CN217897388U - Supporting structure for overhanging cornice formwork on reinforcing steel bar net rack - Google Patents
Supporting structure for overhanging cornice formwork on reinforcing steel bar net rack Download PDFInfo
- Publication number
- CN217897388U CN217897388U CN202222290699.2U CN202222290699U CN217897388U CN 217897388 U CN217897388 U CN 217897388U CN 202222290699 U CN202222290699 U CN 202222290699U CN 217897388 U CN217897388 U CN 217897388U
- Authority
- CN
- China
- Prior art keywords
- support
- bracket
- formwork
- cantilevered
- eaves
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Emergency Lowering Means (AREA)
Abstract
本实用新型公开了一种用于钢筋网架上悬挑檐板支模的支撑结构,涉及钢筋网架支撑结构技术领域。用于钢筋网架上悬挑檐板支模的支撑结构,包括支架、横梁、托钩、支撑板和限位夹;支架的两侧分别固定有托钩,支架的顶部连接有横梁,横梁卡在限位夹中,限位夹固定在支撑板上。本实用新型的支架放置在钢筋网架中,利用托钩对钢筋网架进行支撑,横梁卡在支撑板上,支撑板为支架的支撑面,降低了支撑面的调节难度,提高稳定性,保证支撑效果,缩短工期,并且本结构制作简单,施工方便,成本低。
The utility model discloses a supporting structure used for formwork support of cantilevered eaves boards on steel bar grids, and relates to the technical field of steel bar grid support structures. The support structure used for supporting the formwork of the cantilevered eaves on the reinforced grid, including brackets, beams, hooks, support plates and limit clips; the two sides of the bracket are respectively fixed with hooks, and the top of the bracket is connected with a beam, and the beam is clamped In the limit clip, the limit clip is fixed on the support plate. The bracket of the utility model is placed in the steel grid frame, and the bracket is used to support the steel grid frame. The supporting effect shortens the construction period, and the structure is simple to manufacture, convenient to construct and low in cost.
Description
技术领域technical field
本实用新型涉及钢筋网架支撑结构技术领域,尤其涉及一种用于钢筋网架上悬挑檐板支模的支撑结构。The utility model relates to the technical field of steel bar grid support structures, in particular to a support structure used for formwork support of cantilevered eaves boards on steel bar grid frames.
背景技术Background technique
现有技术中,一般悬挑的混凝土檐板、矮板进行模板支撑体系搭设均在已经浇筑完成混凝土顶板面或者混凝土支座面上进行支撑架体搭设,即必须保证下部具有稳定支撑面,这样做局限性有:(1)檐板与下部混凝土结构板必须分成两部分进行施工,施工速度慢,耗费工期较长;(2)由于檐板或者矮板距离下部结构板距离小,分开施工,效率低,檐板支设体系安装困难,增加施工难度,施工成本大。In the prior art, the formwork support system of the cantilevered concrete eaves and short slabs is erected on the surface of the poured concrete roof or the concrete support surface, that is, it must be ensured that the lower part has a stable support surface, so The limitations are as follows: (1) The eaves board and the lower concrete structural slab must be divided into two parts for construction, the construction speed is slow and the construction period is long; (2) Since the distance between the eaves board or the short board and the lower structural slab is small, they must be constructed separately. The efficiency is low, and the installation of the eaves support system is difficult, which increases the construction difficulty and costs a lot.
由于工期紧张、施工因素或者气候原因不得不压缩工期进行施工,下侧混凝土板与上部悬挑檐板同时浇筑施工,这样要求在钢筋网格上支撑必须牢固稳定,否则容易出现整体支撑架失稳、倾覆等质量事故发生。传统钢筋网架上支模竖向支撑固定的施工方法主要为在钢筋网架上铺设钢板,通过焊接垫板将钢板调平保证在水平面上,在钢板上进行竖向钢管支撑安装,底板混凝土浇筑完成后将钢管切除。Due to the tight construction period, construction factors or climate reasons, the construction period has to be shortened. The lower concrete slab and the upper cantilever cornice are poured and constructed at the same time. This requires that the support on the steel grid must be firm and stable, otherwise the overall support frame will be prone to instability. , Overturning and other quality accidents occurred. The construction method of vertically supporting and fixing the formwork on the traditional reinforced grid is mainly to lay steel plates on the reinforced grid, level the steel plates through welding backing plates to ensure that they are on the horizontal plane, install vertical steel pipe supports on the steel plates, and pour concrete on the bottom slab Cut off the steel pipe when finished.
该施工方法存在局限性:(1)钢板吊运安装不方便,固定困难;(2)钢板平面调平作业难控制,精度低,施工效果差;(3)后期需要切除钢管,钢板和垫板投入多,施工成本高;(4)实施工序多,效率低,施工周期长。This construction method has limitations: (1) It is inconvenient to lift and install the steel plate, and it is difficult to fix; (2) It is difficult to control the flat leveling of the steel plate, with low precision and poor construction effect; (3) It is necessary to remove the steel pipe, steel plate and backing plate in the later stage Large investment and high construction cost; (4) Many implementation procedures, low efficiency and long construction period.
实用新型内容Utility model content
为了解决在底板钢筋网格上进行高度较小的悬挑檐板支模的竖向支撑施工方法存在的技术问题,本实用新型提供了一种用于钢筋网架上悬挑檐板支模的支撑结构,檐板与下部混凝土结构板无需分成两部分进行施工,施工速度快,耗费工期短。In order to solve the technical problems existing in the vertical support construction method of the cantilevered eaves with a small height on the steel bar grid of the bottom plate, the utility model provides a formwork for the cantilevered eaves on the steel grid. The supporting structure, the cornice and the lower concrete structural slab do not need to be divided into two parts for construction, the construction speed is fast and the construction period is short.
为实现此技术目的,本实用新型采用如下方案:用于钢筋网架上悬挑檐板支模的支撑结构,包括支架、横梁、托钩、支撑板和限位夹;支架的两侧分别固定有托钩,支架的顶部连接有横梁,横梁卡在限位夹中,限位夹固定在支撑板上。In order to achieve this technical purpose, the utility model adopts the following scheme: the supporting structure for the cantilevered eaves board formwork on the reinforced grid, including brackets, beams, hooks, supporting plates and limit clips; the two sides of the bracket are respectively fixed There is a supporting hook, and the top of the bracket is connected with a crossbeam, and the crossbeam is clamped in the limit clip, and the limit clip is fixed on the support plate.
与现有技术相比,本实用新型的有益效果在于:本实用新型的支架放置在钢筋网架中,利用托钩对钢筋网架进行支撑,横梁卡在木方支撑板下表面,支撑板为脚手架竖向支撑的支撑面,安装方便,提高了结构稳定性,保证支撑效果,缩短工期,并且本结构制作简单,施工方便,成本低。Compared with the prior art, the utility model has the beneficial effects that: the bracket of the utility model is placed in the steel grid frame, and the steel grid frame is supported by the hook, and the beam is stuck on the lower surface of the wooden support plate, and the support plate is The supporting surface for the vertical support of the scaffold is easy to install, improves the structural stability, ensures the supporting effect, shortens the construction period, and the structure is simple to manufacture, convenient to construct and low in cost.
进一步地,横梁的两端分别连接一个支架,支架为弧形架结构,托钩固定在支架的中上部。Further, two ends of the beam are respectively connected to a bracket, the bracket is an arc-shaped frame structure, and the hook is fixed on the middle and upper part of the bracket.
进一步地,同侧的托钩上放置有托梁,托梁承托钢筋网架。Further, joists are placed on the brackets on the same side, and the joists support the steel grid frame.
进一步地,限位夹为C型槽结构,C型槽的开口朝下设置。Further, the limit clip is a C-shaped groove structure, and the opening of the C-shaped groove is set downward.
附图说明Description of drawings
图1为本实用新型实施例提供的用于钢筋网架上悬挑檐板支模的支撑结构的结构示意图;Fig. 1 is the structural schematic diagram of the supporting structure for the cantilevered cornice support formwork on the reinforced grid provided by the embodiment of the utility model;
图2为本实用新型实施例提供的用于钢筋网架上悬挑檐板支模的支撑结构的第一状态图;Fig. 2 is the first state diagram of the support structure for the cantilevered eaves formwork on the reinforced grid provided by the embodiment of the present invention;
图3为本实用新型实施例提供的用于钢筋网架上悬挑檐板支模的支撑结构的第二状态图;Fig. 3 is the second state diagram of the supporting structure used for supporting the formwork of the cantilevered eaves on the reinforced grid provided by the embodiment of the utility model;
图中标记为:1、支架;2、横梁;3、托钩;4、限位块;5、托梁;6、支撑板。The marks in the figure are: 1. Bracket; 2. Beam; 3. Support hook; 4. Limit block; 5. Joist; 6. Support plate.
具体实施方式Detailed ways
为充分了解本实用新型之目的、特征及功效,借由下述具体的实施方式,对本实用新型做详细说明,但本实用新型并不仅仅限于此。In order to fully understand the purpose, features and effects of the utility model, the utility model will be described in detail through the following specific implementation methods, but the utility model is not limited thereto.
如图1和图2所示,本实用新型提供的一种用于钢筋网架上悬挑檐板支模的支撑结构,由支架1、横梁2、托钩3、支撑板6和限位块4组成。支架1为倒U型结构,支架1的两侧腿上部分别焊接一个开口朝上的弧形托钩3,弧形托钩3承托钢筋网架的上层钢筋。支架1的上端中部固定连接有横梁2,优选的,横梁2两端分别固定一个支架1,组成一个马镫支撑结构。横梁2穿装在限位块4中,限位块4为开口朝下的C型槽,C型槽固定在支撑板6的下表面上,防止支撑板6发生左右偏移。As shown in Figures 1 and 2, the utility model provides a support structure for supporting the formwork of the cantilevered eaves on the reinforced grid, which consists of a
现场施工的具体操作方法:The specific operation method of on-site construction:
使用HPB300φ12~φ18钢筋进行弯折成弧形,两个弧形腿上端焊接制作成支架1,支架1的顶部与一根长度合适的HPB335φ12~φ18钢筋一端焊接牢固,另一端与另一个支架1顶部焊接,两个支架1之间的顶部钢筋作为支撑结构的横梁2。Use HPB300φ12~φ18 steel bars to bend into an arc shape, and weld the upper ends of the two arc-shaped legs to form a
根据钢筋混凝土结构板的厚度在每对支架1距离底部相适宜的高度位置的外侧焊接一个钢筋弯钩作为托钩3,这样由支架1、横梁2、托钩3制作组成了新型马镫支撑结构。According to the thickness of the reinforced concrete structural slab, a steel bar crotch is welded on the outside of each pair of
选取截面尺寸为100mm×100mm的木方作为支撑板6,在木方两端底面位置分别嵌入一对螺栓,螺栓露出木方底面一定高度,端部成对设置的螺栓形成一个开口朝下的C型卡槽,作为限位块,将横梁2由端部滑入C型卡槽中,防止木方在横梁2上部相对左右方向滑动。Select a wooden square with a cross-sectional size of 100mm×100mm as the
结构板钢筋绑扎底层钢筋后,根据悬挑檐板的厚度、支架距离、高度等相关因素,两个一对布置新型马镫支撑结构,然后选取直径和长度合适的钢筋放置于托钩3上作为托梁5,绑扎结构板钢筋,将结构板顶层钢筋放置于托梁5上,绑扎另一方向的结构板顶层钢筋,通过支架1、托钩3、托梁5承托结构板钢筋网架。最后将悬挑檐板的支撑架体系的竖向支杆底部放置在木方顶面上部,即可进行支架安装,如图3所示。After the steel bars on the structural slab are bound to the bottom steel bars, according to the thickness of the cantilevered eaves, the distance between the brackets, the height and other related factors, two pairs of new stirrup support structures are arranged, and then steel bars with appropriate diameters and lengths are selected and placed on the
本实用新型与常规支模用支撑结构对比,具有以下优点:(1)檐板与下部混凝土结构板无需分成两部分进行施工,施工速度快,耗费工期短;(2)制作简单,施工方便;(3)支撑面调平易控制,施工效果好;(4)工序实施少,效率高;(5)制安周期短,安装速度快;(6)损耗小,施工成本低;(7)还可以作为马凳筋,使用范围广;(8)稳定性好,支撑效果好,无安全隐患。Compared with the support structure for conventional formwork, the utility model has the following advantages: (1) The eaves board and the lower concrete structure plate do not need to be divided into two parts for construction, the construction speed is fast, and the construction period is short; (2) The production is simple and the construction is convenient; (3) The leveling of the supporting surface is easy to control, and the construction effect is good; (4) The implementation of the process is less, and the efficiency is high; (5) The production and installation period is short, and the installation speed is fast; (6) The loss is small, and the construction cost is low; (7) It is OK As a horse stool bar, it can be used in a wide range; (8) It has good stability, good support effect, and no safety hazard.
最后,需要注意的是:以上列举的仅是本实用新型的优选实施例,当然本领域的技术人员可以对本实用新型进行改动和变型,倘若这些修改和变型属于本实用新型权利要求及其等同技术的范围之内,均应认为是本实用新型的保护范围。Finally, it should be noted that: the above enumerations are only preferred embodiments of the present utility model, and of course those skilled in the art can modify and modify the present utility model, provided that these modifications and variations belong to the claims of the present utility model and equivalent technologies thereof Within the scope, all should be considered as the protection scope of the present utility model.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222290699.2U CN217897388U (en) | 2022-08-30 | 2022-08-30 | Supporting structure for overhanging cornice formwork on reinforcing steel bar net rack |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222290699.2U CN217897388U (en) | 2022-08-30 | 2022-08-30 | Supporting structure for overhanging cornice formwork on reinforcing steel bar net rack |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN217897388U true CN217897388U (en) | 2022-11-25 |
Family
ID=84108538
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202222290699.2U Active CN217897388U (en) | 2022-08-30 | 2022-08-30 | Supporting structure for overhanging cornice formwork on reinforcing steel bar net rack |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN217897388U (en) |
-
2022
- 2022-08-30 CN CN202222290699.2U patent/CN217897388U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101949191B (en) | Method for constructing unsupported super-long irregularly-shaped overhanging floor | |
| CN215104737U (en) | A prefabricated bracket for bridge construction | |
| CN208122301U (en) | A kind of floor support plate supporting apparatus | |
| CN106522282A (en) | Liftable post-cast strip template structure and system and construction method thereof | |
| CN112982485A (en) | Construction method for cast-in-situ pipe gallery bottom plate and top plate synchronous formwork pouring concrete | |
| CN217897388U (en) | Supporting structure for overhanging cornice formwork on reinforcing steel bar net rack | |
| CN214942435U (en) | Vertical supporting device for upper formwork of reinforcing steel bar net rack | |
| CN207392451U (en) | A kind of building armored concrete overhangs girder construction | |
| CN206418523U (en) | A kind of liftable post-cast strip template structure and system | |
| CN211286650U (en) | Foot-supported split heads for suspending high and large wall formworks | |
| CN207847079U (en) | Hanging mould structure | |
| CN219010989U (en) | Auxiliary bracket for 0# block | |
| CN112031403A (en) | Detachable bottom plate support for steel bar quilting frame floor support plate | |
| CN217812356U (en) | Multi-level cantilever plate integral pouring system | |
| CN115070935B (en) | High pile wharf precast bridge approach box girder steel bar binding and positioning device | |
| CN217268831U (en) | Descending plate hanging mould supporting construction structure | |
| CN110700443A (en) | Integral concrete structure of steel frame shear wall structure and construction method thereof | |
| CN215978445U (en) | Arch grid beam-shaped fabricated structure formwork | |
| CN214739138U (en) | Prefabricated steel truss free formwork | |
| CN115354788A (en) | Template-free supporting and reinforcing structure for steel frame composite floor slab and construction method thereof | |
| CN211228141U (en) | A New Type of T-beam Diaphragm Construction Platform Cross Bracing | |
| CN210002571U (en) | Detachable steel crane beams for concrete structures | |
| CN206539011U (en) | Hang the solid split heads device of template in a kind of new Jiang Ban areas | |
| CN219157408U (en) | A corbel support structure of top formwork for No. 0 block continuous beam with box section | |
| CN112323835A (en) | Construction method of raft plate split heads of foundation |