineering Download PDF

Info

Publication number
CN217924794U
CN217924794U CN202222008198.0U CN202222008198U CN217924794U CN 217924794 U CN217924794 U CN 217924794U CN 202222008198 U CN202222008198 U CN 202222008198U CN 217924794 U CN217924794 U CN 217924794U
Authority
CN
China
Prior art keywords
fixedly connected
scaffold
roof
sliding
constructor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222008198.0U
Other languages
Chinese (zh)
Inventor
李国祥
耿培培
李连涛
丁秋华
袁航
王中晖
麻力超
刘丹
陈晓波
陈腾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Kaiteng Construction Group Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222008198.0U priority Critical patent/CN217924794U/en
Application granted granted Critical
Publication of CN217924794U publication Critical patent/CN217924794U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a scaffold frame for building engineering, which comprises a top plate, the left side fixedly connected with mount one of roof, the right side end fixedly connected with mount two of roof, the side fixedly connected with stop gear of sliding sleeve, the top sliding connection of roof has elevating system. The utility model discloses a tie up constructor inside the bandage, after the bandage elasticity adjustment, it is spacing by the inserted bar to loosen the pull ring back commentaries on classics board, the bandage is just fixed this moment, constructor can control on the roof according to the needs of construction this moment and remove, the board cover will slide in every diaphragm outer end this moment, when the constructor back-and-forth movement, the sliding sleeve will slide around the outer end of connecting band is gone on, can remove at will again under the prerequisite of having guaranteed constructor safety, constructor's work efficiency can not be influenced, the barrier propterty of device has been improved, the potential safety hazard of construction has been reduced.

Description

Scaffold for building engineering
Technical Field
The utility model relates to a building engineering technical field especially relates to a scaffold frame for building engineering.
Background
Scaffolding refers to various supports erected on a construction site for workers to handle and solve vertical and horizontal transportation. The general term of the building industry refers to the places which cannot be directly constructed on the building site and are used for exterior wall, interior decoration or high floor height. The scaffold has the main functions that constructors can work at different positions and can have safe standing points when the constructors carry out construction at high altitude.
And current scaffold for building engineering, safeguard measure is relatively poor, and generally only a guardrail blocks the constructor and protects, when constructor constructs, has certain potential safety hazard, topples over when the constructor is careless, can influence constructor's life health, for this reason, needs a scaffold for building engineering to solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a scaffold frame for building engineering to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a scaffold frame for building engineering, includes the roof, the left side fixedly connected with mount one of roof, the right side end fixedly connected with mount two of roof, the top side of mount one and the equal fixedly connected with diaphragm of the top side of mount two, every the outer end of diaphragm all overlaps and is equipped with the board cover, adjacent two fixedly connected with connecting band between the board cover, the bottom side fixedly connected with staircase of roof, the outer pot head of connecting band is equipped with the sliding sleeve, the one end of the side fixedly connected with bandage of sliding sleeve, the opposite side fixedly connected with spacing of sliding sleeve, it is connected with the bull stick to rotate between the inboard of spacing, the top fixedly connected with rotor plate of bull stick, a plurality of jack has been seted up on the top of rotor plate, the side fixedly connected with stop gear of sliding sleeve, the top sliding connection of roof has elevating system.
As a further improvement scheme of the technical scheme: a plurality of first sliding grooves are formed in the top end of the top plate, and the other end of the binding band is fixedly connected to the side end of the rotating rod.
As a further improvement scheme of the technical scheme: the rotating plate is arranged at the top end of the outer side of the limiting frame, and the plurality of inserting holes are arranged circumferentially.
As a further improvement scheme of the technical scheme: stop gear is including stretching the board, stretch board fixed connection is at the side of sliding sleeve, the top of stretching the board is inserted and is equipped with the inserted bar, the outer end fixedly connected with limiting plate of inserted bar, the top fixedly connected with pull ring of inserted bar, the outer pot head of inserted bar is equipped with the spring, stretch the inside side of board and seted up spout two, the side fixedly connected with slider one of limiting plate.
As a further improvement scheme of the technical scheme: the first sliding block is slidably connected inside the second sliding groove, the extending plate is L-shaped, and the bottom end of the inserting rod is inserted into the inserting hole.
As a further improvement scheme of the technical scheme: elevating system includes a plurality of slider two, every slider two difference sliding connection is in every spout one inside, every the equal fixedly connected with screw thread section of thick bamboo in top of slider two, every the equal threaded connection in inside of screw thread section of thick bamboo one has double threaded rod, every the equal fixedly connected with swivel in outer end of double threaded rod, every the equal threaded connection in top of double threaded rod has screw thread section of thick bamboo two, adjacent two fixedly connected with toolbox between the top of screw thread section of thick bamboo two.
As a further improvement scheme of the technical scheme: the length of each first thread cylinder is the same as that of each second thread cylinder.
Compared with the prior art, the beneficial effects of the utility model are that:
by binding constructors inside the binding bands, after the tightness of the binding bands is adjusted, the rotating plate is limited by the inserting rods after the pull rings are loosened, the binding bands are fixed, the constructors can move left and right on the top plate according to construction requirements, the plate sleeves can slide at the outer ends of the transverse plates, when the constructors move back and forth, the sliding sleeves can slide back and forth at the outer ends of the connecting bands, the constructors can move freely on the premise of ensuring the safety of the constructors, the working efficiency of the constructors cannot be influenced, the protection performance of the device is improved, and the potential safety hazard of construction is reduced;
by pushing the tool box, the tool box can move along with the constructors, and the constructors can take tools conveniently;
through rotating the swivel simultaneously, can adjust the height of toolbox, be applicable to the constructor of various heights, improved the practicality of device.
The above description is only an overview of the technical solution of the present invention, and in order to make the technical means of the present invention clearer and can be implemented according to the content of the description, the following detailed description is made with reference to the preferred embodiments of the present invention and accompanying drawings. The detailed description of the present invention is given by the following examples and the accompanying drawings.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the invention without undue limitation to the invention. In the drawings:
fig. 1 is a schematic front sectional view of a scaffold for construction engineering according to the present invention;
fig. 2 is a schematic side view of the scaffold for construction engineering according to the present invention;
fig. 3 is a schematic view of a partially enlarged structure of a scaffold a for construction engineering according to the present invention;
fig. 4 is a schematic top view of a rotating plate of the scaffold for construction engineering according to the present invention;
fig. 5 is a schematic view of a partially enlarged structure of a scaffold B for construction engineering according to the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. a top plate; 101. a first sliding chute; 2. a first fixing frame; 201. a second fixing frame; 3. a transverse plate; 301. sheathing the plate; 302. a connecting belt; 4. an escalator; 5. a sliding sleeve; 6. binding bands; 7. a limiting frame; 701. a rotating rod; 702. rotating the plate; 703. a jack; 8. a limiting mechanism; 801. extending the plate; 802. inserting a rod; 803. a limiting plate; 804. a pull ring; 805. a spring; 806. a second chute; 807. a first sliding block; 9. a lifting mechanism; 901. a second sliding block; 902. a first thread cylinder; 903. a double-headed threaded rod; 904. rotating the ring; 905. a second threaded cylinder; 906. a tool box.
Detailed Description
The principles and features of the present invention are described below in conjunction with the following drawings, the examples given are only intended to illustrate the present invention and are not intended to limit the scope of the present invention. The invention is described in more detail in the following paragraphs by way of example with reference to the accompanying drawings. The advantages and features of the present invention will become more fully apparent from the following description and appended claims. It should be noted that the drawings are in simplified form and are not to precise scale, and are provided for convenience and clarity in order to facilitate the description of the embodiments of the present invention.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When a component is referred to as being "connected" to another component, it can be directly connected to the other component or intervening components may also be present. When a component is referred to as being "disposed on" another component, it can be directly on the other component or intervening components may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used herein in the description of the invention is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
Please refer to fig. 1-5, in the embodiment of the utility model, a scaffold frame for building engineering, including roof 1, the left side fixedly connected with mount 2 of roof 1, the right side fixedly connected with mount two 201 of roof 1, the equal fixedly connected with diaphragm 3 of the top side of mount 2 and the top side of mount two 201, the outer end of every diaphragm 3 all overlaps and is equipped with the board cover 301, fixedly connected with connecting band 302 between two adjacent board covers 301, the bottom side fixedly connected with staircase 4 of roof 1, the outer pot head of connecting band 302 is equipped with sliding sleeve 5, the one end of the side fixedly connected with bandage 6 of sliding sleeve 5, the opposite side fixedly connected with spacing frame 7 of sliding sleeve 5, it is connected with bull stick 701 to rotate between the inboard of spacing frame 7, the top fixedly connected with commentaries on classics board 702 of bull stick 701, a plurality of jack 703 has been seted up on the top of commentaries on classics board 702, the side fixedly connected with stop gear 8 of sliding sleeve 5, the top sliding connection of roof 1 has elevating system 9.
Referring to fig. 1, the top end of the top plate 1 is provided with a plurality of first sliding grooves 101, and the other end of the binding band 6 is fixedly connected to the side end of the rotating rod 701.
Referring to fig. 3 and 4, the rotating plate 702 is disposed at the top end of the outer side of the limiting frame 7, and a plurality of insertion holes 703 are circumferentially arranged.
Referring to fig. 3, the limiting mechanism 8 includes an extending plate 801, the extending plate 801 is fixedly connected to a side end of the sliding sleeve 5, an inserting rod 802 is inserted into a top end of the extending plate 801, a limiting plate 803 is fixedly connected to an outer end of the inserting rod 802, a pulling ring 804 is fixedly connected to a top end of the inserting rod 802, a spring 805 is sleeved on an outer end of the inserting rod 802, a second sliding slot 806 is formed in an inner side end of the extending plate 801, and a first sliding block 807 is fixedly connected to a side end of the limiting plate 803.
Referring to fig. 3, the first sliding block 807 is slidably connected inside the second sliding slot 806, the extending plate 801 is L-shaped, and the bottom end of the insertion rod 802 is inserted into the insertion hole 703.
Referring to fig. 5, the lifting mechanism 9 includes a plurality of second sliding blocks 901, each second sliding block 901 is slidably connected inside each first sliding groove 101, a first threaded cylinder 902 is fixedly connected to the top end of each second sliding block 901, a double-threaded rod 903 is fixedly connected to the inside of each first threaded cylinder 902, a swivel 904 is fixedly connected to the outer end of each double-threaded rod 903, a second threaded cylinder 905 is fixedly connected to the top end of each double-threaded rod 903, and a tool box 906 is fixedly connected between the top ends of the two adjacent threaded cylinders 905.
Referring to fig. 5, the length of each threaded cylinder one 902 is the same as the length of each threaded cylinder two 905.
The utility model discloses a theory of operation is:
when a constructor goes up, firstly, the pull ring 804 is pulled upwards, the limiting plate 803 abuts against the spring 805 and drives the sliding block 807 to move upwards, the inserting rod 802 leaves the inside of the jack 703, then the binding band 6 is unreeled by rotating the rotating plate 702, at the moment, the constructor drills into the wide opening of the binding band 6 after unreeling to a certain width, at the moment, the pull ring 804 is lifted again, then the rotating plate 702 is rotated, at the moment, the binding band 6 is reeled, when the waist tightness of the constructor is suitable for the tightness, the pull ring 804 is loosened, the spring 805 pushes against the limiting plate 803 and drives the inserting rod 802 to move downwards until the inserting rod 802 is inserted into the jack 703, at the moment, the rotating plate 702 is limited, at the moment, the binding band 6 is fixed, at the moment, the constructor can move left and right on the top plate 1 according to construction requirements, at the outer end of each transverse plate sleeve 301 can slide at the outer end of each transverse plate 3, when the constructor moves forwards and backwards, the sliding sleeve 5 can slide forwards and backwards and forwards at the outer end of the connecting belt 302, and can move randomly on the premise that the safety of the constructor is guaranteed, the working efficiency of the constructor can not be affected, the protection performance of the constructor is improved, and the safety hidden danger of the constructor is reduced; through promoting toolbox 906, can make toolbox 906 be convenient for follow constructor and remove, make things convenient for the constructor to take the instrument, through rotating swivel 904 simultaneously, can adjust toolbox 906's height, be applicable to the constructor of various heights, improved the practicality of device.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (7)

1. The utility model provides a scaffold for building engineering, includes roof (1), its characterized in that, the left side fixedly connected with mount (2) of roof (1), the right side end fixedly connected with mount two (201) of roof (1), the equal fixedly connected with diaphragm (3) of the top side of mount two (201) and mount (2), every the outer end of diaphragm (3) all overlaps and is equipped with board cover (301), adjacent two fixedly connected with connecting band (302) between board cover (301), the bottom side fixedly connected with staircase (4) of roof (1), the outer pot head of connecting band (302) is equipped with sliding sleeve (5), the one end of the side fixedly connected with bandage (6) of sliding sleeve (5), the opposite side fixedly connected with spacing (7) of sliding sleeve (5), rotate between the inboard of spacing (7) and be connected with bull stick (701), the top fixedly connected with rotor (702) of bull stick (701), a plurality of jack (703) have been seted up on the top of rotor (702), the fixedly connected with fixed connection of sliding sleeve (5) jack (8), the top of spacing mechanism (9) is connected with elevating system.
2. The scaffold for building engineering according to claim 1, wherein a plurality of sliding grooves I (101) are formed at the top end of the top plate (1), and the other end of the binding band (6) is fixedly connected to the side end of the rotating rod (701).
3. A scaffold for construction engineering according to claim 1, wherein said rotating plate (702) is arranged on the top of the outer side of the limiting frame (7), and a plurality of said insertion holes (703) are arranged in a circle.
4. The scaffold for building engineering according to claim 1, wherein the limiting mechanism (8) comprises an extending plate (801), the extending plate (801) is fixedly connected to a side end of the sliding sleeve (5), an inserting rod (802) is inserted into a top end of the extending plate (801), a limiting plate (803) is fixedly connected to an outer end of the inserting rod (802), a pull ring (804) is fixedly connected to a top end of the inserting rod (802), a spring (805) is sleeved on an outer end of the inserting rod (802), a second sliding groove (806) is formed in an inner side end of the extending plate (801), and a first sliding block (807) is fixedly connected to a side end of the limiting plate (803).
5. A scaffold for building engineering according to claim 4, characterized in that the first sliding block (807) is slidably connected inside the second sliding slot (806), the extending plate (801) is L-shaped, and the bottom end of the inserting rod (802) is inserted into the inserting hole (703).
6. The scaffold for building engineering according to claim 1, wherein the lifting mechanism (9) comprises a plurality of second sliding blocks (901), each second sliding block (901) is respectively slidably connected inside each first sliding groove (101), a first threaded cylinder (902) is fixedly connected to the top end of each second sliding block (901), a double-threaded rod (903) is respectively and threadedly connected inside each first threaded cylinder (902), a rotating ring (904) is fixedly connected to the outer end of each double-threaded rod (903), a second threaded cylinder (905) is respectively and threadedly connected to the top end of each double-threaded rod (903), and a tool box (906) is fixedly connected between the top ends of two adjacent second threaded cylinders (905).
7. A scaffolding for building engineering according to claim 6, wherein the length of each of the first threaded cylinders (902) is the same as the length of each of the second threaded cylinders (905).
CN202222008198.0U 2022-08-01 2022-08-01 Scaffold for building engineering Active CN217924794U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222008198.0U CN217924794U (en) 2022-08-01 2022-08-01 Scaffold for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222008198.0U CN217924794U (en) 2022-08-01 2022-08-01 Scaffold for building engineering

Publications (1)

Publication Number Publication Date
CN217924794U true CN217924794U (en) 2022-11-29

Family

ID=84151686

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222008198.0U Active CN217924794U (en) 2022-08-01 2022-08-01 Scaffold for building engineering

Country Status (1)

Country Link
CN (1) CN217924794U (en)

Similar Documents

Publication Publication Date Title
CN208718328U (en) A kind of movable Scaffold
CN217924794U (en) Scaffold for building engineering
CN107882317A (en) A kind of nacelle device for external wall work high above the ground
CN110805249A (en) Indoor scaffold with protection structure
CN208992668U (en) A kind of ore Grab bucket maintaining platform
CN222276121U (en) Basket for house building
CN103899241A (en) Maintenance ladder for transformer substation
CN209429487U (en) A kind of scaffold of architectural engineering
CN213112203U (en) Material transportation device for building construction
CN209556312U (en) A kind of construction frame
CN210459930U (en) A foldable low-altitude support special scaffold
CN217557636U (en) Lower-hanging type walkway plate
CN203729562U (en) Lifting and efficient working platform
CN203969628U (en) A kind of liftable art working table
CN203821855U (en) Novel telescopic elevating platform with special steel structural inner barrel
CN208716791U (en) A kind of building maintenance platform
CN223018229U (en) Protection network is used in construction engineering construction convenient to adjust
CN212583175U (en) Shear force crane is removed in house wall fitment construction
CN221373144U (en) Building guardrail for civil engineering
CN220705162U (en) Pouring plate support frame for building construction
CN219840342U (en) Movable lifting scaffold
CN210918174U (en) Liftable scaffold
CN216446464U (en) Adjustable scaffold for constructional engineering
CN207484936U (en) A kind of nacelle device of Landscape Lighting installation
CN208502201U (en) A kind of construction worker's support frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240108

Address after: 635600 Community 1, Zhongjiang Village, Ganchang Town, Nanjiang County, Bazhong City, Sichuan Province

Patentee after: Zhao Shunqiang

Address before: No. 174, Beideng Village, Qingyun Town, Yanshan County, Cangzhou City, Hebei Province 061000

Patentee before: Li Guoxiang

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240122

Address after: Room 13, 8-1A, Hunhe Seventh Street, Shenyang Economic and Technological Development Zone, Liaoning Province, 110027

Patentee after: Liaoning Kaiteng Construction Group Co.,Ltd.

Country or region after: China

Address before: 635600 Community 1, Zhongjiang Village, Ganchang Town, Nanjiang County, Bazhong City, Sichuan Province

Patentee before: Zhao Shunqiang

Country or region before: China

TR01 Transfer of patent right