CN217858371U - Leading conveyor of continuous stamping die's steel sheet - Google Patents

Leading conveyor of continuous stamping die's steel sheet Download PDF

Info

Publication number
CN217858371U
CN217858371U CN202221672159.4U CN202221672159U CN217858371U CN 217858371 U CN217858371 U CN 217858371U CN 202221672159 U CN202221672159 U CN 202221672159U CN 217858371 U CN217858371 U CN 217858371U
Authority
CN
China
Prior art keywords
frame
conveying roller
steel plate
block
stamping die
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221672159.4U
Other languages
Chinese (zh)
Inventor
谢海永
李明明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinhua Yutuo Mold Co ltd
Original Assignee
Jinhua Yutuo Mold Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinhua Yutuo Mold Co ltd filed Critical Jinhua Yutuo Mold Co ltd
Priority to CN202221672159.4U priority Critical patent/CN217858371U/en
Application granted granted Critical
Publication of CN217858371U publication Critical patent/CN217858371U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Press Drives And Press Lines (AREA)

Abstract

本实用新型涉及一种连续冲压模具的钢板前置输送装置,属于冲压设备辅助领域,包括机架、放卷架、校平机、安装架、第一输送辊、第二输送辊、导向架和压块;放卷架、校平机、安装架和导向架从左往右依次设置在机架上;第一输送辊转动设置在机架上;第二输送辊滑动设置在安装架上;安装架上设置有用于推动第二输送辊朝向第一输送辊方向移动的抵接机构;机架上设置有用于驱动第一输送辊和第二输送辊同步转动的驱动机构;压块滑动设置在导向架上,压块与导向架抵接;导向架上设置有用于驱动压块移动的伸缩缸;驱动机构与伸缩缸电性连接。本实用新型能够自动对钢卷进行校平,并在冲压时对钢卷进行固定,防止钢卷移动。

Figure 202221672159

The utility model relates to a steel plate front conveying device for a continuous stamping die, which belongs to the auxiliary field of stamping equipment, and includes a machine frame, an unwinding frame, a leveling machine, a mounting frame, a first conveying roller, a second conveying roller, a guide frame and Pressing block; unwinding frame, leveling machine, mounting frame and guide frame are arranged on the frame from left to right; the first conveying roller is set on the frame in rotation; the second conveying roller is slidably set on the mounting frame; installation The frame is provided with an abutting mechanism for pushing the second conveying roller to move toward the first conveying roller; the frame is provided with a driving mechanism for driving the first conveying roller and the second conveying roller to rotate synchronously; On the frame, the pressing block abuts against the guiding frame; the guiding frame is provided with a telescopic cylinder for driving the pressing block to move; the driving mechanism is electrically connected with the telescopic cylinder. The utility model can automatically level the steel coils and fix the steel coils during stamping to prevent the steel coils from moving.

Figure 202221672159

Description

一种连续冲压模具的钢板前置输送装置A steel plate pre-conveying device for a continuous stamping die

技术领域technical field

本实用新型涉及冲压设备辅助领域,特别是涉及一种连续冲压模具的钢板前置输送装置。The utility model relates to the auxiliary field of stamping equipment, in particular to a steel plate front conveying device for a continuous stamping die.

背景技术Background technique

钢板冲压是靠压力机和模具对钢板施加外力,使之产生塑性变形或分离,从而获得所需形状和尺寸工件的成形加工方法。Steel plate stamping is a forming processing method that relies on presses and molds to apply external forces to steel plates to cause plastic deformation or separation, thereby obtaining workpieces of required shape and size.

现有的冲压设备在对钢板进行连续高速冲压时,需要人工将钢板慢慢的推入到冲压模具内进行冲压,而使用钢卷进行连续冲压时,需要预先对钢卷进行校平操作后,才能进行冲压,且在冲压时,钢卷会移动发生位移,容易影响成品的质量。When the existing stamping equipment performs continuous high-speed stamping on the steel plate, it is necessary to manually push the steel plate into the stamping die for stamping. When using steel coils for continuous stamping, it is necessary to level the steel coils in advance. Stamping can only be carried out, and during stamping, the steel coil will move and be displaced, which will easily affect the quality of the finished product.

实用新型内容Utility model content

本实用新型的目的是针对背景技术中存在的问题,提出一种能够自动对钢卷进行校平,并在冲压时对钢卷进行固定,防止钢卷移动的连续冲压模具的钢板前置输送装置。The purpose of this utility model is to solve the problems existing in the background technology and propose a steel plate pre-conveying device for a continuous stamping die that can automatically level the steel coil and fix the steel coil during stamping to prevent the steel coil from moving .

本实用新型的技术方案:一种连续冲压模具的钢板前置输送装置,包括机架、放卷架、校平机、安装架、第一输送辊、第二输送辊、导向架和压块;The technical solution of the utility model: a steel plate front conveying device for a continuous stamping die, including a machine frame, an unwinding frame, a leveling machine, a mounting frame, a first conveying roller, a second conveying roller, a guide frame and a pressing block;

放卷架、校平机、安装架和导向架从左往右依次设置在机架上;第一输送辊转动设置在机架上;第二输送辊滑动设置在安装架上;安装架上设置有用于推动第二输送辊朝向第一输送辊方向移动的抵接机构;机架上设置有用于驱动第一输送辊和第二输送辊同步转动的驱动机构;压块滑动设置在导向架上,压块与导向架抵接;导向架上设置有用于驱动压块移动的伸缩缸;驱动机构与伸缩缸电性连接。The unwinding frame, leveling machine, mounting frame and guide frame are set on the frame from left to right; the first conveying roller is set on the frame in rotation; the second conveying roller is slidably set on the mounting frame; the mounting frame is set There is an abutment mechanism for pushing the second conveying roller to move towards the first conveying roller; the frame is provided with a driving mechanism for driving the first conveying roller and the second conveying roller to rotate synchronously; the pressure block is slidably arranged on the guide frame, The pressing block abuts against the guide frame; the guiding frame is provided with a telescopic cylinder for driving the pressing block to move; the driving mechanism is electrically connected with the telescopic cylinder.

优选的,放卷架上设置有安装槽和阻挡块;安装槽呈半圆型结构;阻挡块上设置有弧形面;阻挡块滑动设置在放卷架上;阻挡块位于安装槽处;放卷架上设置有用于驱动阻挡块移动的升降机构。Preferably, the unwinding frame is provided with a mounting groove and a blocking block; the mounting groove is a semicircular structure; the blocking block is provided with an arc-shaped surface; the blocking block is slidably arranged on the unwinding frame; the blocking block is located at the mounting groove; A lifting mechanism for driving the blocking block to move is arranged on the frame.

优选的,升降机构包括驱动电机、丝杆、升降板和导轨;驱动电机和导轨均设置在放卷架上;驱动电机的输出端与丝杆连接;升降板设置在阻挡块的下端,升降板滑动设置在导轨上,升降板与丝杆螺纹连接。Preferably, the lifting mechanism includes a driving motor, a screw mandrel, a lifting plate and a guide rail; the driving motor and the guiding rail are all arranged on the unwinding frame; the output end of the driving motor is connected with the screw mandrel; the lifting plate is arranged at the lower end of the blocking block, and the lifting plate The slide is arranged on the guide rail, and the lifting plate is screwed with the screw rod.

优选的,抵接机构包括滑杆、弹性件和滑动块;滑杆设置在安装架上;滑动块滑动设置在滑杆和安装架上;弹性件设置在滑杆的外周侧,弹性件的两端分别与安装架和滑动块连接;第二输送辊转动设置在滑动块上。Preferably, the abutting mechanism includes a slide bar, an elastic member and a slide block; the slide bar is arranged on the mounting frame; the slide block is slidably arranged on the slide bar and the mounting frame; The ends are respectively connected with the mounting frame and the sliding block; the second conveying roller is rotatably arranged on the sliding block.

优选的,机架上设置有导向轮;导向轮位于放卷架和校平机之间。Preferably, the frame is provided with guide wheels; the guide wheels are located between the unwinding frame and the leveling machine.

优选的,机架上转动设置有支撑轮;支撑轮设置有多个,多个支撑轮均位于校平机和安装架之间。Preferably, there are support wheels rotatably provided on the frame; there are multiple support wheels, and the multiple support wheels are all located between the leveler and the mounting frame.

优选的,压块的下端设置有防滑纹。Preferably, the lower end of the pressure block is provided with anti-skid lines.

与现有技术相比,本实用新型具有如下有益的技术效果:Compared with the prior art, the utility model has the following beneficial technical effects:

本实用新型中,将钢卷放置到放卷架上进行放卷,钢卷的一端引出,并插入到校平机内进行校平,校平后的钢板移动到第一输送辊和第二输送辊之间,抵接机构推动第二输送辊压在钢板上,使得钢板压在第一输送辊上,从而能够在驱动机构驱动第一输送辊和第二输送辊转动时,能更好对钢板进行输送,防止因为打滑而导致钢卷无法输送到冲压模具内,钢板被第一输送辊和第二输送辊输送到导向架内,导向架对钢板进行导向,方便钢板移动到冲压模具内,进行冲压作业,当钢板移动到冲压模具内进行冲压加工时,伸缩缸驱动压块向下移动,使得压块压在钢板上,将钢板压在导向架上,防止钢板移动,且此时驱动机构处于停机状态,从而能够避免在冲压作业时,未输送到冲压模具内的钢板影响加工的质量,冲压完成后,伸缩缸驱动压块与钢板分离,驱动机构继续通过第一输送辊和第二输送辊输送钢板,进行下一轮的加工,从而实现连续加工,直至一卷钢卷用完,更换新的钢卷。In the utility model, the steel coil is placed on the unwinding frame for unwinding, and one end of the steel coil is drawn out and inserted into the leveling machine for leveling, and the leveled steel plate moves to the first conveying roller and the second conveying roller Between the rollers, the abutment mechanism pushes the second conveying roller to press against the steel plate, so that the steel plate is pressed against the first conveying roller, so that when the driving mechanism drives the first conveying roller and the second conveying roller to rotate, the steel plate can be better To prevent the steel coil from being transported into the stamping die due to slipping, the steel plate is transported into the guide frame by the first conveying roller and the second conveying roller, and the guide frame guides the steel plate to facilitate the steel plate to move into the stamping die. In the stamping operation, when the steel plate moves into the stamping die for stamping processing, the telescopic cylinder drives the pressing block to move downward, so that the pressing block presses on the steel plate, presses the steel plate on the guide frame, and prevents the steel plate from moving. At this time, the driving mechanism is in the Stop state, so as to avoid the impact of the steel plate not transported into the stamping die on the processing quality during the stamping operation. After the stamping is completed, the telescopic cylinder drives the pressing block to separate from the steel plate, and the driving mechanism continues to pass through the first conveying roller and the second conveying roller. The steel plate is conveyed for the next round of processing, so as to realize continuous processing until a coil of steel is used up, and a new coil is replaced.

附图说明Description of drawings

图1为本实用新型中实施例的结构示意图;Fig. 1 is the structural representation of embodiment in the utility model;

图2为图1中A处的局部放大结构示意图;Fig. 2 is a schematic diagram of a partially enlarged structure at A in Fig. 1;

图3为图1中B处的局部放大结构示意图。FIG. 3 is a schematic diagram of a partially enlarged structure at B in FIG. 1 .

附图标记:1、机架;2、放卷架;201、安装槽;3、阻挡块;4、升降机构;401、驱动电机;402、丝杆;403、升降板;404、导轨;5、导向轮;6、校平机;7、支撑轮;8、安装架;91、第一输送辊;92、第二输送辊;10、导向架;11、压块;12、伸缩缸;13、抵接机构;1301、滑杆;1302、弹性件;1303、滑动块;14、驱动机构。Reference signs: 1, frame; 2, unwinding rack; 201, installation groove; 3, blocking block; 4, lifting mechanism; 401, driving motor; 402, screw rod; 403, lifting plate; 404, guide rail; 5 , guide wheel; 6, leveling machine; 7, support wheel; 8, mounting frame; 91, first conveying roller; 92, second conveying roller; 10, guide frame; 11, briquetting block; 12, telescopic cylinder; 13 , abutting mechanism; 1301, a sliding rod; 1302, an elastic member; 1303, a sliding block; 14, a driving mechanism.

具体实施方式Detailed ways

实施例一Embodiment one

如图1-3所示,本实用新型提出的一种连续冲压模具的钢板前置输送装置,包括机架1、放卷架2、校平机6、安装架8、第一输送辊91、第二输送辊92、导向架10和压块11;As shown in Figures 1-3, a steel plate front conveying device for a continuous stamping die proposed by the utility model includes a frame 1, an unwinding frame 2, a leveling machine 6, a mounting frame 8, a first conveying roller 91, The second conveying roller 92, the guide frame 10 and the briquetting block 11;

放卷架2、校平机6、安装架8和导向架10从左往右依次设置在机架1上;机架1上设置有导向轮5;导向轮5位于放卷架2和校平机6之间;导向轮5能够对钢卷进行导向,方便钢卷移动到校平机6内。第一输送辊91转动设置在机架1上;第二输送辊92滑动设置在安装架8上;安装架8上设置有用于推动第二输送辊92朝向第一输送辊91方向移动的抵接机构13;机架1上设置有用于驱动第一输送辊91和第二输送辊92同步转动的驱动机构14;机架1上转动设置有支撑轮7;支撑轮7设置有多个,多个支撑轮7均位于校平机6和安装架8之间;支撑轮7能够对校平后的钢板进行支撑,减少钢板与机架1之间的摩擦力,方便移动到第一输送辊91和第二输送辊92处。压块11滑动设置在导向架10上,压块11与导向架10抵接;导向架10上设置有用于驱动压块11移动的伸缩缸12;驱动机构14与伸缩缸12电性连接。压块11的下端设置有防滑纹;防滑纹能够使得压块11更好的压在钢板上,防止钢板移动。The unwinding frame 2, the leveling machine 6, the mounting frame 8 and the guide frame 10 are sequentially arranged on the frame 1 from left to right; the frame 1 is provided with a guide wheel 5; Between the machine 6; the guide wheel 5 can guide the steel coil to facilitate the steel coil to move into the leveler 6. The first conveying roller 91 is rotatably arranged on the frame 1; the second conveying roller 92 is slidably arranged on the mounting frame 8; Mechanism 13; the frame 1 is provided with a driving mechanism 14 for driving the first conveyor roller 91 and the second conveyor roller 92 to rotate synchronously; the frame 1 is provided with a support wheel 7 for rotation; the support wheel 7 is provided with multiple, multiple The support wheels 7 are all located between the leveler 6 and the mounting frame 8; the support wheels 7 can support the steel plate after leveling, reduce the friction between the steel plate and the frame 1, and facilitate moving to the first conveying roller 91 and The second conveying roller 92 places. The pressing block 11 is slidably arranged on the guide frame 10 , and the pressing block 11 abuts against the guiding frame 10 ; the guiding frame 10 is provided with a telescopic cylinder 12 for driving the pressing block 11 to move; the driving mechanism 14 is electrically connected with the telescopic cylinder 12 . The lower end of the pressing block 11 is provided with anti-slip lines; the anti-slip lines can make the pressing block 11 better press on the steel plate and prevent the steel plate from moving.

本实施例中,将钢卷放置到放卷架2上进行放卷,钢卷的一端引出,并插入到校平机6内进行校平,校平后的钢板移动到第一输送辊91和第二输送辊92之间,抵接机构13推动第二输送辊92压在钢板上,使得钢板压在第一输送辊91上,从而能够在驱动机构14驱动第一输送辊91和第二输送辊92转动时,能更好对钢板进行输送,防止因为打滑而导致钢卷无法输送到冲压模具内,钢板被第一输送辊91和第二输送辊92输送到导向架10内,导向架10对钢板进行导向,方便钢板移动到冲压模具内,进行冲压作业,当钢板移动到冲压模具内进行冲压加工时,伸缩缸12驱动压块11向下移动,使得压块11压在钢板上,将钢板压在导向架10上,防止钢板移动,且此时驱动机构14处于停机状态,从而能够避免在冲压作业时,未输送到冲压模具内的钢板影响加工的质量,冲压完成后,伸缩缸12驱动压块11与钢板分离,驱动机构14继续通过第一输送辊91和第二输送辊92输送钢板,进行下一轮的加工,从而实现连续加工,直至一卷钢卷用完,更换新的钢卷。In this embodiment, the steel coil is placed on the unwinding frame 2 for unwinding, and one end of the steel coil is drawn out and inserted into the leveling machine 6 for leveling. The steel plate after leveling moves to the first conveying roller 91 and Between the second conveying rollers 92, the abutting mechanism 13 pushes the second conveying roller 92 to press against the steel plate, so that the steel plate is pressed against the first conveying roller 91, so that the driving mechanism 14 can drive the first conveying roller 91 and the second conveying roller. When the roller 92 rotates, the steel plate can be better conveyed to prevent the steel coil from being conveyed into the stamping die due to slipping. The steel plate is conveyed into the guide frame 10 by the first conveying roller 91 and the second conveying roller 92. The guide frame 10 The steel plate is guided to facilitate the steel plate to move into the stamping die for stamping operations. When the steel plate moves into the stamping die for stamping processing, the telescopic cylinder 12 drives the pressing block 11 to move downward, so that the pressing block 11 is pressed on the steel plate, and the The steel plate is pressed on the guide frame 10 to prevent the steel plate from moving, and at this time the drive mechanism 14 is in a shutdown state, so as to avoid the impact of the steel plate not transported into the stamping die on the quality of the processing during the stamping operation. After the stamping is completed, the telescopic cylinder 12 The driving briquetting block 11 is separated from the steel plate, and the driving mechanism 14 continues to convey the steel plate through the first conveying roller 91 and the second conveying roller 92 for the next round of processing, thereby realizing continuous processing until one roll of steel coil is used up and replaced with a new one. steel coil.

实施例二Embodiment two

如图1-3所示,本实用新型提出的一种连续冲压模具的钢板前置输送装置,相较于实施例一,本实施例中的放卷架2上设置有安装槽201和阻挡块3;安装槽201呈半圆型结构;阻挡块3上设置有弧形面;阻挡块3滑动设置在放卷架2上;阻挡块3位于安装槽201处;放卷架2上设置有用于驱动阻挡块3移动的升降机构4。As shown in Figures 1-3, the utility model proposes a steel plate front conveying device for a continuous stamping die. Compared with Embodiment 1, the unwinding frame 2 in this embodiment is provided with a mounting groove 201 and a blocking block 3; the installation groove 201 is a semicircular structure; the blocking block 3 is provided with an arc-shaped surface; the blocking block 3 is slidably set on the unwinding frame 2; the blocking block 3 is located at the installation groove 201; The lifting mechanism 4 that stops block 3 to move.

升降机构4包括驱动电机401、丝杆402、升降板403和导轨404;驱动电机401和导轨404均设置在放卷架2上;驱动电机401的输出端与丝杆402连接;升降板403设置在阻挡块3的下端,升降板403滑动设置在导轨404上,升降板403与丝杆402螺纹连接。Lifting mechanism 4 comprises drive motor 401, screw mandrel 402, lift plate 403 and guide rail 404; Drive motor 401 and guide rail 404 are all arranged on the unwinding frame 2; The output end of drive motor 401 is connected with screw mandrel 402; Lift plate 403 sets At the lower end of the blocking block 3 , the lifting plate 403 is slidably disposed on the guide rail 404 , and the lifting plate 403 is screwed to the screw rod 402 .

本实施例中,机架1上设置有安装轴,安装轴与放卷架2可拆连接且卡接,安装轴用于对钢卷进行支撑,将钢卷放置到安装轴上,安装轴的两端均设置有轴承,将安装轴的放入到放卷架2上,且轴承位于安装槽201内,驱动电机401驱动丝杆402转动,丝杆402驱动升降板403移动,升降板403带动阻挡块3移动,从而使得阻挡块3移出,与轴承接触从而能够对安装轴进行限位,防止安装轴移动,方便进行放卷,当需要取下安装轴时,升降机构4驱动阻挡块3收回到放卷架2内,解除对安装槽201的封堵,从而使得安装轴能够取下。In this embodiment, the frame 1 is provided with an installation shaft, which is detachably connected and clamped with the unwinding frame 2. The installation shaft is used to support the steel coil, and the steel coil is placed on the installation shaft. Both ends are provided with bearings, put the installation shaft on the unwinding frame 2, and the bearing is located in the installation groove 201, the driving motor 401 drives the screw rod 402 to rotate, the screw rod 402 drives the lifting plate 403 to move, and the lifting plate 403 drives The blocking block 3 moves, so that the blocking block 3 moves out, and contacts with the bearing to limit the position of the installation shaft, prevent the installation shaft from moving, and facilitate unwinding. When the installation shaft needs to be removed, the lifting mechanism 4 drives the blocking block 3 to retract In the unwinding stand 2, unblock the mounting groove 201, so that the mounting shaft can be removed.

实施例三Embodiment three

如图1-3所示,本实用新型提出的一种连续冲压模具的钢板前置输送装置,相较于实施例一或实施例二,本实施例中的抵接机构13包括滑杆1301、弹性件1302和滑动块1303;滑杆1301设置在安装架8上;滑动块1303滑动设置在滑杆1301和安装架8上;弹性件1302设置在滑杆1301的外周侧,弹性件1302的两端分别与安装架8和滑动块1303连接;第二输送辊92转动设置在滑动块1303上。As shown in Figures 1-3, the utility model proposes a steel plate front conveying device for a continuous stamping die. Compared with Embodiment 1 or Embodiment 2, the abutment mechanism 13 in this embodiment includes a slide bar 1301, Elastic part 1302 and sliding block 1303; Slide bar 1301 is arranged on the mounting frame 8; Slide block 1303 is slidably arranged on the sliding bar 1301 and mounting frame 8; The ends are respectively connected with the mounting frame 8 and the sliding block 1303; the second conveying roller 92 is rotatably arranged on the sliding block 1303.

本实施例中,弹性件1302推动滑动块1303向下移动,滑动块1303带动第二输送辊92向下移动,滑杆1301对滑动块1303进行导向和支撑,使得滑动块1303运动的更加平稳,使得第二输送辊92能够抵在钢板上,并将钢板压在第一输送辊91上,能够更好的通过摩擦对钢板进行输送,防止因为打滑导致无法输送钢板。In this embodiment, the elastic member 1302 pushes the sliding block 1303 to move downward, and the sliding block 1303 drives the second conveying roller 92 to move downward, and the sliding rod 1301 guides and supports the sliding block 1303, so that the sliding block 1303 moves more smoothly. The second conveying roller 92 can abut against the steel plate and press the steel plate on the first conveying roller 91, so that the steel plate can be better conveyed by friction and prevent the steel plate from being unable to be conveyed due to slipping.

上面结合附图对本实用新型的实施方式作了详细说明,但是本实用新型并不限于此,在所属技术领域的技术人员所具备的知识范围内,在不脱离本实用新型宗旨的前提下还可以作出各种变化。Above, the embodiment of the present utility model has been described in detail in conjunction with the accompanying drawings, but the present utility model is not limited thereto. Make various changes.

Claims (7)

1.一种连续冲压模具的钢板前置输送装置,其特征在于,包括机架(1)、放卷架(2)、校平机(6)、安装架(8)、第一输送辊(91)、第二输送辊(92)、导向架(10)和压块(11);1. a steel plate front conveying device of a continuous stamping die, is characterized in that, comprises frame (1), unwinding rack (2), leveling machine (6), mounting frame (8), the first conveying roller ( 91), the second delivery roller (92), guide frame (10) and briquetting block (11); 放卷架(2)、校平机(6)、安装架(8)和导向架(10)从左往右依次设置在机架(1)上;第一输送辊(91)转动设置在机架(1)上;第二输送辊(92)滑动设置在安装架(8)上;安装架(8)上设置有用于推动第二输送辊(92)朝向第一输送辊(91)方向移动的抵接机构(13);机架(1)上设置有用于驱动第一输送辊(91)和第二输送辊(92)同步转动的驱动机构(14);压块(11)滑动设置在导向架(10)上,压块(11)与导向架(10)抵接;导向架(10)上设置有用于驱动压块(11)移动的伸缩缸(12);驱动机构(14)与伸缩缸(12)电性连接。Unwinding frame (2), leveling machine (6), installation frame (8) and guide frame (10) are arranged on the frame (1) successively from left to right; on the frame (1); the second conveying roller (92) is slidably arranged on the mounting frame (8); The abutment mechanism (13); the frame (1) is provided with a driving mechanism (14) for driving the first conveying roller (91) and the second conveying roller (92) to rotate synchronously; the pressing block (11) is slidably arranged on On the guide frame (10), the briquetting block (11) abuts against the guide frame (10); the guide frame (10) is provided with a telescopic cylinder (12) for driving the briquetting block (11) to move; the drive mechanism (14) and The telescopic cylinder (12) is electrically connected. 2.根据权利要求1所述的一种连续冲压模具的钢板前置输送装置,其特征在于,放卷架(2)上设置有安装槽(201)和阻挡块(3);安装槽(201)呈半圆型结构;阻挡块(3)上设置有弧形面;阻挡块(3)滑动设置在放卷架(2)上;阻挡块(3)位于安装槽(201)处;放卷架(2)上设置有用于驱动阻挡块(3)移动的升降机构(4)。2. The steel plate front conveying device of a kind of continuous stamping die according to claim 1, characterized in that, the unwinding rack (2) is provided with an installation groove (201) and a blocking block (3); the installation groove (201 ) is a semicircular structure; the blocking block (3) is provided with an arc-shaped surface; the blocking block (3) is slidably arranged on the unwinding frame (2); the blocking block (3) is located at the installation groove (201); the unwinding frame (2) is provided with a lifting mechanism (4) for driving the blocking block (3) to move. 3.根据权利要求2所述的一种连续冲压模具的钢板前置输送装置,其特征在于,升降机构(4)包括驱动电机(401)、丝杆(402)、升降板(403)和导轨(404);驱动电机(401)和导轨(404)均设置在放卷架(2)上;驱动电机(401)的输出端与丝杆(402)连接;升降板(403)设置在阻挡块(3)的下端,升降板(403)滑动设置在导轨(404)上,升降板(403)与丝杆(402)螺纹连接。3. A steel plate front conveying device for a continuous stamping die according to claim 2, characterized in that the lifting mechanism (4) includes a driving motor (401), a screw rod (402), a lifting plate (403) and a guide rail (404); the driving motor (401) and the guide rail (404) are all arranged on the unwinding stand (2); the output end of the driving motor (401) is connected with the screw mandrel (402); the lifting plate (403) is arranged on the blocking block (3) the lower end, the lifting plate (403) is slidably arranged on the guide rail (404), and the lifting plate (403) is threadedly connected with the screw mandrel (402). 4.根据权利要求1所述的一种连续冲压模具的钢板前置输送装置,其特征在于,抵接机构(13)包括滑杆(1301)、弹性件(1302)和滑动块(1303);滑杆(1301)设置在安装架(8)上;滑动块(1303)滑动设置在滑杆(1301)和安装架(8)上;弹性件(1302)设置在滑杆(1301)的外周侧,弹性件(1302)的两端分别与安装架(8)和滑动块(1303)连接;第二输送辊(92)转动设置在滑动块(1303)上。4. A steel plate front conveying device for a continuous stamping die according to claim 1, characterized in that, the abutting mechanism (13) includes a sliding rod (1301), an elastic member (1302) and a sliding block (1303); The sliding bar (1301) is set on the mounting frame (8); the sliding block (1303) is slidably set on the sliding bar (1301) and the mounting frame (8); the elastic member (1302) is set on the outer peripheral side of the sliding bar (1301) , the two ends of the elastic member (1302) are respectively connected with the installation frame (8) and the sliding block (1303); the second conveying roller (92) is rotatably arranged on the sliding block (1303). 5.根据权利要求1所述的一种连续冲压模具的钢板前置输送装置,其特征在于,机架(1)上设置有导向轮(5);导向轮(5)位于放卷架(2)和校平机(6)之间。5. The steel plate front conveying device of a kind of continuous stamping die according to claim 1, characterized in that, the frame (1) is provided with guide wheels (5); the guide wheels (5) are located on the unwinding frame (2 ) and the leveler (6). 6.根据权利要求1所述的一种连续冲压模具的钢板前置输送装置,其特征在于,机架(1)上转动设置有支撑轮(7);支撑轮(7)设置有多个,多个支撑轮(7)均位于校平机(6)和安装架(8)之间。6. The steel plate front conveying device of a kind of continuous stamping die according to claim 1, characterized in that, the frame (1) is provided with support wheels (7) for rotation; the support wheels (7) are provided with multiple, Multiple support wheels (7) are located between the leveler (6) and the mounting frame (8). 7.根据权利要求1所述的一种连续冲压模具的钢板前置输送装置,其特征在于,压块(11)的下端设置有防滑纹。7. A steel plate front conveying device for a continuous stamping die according to claim 1, characterized in that the lower end of the pressing block (11) is provided with anti-slip lines.
CN202221672159.4U 2022-06-30 2022-06-30 Leading conveyor of continuous stamping die's steel sheet Expired - Fee Related CN217858371U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221672159.4U CN217858371U (en) 2022-06-30 2022-06-30 Leading conveyor of continuous stamping die's steel sheet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221672159.4U CN217858371U (en) 2022-06-30 2022-06-30 Leading conveyor of continuous stamping die's steel sheet

Publications (1)

Publication Number Publication Date
CN217858371U true CN217858371U (en) 2022-11-22

Family

ID=84100403

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221672159.4U Expired - Fee Related CN217858371U (en) 2022-06-30 2022-06-30 Leading conveyor of continuous stamping die's steel sheet

Country Status (1)

Country Link
CN (1) CN217858371U (en)

Similar Documents

Publication Publication Date Title
CN204892776U (en) Thick plate type three-in-one feeder
CN201823794U (en) Roll-type drum machine
CN207563615U (en) Strip punching and shearing conveying device
CN105013904B (en) Automatic-feeding bending machine
CN217858371U (en) Leading conveyor of continuous stamping die's steel sheet
CN112707229A (en) Movable pressing device for photocuring hose
CN116374356B (en) Film tearing workbench
CN204917332U (en) Precision two-in-one leveling machine
CN209505162U (en) A kind of three roller synchronous mode stripping machines
CN207698867U (en) A kind of feed mechanism of paper tube core
CN116329951B (en) Cutting device of high-elastic ultrathin steel strip
CN216176044U (en) Hydraulic sheet metal bending machine automatic feeding structure
CN117718520A (en) Shearing machine material supporting device
CN107500000B (en) Label Feeder
CN210553004U (en) Prevent stainless steel laminating machine that splits
CN211707944U (en) Feeding device for stamping die
CN209614095U (en) A fully automatic straightening and bending forming machine for iron rods
CN222846130U (en) A roll material taking-up and unloading transmission device
CN217726700U (en) Automatic feeding mechanism for metal strips
CN220976002U (en) Metal grid touch product coiler device
CN115072263A (en) Paper printing production system
CN219206102U (en) Vamp roll-in flattening mechanism
CN207872927U (en) The steel band automatic charging device of continous way press machine
CN201008892Y (en) Surface cleaning device for plate and strip
CN219335525U (en) Stamping forming device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221122