CN217897933U - Tunnel excavation trolley with hydraulic system - Google Patents

Tunnel excavation trolley with hydraulic system Download PDF

Info

Publication number
CN217897933U
CN217897933U CN202222137574.6U CN202222137574U CN217897933U CN 217897933 U CN217897933 U CN 217897933U CN 202222137574 U CN202222137574 U CN 202222137574U CN 217897933 U CN217897933 U CN 217897933U
Authority
CN
China
Prior art keywords
portal
portal frame
roller
hydraulic system
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222137574.6U
Other languages
Chinese (zh)
Inventor
谢虎
黎耘
邱宏雨
赵笑楠
王若儒
刘函廷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Investment And Construction Co ltd
Original Assignee
Guizhou Investment And Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Investment And Construction Co ltd filed Critical Guizhou Investment And Construction Co ltd
Priority to CN202222137574.6U priority Critical patent/CN217897933U/en
Application granted granted Critical
Publication of CN217897933U publication Critical patent/CN217897933U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a tunnel excavation trolley with a hydraulic system, which comprises a track, a portal frame and a plurality of jacks, wherein the bottom of the portal frame is fixedly connected with a roller and a speed reducing motor and is connected on the track in a sliding way through the roller; the rotating shaft of the roller is in transmission connection with a speed reducing motor; a plurality of groups of support columns are symmetrically arranged on two sides of the portal frame, and one end of each support column, which is far away from the portal frame, is fixedly connected with 1 hydraulic jack; an operating platform is fixedly arranged at the top of the portal; two ends of the operating platform are respectively hinged with 1 hydraulic jack. The utility model discloses an establish operation platform on the portal, the workman can utilize and carry out the I-steel installation, and whole operation platform can remove along with the portal moreover, can be under construction in succession along the tunnel, has promoted the I-steel construction quality of tunnel preliminary bracing, has reduced labour's cost, has shortened the time limit for a project, fine solution in traditional excavation platform truck installation I-steel safety, the quality can not obtain the problem of guarantee and inefficiency.

Description

Tunnel excavation trolley with hydraulic system
Technical Field
The utility model relates to a tunnel construction technical field, more specifically say so and relate to a take hydraulic system's tunnel excavation platform truck.
Background
Need carry out preliminary bracing after the tunnel blasting, often adopt the I-steel to come as the rigid support, erect the I-steel after the tunnel blasting slagging tap and can increase tunnel country rock stability, can strengthen country rock self-supporting ability, have important influence to tunnel stability and security. In the traditional installation process, workers are used for installing I-shaped steel on an excavation trolley in a standing mode, at least 8 persons are needed to be matched with each other one by one, manpower and material resources are wasted, the matching is improper, and safety accidents are easy to happen.
Therefore, how to provide a tunnel excavation trolley with a hydraulic system, which can not only reduce labor cost and shorten construction period, but also well solve the problems of safety, incapability of guaranteeing quality and low efficiency in the installation of i-steel by the traditional excavation trolley, is one of the technical problems that the technical personnel in the field need to solve urgently.
SUMMERY OF THE UTILITY MODEL
In view of this, for solving the problem mentioned in the above-mentioned background art, the utility model provides a take hydraulic system's tunnel excavation platform truck can utilize hydraulic system to assist the installation I-steel through increasing hydraulic system on the excavation platform truck, and reducible workman drops into and labour saving and time saving.
In order to solve the technical problem, the utility model discloses following technical scheme has been taken:
the tunnel excavation trolley with the hydraulic system comprises a rail, a portal frame and a plurality of jacks, wherein the bottom of the portal frame is fixedly connected with a roller and a speed reduction motor and is connected to the rail in a sliding manner through the roller; the rotating shaft of the roller is in transmission connection with the speed reducing motor; a plurality of groups of support columns are symmetrically arranged on two sides of the portal frame, and one end of each support column, which is far away from the portal frame, is fixedly connected with 1 hydraulic jack; an operating platform is fixedly arranged at the top of the portal; two ends of the operating platform are respectively hinged with 1 hydraulic jack.
Preferably, guard railings are fixedly installed around the operating platform.
Preferably, each support column is vertically arranged on the side surface of the gantry, and an inclined strut is fixedly connected between the support column and the gantry.
Preferably, the support columns are arranged in 2 groups.
Preferably, the number of the hydraulic jacks is 6.
The utility model discloses for prior art gain following technological effect:
the utility model discloses an establish operation platform on the portal, the workman can utilize to carry out the I-steel installation, and whole operation platform can remove along with the portal moreover, can be along the continuous construction in tunnel, has promoted the I-steel construction quality of tunnel preliminary bracing, has reduced labour's cost, has shortened the time limit for a project, fine solution safety, quality can not obtain guarantee and the problem of inefficiency in traditional excavation platform truck installation I-steel.
Drawings
Fig. 1 is a schematic structural view of a tunnel excavation trolley with a hydraulic system of the present invention;
in the figure: 1. a track; 2. a gantry; 3. a reduction motor; 4. a support pillar; 5. protecting a fence; 6. an operating platform; 7. a hydraulic jack; 8. bracing; 9. and a roller.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Examples
Referring to fig. 1, the tunnel excavation trolley with the hydraulic system comprises a track 1, a portal 2 and 6 jacks 7, wherein the bottom of the portal 2 is fixedly connected with a roller 9 and a speed reduction motor 3, and is slidably connected to the track 1 through the roller 9; the rotating shaft of the roller 9 is in transmission connection with the speed reducing motor 3; two sides of the portal frame 2 are symmetrically provided with 2 groups of support columns 4, and one end of each support column 4 far away from the portal frame 2 is fixedly connected with 1 hydraulic jack 7; each support column 4 is vertically arranged on the side surface of the portal 2, and an inclined strut 8 is fixedly connected between each support column 4 and the portal 2; an operating platform 6 is fixedly arranged at the top of the portal 2; two ends of the operating platform 6 are respectively hinged with 1 hydraulic jack 7.
As a preferred or optional way of this embodiment, guard railings 5 are fixedly installed around the operating platform 6.
The utility model discloses an set up operation platform 6 on portal 2, the workman can utilize and carry out the I-steel installation, and whole operation platform 6 can remove along with the portal moreover, can be under construction in succession along tunnel 1, has promoted the I-steel construction quality of tunnel preliminary bracing, has reduced labour's cost, has shortened the time limit for a project, fine solution in traditional excavation platform truck installation I-steel safety, the quality can not obtain the guarantee and the problem of inefficiency.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the technical scope of the present invention, so that any slight modifications, equivalent changes and modifications made by the technical spirit of the present invention to the above embodiments are all within the scope of the technical solution of the present invention.

Claims (5)

1. The tunnel excavation trolley with the hydraulic system comprises a track (1), a portal (2) and a plurality of jacks (7), and is characterized in that the bottom of the portal (2) is fixedly connected with a roller (9) and a speed reducing motor (3) and is connected to the track (1) in a sliding manner through the roller (9); the rotating shaft of the roller (9) is in transmission connection with the speed reducing motor (3); a plurality of groups of supporting columns (4) are symmetrically arranged on two sides of the portal frame (2), and one end, far away from the portal frame (2), of each supporting column (4) is fixedly connected with 1 hydraulic jack (7); an operating platform (6) is fixedly arranged at the top of the gantry (2); and two ends of the operating platform (6) are respectively hinged with 1 hydraulic jack (7).
2. The tunnel excavation trolley with the hydraulic system as claimed in claim 1, wherein guard rails (5) are fixedly mounted around the operating platform (6).
3. The tunnel excavation trolley with the hydraulic system according to claim 1, characterized in that each support column (4) is vertically arranged on the side of a portal frame (2), and a diagonal brace (8) is fixedly connected between the support column (4) and the portal frame (2).
4. The tunneling trolley with hydraulic system according to claim 1, characterized in that the support columns (4) are arranged in 2 groups.
5. The tunneling trolley with hydraulic system according to claim 1, characterized in that the number of hydraulic jacks (7) is 6.
CN202222137574.6U 2022-08-15 2022-08-15 Tunnel excavation trolley with hydraulic system Active CN217897933U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222137574.6U CN217897933U (en) 2022-08-15 2022-08-15 Tunnel excavation trolley with hydraulic system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222137574.6U CN217897933U (en) 2022-08-15 2022-08-15 Tunnel excavation trolley with hydraulic system

Publications (1)

Publication Number Publication Date
CN217897933U true CN217897933U (en) 2022-11-25

Family

ID=84142281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222137574.6U Active CN217897933U (en) 2022-08-15 2022-08-15 Tunnel excavation trolley with hydraulic system

Country Status (1)

Country Link
CN (1) CN217897933U (en)

Similar Documents

Publication Publication Date Title
CN109538238B (en) Tunnel arch prefabricated segment construction device and control method
CN103032073B (en) Urban subway mudstone stratum connected aisle and shield tunneling parallel construction method
CN217897933U (en) Tunnel excavation trolley with hydraulic system
CN105298102A (en) Movable steel structure special-shaped rail car scaffold and construction method
CN105544406A (en) Sliding-type Bailey beam dismantling device and dismantling method thereof
CN210366808U (en) Lifting and dismantling device for rail walking
CN205257792U (en) Bridge crane with triangular support girder
CN102145353B (en) O-forming machine mounting method
CN216809617U (en) Detachable self-propelled operating platform for steel beam flange plate construction
CN205604089U (en) Whole sideslip system of cast -in -situ box girder gate -type full framing
CN210563531U (en) Steel structure support for building protection
CN213233154U (en) Secondary tensioning movable hanging rack for track traffic cover beam
CN204456881U (en) Dismantling system of large-span building bailey frame
CN209066247U (en) A kind of good multi-functional all-hydraulic moving trestle of protective performance
CN211342945U (en) Tunnel trolley
CN218753120U (en) Vertical shaft heading machine detacher wellhead translation system
CN207377505U (en) A kind of coal mine roadway multifunctional mobile trolley
CN216196793U (en) Install retractable safety protection passageway on platform of unloading
CN218813173U (en) A moving platform for public road bridge roof beam anticollision barrier
CN217176646U (en) Shield tunnel leaking stoppage moving platform
CN220267767U (en) Novel trolley-based cooperation lifting system
CN217419533U (en) Maintenance structure for trash rack at water inlet and water outlet of pumping power station
CN215484533U (en) Telescopic tower crane escape way
CN218541476U (en) Fence for steel net rack mounting platform
CN217760921U (en) Lifting conversion platform at top of movable ventilation shaft

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant