CN217897933U - Tunnel excavation trolley with hydraulic system - Google Patents
Tunnel excavation trolley with hydraulic system Download PDFInfo
- Publication number
- CN217897933U CN217897933U CN202222137574.6U CN202222137574U CN217897933U CN 217897933 U CN217897933 U CN 217897933U CN 202222137574 U CN202222137574 U CN 202222137574U CN 217897933 U CN217897933 U CN 217897933U
- Authority
- CN
- China
- Prior art keywords
- portal
- portal frame
- roller
- hydraulic system
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009412 basement excavation Methods 0.000 title claims abstract description 18
- 230000005540 biological transmission Effects 0.000 claims abstract description 4
- 230000005641 tunneling Effects 0.000 claims 2
- 229910000831 Steel Inorganic materials 0.000 abstract description 14
- 239000010959 steel Substances 0.000 abstract description 14
- 238000010276 construction Methods 0.000 abstract description 8
- 238000009434 installation Methods 0.000 abstract description 8
- 238000005422 blasting Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses a tunnel excavation trolley with a hydraulic system, which comprises a track, a portal frame and a plurality of jacks, wherein the bottom of the portal frame is fixedly connected with a roller and a speed reducing motor and is connected on the track in a sliding way through the roller; the rotating shaft of the roller is in transmission connection with a speed reducing motor; a plurality of groups of support columns are symmetrically arranged on two sides of the portal frame, and one end of each support column, which is far away from the portal frame, is fixedly connected with 1 hydraulic jack; an operating platform is fixedly arranged at the top of the portal; two ends of the operating platform are respectively hinged with 1 hydraulic jack. The utility model discloses an establish operation platform on the portal, the workman can utilize and carry out the I-steel installation, and whole operation platform can remove along with the portal moreover, can be under construction in succession along the tunnel, has promoted the I-steel construction quality of tunnel preliminary bracing, has reduced labour's cost, has shortened the time limit for a project, fine solution in traditional excavation platform truck installation I-steel safety, the quality can not obtain the problem of guarantee and inefficiency.
Description
Technical Field
The utility model relates to a tunnel construction technical field, more specifically say so and relate to a take hydraulic system's tunnel excavation platform truck.
Background
Need carry out preliminary bracing after the tunnel blasting, often adopt the I-steel to come as the rigid support, erect the I-steel after the tunnel blasting slagging tap and can increase tunnel country rock stability, can strengthen country rock self-supporting ability, have important influence to tunnel stability and security. In the traditional installation process, workers are used for installing I-shaped steel on an excavation trolley in a standing mode, at least 8 persons are needed to be matched with each other one by one, manpower and material resources are wasted, the matching is improper, and safety accidents are easy to happen.
Therefore, how to provide a tunnel excavation trolley with a hydraulic system, which can not only reduce labor cost and shorten construction period, but also well solve the problems of safety, incapability of guaranteeing quality and low efficiency in the installation of i-steel by the traditional excavation trolley, is one of the technical problems that the technical personnel in the field need to solve urgently.
SUMMERY OF THE UTILITY MODEL
In view of this, for solving the problem mentioned in the above-mentioned background art, the utility model provides a take hydraulic system's tunnel excavation platform truck can utilize hydraulic system to assist the installation I-steel through increasing hydraulic system on the excavation platform truck, and reducible workman drops into and labour saving and time saving.
In order to solve the technical problem, the utility model discloses following technical scheme has been taken:
the tunnel excavation trolley with the hydraulic system comprises a rail, a portal frame and a plurality of jacks, wherein the bottom of the portal frame is fixedly connected with a roller and a speed reduction motor and is connected to the rail in a sliding manner through the roller; the rotating shaft of the roller is in transmission connection with the speed reducing motor; a plurality of groups of support columns are symmetrically arranged on two sides of the portal frame, and one end of each support column, which is far away from the portal frame, is fixedly connected with 1 hydraulic jack; an operating platform is fixedly arranged at the top of the portal; two ends of the operating platform are respectively hinged with 1 hydraulic jack.
Preferably, guard railings are fixedly installed around the operating platform.
Preferably, each support column is vertically arranged on the side surface of the gantry, and an inclined strut is fixedly connected between the support column and the gantry.
Preferably, the support columns are arranged in 2 groups.
Preferably, the number of the hydraulic jacks is 6.
The utility model discloses for prior art gain following technological effect:
the utility model discloses an establish operation platform on the portal, the workman can utilize to carry out the I-steel installation, and whole operation platform can remove along with the portal moreover, can be along the continuous construction in tunnel, has promoted the I-steel construction quality of tunnel preliminary bracing, has reduced labour's cost, has shortened the time limit for a project, fine solution safety, quality can not obtain guarantee and the problem of inefficiency in traditional excavation platform truck installation I-steel.
Drawings
Fig. 1 is a schematic structural view of a tunnel excavation trolley with a hydraulic system of the present invention;
in the figure: 1. a track; 2. a gantry; 3. a reduction motor; 4. a support pillar; 5. protecting a fence; 6. an operating platform; 7. a hydraulic jack; 8. bracing; 9. and a roller.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Examples
Referring to fig. 1, the tunnel excavation trolley with the hydraulic system comprises a track 1, a portal 2 and 6 jacks 7, wherein the bottom of the portal 2 is fixedly connected with a roller 9 and a speed reduction motor 3, and is slidably connected to the track 1 through the roller 9; the rotating shaft of the roller 9 is in transmission connection with the speed reducing motor 3; two sides of the portal frame 2 are symmetrically provided with 2 groups of support columns 4, and one end of each support column 4 far away from the portal frame 2 is fixedly connected with 1 hydraulic jack 7; each support column 4 is vertically arranged on the side surface of the portal 2, and an inclined strut 8 is fixedly connected between each support column 4 and the portal 2; an operating platform 6 is fixedly arranged at the top of the portal 2; two ends of the operating platform 6 are respectively hinged with 1 hydraulic jack 7.
As a preferred or optional way of this embodiment, guard railings 5 are fixedly installed around the operating platform 6.
The utility model discloses an set up operation platform 6 on portal 2, the workman can utilize and carry out the I-steel installation, and whole operation platform 6 can remove along with the portal moreover, can be under construction in succession along tunnel 1, has promoted the I-steel construction quality of tunnel preliminary bracing, has reduced labour's cost, has shortened the time limit for a project, fine solution in traditional excavation platform truck installation I-steel safety, the quality can not obtain the guarantee and the problem of inefficiency.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the technical scope of the present invention, so that any slight modifications, equivalent changes and modifications made by the technical spirit of the present invention to the above embodiments are all within the scope of the technical solution of the present invention.
Claims (5)
1. The tunnel excavation trolley with the hydraulic system comprises a track (1), a portal (2) and a plurality of jacks (7), and is characterized in that the bottom of the portal (2) is fixedly connected with a roller (9) and a speed reducing motor (3) and is connected to the track (1) in a sliding manner through the roller (9); the rotating shaft of the roller (9) is in transmission connection with the speed reducing motor (3); a plurality of groups of supporting columns (4) are symmetrically arranged on two sides of the portal frame (2), and one end, far away from the portal frame (2), of each supporting column (4) is fixedly connected with 1 hydraulic jack (7); an operating platform (6) is fixedly arranged at the top of the gantry (2); and two ends of the operating platform (6) are respectively hinged with 1 hydraulic jack (7).
2. The tunnel excavation trolley with the hydraulic system as claimed in claim 1, wherein guard rails (5) are fixedly mounted around the operating platform (6).
3. The tunnel excavation trolley with the hydraulic system according to claim 1, characterized in that each support column (4) is vertically arranged on the side of a portal frame (2), and a diagonal brace (8) is fixedly connected between the support column (4) and the portal frame (2).
4. The tunneling trolley with hydraulic system according to claim 1, characterized in that the support columns (4) are arranged in 2 groups.
5. The tunneling trolley with hydraulic system according to claim 1, characterized in that the number of hydraulic jacks (7) is 6.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222137574.6U CN217897933U (en) | 2022-08-15 | 2022-08-15 | Tunnel excavation trolley with hydraulic system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222137574.6U CN217897933U (en) | 2022-08-15 | 2022-08-15 | Tunnel excavation trolley with hydraulic system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217897933U true CN217897933U (en) | 2022-11-25 |
Family
ID=84142281
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222137574.6U Active CN217897933U (en) | 2022-08-15 | 2022-08-15 | Tunnel excavation trolley with hydraulic system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217897933U (en) |
-
2022
- 2022-08-15 CN CN202222137574.6U patent/CN217897933U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109538238B (en) | Tunnel arch prefabricated segment construction device and control method | |
CN103032073B (en) | Urban subway mudstone stratum connected aisle and shield tunneling parallel construction method | |
CN217897933U (en) | Tunnel excavation trolley with hydraulic system | |
CN105298102A (en) | Movable steel structure special-shaped rail car scaffold and construction method | |
CN105544406A (en) | Sliding-type Bailey beam dismantling device and dismantling method thereof | |
CN210366808U (en) | Lifting and dismantling device for rail walking | |
CN205257792U (en) | Bridge crane with triangular support girder | |
CN102145353B (en) | O-forming machine mounting method | |
CN216809617U (en) | Detachable self-propelled operating platform for steel beam flange plate construction | |
CN205604089U (en) | Whole sideslip system of cast -in -situ box girder gate -type full framing | |
CN210563531U (en) | Steel structure support for building protection | |
CN213233154U (en) | Secondary tensioning movable hanging rack for track traffic cover beam | |
CN204456881U (en) | Dismantling system of large-span building bailey frame | |
CN209066247U (en) | A kind of good multi-functional all-hydraulic moving trestle of protective performance | |
CN211342945U (en) | Tunnel trolley | |
CN218753120U (en) | Vertical shaft heading machine detacher wellhead translation system | |
CN207377505U (en) | A kind of coal mine roadway multifunctional mobile trolley | |
CN216196793U (en) | Install retractable safety protection passageway on platform of unloading | |
CN218813173U (en) | A moving platform for public road bridge roof beam anticollision barrier | |
CN217176646U (en) | Shield tunnel leaking stoppage moving platform | |
CN220267767U (en) | Novel trolley-based cooperation lifting system | |
CN217419533U (en) | Maintenance structure for trash rack at water inlet and water outlet of pumping power station | |
CN215484533U (en) | Telescopic tower crane escape way | |
CN218541476U (en) | Fence for steel net rack mounting platform | |
CN217760921U (en) | Lifting conversion platform at top of movable ventilation shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |