CN217871941U - Building construction stair safety protection net - Google Patents

Building construction stair safety protection net Download PDF

Info

Publication number
CN217871941U
CN217871941U CN202222336627.7U CN202222336627U CN217871941U CN 217871941 U CN217871941 U CN 217871941U CN 202222336627 U CN202222336627 U CN 202222336627U CN 217871941 U CN217871941 U CN 217871941U
Authority
CN
China
Prior art keywords
wall
support body
main body
fixedly connected
way screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222336627.7U
Other languages
Chinese (zh)
Inventor
李春园
闫永庆
张红芬
王野驰
卫赵斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Institute of Science and Technology
Original Assignee
North China Institute of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Institute of Science and Technology filed Critical North China Institute of Science and Technology
Priority to CN202222336627.7U priority Critical patent/CN217871941U/en
Application granted granted Critical
Publication of CN217871941U publication Critical patent/CN217871941U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

本实用新型涉及施工安全技术领域,具体为一种建筑施工楼梯安全防护网,包括防护网主体和墙面,所述防护网主体的外壁固定连接有第一拨叉,所述防护网主体外壁固定有第二拨叉,所述第一拨叉的内壁滑动连接有第一横轴。该建筑施工楼梯安全防护网,在安全防护网安装过程中,首先听过底部的万向轮将防护网主体移动至安装部位,随后将第一卡块对准楼梯口的预留槽内,随后向右拉动第二支撑体部分,第二支撑体受力后带着衔接杆偏移,衔接杆偏移时带着第一横轴在第一拨叉内滑动,衔接杆偏移时带着第二横轴在第二拨叉内滑动,此时衔接杆之间夹角变小,第二支撑体开始向右移动,直至第二支撑体右侧外壁接触至墙面表面。

Figure 202222336627

The utility model relates to the technical field of construction safety, in particular to a safety protection net for building construction stairs, comprising a main body of the protective net and a wall surface, the outer wall of the main body of the protective net is fixedly connected with a first shift fork, and the outer wall of the main body of the protective net is fixed There is a second shift fork, and the inner wall of the first shift fork is slidably connected with a first transverse shaft. During the installation of the safety net for the stairs of this building construction, first move the main body of the net to the installation position by listening to the universal wheel at the bottom, and then align the first block with the reserved groove at the stairway, and then Pull the second support body part to the right, and the second support body will shift with the connecting rod after being stressed. When the connecting rod shifts, it will slide in the first shift fork with the first horizontal axis. The two horizontal shafts slide in the second shift fork, at this time, the angle between the connecting rods becomes smaller, and the second support body starts to move to the right until the right outer wall of the second support body touches the wall surface.

Figure 202222336627

Description

一种建筑施工楼梯安全防护网A kind of building construction stair safety protection net

技术领域technical field

本实用新型涉及施工安全技术领域,具体为一种建筑施工楼梯安全防护网。The utility model relates to the technical field of construction safety, in particular to a safety protection net for building construction stairs.

背景技术Background technique

防护网指被用以阻拦与保护施工位置的防护装置,主要用在各种需要安全、防护的产业领域,常规的防护网有支架与网体构成,被应用于施工时对施工区域的隔离与防护,防止外来人员进入施工区域受到伤害,在建筑楼梯施工过程中,为了防止外来人员进入未建造完成的楼梯发生坠落等伤害,常常会在楼梯口处设置安全防护网对外来人员进行拦截。The protective net refers to the protective device used to block and protect the construction site. It is mainly used in various industrial fields that require safety and protection. The conventional protective net is composed of a bracket and a net body. It is used to isolate and protect the construction area during construction. Protection to prevent outsiders from entering the construction area and being injured. During the construction of the building stairs, in order to prevent outsiders from entering the unfinished stairs and causing injuries such as falling, a safety net is often set up at the stairway to intercept outsiders.

市面上现存的大部分楼梯安全防护网在安装过程中,由于不同建筑的楼梯口位置宽度大不相同,因此需要根据不同宽度的楼梯口定制不同尺寸的安全防护网进行安装,所以在造价上十分的浪费,现存的大部分楼梯安全防护网不方便根据不同宽度的楼梯口进行适应性调节安装措施;市面上现存的大部分楼梯安全防护网在安装过程中需要将防护网通过螺栓等结构安装在楼梯口处,在安装和拆卸过程中都需要借助螺丝刀和电动钻枪等工具进行固定和拆除,不方便对防护网外壁和楼梯口墙体进行快捷固定措施。During the installation process of most of the existing stair safety nets on the market, because the width of the stairways of different buildings is very different, it is necessary to customize safety nets of different sizes according to the stairways of different widths for installation, so the cost is very high. Most of the existing stair safety nets are inconvenient to carry out adaptive adjustment and installation measures according to the stair openings of different widths; most of the existing stair safety nets on the market need to install the protective nets through bolts and other structures during the installation process At the entrance of the stairs, tools such as screwdrivers and electric drill guns are required to fix and remove them during the installation and disassembly process. It is inconvenient to quickly fix the outer wall of the protective net and the wall of the staircase entrance.

实用新型内容Utility model content

本实用新型的目的在于提供一种建筑施工楼梯安全防护网,以解决上述背景技术中提出不方便根据不同宽度的楼梯口进行适应性调节安装措施,不方便对防护网进行快捷固定措施的问题。为实现上述目的,本实用新型提供如下技术方案:一种建筑施工楼梯安全防护网,包括防护网主体和墙面,所述防护网主体的外壁固定连接有第一拨叉,所述防护网主体外壁固定有第二拨叉,所述第一拨叉的内壁滑动连接有第一横轴;The purpose of this utility model is to provide a safety net for building construction stairs to solve the problems in the above-mentioned background technology that it is inconvenient to carry out adaptive adjustment and installation measures according to stair openings of different widths, and it is inconvenient to quickly fix the safety net. In order to achieve the above object, the utility model provides the following technical solutions: a safety protection net for building construction stairs, comprising a main body of the protective net and a wall surface, the outer wall of the main body of the protective net is fixedly connected with a first shift fork, the main body of the protective net The outer wall is fixed with a second shift fork, and the inner wall of the first shift fork is slidably connected with a first horizontal shaft;

所述防护网主体的下表面固定连接有万向轮,所述第一横轴的外壁转动连接有衔接杆,所述第二拨叉的内壁滑动连接有第二横轴,所述第二横轴的外壁与衔接杆转动连接,所述衔接杆设有多个,所述衔接杆端部之间为转动连接,所述防护网主体包括第一支撑体和第二支撑体,所述第一支撑体与第二支撑体的内壁为滑动连接设置,所述第一支撑体的外壁开设有限位槽,所述第二支撑体的外壁安装有第一电机,所述第一电机的输出端通过传动件与限位槽卡合连接,所述第二支撑体的内部安装有第二电机,所述第二电机的输出端通过传导件卡合连接有预留槽,所述预留槽开设于墙面,所述第一支撑体的外壁固定连接有第一卡块。The lower surface of the protective net main body is fixedly connected with a universal wheel, the outer wall of the first horizontal shaft is rotatably connected with an engaging rod, the inner wall of the second shift fork is slidably connected with a second horizontal shaft, and the second horizontal shaft The outer wall of the shaft is rotatably connected to the connecting rod, and there are several connecting rods, and the ends of the connecting rods are connected in rotation. The main body of the protective net includes a first support body and a second support body, and the first The inner wall of the supporting body and the second supporting body is arranged for sliding connection, the outer wall of the first supporting body is provided with a limiting groove, the outer wall of the second supporting body is equipped with a first motor, and the output end of the first motor is passed through The transmission part is engaged with the limiting groove, and a second motor is installed inside the second support body, and the output end of the second motor is connected with a reserved groove through the engaging part, and the reserved groove is opened in On the wall surface, the outer wall of the first supporting body is fixedly connected with the first clamping block.

优选的,所述传动件包括第一双向丝杆、滑块、夹板、限位块和第一导向杆,所述第一双向丝杆的端部和第一电机的输出端固定连接,所述第一双向丝杆的外壁和滑块的内壁螺纹连接,所述滑块的下表面和夹板固定连接,所述夹板的内壁和第一导向杆的外壁滑动连接,所述第一导向杆的两端和防护网主体的内壁固定连接,所述夹板的外壁和限位块固定连接,所述限位块的外轮廓和限位槽的内轮廓相配套。Preferably, the transmission member includes a first two-way screw rod, a slider, a splint, a limit block and a first guide rod, the end of the first two-way screw rod is fixedly connected to the output end of the first motor, and the The outer wall of the first two-way screw rod is threadedly connected to the inner wall of the slider, the lower surface of the slider is fixedly connected to the splint, the inner wall of the splint is slidably connected to the outer wall of the first guide rod, and the two sides of the first guide rod The end is fixedly connected to the inner wall of the main body of the protective net, the outer wall of the splint is fixedly connected to the limiting block, and the outer contour of the limiting block matches the inner contour of the limiting groove.

优选的,所述传导件包括第二双向丝杆、滑动块、第二导向杆、连杆、压板、第二卡块,所述第二双向丝杆的端部和第二电机的输出端固定连接,所述第二双向丝杆的外壁和滑动块的内壁螺纹连接,所述滑动块的内壁和第二导向杆的外壁滑动连接,所述第二导向杆的两端和第二支撑体的内壁固定连接,所述滑动块的外壁和连杆的端部转动连接,所述连杆的端部和压杆的外壁转动连接,所述压板的外壁和第二卡块固定连接。Preferably, the conduction member includes a second two-way screw rod, a sliding block, a second guide rod, a connecting rod, a pressing plate, and a second block, and the end of the second two-way screw rod is fixed to the output end of the second motor connection, the outer wall of the second two-way screw rod is screwed to the inner wall of the sliding block, the inner wall of the sliding block is slidingly connected to the outer wall of the second guide rod, and the two ends of the second guide rod and the second support body The inner wall is fixedly connected, the outer wall of the sliding block is rotatably connected to the end of the connecting rod, the end of the connecting rod is rotatably connected to the outer wall of the pressing rod, and the outer wall of the pressing plate is fixedly connected to the second clamping block.

优选的,所述万向轮和防护网主体的下表面相互垂直设置,所述第一电机和第二支撑体的外壁呈相互垂直设置。Preferably, the universal wheels and the lower surface of the main body of the protective net are arranged perpendicular to each other, and the outer walls of the first motor and the second support body are arranged perpendicular to each other.

优选的,所述第一双向丝杆的一端和第二支撑体的内壁转动连接,所述第一双向丝杆和第一导向杆呈水平方向设置。Preferably, one end of the first two-way screw is rotatably connected to the inner wall of the second support body, and the first two-way screw and the first guide rod are arranged in a horizontal direction.

优选的,所述第二双向丝杆和第二导向杆呈水平方向设置,所述压板和第二双向丝杆相互平行设置。Preferably, the second two-way screw rod and the second guide rod are arranged in a horizontal direction, and the pressing plate and the second two-way screw rod are arranged parallel to each other.

与现有技术相比,本实用新型的有益效果:Compared with the prior art, the utility model has the beneficial effects:

本实用新型中,在安全防护网安装过程中,首先听过底部的万向轮将防护网主体移动至安装部位,随后将第一卡块对准楼梯口的预留槽内,随后向右拉动第二支撑体部分,第二支撑体受力后带着衔接杆偏移,衔接杆偏移时带着第一横轴在第一拨叉内滑动,衔接杆偏移时带着第二横轴在第二拨叉内滑动,此时衔接杆之间夹角变小,第二支撑体开始向右移动,直至第二支撑体右侧外壁接触至墙面表面,打开第一电机,第一电机带动第一双向丝杆转动,第一双向丝杆转动时,滑块通过第一导向杆的导向在第一双向丝杆上移动,滑块移动过程中带着夹板向心移动,夹板带着限位块夹持进此时的第一支撑体外壁的限位槽内进行固定限位,解决了现存的安全防护网不方便根据不同宽度的楼梯口进行适应性调节安装措施的问题。In the utility model, during the installation process of the safety protection net, the main body of the protection net is moved to the installation position by first listening to the universal wheel at the bottom, and then the first block is aligned with the reserved groove at the stairway, and then pulled to the right The second support body part, the second support body is biased with the connecting rod after being stressed, when the connecting rod is shifted, it slides in the first shift fork with the first horizontal axis, and when the connecting rod is deflected, it takes the second horizontal axis Slide in the second shift fork, at this time the angle between the connecting rods becomes smaller, the second support body starts to move to the right, until the right outer wall of the second support body touches the wall surface, turn on the first motor, the first motor Drive the first two-way screw to rotate. When the first two-way screw rotates, the slider moves on the first two-way screw through the guidance of the first guide rod. During the movement of the slider, it moves centripetally with the splint. The block is clamped into the limiting groove of the outer wall of the first support at this time to fix and limit the position, which solves the problem that the existing safety net is inconvenient to carry out adaptive adjustment and installation measures according to the stairways of different widths.

本实用新型中,打开第二电机,第二电机带动第二双向丝杆转动,此时滑动块在第二导向杆的导向下沿第二双向丝杆移动,随着滑动块的移动带动连杆偏移,连杆的一端在偏移过程中给予压板向右的作用力,此时压板带着第二卡块向右水平移动,直至第二卡块紧密的抵住右侧墙面的预留槽内,此时防护网主体的固定完成,解决了现存的安全防护网不方便对防护网进行快捷固定措施的问题。In the utility model, the second motor is turned on, and the second motor drives the second two-way screw to rotate. At this time, the sliding block moves along the second two-way screw under the guidance of the second guide rod, and the connecting rod is driven by the movement of the sliding block. Offset, one end of the connecting rod gives the pressure plate a rightward force during the offset process. At this time, the pressure plate moves horizontally to the right with the second clamping block until the second clamping block is tightly against the reserved wall on the right side. In the groove, the fixing of the main body of the protective net is completed at this time, which solves the problem that the existing safety protective net is inconvenient to quickly fix the protective net.

附图说明Description of drawings

图1为本实用新型的正视结构剖面图;Fig. 1 is the front structural sectional view of the utility model;

图2为本实用新型的图1中A处放大结构示意图;Fig. 2 is the schematic diagram of enlarged structure at A place in Fig. 1 of the present utility model;

图3为本实用新型的传动件结构示意图。Fig. 3 is a structural schematic diagram of the transmission part of the present invention.

图中:1、防护网主体;2、第一拨叉;3、第二拨叉;4、第一横轴;5、万向轮;6、衔接杆;7、第二横轴;8、第一支撑体;9、第二支撑体;10、第一电机;11、第二电机;12、限位槽;13、预留槽;14、墙面;15、第一卡块;16、第一双向丝杆;17、滑块;18、夹板;19、限位块;20、第一导向杆;21、第二双向丝杆;22、滑动块;23、第二导向杆;24、连杆;25、压板;26、第二卡块。In the figure: 1. Main body of protective net; 2. First shift fork; 3. Second shift fork; 4. First horizontal axis; 5. Universal wheel; 6. Connecting rod; 7. Second horizontal axis; 8. The first support body; 9, the second support body; 10, the first motor; 11, the second motor; 12, the limit slot; 13, the reserved slot; 14, the wall; 15, the first block; 16, 17, slide block; 18, splint; 19, limit block; 20, the first guide rod; 21, the second two-way screw rod; 22, sliding block; 23, the second guide rod; 24, Connecting rod; 25, pressing plate; 26, the second block.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术工作人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

请参阅图1至图3,本实用新型提供一种技术方案:一种建筑施工楼梯安全防护网,包括防护网主体1和墙面14,防护网主体1的外壁固定连接有第一拨叉2,防护网主体1外壁固定有第二拨叉3,第一拨叉2的内壁滑动连接有第一横轴4;Please refer to Fig. 1 to Fig. 3, the utility model provides a kind of technical scheme: a kind of building construction stair safety protective net, comprises protective net main body 1 and wall surface 14, and the outer wall of protective net main body 1 is fixedly connected with first shift fork 2 , the outer wall of the protective net main body 1 is fixed with a second shift fork 3, and the inner wall of the first shift fork 2 is slidably connected with a first horizontal shaft 4;

防护网主体1的下表面固定连接有万向轮5,第一横轴4的外壁转动连接有衔接杆6,第二拨叉3的内壁滑动连接有第二横轴7,第二横轴7的外壁与衔接杆6转动连接,衔接杆6设有多个,衔接杆6端部之间为转动连接,防护网主体1包括第一支撑体8和第二支撑体9,第一支撑体8与第二支撑体9的内壁为滑动连接设置,第一支撑体8的外壁开设有限位槽12,第二支撑体9的外壁安装有第一电机10,第一电机10的输出端通过传动件与限位槽12卡合连接,第二支撑体9的内部安装有第二电机11,第二电机11的输出端通过传导件卡合连接有预留槽13,预留槽13开设于墙面14,第一支撑体8的外壁固定连接有第一卡块15,在安全防护网安装过程中,首先听过底部的万向轮5将防护网主体1移动至安装部位,随后将第一卡块15对准楼梯口的预留槽13内,随后向右拉动第二支撑体9部分,第二支撑体9受力后带着衔接杆6偏移,衔接杆6偏移时带着第一横轴4在第一拨叉2内滑动,衔接杆6偏移时带着第二横轴7在第二拨叉3内滑动,此时衔接杆6之间夹角变小,第二支撑体9开始向右移动,直至第二支撑体9右侧外壁接触至墙面14表面,此时打开第一电机10,第一电机10带动第一双向丝杆16转动,第一双向丝杆16转动时,滑块17通过第一导向杆20的导向在第一双向丝杆16上移动,滑块17移动过程中带着夹板18向心移动,夹板18带着限位块19夹持进此时的第一支撑体8外壁的限位槽12内进行固定限位,此时打开第二电机11,第二电机11带动第二双向丝杆21转动,此时滑动块22在第二导向杆23的导向下沿第二双向丝杆21移动,随着滑动块22的移动带动连杆24偏移,连杆24的一端在偏移过程中给予压板25向右的作用力,此时压板25带着第二卡块26向右水平移动,直至第二卡块26紧密的抵住右侧墙面14的预留槽13内,此时防护网主体1的固定完成。The lower surface of the protective net main body 1 is fixedly connected with a universal wheel 5, the outer wall of the first horizontal shaft 4 is rotatably connected with an engaging rod 6, the inner wall of the second shift fork 3 is slidingly connected with a second horizontal shaft 7, and the second horizontal shaft 7 The outer wall of the connecting rod 6 is rotationally connected, and there are multiple connecting rods 6, and the ends of the connecting rods 6 are rotationally connected. The protective net main body 1 includes a first support body 8 and a second support body 9, and the first support body 8 The inner wall of the second support body 9 is slidingly connected, the outer wall of the first support body 8 is provided with a limit groove 12, the outer wall of the second support body 9 is equipped with a first motor 10, and the output end of the first motor 10 passes through the transmission part Engaged with the limit groove 12, the second support body 9 is installed with a second motor 11, and the output end of the second motor 11 is connected with a reserved groove 13 through a conductive member, and the reserved groove 13 is opened on the wall 14. The outer wall of the first support body 8 is fixedly connected with the first block 15. During the installation of the safety net, the main body 1 of the safety net is moved to the installation position by listening to the universal wheel 5 at the bottom, and then the first block The block 15 is aligned in the reserved groove 13 of the stairway, and then the second support body 9 is pulled to the right. The second support body 9 is biased with the connecting rod 6 after being stressed, and the connecting rod 6 is shifted with the first The horizontal shaft 4 slides in the first shift fork 2, and when the connecting rod 6 shifts, it slides in the second shifting fork 3 with the second horizontal shaft 7. At this time, the angle between the connecting rods 6 becomes smaller, and the second support body 9 begins to move to the right until the outer wall on the right side of the second support body 9 touches the surface of the wall 14. At this time, the first motor 10 is turned on, and the first motor 10 drives the first two-way screw rod 16 to rotate, and the first two-way screw rod 16 rotates At this time, the slider 17 moves on the first two-way screw rod 16 through the guidance of the first guide rod 20. During the movement of the slider 17, it moves centripetally with the splint 18, and the splint 18 is clamped with the stop block 19 to enter the position at this time. The position is fixed in the limit groove 12 on the outer wall of the first support body 8. At this time, the second motor 11 is turned on, and the second motor 11 drives the second two-way screw rod 21 to rotate. At this time, the sliding block 22 is on the second guide rod 23 Under the guidance of the guide, it moves along the second two-way screw rod 21. With the movement of the sliding block 22, the connecting rod 24 is shifted. One end of the connecting rod 24 gives the pressing plate 25 a rightward force during the shifting process. At this time, the pressing plate 25 has With the second clamping block 26 moving horizontally to the right, until the second clamping block 26 is tightly against the reserved groove 13 of the right side wall 14, the fixing of the protective net main body 1 is now completed.

本实施例中,如图1、图2、图3所示,传动件包括第一双向丝杆16、滑块17、夹板18、限位块19和第一导向杆20,第一双向丝杆16的端部和第一电机10的输出端固定连接,第一双向丝杆16的外壁和滑块17的内壁螺纹连接,滑块17的下表面和夹板18固定连接,夹板18的内壁和第一导向杆20的外壁滑动连接,第一导向杆20的两端和防护网主体1的内壁固定连接,夹板18的外壁和限位块19固定连接,限位块19的外轮廓和限位槽12的内轮廓相配套,打开第一电机10,第一电机10带动第一双向丝杆16转动,第一双向丝杆16转动时,滑块17通过第一导向杆20的导向在第一双向丝杆16上移动,滑块17移动过程中带着夹板18向心移动,夹板18带着限位块19夹持进此时的第一支撑体8外壁的限位槽12内进行固定限位。In this embodiment, as shown in Fig. 1, Fig. 2 and Fig. 3, the transmission member includes a first two-way screw rod 16, a slider 17, a splint 18, a limit block 19 and a first guide rod 20, and the first two-way screw rod The end of 16 is fixedly connected with the output end of the first motor 10, the outer wall of the first two-way screw mandrel 16 is screwed with the inner wall of the slider 17, the lower surface of the slider 17 is fixedly connected with the clamping plate 18, and the inner wall of the clamping plate 18 is connected with the first clamping plate 18. The outer wall of a guide rod 20 is slidingly connected, the two ends of the first guide rod 20 are fixedly connected with the inner wall of the protective net main body 1, the outer wall of the splint 18 is fixedly connected with the limit block 19, the outer contour of the limit block 19 and the limit groove The inner contour of 12 is matched, and the first motor 10 is opened, and the first motor 10 drives the first two-way screw mandrel 16 to rotate. The screw rod 16 moves up, and the slider 17 moves centripetally with the splint 18 during the movement, and the splint 18 is clamped into the limit groove 12 on the outer wall of the first support body 8 at this time with the limit block 19 for fixed limit .

本实施例中,如图1、图2、图3所示,传导件包括第二双向丝杆21、滑动块22、第二导向杆23、连杆24、压板25、第二卡块26,第二双向丝杆21的端部和第二电机11的输出端固定连接,第二双向丝杆21的外壁和滑动块22的内壁螺纹连接,滑动块22的内壁和第二导向杆23的外壁滑动连接,第二导向杆23的两端和第二支撑体9的内壁固定连接,滑动块22的外壁和连杆24的端部转动连接,连杆24的端部和压杆的外壁转动连接,压板25的外壁和第二卡块26固定连接,打开第二电机11,第二电机11带动第二双向丝杆21转动,此时滑动块22在第二导向杆23的导向下沿第二双向丝杆21移动,随着滑动块22的移动带动连杆24偏移,连杆24的一端在偏移过程中给予压板25向右的作用力,此时压板25带着第二卡块26向右水平移动,直至第二卡块26紧密的抵住右侧墙面14的预留槽13内,此时防护网主体1的固定完成。In this embodiment, as shown in Fig. 1, Fig. 2 and Fig. 3, the conductive member includes a second two-way screw rod 21, a sliding block 22, a second guide rod 23, a connecting rod 24, a pressing plate 25, and a second clamping block 26, The end of the second two-way screw mandrel 21 is fixedly connected with the output end of the second motor 11, the outer wall of the second two-way screw mandrel 21 is screwed with the inner wall of the sliding block 22, and the inner wall of the sliding block 22 is connected with the outer wall of the second guide rod 23 Sliding connection, the two ends of the second guide rod 23 are fixedly connected to the inner wall of the second support body 9, the outer wall of the sliding block 22 is connected to the end of the connecting rod 24 in rotation, and the end of the connecting rod 24 is connected in rotation to the outer wall of the pressure rod , the outer wall of the pressing plate 25 is fixedly connected with the second block 26, the second motor 11 is opened, and the second motor 11 drives the second two-way screw rod 21 to rotate. The two-way screw rod 21 moves, and the movement of the sliding block 22 drives the connecting rod 24 to shift, and one end of the connecting rod 24 gives a force to the right of the pressing plate 25 during the shifting process. At this time, the pressing plate 25 carries the second clamping block 26 Move horizontally to the right until the second block 26 is tightly against the reserved groove 13 of the right side wall 14, at this time the fixing of the protective net main body 1 is completed.

本实施例中,如图1、图2、图3所示,万向轮5和防护网主体1的下表面相互垂直设置,第一电机10和第二支撑体9的外壁呈相互垂直设置,相互垂直设置增加了万向轮5和防护网主体1间的稳定性,相互垂直设置增加了第一电机10和第二支撑体9间的稳定性。In this embodiment, as shown in Fig. 1, Fig. 2 and Fig. 3, the lower surfaces of the universal wheel 5 and the protective net main body 1 are arranged vertically to each other, and the outer walls of the first motor 10 and the second support body 9 are arranged perpendicularly to each other. The mutually perpendicular arrangement increases the stability between the universal wheel 5 and the main body 1 of the protective net, and the mutually perpendicular arrangement increases the stability between the first motor 10 and the second support body 9 .

本实施例中,如图1、图2、图3所示,第一双向丝杆16的一端和第二支撑体9的内壁转动连接,第一双向丝杆16和第一导向杆20呈水平方向设置,转动连接设置增加了第一双向丝杆16转动时两端的平衡性,水平方向设置增加了第一双向丝杆16和第一导向杆20间的稳定性。In this embodiment, as shown in Fig. 1, Fig. 2 and Fig. 3, one end of the first two-way screw rod 16 is rotationally connected with the inner wall of the second support body 9, and the first two-way screw rod 16 and the first guide rod 20 are horizontal The direction setting and the rotation connection setting increase the balance of both ends of the first two-way screw rod 16 when it rotates, and the horizontal direction setting increases the stability between the first two-way screw rod 16 and the first guide rod 20 .

本实施例中,如图1、图2、图3所示,第二双向丝杆21和第二导向杆23呈水平方向设置,压板25和第二双向丝杆21相互平行设置,水平方向设置增加了第二双向丝杆21和第二导向杆23间的稳定性。In this embodiment, as shown in Fig. 1, Fig. 2 and Fig. 3, the second two-way screw rod 21 and the second guide rod 23 are arranged in a horizontal direction, and the pressing plate 25 and the second two-way screw rod 21 are arranged parallel to each other, and the horizontal direction is arranged The stability between the second two-way screw rod 21 and the second guide rod 23 is increased.

本实用新型的使用方法和优点:该种建筑施工楼梯安全防护网在工作时,工作过程如下:The use method and advantages of this utility model: when this kind of building construction staircase safety protection net is working, the working process is as follows:

如图1、图2、图3所示,在建筑工程楼梯施工过程中会需要采用到楼梯安全防护网对外界人员进行阻拦,在安全防护网安装过程中,首先听过底部的万向轮5将防护网主体1移动至安装部位,随后将第一卡块15对准楼梯口的预留槽13内,随后向右拉动第二支撑体9部分,第二支撑体9受力后带着衔接杆6偏移,衔接杆6偏移时带着第一横轴4在第一拨叉2内滑动,衔接杆6偏移时带着第二横轴7在第二拨叉3内滑动,此时衔接杆6之间夹角变小,第二支撑体9开始向右移动,直至第二支撑体9右侧外壁接触至墙面14表面,此时打开第一电机10,第一电机10带动第一双向丝杆16转动,第一双向丝杆16转动时,滑块17通过第一导向杆20的导向在第一双向丝杆16上移动,滑块17移动过程中带着夹板18向心移动,夹板18带着限位块19夹持进此时的第一支撑体8外壁的限位槽12内进行固定限位,此时打开第二电机11,第二电机11带动第二双向丝杆21转动,此时滑动块22在第二导向杆23的导向下沿第二双向丝杆21移动,随着滑动块22的移动带动连杆24偏移,连杆24的一端在偏移过程中给予压板25向右的作用力,此时压板25带着第二卡块26向右水平移动,直至第二卡块26紧密的抵住右侧墙面14的预留槽13内,此时防护网主体1的固定完成。As shown in Figure 1, Figure 2, and Figure 3, in the construction process of the stairs in the construction project, it is necessary to use the staircase safety net to block outsiders. During the installation of the safety net, first listen to the universal wheel 5 at the bottom Move the protective net main body 1 to the installation position, then align the first block 15 in the reserved groove 13 of the stairway, and then pull the second support body 9 part to the right, and the second support body 9 will be connected with it after being stressed. The rod 6 is offset, and when the connecting rod 6 is offset, it slides in the first shift fork 2 with the first cross shaft 4 , and when the connecting rod 6 shifts, it slides in the second shift fork 3 with the second cross shaft 7 . When the angle between the connecting rods 6 becomes smaller, the second support body 9 begins to move to the right until the outer wall on the right side of the second support body 9 touches the surface of the wall surface 14. At this time, the first motor 10 is turned on, and the first motor 10 drives The first two-way screw mandrel 16 rotates, and when the first two-way screw mandrel 16 rotates, the slider 17 moves on the first two-way screw mandrel 16 through the guidance of the first guide rod 20, and the slider 17 moves with the splint 18 centripetally Move, clamping plate 18 is clamped into the limit groove 12 of the outer wall of the first support body 8 at this moment with the limit block 19 to carry out fixed limit, open the second motor 11 at this moment, the second motor 11 drives the second two-way wire Rod 21 rotates, and now sliding block 22 moves along the second two-way screw rod 21 under the guidance of second guide rod 23, along with the movement of sliding block 22 drives connecting rod 24 to shift, and one end of connecting rod 24 is in the shifting process Rightward force is given to the pressing plate 25, and now the pressing plate 25 moves horizontally to the right with the second clamping block 26 until the second clamping block 26 is tightly against the reserved groove 13 of the right side wall 14, at this time The fixing of the protective net main body 1 is completed.

以上显示和描述了本实用新型的基本原理、主要特征和本实用新型的优点。本行业的技术工作人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的仅为本实用新型的优选例,并不用来限制本实用新型,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定。The basic principles, main features and advantages of the present utility model have been shown and described above. Technical staff in this industry should understand that the utility model is not limited by the above-mentioned embodiments, and the above-mentioned embodiments and descriptions are only preferred examples of the utility model, and are not used to limit the utility model, without departing from the utility model Under the premise of the new spirit and scope, the utility model also has various changes and improvements, and these changes and improvements all fall within the scope of the claimed utility model. The scope of protection required by the utility model is defined by the appended claims and their equivalents.

Claims (6)

1.一种建筑施工楼梯安全防护网,包括防护网主体(1)和墙面(14),其特征在于:所述防护网主体(1)的外壁固定连接有第一拨叉(2),所述防护网主体(1)外壁固定有第二拨叉(3),所述第一拨叉(2)的内壁滑动连接有第一横轴(4);1. A building construction staircase safety protection net, comprising a protective net main body (1) and a wall surface (14), is characterized in that: the outer wall of the described protective net main body (1) is fixedly connected with the first shift fork (2), The outer wall of the protective net main body (1) is fixed with a second shift fork (3), and the inner wall of the first shift fork (2) is slidably connected with a first horizontal shaft (4); 所述防护网主体(1)的下表面固定连接有万向轮(5),所述第一横轴(4)的外壁转动连接有衔接杆(6),所述第二拨叉(3)的内壁滑动连接有第二横轴(7),所述第二横轴(7)的外壁与衔接杆(6)转动连接,所述衔接杆(6)设有多个,所述衔接杆(6)端部之间为转动连接,所述防护网主体(1)包括第一支撑体(8)和第二支撑体(9),所述第一支撑体(8)与第二支撑体(9)的内壁为滑动连接设置,所述第一支撑体(8)的外壁开设有限位槽(12),所述第二支撑体(9)的外壁安装有第一电机(10),所述第一电机(10)的输出端通过传动件与限位槽(12)卡合连接,所述第二支撑体(9)的内部安装有第二电机(11),所述第二电机(11)的输出端通过传导件卡合连接有预留槽(13),所述预留槽(13)开设于墙面(14),所述第一支撑体(8)的外壁固定连接有第一卡块(15)。The lower surface of the protective net main body (1) is fixedly connected with a universal wheel (5), the outer wall of the first horizontal shaft (4) is rotatably connected with an engaging rod (6), and the second shift fork (3) The inner wall of the second horizontal shaft (7) is slidably connected with the second horizontal shaft (7), and the outer wall of the second horizontal shaft (7) is rotationally connected with the connecting rod (6). The connecting rod (6) is provided with a plurality of connecting rods ( 6) There is a rotational connection between the ends, and the protective net main body (1) includes a first support body (8) and a second support body (9), and the first support body (8) and the second support body ( The inner wall of 9) is set for sliding connection, the outer wall of the first support (8) has a limit groove (12), the outer wall of the second support (9) is equipped with a first motor (10), the The output end of the first motor (10) is engaged and connected with the limit groove (12) through the transmission member, and the second motor (11) is installed inside the second support body (9), and the second motor (11) ) is connected to a reserved slot (13) through a conductive member, and the reserved slot (13) is opened on the wall (14), and the outer wall of the first support (8) is fixedly connected with a first Block (15). 2.根据权利要求1所述的一种建筑施工楼梯安全防护网,其特征在于:所述传动件包括第一双向丝杆(16)、滑块(17)、夹板(18)、限位块(19)和第一导向杆(20),所述第一双向丝杆(16)的端部和第一电机(10)的输出端固定连接,所述第一双向丝杆(16)的外壁和滑块(17)的内壁螺纹连接,所述滑块(17)的下表面和夹板(18)固定连接,所述夹板(18)的内壁和第一导向杆(20)的外壁滑动连接,所述第一导向杆(20)的两端和防护网主体(1)的内壁固定连接,所述夹板(18)的外壁和限位块(19)固定连接,所述限位块(19)的外轮廓和限位槽(12)的内轮廓相配套。2. A kind of construction stair safety net according to claim 1, is characterized in that: described transmission member comprises first two-way screw rod (16), slide block (17), splint (18), limit block (19) and the first guide rod (20), the end of the first two-way screw rod (16) is fixedly connected with the output end of the first motor (10), and the outer wall of the first two-way screw rod (16) It is threadedly connected with the inner wall of the slide block (17), the lower surface of the slide block (17) is fixedly connected with the clamping plate (18), and the inner wall of the clamping plate (18) is slidably connected with the outer wall of the first guide rod (20), The two ends of the first guide rod (20) are fixedly connected to the inner wall of the protective net main body (1), the outer wall of the splint (18) is fixedly connected to the limit block (19), and the limit block (19) The outer contour of the outer contour and the inner contour of the limit groove (12) are matched. 3.根据权利要求1所述的一种建筑施工楼梯安全防护网,其特征在于:所述传导件包括第二双向丝杆(21)、滑动块(22)、第二导向杆(23)、连杆(24)、压板(25)、第二卡块(26),所述第二双向丝杆(21)的端部和第二电机(11)的输出端固定连接,所述第二双向丝杆(21)的外壁和滑动块(22)的内壁螺纹连接,所述滑动块(22)的内壁和第二导向杆(23)的外壁滑动连接,所述第二导向杆(23)的两端和第二支撑体(9)的内壁固定连接,所述滑动块(22)的外壁和连杆(24)的端部转动连接,所述连杆(24)的端部和压杆的外壁转动连接,所述压板(25)的外壁和第二卡块(26)固定连接。3. A kind of building construction stair safety protection net according to claim 1, is characterized in that: described conduction member comprises second two-way screw mandrel (21), slide block (22), second guide rod (23), connecting rod (24), pressing plate (25), second block (26), the end of the second bidirectional screw rod (21) is fixedly connected to the output end of the second motor (11), and the second bidirectional The outer wall of the screw mandrel (21) is threadedly connected with the inner wall of the sliding block (22), the inner wall of the sliding block (22) is slidably connected with the outer wall of the second guide rod (23), the second guide rod (23) Both ends are fixedly connected with the inner wall of the second support body (9), the outer wall of the sliding block (22) is rotationally connected with the end of the connecting rod (24), and the end of the connecting rod (24) is connected with the end of the pressing bar. The outer wall is rotatably connected, and the outer wall of the pressing plate (25) is fixedly connected to the second block (26). 4.根据权利要求1所述的一种建筑施工楼梯安全防护网,其特征在于:所述万向轮(5)和防护网主体(1)的下表面相互垂直设置,所述第一电机(10)和第二支撑体(9)的外壁呈相互垂直设置。4. A kind of building construction stair safety protection net according to claim 1, is characterized in that: the lower surface of described universal wheel (5) and protection net main body (1) is vertically arranged mutually, and described first motor ( 10) and the outer wall of the second support body (9) are arranged perpendicular to each other. 5.根据权利要求2所述的一种建筑施工楼梯安全防护网,其特征在于:所述第一双向丝杆(16)的一端和第二支撑体(9)的内壁转动连接,所述第一双向丝杆(16)和第一导向杆(20)呈水平方向设置。5. The safety protection net for building construction stairs according to claim 2, characterized in that: one end of the first two-way screw rod (16) is rotatably connected to the inner wall of the second support body (9), and the first A two-way screw rod (16) and the first guide rod (20) are arranged in a horizontal direction. 6.根据权利要求3所述的一种建筑施工楼梯安全防护网,其特征在于:所述第二双向丝杆(21)和第二导向杆(23)呈水平方向设置,所述压板(25)和第二双向丝杆(21)相互平行设置。6. The safety protection net for building construction stairs according to claim 3, characterized in that: the second two-way screw (21) and the second guide rod (23) are arranged in a horizontal direction, and the pressing plate (25 ) and the second two-way screw mandrel (21) are arranged parallel to each other.
CN202222336627.7U 2022-09-02 2022-09-02 Building construction stair safety protection net Active CN217871941U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222336627.7U CN217871941U (en) 2022-09-02 2022-09-02 Building construction stair safety protection net

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222336627.7U CN217871941U (en) 2022-09-02 2022-09-02 Building construction stair safety protection net

Publications (1)

Publication Number Publication Date
CN217871941U true CN217871941U (en) 2022-11-22

Family

ID=84081832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222336627.7U Active CN217871941U (en) 2022-09-02 2022-09-02 Building construction stair safety protection net

Country Status (1)

Country Link
CN (1) CN217871941U (en)

Similar Documents

Publication Publication Date Title
CN212082792U (en) A kind of construction engineering scaffold erection quality acceptance inspection device
CN111502219A (en) Bearing frame for building construction
CN217871941U (en) Building construction stair safety protection net
CN108797970B (en) Building wall plastering machine
CN222184105U (en) Frame post template reinforcing apparatus is built in room
CN216109536U (en) Support device for mounting building door and window
CN115057340A (en) A prefabricated panel hoisting device for construction
CN118559389A (en) A splicing device for door and window profiles and a method of using the same
CN213509500U (en) A scaffolding for construction engineering that is easy to adjust the height of pedals
CN211473310U (en) An adjustable scaffolding for construction sites
CN223722479U (en) Elevartor shaft guard gate convenient to installation
CN217512749U (en) A safety type steel bar processing and bending device
CN112234750A (en) Durable electric push rod
CN220372355U (en) Steel construction multi-angle cutting device
CN115028016A (en) Guide conveying device for wire and cable processing
CN220118056U (en) Positioning stable building decoration telescopic ladder
CN221720370U (en) A pulley assembly that is easy to disassemble and clean
CN221481360U (en) Construction is supplementary with fixed ware of exempting from to climb
CN220903233U (en) Pipeline installation device for construction
CN220953975U (en) A fireproof rock wool board that is easy to install
CN221702138U (en) A crash barrier decoration platform for municipal bridge construction projects
CN221440089U (en) Prefabricated stair lifting appliance
CN221502493U (en) An assembled staircase structure for house construction
CN222314662U (en) Elevator entrance to a cave safety device
CN220014548U (en) Building safety devices

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant