CN217845204U - Marker post for building construction survey - Google Patents

Marker post for building construction survey Download PDF

Info

Publication number
CN217845204U
CN217845204U CN202221594927.9U CN202221594927U CN217845204U CN 217845204 U CN217845204 U CN 217845204U CN 202221594927 U CN202221594927 U CN 202221594927U CN 217845204 U CN217845204 U CN 217845204U
Authority
CN
China
Prior art keywords
pile
fixed
building construction
fixed pile
rod body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221594927.9U
Other languages
Chinese (zh)
Inventor
王瑾
康春明
周星
袁志斌
赵志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221594927.9U priority Critical patent/CN217845204U/en
Application granted granted Critical
Publication of CN217845204U publication Critical patent/CN217845204U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型涉及一种房建施工测量用标杆,属于房建施工技术领域。主要包括固定桩、水平台、水平仪、杆体、支脚,所述的水平台安装在固定桩顶部,水平仪安装在水平台上,杆体直立安装在水平台上,三个支脚沿固定桩圆周方向均匀安装在固定桩上;所述的支脚包括固定套、伸缩杆,所述的固定套顶端安装在固定桩上,所述的固定套和伸缩杆螺纹连接;固定桩底端为方便插入松软地面的尖端;杆体上设有刻度线;通过三脚支撑结构达到了较好的支撑效果,无需人工手持支撑,省时省力;通过可分别调节支脚的长度,能够在不同地形环境下调平使用,同时保留原有底端尖端,以便插入至松软地面固定,增强了实用性。

Figure 202221594927

The utility model relates to a benchmark used for house construction measurement, which belongs to the technical field of house construction. It mainly includes a fixed pile, a water platform, a level, a rod body, and a foot. The water platform is installed on the top of the fixed pile, the level is installed on the water platform, the rod body is installed upright on the water platform, and the three feet are evenly installed along the circumference of the fixed pile. On the fixed pile; the legs include a fixed sleeve and a telescopic rod, the top of the fixed sleeve is installed on the fixed pile, and the fixed sleeve and the telescopic rod are threaded; the bottom end of the fixed pile is conveniently inserted into the tip of the soft ground There is a scale line on the rod body; a better support effect is achieved through the tripod support structure, which saves time and effort without manual support; by adjusting the length of the legs separately, it can be leveled and used in different terrain environments while retaining the original The bottom end is sharp, so that it can be inserted into the soft ground and fixed, which enhances the practicality.

Figure 202221594927

Description

一种房建施工测量用标杆A benchmark for housing construction measurement

技术领域technical field

本实用新型属于房建施工技术领域,具体涉及一种房建施工测量用标杆。The utility model belongs to the technical field of house construction, in particular to a benchmark for house construction measurement.

背景技术Background technique

在房建施工中需要进行测量作业,测量作业中一般会用到标杆,使得在视线观察不良的位置处也能进行较为便利的观察;房建施工测量用标杆使用时需要把标杆立在地上,现有的测量标杆一般一端呈尖端,以便插入至松软地面固定,使得测量标杆保持位置稳定,但是当在硬质地面上使用时由于其并不具备足够的支撑结构,常常需要辅助人员使用手持的方式使其立在地面上,长时间的手持工作导致辅助人员手部酸痛等问题,使用起来较为不便,同时手持的方式难以保证标杆的垂直度,直接影响测量标杆的稳定性并对测量结果有所影响。It is necessary to carry out surveying work in the construction of housing construction, and benchmarking poles are generally used in the surveying work, so that it can be observed more conveniently at positions with poor line of sight observation; when using benchmarking poles for housing construction construction, the benchmarking poles need to be erected on the ground, Existing measuring poles generally have a sharp end at one end, so that they can be inserted into the soft ground and fixed, so that the measuring pole can maintain a stable position. However, when used on hard ground, because it does not have sufficient support structure, it is often necessary for auxiliary personnel to use a hand-held The method makes it stand on the ground, and the long-term hand-held work causes problems such as sore hands of the assistants, which is inconvenient to use. At the same time, the hand-held method is difficult to ensure the verticality of the benchmark. affected by.

发明内容Contents of the invention

为了克服背景技术中在硬质地面上使用时由于其并不具备足够的支撑结构,常常需要辅助人员使用手持的方式使其立在地面上,长时间的手持工作导致辅助人员手部酸痛等问题,使用起来较为不便,同时手持的方式难以保证标杆的垂直度,直接影响测量标杆的稳定性并对测量结果有所影响的问题,本实用新型提供一种房建施工测量用标杆,通过三脚支撑结构达到了较好的支撑效果,无需人工手持支撑,省时省力;通过可分别调节支脚的长度,能够在不同地形环境下调平使用,同时保留原有底端尖端,以便插入至松软地面固定,增强了实用性。In order to overcome the background technology when used on hard ground because it does not have sufficient support structure, it is often necessary for the assistant to stand on the ground in a handheld manner, and the long-term hand-held work will cause the assistant's hands to be sore and other problems. , it is inconvenient to use, and at the same time, it is difficult to ensure the verticality of the benchmark in the hand-held way, which directly affects the stability of the measurement benchmark and affects the measurement results. The utility model provides a benchmark for housing construction, which is supported by a tripod The structure achieves a better supporting effect, no manual support is required, saving time and effort; by adjusting the length of the feet separately, it can be leveled and used in different terrain environments, while retaining the original bottom tip for insertion into the soft ground for fixation, Enhanced practicality.

为实现上述目的,本实用新型是通过如下技术方案实现的:一种房建施工测量用标杆主要包括固定桩1、水平台2、水平仪3、杆体4、支脚5,所述的水平台2安装在固定桩1顶部,水平仪3安装在水平台2上,杆体4直立安装在水平台2上,三个支脚5沿固定桩1圆周方向均匀安装在固定桩1上;所述的支脚5包括固定套51、伸缩杆52,所述的固定套51顶端安装在固定桩1上,所述的固定套51和伸缩杆52螺纹连接;固定桩1底端为方便插入松软地面的尖端;杆体4上设有刻度线。In order to achieve the above object, the utility model is achieved through the following technical solutions: a benchmark for building construction measurement mainly includes a fixed pile 1, a water platform 2, a spirit level 3, a rod body 4, and a foot 5, and the water platform 2 is installed On the top of the fixed pile 1, the spirit level 3 is installed on the horizontal platform 2, the rod body 4 is installed upright on the horizontal platform 2, and the three legs 5 are evenly installed on the fixed pile 1 along the circumferential direction of the fixed pile 1; Cover 51, telescopic rod 52, the top of the fixed sleeve 51 is installed on the fixed pile 1, the fixed sleeve 51 and the telescopic rod 52 are threaded; the bottom end of the fixed pile 1 is inserted into the tip of the soft ground for convenience; With tick marks.

进一步,所述的固定套51可折叠安装在固定桩1上;所述的固定套51顶端设有插销53,所述的固定桩1上倾斜设有与固定套51相匹配的插槽11,插槽11两侧设有滑槽12,固定套51顶端插设在插槽11内,插销53可滑动限位安装在滑槽12内,插销53处于滑槽12外端时,固定套51可以插销53为转轴摆动到贴合固定桩1状态。Further, the fixed sleeve 51 can be folded and installed on the fixed pile 1; the top of the fixed sleeve 51 is provided with a pin 53, and the fixed pile 1 is obliquely provided with a slot 11 matching the fixed sleeve 51, Both sides of the slot 11 are provided with chute 12, the top of the fixing sleeve 51 is inserted in the slot 11, the latch 53 is slidably limited and installed in the chute 12, when the latch 53 is at the outer end of the chute 12, the fixing sleeve 51 can The latch 53 swings to the state of fitting the fixed pile 1 for the rotating shaft.

进一步,所述的固定桩1上设有与支脚5相匹配的嵌槽13,固定套51摆动到贴合固定桩1状态时,支脚5嵌入嵌槽13内。Further, the fixed pile 1 is provided with an embedding groove 13 that matches the supporting foot 5 , and when the fixing sleeve 51 swings to fit the fixing pile 1 , the supporting foot 5 is inserted into the embedding groove 13 .

进一步,所述的嵌槽13反向延长到水平台2底部,水平台2底部设有与伸缩杆52外螺纹匹配的螺纹孔21,固定套51摆动到贴合固定桩1状态时,伸缩杆52反向延伸并与螺纹孔21连接固定。Further, the embedded groove 13 is reversely extended to the bottom of the horizontal platform 2, and the bottom of the horizontal platform 2 is provided with a threaded hole 21 matching the external thread of the telescopic rod 52. When the fixed sleeve 51 swings to fit the fixed pile 1, the telescopic rod 52 extends in reverse and is connected and fixed with the threaded hole 21.

进一步,所述的伸缩杆52底端为便于支撑调节的球头。Further, the bottom end of the telescopic rod 52 is a ball head for easy support adjustment.

进一步,所述的杆体4为塔尺,由多节不同截面的套尺套接组成。Further, the rod body 4 is a tower ruler, which is composed of multiple sections of sleeve rulers with different cross-sections.

进一步,所述的相互套接的两个套尺通过销孔41和弹性销42限位安装,处于外部的套尺上设有销孔41,处于内部的套尺上通过弹片43安装有弹性销42,弹性销42与销孔41销接,弹性销42为方便进入或退出销孔41的圆头结构。Further, the two sets of rulers nested in each other are limitedly installed through the pin hole 41 and the elastic pin 42, the outer ruler is provided with a pin hole 41, and the inner ruler is equipped with an elastic pin through a spring piece 43 42, the elastic pin 42 is pinned to the pin hole 41, and the elastic pin 42 is a round head structure that facilitates entering or exiting the pin hole 41.

本实用新型的有益效果:The beneficial effects of the utility model:

本实用新型通过三脚支撑结构达到了较好的支撑效果,无需人工手持支撑,省时省力;通过可分别调节支脚的长度,能够在不同地形环境下调平使用,同时保留原有底端尖端,以便插入至松软地面固定,增强了实用性。The utility model achieves a better supporting effect through the tripod support structure, which saves time and effort without the need for manual support; by adjusting the lengths of the legs separately, it can be leveled and used under different terrain environments, while retaining the original bottom tip to facilitate It is inserted into the soft ground and fixed, which enhances the practicality.

附图说明Description of drawings

图1是本实用新型工作状态立体示意图。Fig. 1 is a three-dimensional schematic view of the working state of the utility model.

图2是本实用新型水平台、固定桩和支脚结构示意图。Fig. 2 is a structural schematic diagram of the water platform, fixed piles and supporting feet of the utility model.

图3是本实用新型非工作状态立体示意图。Fig. 3 is a three-dimensional schematic view of the utility model in a non-working state.

图4是本实用新型固定桩和水平台立体示意图。Fig. 4 is a three-dimensional schematic diagram of the fixed pile and the water platform of the utility model.

图5是本实用新型套尺连接件限位结构示意图。Fig. 5 is a schematic diagram of the limit structure of the connecting piece of the sleeve ruler of the present invention.

图6是本实用新型套尺连接件限位结构分解示意图。Fig. 6 is an exploded schematic diagram of the limit structure of the sleeve ruler connector of the present invention.

具体实施方式Detailed ways

为了使本实用新型的目的、技术方案和有益效果更加清楚,下面将结合附图,对本实用新型的优选实施例进行详细的说明,以方便技术人员理解。In order to make the purpose, technical solutions and beneficial effects of the present utility model clearer, the preferred embodiments of the present utility model will be described in detail below in conjunction with the accompanying drawings, so as to facilitate the understanding of technical personnel.

本实用新型公开了一种房建施工测量用标杆,所述的一种房建施工测量用标杆主要包括固定桩1、水平台2、水平仪3、杆体4、支脚5,所述的水平台2安装在固定桩1顶部,水平仪3安装在水平台2上,杆体4直立安装在水平台2上,三个支脚5沿固定桩1圆周方向均匀安装在固定桩1上;所述的支脚5包括固定套51、伸缩杆52,所述的固定套51顶端安装在固定桩1上,所述的固定套51和伸缩杆52螺纹连接;固定桩1底端为方便插入松软地面的尖端;杆体4上设有刻度线;通过水平仪3能够调节水平台2处于水平状态,保证杆体4处于垂直状态,减小测量误差;通过三脚支撑结构达到了较好的支撑效果,无需人工手持支撑,省时省力;通过可分别调节支脚的长度,能够在不同地形环境下调平使用,同时保留原有底端尖端,以便插入至松软地面固定,增强了实用性。The utility model discloses a benchmarking pole for building construction measurement. The benchmarking pole for housing construction construction mainly includes a fixed pile 1, a water platform 2, a spirit level 3, a rod body 4, and a foot 5. The water platform 2 Installed on the top of the fixed pile 1, the spirit level 3 is installed on the horizontal platform 2, the rod body 4 is installed upright on the horizontal platform 2, and the three supporting feet 5 are evenly installed on the fixed pile 1 along the circumferential direction of the fixed pile 1; the described supporting feet 5 include Fixed sleeve 51, expansion rod 52, described fixed sleeve 51 tops are installed on the fixed pile 1, and described fixed sleeve 51 and telescopic rod 52 are threaded; There is a scale line on the top; the level 3 can be used to adjust the level of the horizontal platform 2 to ensure that the rod body 4 is in a vertical state and reduce the measurement error; the tripod support structure achieves a better support effect, without manual support, saving time and effort ;By adjusting the length of the feet separately, it can be used in different terrain environments, while retaining the original bottom tip for insertion into the soft ground for fixing, which enhances the practicality.

所述的固定套51可折叠安装在固定桩1上;所述的固定套51顶端设有插销53,所述的固定桩1上倾斜设有与固定套51相匹配的插槽11,插槽11两侧设有滑槽12,固定套51顶端插设在插槽11内,插销53可滑动限位安装在滑槽12内,插销53处于滑槽12外端时,固定套51可以插销53为转轴摆动到贴合固定桩1状态;所述的固定桩1上设有与支脚5相匹配的嵌槽13,固定套51摆动到贴合固定桩1状态时,支脚5嵌入嵌槽13内;所述的嵌槽13反向延长到水平台2底部,水平台2底部设有与伸缩杆52外螺纹匹配的螺纹孔21,固定套51摆动到贴合固定桩1状态时,伸缩杆52反向延伸并与螺纹孔21连接固定;当需要使用时,转动伸缩杆52,使伸缩杆52顶端退出螺纹孔21并缩回到固定套51内,将固定套51以插销53为转轴摆动,从嵌槽13内取出后插入插槽11内固定,形成能够稳定支撑的支脚,如图1所示;使用完成后,拉拔出固定套51,插销53沿滑槽12滑移至滑槽12外端时,将固定套51以插销53为转轴摆动到贴合固定桩1状态并嵌入嵌槽13内,转动伸缩杆52,使伸缩杆52缩回至固定套51内,直至伸缩杆52顶端与螺纹孔21连接形成固定,支脚5处于缩回状态后能够保证本实用新型占地空间,体积小,整体结构相对规则,便于携带和管理。The fixed sleeve 51 can be folded and installed on the fixed pile 1; the top of the fixed sleeve 51 is provided with a latch 53, and the fixed pile 1 is obliquely provided with a slot 11 matching the fixed sleeve 51, the slot The two sides of 11 are provided with chute 12, the top of fixed sleeve 51 is inserted in the slot 11, and the latch 53 is slidably limited and installed in the chute 12, when the latch 53 is at the outer end of the chute 12, the fixed sleeve 51 can latch 53 The rotating shaft swings to the state of fitting the fixed pile 1; the fixed pile 1 is provided with an embedding groove 13 that matches the supporting foot 5, and when the fixing sleeve 51 swings to fit the fixing pile 1 state, the supporting foot 5 is embedded in the embedding groove 13 The embedded groove 13 is reversely extended to the bottom of the horizontal platform 2, and the bottom of the horizontal platform 2 is provided with a threaded hole 21 matching the external thread of the telescopic rod 52. When the fixed sleeve 51 swings to the state of fitting the fixed pile 1, the telescopic rod 52 Reverse extension and connection with threaded hole 21; when needed, turn the telescopic rod 52 so that the top end of the telescopic rod 52 exits the threaded hole 21 and retracts into the fixed sleeve 51, and the fixed sleeve 51 swings with the latch 53 as the rotating shaft. Take it out from the slot 13 and insert it into the slot 11 to fix it, forming a stable supporting foot, as shown in Figure 1; after use, pull out the fixing sleeve 51, and the latch 53 slides along the chute 12 to the chute 12 At the outer end, swing the fixed sleeve 51 with the pin 53 as the rotating shaft to fit the fixed pile 1 and embed it in the slot 13, turn the telescopic rod 52 to retract the telescopic rod 52 into the fixed sleeve 51 until the top of the telescopic rod 52 It is connected with the threaded hole 21 to form a fixation. After the support foot 5 is in the retracted state, it can ensure the space occupied by the utility model, the volume is small, the overall structure is relatively regular, and it is easy to carry and manage.

所述的伸缩杆52底端为便于支撑调节的球头。The bottom end of the telescopic rod 52 is a ball head for easy support adjustment.

所述的杆体4为塔尺,由多节不同截面的套尺套接组成。所述的相互套接的两个套尺通过销孔41和弹性销42限位安装,处于外部的套尺上设有销孔41,处于内部的套尺上通过弹片43安装有弹性销42,弹性销42与销孔41销接,弹性销42为方便进入或退出销孔41的圆头结构。The rod body 4 is a tower ruler, which is composed of multiple joints with different cross-sections. The two sets of rulers nested with each other are limitedly installed through pin holes 41 and elastic pins 42, the outer ruler is provided with pin holes 41, and the inner ruler is equipped with elastic pins 42 through elastic plates 43, The elastic pin 42 is pin-connected with the pin hole 41 , and the elastic pin 42 is a round head structure that is convenient for entering or exiting the pin hole 41 .

工作过程:work process:

当需要使用时,转动伸缩杆52,使伸缩杆52顶端退出螺纹孔21并缩回到固定套51内,将固定套51以插销53为转轴摆动,从嵌槽13内取出后插入插槽11内固定,形成能够稳定支撑的支脚,如图1所示;根据地面的状态,配合水平仪3可分别调节支脚的长度,将水平台2调平,保证杆体4处于垂直状态,将塔尺展开,即可开始测量工作;使用完成后,拉拔出固定套51,插销53沿滑槽12滑移至滑槽12外端时,将固定套51以插销53为转轴摆动到贴合固定桩1状态并嵌入嵌槽13内,转动伸缩杆52,使伸缩杆52缩回至固定套51内,直至伸缩杆52顶端与螺纹孔21连接形成固定,支脚5处于缩回状态后能够保证本实用新型占地空间,体积小,整体结构相对规则,便于携带和管理;通过三脚支撑结构达到了较好的支撑效果,无需人工手持支撑,省时省力;通过可分别调节支脚的长度,能够在不同地形环境下调平使用,同时保留原有底端尖端,以便插入至松软地面固定,增强了实用性。When it needs to be used, turn the telescopic rod 52 so that the top end of the telescopic rod 52 withdraws from the threaded hole 21 and retracts into the fixed sleeve 51, swing the fixed sleeve 51 with the latch 53 as the rotating shaft, take it out from the socket 13 and insert it into the slot 11 Internally fixed to form a stable supporting foot, as shown in Figure 1; according to the state of the ground, the length of the supporting foot can be adjusted respectively with the spirit level 3, and the horizontal platform 2 is leveled to ensure that the rod body 4 is in a vertical state, and the tower ruler is unfolded. You can start the measurement work; after use, pull out the fixing sleeve 51, and when the bolt 53 slides along the chute 12 to the outer end of the chute 12, swing the fixing sleeve 51 with the bolt 53 as the rotating shaft to fit the fixed pile 1 And embedded in the slot 13, rotate the telescopic rod 52, so that the telescopic rod 52 is retracted into the fixed sleeve 51, until the top of the telescopic rod 52 is connected with the threaded hole 21 to form a fixation, and the support foot 5 can ensure that the utility model occupies The ground space, small size, the overall structure is relatively regular, easy to carry and manage; through the three-legged support structure to achieve a better supporting effect, no need for manual hand-held support, saving time and effort; It can be lowered and leveled for use, while retaining the original bottom tip, so that it can be inserted into the soft ground and fixed, which enhances the practicability.

最后说明的是,以上优选实施例仅用以说明本实用新型的技术方案而非限制,尽管通过上述优选实施例已经对本实用新型进行了详细的描述,但本领域技术人员应当理解,可以在形式上和细节上对其作出各种各样的改变,而不偏离本实用新型权利要求书所限定的范围。Finally, it is noted that the above preferred embodiments are only used to illustrate the technical solutions of the present utility model without limitation. Although the utility model has been described in detail through the above preferred embodiments, those skilled in the art should understand that it can be described in the form Various changes can be made in the above and in the details without departing from the scope defined by the claims of the present invention.

Claims (7)

1. The utility model provides a marker post for construction survey is built in room which characterized in that: the marker post for building construction measurement comprises a fixed pile (1), a horizontal table (2), a level (3), a rod body (4) and support legs (5), wherein the horizontal table (2) is installed at the top of the fixed pile (1), the level (3) is installed on the horizontal table (2), the rod body (4) is vertically installed on the horizontal table (2), and the three support legs (5) are evenly installed on the fixed pile (1) along the circumferential direction of the fixed pile (1); the supporting foot (5) comprises a fixing sleeve (51) and an expansion rod (52), the top end of the fixing sleeve (51) is installed on the fixing pile (1), and the fixing sleeve (51) is in threaded connection with the expansion rod (52); the bottom end of the fixed pile (1) is a tip end which is conveniently inserted into soft ground; the rod body (4) is provided with scale marks.
2. The post for building construction measurement as claimed in claim 1, wherein: the fixing sleeve (51) can be arranged on the fixed pile (1) in a folding way; fixed cover (51) top be equipped with bolt (53), spud pile (1) on the slope be equipped with fixed cover (51) assorted slot (11), slot (11) both sides are equipped with spout (12), fixed cover (51) top is inserted and is established in slot (11), bolt (53) slidable is spacing to be installed in spout (12), when bolt (53) are in spout (12) outer end, fixed cover (51) can be swung laminating spud pile (1) state for pivot bolt (53).
3. The post for building construction measurement as claimed in claim 2, wherein: the fixing pile (1) is provided with an embedded groove (13) matched with the support leg (5), and when the fixing sleeve (51) swings to the state of attaching the fixing pile (1), the support leg (5) is embedded into the embedded groove (13).
4. The marker post for building construction measurement as claimed in claim 3, wherein: caulking groove (13) reverse extension to horizontal stand (2) bottom, horizontal stand (2) bottom is equipped with screw hole (21) with telescopic link (52) external screw thread matching, when fixed cover (51) swung laminating spud pile (1) state, telescopic link (52) reverse extension and be connected fixedly with screw hole (21).
5. The marker post for building construction measurement as claimed in any one of claims 1, 2 and 3, wherein: the bottom end of the telescopic rod (52) is a ball head convenient for supporting and adjusting.
6. The marker post for building construction measurement as claimed in any one of claims 1, 2 and 3, wherein: the rod body (4) is a tower ruler and is formed by sleeving a plurality of sleeve rulers with different sections.
7. The marker post for building construction measurement as claimed in claim 6, wherein: two set rules that cup joint each other pass through pinhole (41) and the spacing installation of elastic pin (42), be equipped with pinhole (41) on the set rule that is in outside, install elastic pin (42) through shell fragment (43) on the set rule that is in inside, elastic pin (42) and pinhole (41) pin joint, elastic pin (42) are for conveniently getting into or withdraw from the button head structure of pinhole (41).
CN202221594927.9U 2022-06-24 2022-06-24 Marker post for building construction survey Active CN217845204U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221594927.9U CN217845204U (en) 2022-06-24 2022-06-24 Marker post for building construction survey

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221594927.9U CN217845204U (en) 2022-06-24 2022-06-24 Marker post for building construction survey

Publications (1)

Publication Number Publication Date
CN217845204U true CN217845204U (en) 2022-11-18

Family

ID=84026625

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221594927.9U Active CN217845204U (en) 2022-06-24 2022-06-24 Marker post for building construction survey

Country Status (1)

Country Link
CN (1) CN217845204U (en)

Similar Documents

Publication Publication Date Title
CN210862643U (en) Portable topographic mapping and collecting device
CN205785181U (en) Adjustable Sopwith staff fixed mount
CN205957972U (en) Novel survey and drawing sighting rod fixing balance support
CN210689598U (en) A kind of engineering measurement level support device
CN214839471U (en) Real estate surveying and mapping measuring instrument support
CN209802346U (en) level gauge for surveying
CN204479069U (en) Mapping levelling staff balance and stability F type foot rest
CN210922633U (en) Sighting rod for surveying and mapping
CN211118437U (en) Village planning field investigation equipment
CN209910641U (en) A tower ruler placement seat for land resources surveying and mapping
CN220168948U (en) Construction mapping device
CN218066493U (en) Attached leveling rod fixing device
CN208443383U (en) A kind of hand-held vertical sliding staff special for surveying land
CN211118561U (en) A surveying instrument bracket with a stable and reinforced structure
CN206479162U (en) A kind of spirit level
CN213985037U (en) A portable engineering measurement tool
CN212254079U (en) Portable gradiometer for land surveying and mapping
CN217275956U (en) A measuring drill with scale
CN219714372U (en) Straightness detection device that hangs down for construction
CN218845651U (en) Supporting foot frame for engineering measurement
CN216482991U (en) A kind of side slope detection ruler for roadbed construction
CN212482370U (en) Guiding rule capable of measuring perpendicularity of template
CN214839479U (en) Surveying instrument for engineering surveying and mapping convenient to adjust
CN220153574U (en) A kind of tower ruler used for land resources surveying and mapping
CN220082723U (en) Mapping equipment convenient to position

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant