CN217871698U - Scaffold convenient to disassemble and assemble - Google Patents

Scaffold convenient to disassemble and assemble Download PDF

Info

Publication number
CN217871698U
CN217871698U CN202222053078.2U CN202222053078U CN217871698U CN 217871698 U CN217871698 U CN 217871698U CN 202222053078 U CN202222053078 U CN 202222053078U CN 217871698 U CN217871698 U CN 217871698U
Authority
CN
China
Prior art keywords
sets
groups
supporting rods
rods
support rods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222053078.2U
Other languages
Chinese (zh)
Inventor
刘红波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cao Yong
Wu Tongyou
Zeng Hong
Original Assignee
Dalian Yitong Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Yitong Construction Engineering Co ltd filed Critical Dalian Yitong Construction Engineering Co ltd
Priority to CN202222053078.2U priority Critical patent/CN217871698U/en
Application granted granted Critical
Publication of CN217871698U publication Critical patent/CN217871698U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

本实用新型涉及脚手架的技术领域,特别是涉及一种方便拆卸组装的脚手架,其提高脚手架安装的操作便利性,提高脚手架拆卸操作便利性,同时降低脚手架空间占用,提高脚手架运输的便利性;包括操作台、四组第一连接件、四组第一支撑杆、支撑装置、四组套件、第一连接架和四组第一顶丝,四组第一连接件分别安装在操作台底端左右两部,四组第一支撑杆顶端分别旋转安装在四组第一连接件上,并且相邻的两组第一支撑杆之间分别设置有连接杆,四组套件分别上下滑动套装在四组第一支撑杆外侧壁上,四组第一顶丝分别配合螺装在四组套件外侧壁上,第一连接架左右两端分别与四组套件外侧壁连接,四组第一支撑杆底端分别伸入支撑装置内部。

Figure 202222053078

The utility model relates to the technical field of scaffolding, in particular to a scaffolding that is convenient for disassembly and assembly, which improves the convenience of scaffolding installation, improves the convenience of scaffolding disassembly operation, reduces the space occupation of scaffolding, and improves the convenience of scaffolding transportation; including Operating table, four sets of first connecting pieces, four sets of first support rods, supporting device, four sets of kits, first connecting frame and four sets of first jacking wires, four sets of first connecting pieces are respectively installed on the left and right sides of the bottom of the operating table Two, four sets of first support rod tops are respectively rotatably mounted on the four sets of first connectors, and connecting rods are arranged between adjacent two sets of first support rods, and the four sets of kits are respectively slid up and down on the four sets of On the outer wall of the first support bar, the four sets of first jacking wires are fitted on the outer walls of the four sets of kits with screws respectively. Respectively extend into the inside of the supporting device.

Figure 202222053078

Description

一种方便拆卸组装的脚手架A scaffold for easy disassembly and assembly

技术领域technical field

本实用新型涉及脚手架的技术领域,特别是涉及一种方便拆卸组装的脚手架。The utility model relates to the technical field of scaffolding, in particular to a scaffolding which is convenient for disassembly and assembly.

背景技术Background technique

脚手架是为了保证各施工过程顺利进行而搭设的工作平台,目前在现有技术CN202020054756.5中,该脚手架包括底座和载板,所述底座上是脚手架本体,且底座左侧设置有转轮,同时转轮与连接杆固定连接,并且连接杆的右端通过轴承穿过底座与丝杆固定连接,丝杆上安装有移动块,且丝杆的右端通过轴承固定在固定块上,移动块下侧通过铰接块与第一连板铰接,且第一连板下侧与第二连板相铰接,同时第二连板右侧安装有第三连板;所述载板下侧固定安装有万向轮,且载板的侧面开设有限位孔,但该脚手架使用时发现,该脚手架拆卸便利性价差,并且拆卸后不便于进行折叠收纳,增加了脚手架运输时的空间占用,降低了脚手架使用的便利性,因此提出一种便于拆卸组装,提高折叠收纳便利性的脚手架。Scaffolding is a working platform set up to ensure the smooth progress of each construction process. Currently, in the prior art CN202020054756.5, the scaffolding includes a base and a carrier plate. The base is the scaffold body, and the left side of the base is provided with a runner. At the same time, the runner is fixedly connected with the connecting rod, and the right end of the connecting rod is fixedly connected with the screw rod through the base through the bearing. The moving block is installed on the screw rod, and the right end of the screw rod is fixed on the fixed block through the bearing. The hinge block is hinged with the first connecting plate, and the lower side of the first connecting plate is hinged with the second connecting plate, and the third connecting plate is installed on the right side of the second connecting plate; the lower side of the carrier plate is fixedly installed with a universal Wheels, and limited holes are set on the side of the carrier plate, but when the scaffold is used, it is found that the convenience of disassembly of the scaffold is poor, and it is not convenient to fold and store after disassembly, which increases the space occupation of the scaffold during transportation and reduces the convenience of the scaffold. Therefore, a scaffold that is convenient for disassembly and assembly and improves the convenience of folding and storage is proposed.

实用新型内容Utility model content

为解决上述技术问题,本实用新型提供一种提高脚手架安装的操作便利性,提高脚手架拆卸操作便利性,同时降低脚手架空间占用,提高脚手架运输的便利性的方便拆卸组装的脚手架。In order to solve the above technical problems, the utility model provides a convenient disassembly and assembly scaffold that improves the convenience of scaffold installation, improves the convenience of scaffold disassembly operation, reduces the space occupied by the scaffold, and improves the convenience of scaffold transportation.

本实用新型的一种方便拆卸组装的脚手架,包括操作台、四组第一连接件、四组第一支撑杆、支撑装置、四组套件、第一连接架和四组第一顶丝,四组第一连接件分别安装在操作台底端左右两部,四组第一支撑杆顶端分别旋转安装在四组第一连接件上,并且相邻的两组第一支撑杆之间分别设置有连接杆,四组套件分别上下滑动套装在四组第一支撑杆外侧壁上,四组第一顶丝分别配合螺装在四组套件外侧壁上,第一连接架左右两端分别与四组套件外侧壁连接,四组第一支撑杆底端分别伸入支撑装置内部,支撑装置用于对四组第一支撑杆底端支撑;首先将四组第一支撑杆通过四组第一连接件旋转为竖直角度,之后将四组套件从下向上套装在四组第一支撑杆外侧壁上,通过将四组第一顶丝旋转,使四组套件固定在四组第一支撑杆外侧壁上,从而使四组套件与四组第一连接架配合将多组第一支撑杆进行固定,之后将四组第一支撑杆底端伸入支撑装置内部,使支撑装置将第一支撑杆抬升一定的高度,提高脚手架安装的操作便利性,当需要对脚手架拆卸时,首先将四组第一支撑杆与支撑装置分离,之后将四组套件拆卸,之后将四组第一支撑杆向上翻转90°,使四组第一支撑杆旋转收纳至操作台底端,从而提高脚手架拆卸操作便利性,同时降低脚手架空间占用,提高脚手架运输的便利性。A scaffolding for easy disassembly and assembly of the utility model, comprising an operation table, four sets of first connecting parts, four sets of first support rods, support devices, four sets of kits, first connecting frames and four sets of first top wires, four The sets of first connecting pieces are respectively installed on the left and right parts of the bottom end of the console, and the top ends of the four sets of first support rods are respectively mounted on the four sets of first connecting pieces in rotation, and the adjacent two sets of first support rods are respectively provided with Connecting rods, the four sets of kits are respectively slid up and down on the outer walls of the four sets of first support rods, and the four sets of first jacking screws are respectively fitted with screws on the outer walls of the four sets of kits. The left and right ends of the first connecting frame are respectively connected to the four sets of The outer wall of the kit is connected, and the bottom ends of the four sets of first support rods respectively extend into the inside of the support device, and the support device is used to support the bottom ends of the four sets of first support rods; firstly, the four sets of first support rods pass through the four sets of first connector Rotate to a vertical angle, then fit the four sets of kits on the outer walls of the four sets of first support rods from bottom to top, and fix the four sets of kits on the outer walls of the four sets of first support rods by rotating the four sets of first jacking screws , so that the four sets of kits cooperate with the four sets of first connecting frames to fix multiple sets of first support rods, and then extend the bottom ends of the four sets of first support rods into the inside of the support device, so that the support device can lift the first support rods A certain height improves the operation convenience of scaffold installation. When the scaffold needs to be disassembled, firstly separate the four sets of first support rods from the support device, then disassemble the four sets of kits, and then flip up the four sets of first support rods 90 °, so that the four sets of first support rods are rotated and stored at the bottom of the operation table, thereby improving the convenience of scaffold disassembly and operation, reducing the space occupied by the scaffold, and improving the convenience of scaffold transportation.

优选的,所述支撑装置包括四组第二支撑杆、四组减震垫、四组螺柱、四组手轮、多组第二连接件和多组第二连接架,四组第二支撑杆顶端分别设置有凹槽,四组第一支撑杆底端分别伸入四组第二支撑杆的凹槽内,四组减震垫分别设置在凹槽内侧壁底部,并且四组第一支撑杆外侧壁下部分别设置有圆孔,四组螺柱分别配合螺装在四组第二支撑杆外侧壁上部,并且四组螺柱分别伸入四组第一支撑杆的圆孔内,四组手轮分别固定安装在四组螺柱后端,多组第二连接件分别安装在四组第二支撑杆外侧壁上,多组第二连接架的左右两端分别通过螺栓与多组第二连接件固定连接;将四组第一支撑杆底端分别伸入四组第二支撑杆凹槽内,之后将四组螺柱前端分别伸入四组第一支撑杆的圆孔内,从而使四组螺柱将四组第一支撑杆的位置进行固定,提高脚手架的组装或拆卸操作便利性,同时提高操作台的使用安全性,之后将多组第二连接件通过螺栓与多组第二连接架固定连接,从而提高多组第二支撑杆之间的稳定性,进而提高脚手架的使用稳定性,通过设置四组减震垫,提高四组第一支撑杆伸入凹槽内时的缓冲效果。Preferably, the support device includes four sets of second support rods, four sets of shock absorbing pads, four sets of studs, four sets of handwheels, multiple sets of second connecting pieces and multiple sets of second connecting frames, and four sets of second support Grooves are respectively arranged on the top of the rods, the bottom ends of the four groups of first support rods respectively extend into the grooves of the four groups of second support rods, the four groups of shock absorbing pads are respectively arranged at the bottom of the inner wall of the groove, and the four groups of first support rods The lower part of the outer wall of the rod is respectively provided with a round hole, and the four groups of studs are fitted on the upper part of the outer side wall of the four groups of second support rods respectively, and the four groups of studs respectively extend into the round holes of the four groups of first support rods, and the four groups of studs respectively The handwheels are fixedly installed on the rear ends of the four sets of studs, and the multiple sets of second connecting pieces are respectively installed on the outer walls of the four sets of second support rods. The connectors are fixedly connected; the bottom ends of the four groups of first support rods are inserted into the grooves of the four groups of second support rods, and then the front ends of the four groups of studs are respectively inserted into the round holes of the four groups of first support rods, so that Four sets of studs fix the position of the four sets of first support rods, which improves the convenience of scaffolding assembly or disassembly, and improves the safety of the operation platform. The connecting frame is fixedly connected to improve the stability between multiple sets of second support rods, thereby improving the stability of the scaffold. By setting four sets of shock-absorbing pads, the cushioning when four sets of first support rods extend into the groove is improved. Effect.

优选的,还包括支架、连接杆、爬梯、挂钩、两组筒体和两组插杆,支架安装在操作台右端,连接杆安装在支架右端,爬梯顶端与挂钩底端连接,并且挂钩套装在连接杆外侧壁上,两组筒体分别安装在右部两组第二支撑杆外侧壁上,两组插杆分别安装在爬梯左端,并且两组插杆分别滑动伸入两组筒体内部;将挂钩套装在连接杆外侧壁上,之后将两组插杆分别伸入两组筒体内部,从而提高爬梯组装或拆卸的操作便利性,提高工作人员通过爬梯对脚手架攀爬使用的便利性,通过设置两组筒体和两组插杆,防止爬梯向上移动造成挂钩脱落,提高爬梯的使用安全性。Preferably, it also includes brackets, connecting rods, ladders, hooks, two sets of barrels and two sets of insertion rods, the brackets are installed at the right end of the console, the connecting rods are installed at the right end of the brackets, the top of the ladders is connected to the bottom of the hooks, and the hooks are set on the On the outer wall of the connecting rod, the two sets of cylinders are respectively installed on the outer walls of the two sets of second support rods on the right, and the two sets of insertion rods are respectively installed on the left end of the ladder, and the two sets of insertion rods slide into the interior of the two sets of cylinders; Set the hook on the outer wall of the connecting rod, and then extend the two sets of inserting rods into the inside of the two sets of cylinders, so as to improve the convenience of assembling or disassembling the ladder, and improve the convenience for the staff to climb and use the scaffold through the ladder. By arranging two sets of barrels and two sets of inserting rods, the hooks are prevented from falling off due to the upward movement of the ladder, and the safety of the ladder is improved.

优选的,还包括多组固定件和四组底板,多组固定件均周向安装在四组第二支撑杆外侧壁下部,四组底板顶端分别设置在四组第二支撑杆底端,并且多组固定件分别通过螺栓与四组底板固定连接;固定件通过螺栓与四组底板固定连接,提高是四组底板安装或拆卸操作便利性,提高脚手架组装拆卸便利性,通过设置四组底板,增加四组第二支撑杆与地面的接触面积,提高脚手架的使用稳定性。Preferably, it also includes multiple sets of fixing pieces and four sets of bottom plates, the multiple sets of fixing pieces are all circumferentially installed on the lower part of the outer side walls of the four sets of second support rods, the top ends of the four sets of bottom plates are respectively arranged at the bottom ends of the four sets of second support rods, and Multiple sets of fixing parts are fixedly connected to the four sets of bottom plates through bolts; the fixing parts are fixedly connected to the four sets of bottom plates through bolts, which improves the convenience of installation or disassembly of the four sets of bottom plates, and improves the convenience of scaffold assembly and disassembly. By setting four sets of bottom plates, Increase the contact area between the four sets of second support rods and the ground to improve the stability of the scaffold.

优选的,还包括四组U形件和四组第二顶丝,四组U形件均安装在操作台底端,并且四组U形件分别与四组第一支撑杆的位置相匹配,四组第二顶丝分别配合螺装在四组U形件上;当四组第一支撑杆旋转收纳后,使四组第一支撑杆分别伸入四组U形件内,通过四组第二顶丝将四组第一支撑杆进行固定,从而提高四组第一支撑杆收纳后固定的便利性。Preferably, it also includes four sets of U-shaped pieces and four sets of second jacking screws, the four sets of U-shaped pieces are all installed at the bottom of the console, and the four sets of U-shaped pieces are respectively matched with the positions of the four sets of first support rods, The four sets of second jacking wires are mounted on the four sets of U-shaped pieces with screws respectively; when the four sets of first support rods are rotated and stored, the four sets of first support rods are respectively extended into the four sets of U-shaped pieces, and the four sets of first support rods are respectively inserted into the four sets of U-shaped pieces. The two top screws fix the four sets of first support rods, thereby improving the convenience of fixing the four groups of first support rods after storage.

优选的,还包括四组防滑垫,四组防滑垫分别设置在四组底板底端;通过设置四组防滑垫,提高四组底板底端的防滑效果,提高脚手架的使用稳定性。Preferably, it also includes four sets of anti-skid pads, and the four sets of anti-slip pads are respectively arranged at the bottom ends of the four sets of base plates; by arranging four sets of anti-slip pads, the anti-skid effect of the bottom ends of the four sets of base plates is improved, and the use stability of the scaffold is improved.

优选的,还包括护栏,护栏安装在操作台顶端;通过设置护栏,提高操作台顶端的防护效果,提高工作人员使用的安全性。Preferably, a guardrail is also included, and the guardrail is installed on the top of the operating table; by setting the guardrail, the protective effect on the top of the operating table is improved, and the safety of the staff is improved.

与现有技术相比本实用新型的有益效果为:首先将四组第一支撑杆通过四组第一连接件旋转为竖直角度,之后将四组套件从下向上套装在四组第一支撑杆外侧壁上,通过将四组第一顶丝旋转,使四组套件固定在四组第一支撑杆外侧壁上,从而使四组套件与四组第一连接架配合将多组第一支撑杆进行固定,之后将四组第一支撑杆底端伸入支撑装置内部,使支撑装置将第一支撑杆抬升一定的高度,提高脚手架安装的操作便利性,当需要对脚手架拆卸时,首先将四组第一支撑杆与支撑装置分离,之后将四组套件拆卸,之后将四组第一支撑杆向上翻转90°,使四组第一支撑杆旋转收纳至操作台底端,从而提高脚手架拆卸操作便利性,同时降低脚手架空间占用,提高脚手架运输的便利性。Compared with the prior art, the utility model has the beneficial effects as follows: first, the four sets of first support rods are rotated to a vertical angle through the four sets of first connecting pieces, and then the four sets of kits are placed on the four sets of first supports from bottom to top On the outer wall of the rod, by rotating the four sets of first jacking wires, the four sets of sets are fixed on the outer wall of the four sets of first support rods, so that the four sets of sets are matched with the four sets of first connecting frames to support multiple sets of first supports. Fix the rods, and then extend the bottom ends of the four sets of first support rods into the support device, so that the support device can raise the first support rods to a certain height, and improve the operation convenience of scaffold installation. When the scaffold needs to be disassembled, firstly put The four sets of first support rods are separated from the support device, and then the four sets of kits are disassembled, and then the four sets of first support rods are turned upside down by 90°, so that the four sets of first support rods are rotated and stored at the bottom of the console, thereby improving the removal of scaffolding. It is easy to operate, while reducing the space occupied by scaffolding and improving the convenience of scaffolding transportation.

附图说明Description of drawings

图1是本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2是爬梯与挂钩等连接的局部结构示意图;Fig. 2 is a partial structural schematic diagram of the connection between the ladder and the hook;

图3是螺柱与手轮等连接的局部结构示意图;Fig. 3 is a partial structural schematic diagram of the connection between the stud and the hand wheel;

图4是支架与连接杆等连接的轴测局部结构示意图;Fig. 4 is a schematic diagram of the axonometric partial structure of the connection between the bracket and the connecting rod;

附图中标记:1、操作台;2、第一连接件;3、第一支撑杆;4、套件;5、第一连接架;6、第一顶丝;7、第二支撑杆;8、减震垫;9、螺柱;10、手轮;11、第二连接件;12、第二连接架;13、支架;14、连接杆;15、爬梯;16、挂钩;17、筒体;18、插杆;19、固定件;20、底板;21、U形件;22、第二顶丝;23、防滑垫;24、护栏。Marks in the attached drawings: 1. Operating table; 2. First connector; 3. First support rod; 4. Kit; 5. First connecting frame; 6. First jacking wire; 7. Second support rod; 8 , Shock absorbing pad; 9, Stud; 10, Hand wheel; 11, Second connecting piece; 12, Second connecting frame; 13, Bracket; 14, Connecting rod; 15, Ladder; 16, Hook; 17, Cylinder ; 18, inserting rod; 19, fixing piece; 20, bottom plate; 21, U-shaped piece; 22, second top wire;

具体实施方式Detailed ways

为了便于理解本实用新型,下面将参照相关附图对本实用新型进行更全面的描述。本实用新型可以以许多不同的形式来实现,并不限于本文所描述的实施例。相反地,提供这些实施例的目的是使对本实用新型的公开内容更加透彻全面。In order to facilitate the understanding of the utility model, the utility model will be described more fully below with reference to the relevant drawings. The invention can be embodied in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive.

四组第一连接件2分别安装在操作台1底端左右两部,四组第一支撑杆3顶端分别旋转安装在四组第一连接件2上,并且相邻的两组第一支撑杆3之间分别设置有连接杆,四组套件4分别上下滑动套装在四组第一支撑杆3外侧壁上,四组第一顶丝6分别配合螺装在四组套件4外侧壁上,第一连接架5左右两端分别与四组套件4外侧壁连接,四组第二支撑杆7顶端分别设置有凹槽,四组第一支撑杆3底端分别伸入四组第二支撑杆7的凹槽内,四组减震垫8分别设置在凹槽内侧壁底部,并且四组第一支撑杆3外侧壁下部分别设置有圆孔,四组螺柱9分别配合螺装在四组第二支撑杆7外侧壁上部,并且四组螺柱9分别伸入四组第一支撑杆3的圆孔内,四组手轮10分别固定安装在四组螺柱9后端,多组第二连接件11分别安装在四组第二支撑杆7外侧壁上,多组第二连接架12的左右两端分别通过螺栓与多组第二连接件11固定连接,支架13安装在操作台1右端,连接杆14安装在支架13右端,爬梯15顶端与挂钩16底端连接,并且挂钩16套装在连接杆14外侧壁上,两组筒体17分别安装在右部两组第二支撑杆7外侧壁上,两组插杆18分别安装在爬梯15左端,并且两组插杆18分别滑动伸入两组筒体17内部,多组固定件19均周向安装在四组第二支撑杆7外侧壁下部,四组底板20顶端分别设置在四组第二支撑杆7底端,并且多组固定件19分别通过螺栓与四组底板20固定连接,四组U形件21均安装在操作台1底端,并且四组U形件21分别与四组第一支撑杆3的位置相匹配,四组第二顶丝22分别配合螺装在四组U形件21上,四组防滑垫23分别设置在四组底板20底端,护栏24安装在操作台1顶端;首先将四组第一支撑杆3通过四组第一连接件2旋转为竖直角度,之后将四组套件4从下向上套装在四组第一支撑杆3外侧壁上,通过将四组第一顶丝6旋转,使四组套件4固定在四组第一支撑杆3外侧壁上,从而使四组套件4与四组第一连接架5配合将多组第一支撑杆3进行固定,之后将四组第一支撑杆3底端分别伸入四组第二支撑杆7凹槽内,之后将四组螺柱9前端分别伸入四组第一支撑杆3的圆孔内,从而使四组螺柱9将四组第一支撑杆3的位置进行固定,提高脚手架的组装或拆卸操作便利性,同时提高操作台1的使用安全性,之后将多组第二连接件11通过螺栓与多组第二连接架12固定连接,从而提高多组第二支撑杆7之间的稳定性,进而提高脚手架的使用稳定性,通过设置四组减震垫8,提高四组第一支撑杆3伸入凹槽内时的缓冲效果,当需要对脚手架拆卸时,首先将四组第一支撑杆3与支撑装置分离,之后将四组套件4拆卸,之后将四组第一支撑杆3向上翻转90°,使四组第一支撑杆3旋转收纳至操作台1底端,从而提高脚手架拆卸操作便利性,同时降低脚手架空间占用,提高脚手架运输的便利性。The four sets of first connectors 2 are respectively mounted on the left and right parts of the bottom end of the console 1, the tops of the four sets of first support rods 3 are respectively mounted on the four sets of first connectors 2 in rotation, and the adjacent two groups of first support rods 3 are respectively provided with connecting rods, and the four sets of kits 4 are respectively slid up and down and fitted on the outer walls of the four sets of first support rods 3, and the four sets of first jacking screws 6 are mounted on the outer walls of the four sets of kits 4 with screws respectively. The left and right ends of a connecting frame 5 are respectively connected to the outer walls of the four sets of kits 4, the tops of the four sets of second support rods 7 are respectively provided with grooves, and the bottom ends of the four sets of first support rods 3 extend into the four sets of second support rods 7 respectively. In the groove, four groups of shock absorbing pads 8 are respectively arranged at the bottom of the inner side wall of the groove, and the lower parts of the outer side walls of the four groups of first support rods 3 are respectively provided with round holes, and the four groups of studs 9 are respectively mounted on the four groups of first support rods 9 with screws. The upper part of the outer wall of the two support rods 7, and the four groups of studs 9 respectively extend into the circular holes of the four groups of first support rods 3, and the four groups of handwheels 10 are fixedly installed on the rear ends of the four groups of studs 9 respectively, and the second groups of multiple groups Connectors 11 are respectively mounted on the outer walls of four sets of second support rods 7, the left and right ends of multiple sets of second connecting frames 12 are fixedly connected to multiple sets of second connectors 11 by bolts respectively, and bracket 13 is installed on the right end of console 1 , the connecting rod 14 is installed on the right end of the bracket 13, the top of the ladder 15 is connected to the bottom end of the hook 16, and the hook 16 is set on the outer wall of the connecting rod 14, and the two sets of cylinders 17 are respectively installed on the outer sides of the two sets of second support rods 7 on the right On the wall, two sets of inserting rods 18 are respectively installed on the left end of the ladder 15, and the two sets of inserting rods 18 respectively slide into the inside of the two sets of barrels 17, and multiple sets of fixing parts 19 are installed circumferentially on the outside of the four sets of second support rods 7 In the lower part of the wall, the tops of the four sets of base plates 20 are respectively arranged on the bottom ends of the four sets of second support rods 7, and multiple sets of fixing parts 19 are respectively fixedly connected with the four sets of base plates 20 by bolts, and the four sets of U-shaped pieces 21 are all installed on the console 1 bottom, and the four sets of U-shaped pieces 21 are respectively matched with the positions of the four sets of first support rods 3, and the four sets of second top screws 22 are respectively fitted with screws on the four sets of U-shaped pieces 21, and the four sets of anti-skid pads 23 are respectively It is arranged at the bottom of the four sets of bottom plates 20, and the guardrail 24 is installed on the top of the console 1; firstly, the four sets of first support rods 3 are rotated to a vertical angle through the four sets of first connectors 2, and then the four sets of kits 4 are arranged from bottom to top Set on the outer walls of four sets of first support rods 3, by rotating four sets of first jacking screws 6, four sets of sets of sets 4 are fixed on the outer walls of four sets of first support bars 3, so that four sets of sets of sets 4 and four sets of sets The first connecting frame 5 of the group cooperates to fix multiple groups of the first support rods 3, then the bottom ends of the four groups of the first support rods 3 are respectively stretched into the grooves of the four groups of the second support rods 7, and then the four groups of studs 9 The front ends extend into the round holes of the four sets of first support rods 3 respectively, so that the four sets of studs 9 fix the positions of the four sets of first support rods 3, which improves the convenience of the scaffolding assembly or disassembly operation, and improves the operating platform at the same time. 1, and then multiple sets of second connectors 11 are fixedly connected to multiple sets of second connecting frames 12 through bolts, thereby improving the stability between multiple sets of second support rods 7, thereby improving the use stability of the scaffold , by setting four groups of damping pads 8, the four groups The cushioning effect when the first support rod 3 stretches into the groove, when the scaffold needs to be disassembled, first the four groups of first support rods 3 are separated from the support device, then the four groups of kits 4 are disassembled, and then the four groups of the first The support rods 3 are turned upward by 90°, so that the four sets of first support rods 3 are rotated and stored at the bottom of the console 1, thereby improving the convenience of scaffold disassembly and operation, reducing the space occupied by the scaffold, and improving the convenience of scaffold transportation.

如图1至图4所示,本实用新型的一种方便拆卸组装的脚手架,其在工作时,首先将四组第一支撑杆3通过四组第一连接件2旋转为竖直角度,之后将四组套件4从下向上套装在四组第一支撑杆3外侧壁上,通过将四组第一顶丝6旋转,使四组套件4固定在四组第一支撑杆3外侧壁上,从而使四组套件4与四组第一连接架5配合将多组第一支撑杆3进行固定,之后将四组第一支撑杆3底端分别伸入四组第二支撑杆7凹槽内,之后将四组螺柱9前端分别伸入四组第一支撑杆3的圆孔内,从而使四组螺柱9将四组第一支撑杆3的位置进行固定,之后将多组第二连接件11通过螺栓与多组第二连接架12固定连接,然后将挂钩16套装在连接杆14外侧壁上,之后将两组插杆18分别伸入两组筒体17内部,当需要对脚手架拆卸时,首先将四组第一支撑杆3与四组第二支撑杆7分离,之后将四组套件4拆卸,之后将四组第一支撑杆3向上翻转90°,使四组第一支撑杆3旋转收纳至四组U形件21内,通过四组第二顶丝22将四组第一支撑杆3进行固定。As shown in Figures 1 to 4, a convenient disassembly and assembly scaffold of the present utility model, when it is working, first rotates four sets of first support rods 3 to a vertical angle through four sets of first connectors 2, and then Put the four sets of sets of kits 4 on the outer walls of the four sets of first support rods 3 from bottom to top, and by rotating the four sets of first jacking screws 6, the four sets of sets of sets 4 are fixed on the outer walls of the four sets of first support rods 3, Thereby four sets of sets of kits 4 cooperate with four sets of first connecting frames 5 to fix multiple sets of first support rods 3, and then extend the bottom ends of four groups of first support rods 3 into the grooves of four groups of second support rods 7 respectively , then the front ends of the four groups of studs 9 are respectively inserted into the round holes of the four groups of first support rods 3, so that the positions of the four groups of first support rods 3 are fixed by the four groups of studs 9, and then the plurality of groups of second support rods 3 are fixed. The connector 11 is fixedly connected with multiple groups of second connecting frames 12 by bolts, and then the hook 16 is set on the outer wall of the connecting rod 14, and then the two groups of insertion rods 18 are respectively inserted into the two groups of cylinders 17. When disassembling, first separate the four sets of first support rods 3 from the four sets of second support rods 7, then disassemble the four sets of kits 4, and then turn the four sets of first support rods 3 upwards by 90°, so that the four sets of first support rods The rods 3 are rotated and accommodated in four sets of U-shaped pieces 21 , and the four sets of first support rods 3 are fixed by four sets of second jacking screws 22 .

本实用新型所实现的主要功能为:当需要对脚手架拆卸时,首先将四组第一支撑杆3与支撑装置分离,之后将四组套件4拆卸,之后将四组第一支撑杆3向上翻转90°,使四组第一支撑杆3旋转收纳至操作台1底端,从而提高脚手架拆卸操作便利性,同时降低脚手架空间占用,提高脚手架运输的便利性。The main functions realized by the utility model are: when the scaffold needs to be disassembled, firstly, the four sets of first support rods 3 are separated from the support device, and then the four sets of kits 4 are disassembled, and then the four groups of first support rods 3 are turned upwards 90°, so that the four sets of first support rods 3 are rotated and stored at the bottom of the console 1, thereby improving the convenience of scaffold disassembly and operation, reducing the space occupied by the scaffold, and improving the convenience of scaffold transportation.

本实用新型的一种方便拆卸组装的脚手架,其安装方式、连接方式或设置方式均为常见机械方式,只要能够达成其有益效果的均可进行实施;本实用新型的一种方便拆卸组装的脚手架的爬梯15和护栏24为市面上采购,本行业内技术人员只需按照其附带的使用说明书进行安装和操作即可,而无需本领域的技术人员付出创造性劳动。A scaffold for easy disassembly and assembly of the utility model, its installation method, connection method or setting method are all common mechanical methods, as long as it can achieve its beneficial effect, it can be implemented; a scaffold for convenient disassembly and assembly of the utility model The climbing ladder 15 and the guardrail 24 are purchased on the market, and those skilled in the art only need to install and operate according to the accompanying instruction manual, without the need for those skilled in the art to pay creative work.

本文所使用的所有的技术和科学术语与属于本实用新型的技术领域的技术人员通常理解的含义相同。本文中在本实用新型的说明书中所使用的术语只是为了描述具体的实施例的目的,不是旨在于限制本实用新型。本文所使用的术语“及/或”包括一个或多个相关的所列项目的任意的和所有的组合。All technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the technical field of the present invention. The terminology used in the description of the utility model herein is only for the purpose of describing specific embodiments, and is not intended to limit the utility model. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.

以上所述仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型技术原理的前提下,还可以做出若干改进和变型,这些改进和变型也应视为本实用新型的保护范围。The above is only a preferred embodiment of the utility model, it should be pointed out that for those of ordinary skill in the art, without departing from the technical principle of the utility model, some improvements and modifications can also be made. And modification should also be regarded as the protection scope of the present utility model.

Claims (7)

1. The scaffold convenient to disassemble and assemble is characterized by comprising an operating platform (1), four groups of first connecting pieces (2), four groups of first supporting rods (3), a supporting device, four groups of kits (4), a first connecting frame (5) and four groups of first jackscrews (6), wherein the four groups of first connecting pieces (2) are respectively installed at the left part and the right part of the bottom end of the operating platform (1), the top ends of the four groups of first supporting rods (3) are respectively and rotatably installed on the four groups of first connecting pieces (2), connecting rods are respectively arranged between the two adjacent groups of first supporting rods (3), the four groups of kits (4) are respectively sleeved on the outer side walls of the four groups of first supporting rods (3) in a vertical sliding mode, the four groups of first jackscrews (6) are respectively matched with the outer side walls of the four groups of kits (4), the left end and the right end of the first connecting frame (5) are respectively connected with the outer side walls of the four groups of kits (4), the bottom ends of the four groups of first supporting rods (3) respectively extend into the supporting device, and the supporting device is used for supporting the bottom ends of the four groups of first supporting rods (3).
2. A scaffold convenient for disassembly and assembly as claimed in claim 1, wherein the supporting device comprises four sets of second supporting rods (7), four sets of shock-absorbing pads (8), four sets of studs (9), four sets of handwheels (10), a plurality of sets of second connecting members (11) and a plurality of sets of second connecting members (12), the top ends of the four sets of second supporting rods (7) are respectively provided with a groove, the bottom ends of the four sets of first supporting rods (3) respectively extend into the grooves of the four sets of second supporting rods (7), the four sets of shock-absorbing pads (8) are respectively arranged at the bottom of the inner side walls of the grooves, the lower parts of the outer side walls of the four sets of first supporting rods (3) are respectively provided with a round hole, the four sets of studs (9) are respectively matched and screwed on the upper parts of the outer side walls of the four sets of second supporting rods (7), the four sets of studs (9) respectively extend into the round holes of the four sets of first supporting rods (3), the four sets of handwheels (10) are respectively fixedly arranged at the rear ends of the four sets of studs (9), the plurality of second connecting members (11) are respectively arranged on the outer side walls of the four sets of second supporting rods (7), and the left and right ends of the plurality of second connecting members (12) are respectively fixedly connected with the plurality of second connecting members (11) through bolts.
3. A scaffold convenient for disassembly and assembly as claimed in claim 1, further comprising a support (13), a connecting rod (14), a ladder (15), a hook (16), two sets of cylinders (17) and two sets of insertion rods (18), wherein the support (13) is installed at the right end of the operation platform (1), the connecting rod (14) is installed at the right end of the support (13), the top end of the ladder (15) is connected with the bottom end of the hook (16), the hook (16) is sleeved on the outer side wall of the connecting rod (14), the two sets of cylinders (17) are respectively installed on the outer side walls of the two sets of second support rods (7) at the right part, the two sets of insertion rods (18) are respectively installed at the left end of the ladder (15), and the two sets of insertion rods (18) respectively extend into the two sets of cylinders (17) in a sliding manner.
4. A scaffold convenient for disassembly and assembly as claimed in claim 2, further comprising a plurality of sets of fixing members (19) and four sets of bottom plates (20), wherein the plurality of sets of fixing members (19) are all circumferentially installed at the lower portions of the outer side walls of the four sets of second supporting rods (7), the top ends of the four sets of bottom plates (20) are respectively arranged at the bottom ends of the four sets of second supporting rods (7), and the plurality of sets of fixing members (19) are respectively fixedly connected with the four sets of bottom plates (20) through bolts.
5. A scaffold convenient for disassembly and assembly as claimed in claim 1, further comprising four sets of U-shaped members (21) and four sets of second jackscrews (22), wherein the four sets of U-shaped members (21) are all installed at the bottom end of the operation table (1), and the four sets of U-shaped members (21) are respectively matched with the positions of the four sets of first supporting rods (3), and the four sets of second jackscrews (22) are respectively matched and screwed on the four sets of U-shaped members (21).
6. A scaffold convenient for disassembly and assembly as claimed in claim 4, further comprising four sets of anti-slip pads (23), wherein the four sets of anti-slip pads (23) are respectively arranged at the bottom ends of the four sets of bottom plates (20).
7. A scaffold which facilitates disassembly and assembly as claimed in claim 1, further comprising a guardrail (24), the guardrail (24) being mounted on top of the operation platform (1).
CN202222053078.2U 2022-08-04 2022-08-04 Scaffold convenient to disassemble and assemble Active CN217871698U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222053078.2U CN217871698U (en) 2022-08-04 2022-08-04 Scaffold convenient to disassemble and assemble

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222053078.2U CN217871698U (en) 2022-08-04 2022-08-04 Scaffold convenient to disassemble and assemble

Publications (1)

Publication Number Publication Date
CN217871698U true CN217871698U (en) 2022-11-22

Family

ID=84076343

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222053078.2U Active CN217871698U (en) 2022-08-04 2022-08-04 Scaffold convenient to disassemble and assemble

Country Status (1)

Country Link
CN (1) CN217871698U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117005658A (en) * 2023-08-10 2023-11-07 中国水电四局(福清)装备工程有限公司 A convenient and disassembly scaffolding work platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117005658A (en) * 2023-08-10 2023-11-07 中国水电四局(福清)装备工程有限公司 A convenient and disassembly scaffolding work platform

Similar Documents

Publication Publication Date Title
CN217871698U (en) Scaffold convenient to disassemble and assemble
CN110295736B (en) A foldable scaffold that can be easily retracted
CN208105830U (en) A kind of interior decoration scaffold
CN211114714U (en) Building scaffold convenient to remove
CN211172982U (en) Scaffold frame for building decoration that security performance is high for indoor
CN212105051U (en) Foldable construction platform
CN219955183U (en) Anti-toppling solar street lamp post
CN115387594B (en) Prevent old house of empting and change scaffold frame for making
CN208220155U (en) A kind of finishing uses scaffold
CN222140642U (en) Bearing frame for building construction
CN115977362A (en) Scaffold capable of preventing frame body from inclining outwards
CN110821125B (en) Double-layer scaffold for tunnel construction
CN204709739U (en) A kind of portable single-arm basketball stand
CN210798227U (en) Movable adjustable safety scaffold
CN208950271U (en) A kind of construction scaffold
CN219826053U (en) Novel scaffold convenient to equipment
CN212559357U (en) A structurally stable lifting platform
CN216042514U (en) Dual self-lifting type external climbing frame for high-rise building
CN221346235U (en) High-strength climbing bracket assembly
CN207710748U (en) A kind of assembly type sculpture table
CN219808675U (en) Construction hanging basket overhanging device
CN206801197U (en) Tent bracket
CN218091939U (en) Combined anti-skidding climbing frame for constructional engineering
CN216038530U (en) Domestic platform hoisting device
CN219654237U (en) Support for interior decoration

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20251124

Address after: 404300 Chongqing City Zhongxian County Bachang Town Chaoyang Village Group 3 No. 138

Patentee after: Wu Tongyou

Country or region after: China

Patentee after: Zeng Hong

Patentee after: Ding Xiabin

Address before: 116000Liaoning Province, Ganjingzi District, Hua Dong Road, No. 66E, Unit 3, 4th Floor, Room 2

Patentee before: Dalian Yitong Construction Engineering Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20251220

Address after: 404300 Chongqing City Zhongxian County Bachang Town Chaoyang Village Group 3 No. 138

Patentee after: Wu Tongyou

Country or region after: China

Patentee after: Zeng Hong

Patentee after: Cao Yong

Address before: 404300 Chongqing City Zhongxian County Bachang Town Chaoyang Village Group 3 No. 138

Patentee before: Wu Tongyou

Country or region before: China

Patentee before: Zeng Hong

Patentee before: Ding Xiabin

TR01 Transfer of patent right
PP01 Preservation of patent right

Effective date of registration: 20260306

Granted publication date: 20221122