CN217839988U - Centrally-mounted self-balancing type double-slideway pile frame - Google Patents
Centrally-mounted self-balancing type double-slideway pile frame Download PDFInfo
- Publication number
- CN217839988U CN217839988U CN202222159581.6U CN202222159581U CN217839988U CN 217839988 U CN217839988 U CN 217839988U CN 202222159581 U CN202222159581 U CN 202222159581U CN 217839988 U CN217839988 U CN 217839988U
- Authority
- CN
- China
- Prior art keywords
- column
- pile frame
- pile
- equipment
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
本实用新型涉及施工设备技术领域,具体来说是一种中置自平衡式双滑道桩架,包括中置的立柱,所述立柱设置于靠近桩架的中心位置;双滑道结构,设置于立柱的前后两侧;龙门式斜撑结构,前后分别有斜撑支撑连接立柱,使桩架整体重心靠近于桩架中心,采用新型的前后双滑道结构:由于针对超深的复杂地层,桩架配套的设备是超大超重的,传统桩架上均需要平衡绳来平衡重型沉桩设备对立柱的单边受力,减小重型设备对桩架立柱造成的弯矩,提高立柱的使用寿命,本实用新型采用的前后双滑道结构,前后各配套一套重型沉桩设备,无需平衡绳即可实现前后重量平衡,施工安全可靠。
The utility model relates to the technical field of construction equipment, in particular to a middle-mounted self-balancing double slideway pile frame, which includes a middle-mounted column, and the column is arranged near the center of the pile frame; the double slideway structure is set On the front and rear sides of the column; the gantry-style diagonal brace structure, with diagonal braces supporting the connection column at the front and rear, so that the overall center of gravity of the pile frame is close to the center of the pile frame, and a new type of front and rear double slideway structure is adopted: due to the ultra-deep complex stratum, The supporting equipment of the pile frame is super large and heavy. The traditional pile frame needs a balance rope to balance the unilateral force of the heavy pile sinking equipment on the column, reduce the bending moment caused by the heavy equipment to the column of the pile frame, and improve the service life of the column. , The utility model adopts the front and rear double slideway structure, and the front and rear are equipped with a set of heavy-duty pile sinking equipment, which can realize the front and rear weight balance without a balance rope, and the construction is safe and reliable.
Description
技术领域technical field
本实用新型涉及施工设备技术领域,具体来说是一种中置自平衡式双滑道桩架。The utility model relates to the technical field of construction equipment, in particular to a middle-mounted self-balancing double slideway pile frame.
背景技术Background technique
针对超深的复杂地层,沉桩需要两套不同的超大型沉桩设备(如振动锤、长螺旋钻机等)先后进行分层施工,而若在同一桩位两套设备来回进场,由于设备超大、超重,行走装置极为笨重,行走缓慢,造成施工效率低下。For ultra-deep and complex strata, two sets of super-large pile sinking equipment (such as vibratory hammer, long auger, etc.) are required to carry out layered construction successively. If two sets of equipment enter the site back and forth at the same pile position, due to the Oversized and overweight, the traveling device is extremely heavy and slow, resulting in low construction efficiency.
中国专利号:882147137公开了一种在桩架上设置了多个滑道的桩架结构,该专利是传统的旋转式的多滑道桩架,虽然解决了同一桩位多套设备的问题,但是其平衡性能不好,不适合超大型沉桩设备。Chinese Patent No.: 882147137 discloses a pile frame structure with multiple slides on the pile frame. This patent is a traditional rotary multi-slide pile frame. Although it solves the problem of multiple sets of equipment at the same pile position, However, its balance performance is not good, so it is not suitable for super-large pile sinking equipment.
中国专利号:2018220693001公开了一种新型平移式双导向机构,在一个桩架上安装两套设备的技术,但该专利采用了正交型双滑道式桩架,正交型双滑道式桩架需要平衡绳来平衡重型沉桩设备对立柱的单边受力,且采用正交式双滑道,因为尺寸空间有限,同时配套两台超大型设备时会相互干涉。Chinese patent number: 2018220693001 discloses a new type of translational double guide mechanism, which installs two sets of equipment on a pile frame, but the patent uses an orthogonal double slideway pile frame, an orthogonal double slideway type The pile frame needs a balance rope to balance the unilateral force of the heavy pile sinking equipment on the column, and adopts an orthogonal double slideway, because the size and space are limited, and two super-large equipment will interfere with each other.
实用新型内容Utility model content
本实用新型的目的在于克服现有技术的不足,提供一种中置自平衡式双滑道桩架,既要解决同一桩位两套设备的问题,还要解决整体平衡和设备之间相互干涉的问题。The purpose of this utility model is to overcome the deficiencies of the prior art and provide a central self-balancing double-slide pile frame, which not only solves the problem of two sets of equipment at the same pile position, but also solves the overall balance and mutual interference between the equipment The problem.
为了实现上述目的,设计一种中置自平衡式双滑道桩架,包括中置的立柱,所述立柱设置于靠近桩架前后向的中心位置;双滑道结构,设置于立柱的前后两侧;龙门式斜撑结构,前后分别有斜撑支撑连接立柱,使桩架整体重心在立柱的范围内,且可以避免斜撑对桩机设备在滑道上上下移动时的干涉。In order to achieve the above purpose, a central self-balancing double-slide pile frame is designed, including a central column, and the column is arranged near the center of the pile frame in the front and rear directions; the double slideway structure is arranged at the front and rear of the column. Side; gantry-type diagonal brace structure, with diagonal braces supporting the connection column at the front and rear, so that the overall center of gravity of the pile frame is within the range of the column, and it can avoid the interference of the diagonal braces when the pile driver equipment moves up and down on the slideway.
本实用新型还具有如下优选的技术方案:The utility model also has the following preferred technical solutions:
1.双滑道结构分别用于活动连接两套不同的沉桩设备。1. The double-slide structure is used to flexibly connect two different sets of pile sinking equipment.
2.沉桩设备包括但不限于振动锤、长螺旋钻机等桩机设备。2. Pile sinking equipment includes but not limited to pile driving equipment such as vibratory hammers and long auger drilling rigs.
3.龙门式斜撑结构以立柱为轴前后对称布置,左右对称布置。3. The gantry-type diagonal bracing structure is arranged symmetrically front and back with the column as the axis, and symmetrically arranged left and right.
4.立柱设置于桩架的中间位置,龙门式斜撑结构,前后分别有斜撑支撑连接立柱,使桩架整体重心靠近桩架中心。4. The column is set in the middle of the pile frame. The gantry-style diagonal brace structure has diagonal braces to support and connect the columns at the front and rear, so that the overall center of gravity of the pile frame is close to the center of the pile frame.
本实用新型同现有技术相比,其优点在于:Compared with the prior art, the utility model has the advantages that:
1.采用新型的前后双滑道结构:由于针对超深的复杂地层,桩架配套的设备是超大超重的,传统桩架上均需要平衡绳来平衡重型沉桩设备对立柱的单边受力,减小重型设备对桩架立柱造成的弯矩,提高立柱的使用寿命,本实用新型采用的前后双滑道结构,前后各配套一套重型沉桩设备,无需平衡绳即可实现前后重量平衡,施工安全可靠。1. Adopt a new front and rear double slideway structure: due to the ultra-deep and complex stratum, the equipment supporting the pile frame is super large and overweight, and the traditional pile frame needs a balance rope to balance the unilateral force of the heavy pile sinking equipment on the column , reduce the bending moment caused by heavy equipment to the pile frame column, and improve the service life of the column. The utility model adopts a front and rear double slideway structure, and a set of heavy-duty pile sinking equipment in the front and rear, so that the front and rear weight balance can be realized without a balance rope , The construction is safe and reliable.
2.传统正交式双滑道,尺寸空间有限,同时配套两台超大型设备时会相互干涉,而采用前后双滑道结构,可以解决超大型设备的布置问题。2. The traditional orthogonal double slideway has limited size and space, and it will interfere with each other when supporting two super-large equipment at the same time. However, the front and rear double slideway structure can solve the layout problem of super-large equipment.
3.采用新型龙门式斜撑结构,使桩架的立柱无论是行走还是打桩均更稳定、更安全。3. The new gantry-type diagonal bracing structure is adopted to make the uprights of the pile frame more stable and safer whether it is walking or piling.
4.采用立柱中置方案,使桩架整体重心靠近桩架中心,无需配重块,桩架整体行走和施工过程均更稳定、更安全。4. Adopt the scheme of placing the column in the middle, so that the overall center of gravity of the pile frame is close to the center of the pile frame, without the need for counterweights, and the overall walking and construction process of the pile frame are more stable and safer.
附图说明Description of drawings
图1是本实用新型实施例一整体结构示意图;Fig. 1 is a schematic diagram of the overall structure of the utility model embodiment;
图2是本实用新型实施例一龙门式斜撑结构示意图;Fig. 2 is a schematic diagram of the structure of a gantry type diagonal bracing according to an embodiment of the present invention;
图3是本实用新型实施例二整体结构示意图;Fig. 3 is a schematic diagram of the overall structure of the second embodiment of the utility model;
图4是本实用新型实施例二俯视图;Fig. 4 is the top view of the second embodiment of the utility model;
图中:1.立柱 2.桩架 3.滑道 4.斜撑 5.振动锤 6.长螺旋钻机。In the figure: 1.
具体实施方式Detailed ways
下面结合附图对本实用新型作进一步说明,本实用新型的结构和原理对本专业的人来说是非常清楚的。应当理解,此处所描述的具体实施例仅仅用以解释本实用新型,并不用于限定本实用新型。Below in conjunction with accompanying drawing, the utility model is further described, and the structure and principle of the utility model are very clear to the professional. It should be understood that the specific embodiments described here are only used to explain the utility model, and are not intended to limit the utility model.
实施例一,参见图1和图2,本实用新型公开一种中置自平衡式双滑道桩架,包括中置的立柱、双滑道结构和龙门式斜撑结构,立柱设置于靠近桩架的中心位置,双滑道结构设置于立柱的前后两侧,龙门式斜撑结构前后分别有斜撑支撑连接立柱,使桩架整体重心靠近于桩架中心。所述的双滑道结构分别活动连接振动锤和长螺旋钻机,所述的龙门式斜撑结构以立柱为轴前后对称布置,左右对称布置。所述的立柱顶部前后两侧分别通过绳索连接振动锤和长螺旋钻机。
实施例二,参见图3-图4,立柱设置于靠近桩架前后向中心的位置,双滑道结构设置于立柱的前后两侧,立柱的前侧或后侧设有斜撑支撑连接立柱,使桩架整体重心在立柱的范围内,本实施例将立柱在前后方向上略向前偏置,有利于提高某些具体施工的效率。
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222159581.6U CN217839988U (en) | 2022-08-17 | 2022-08-17 | Centrally-mounted self-balancing type double-slideway pile frame |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222159581.6U CN217839988U (en) | 2022-08-17 | 2022-08-17 | Centrally-mounted self-balancing type double-slideway pile frame |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN217839988U true CN217839988U (en) | 2022-11-18 |
Family
ID=84013902
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202222159581.6U Active CN217839988U (en) | 2022-08-17 | 2022-08-17 | Centrally-mounted self-balancing type double-slideway pile frame |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN217839988U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115110525A (en) * | 2022-08-17 | 2022-09-27 | 上海振中建机科技有限公司 | A central self-balancing double-slide pile frame |
-
2022
- 2022-08-17 CN CN202222159581.6U patent/CN217839988U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115110525A (en) * | 2022-08-17 | 2022-09-27 | 上海振中建机科技有限公司 | A central self-balancing double-slide pile frame |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110080557A (en) | A kind of wall dismounting device | |
| CN202099008U (en) | Folding crane | |
| CN101748968B (en) | Turntable of rotary drilling rig and rotary drilling rig | |
| CN213087065U (en) | Connecting structure of cross-layer outrigger truss and viscous damper combined member | |
| CN213448471U (en) | Road and bridge engineering is with effectual vibration pile driver of antidetonation | |
| CN115110525A (en) | A central self-balancing double-slide pile frame | |
| CN116816058B (en) | A wind-resistant construction scaffold | |
| CN218492502U (en) | Pile driver auxiliary equipment for side slope severe condition construction | |
| CN207278178U (en) | A kind of construction piling equipment | |
| CN209260708U (en) | A kind of civil engineering piling machine | |
| CN111636820B (en) | Rotary drilling rig with fixing device with good stability | |
| CN202325313U (en) | Long pressurized spiral drilling machine | |
| CN215563555U (en) | A frame shear wall structure with rocking wall energy dissipation | |
| CN215332720U (en) | Drill rod fixing device of rotary drilling rig | |
| CN202401964U (en) | Long spiral long-hole drilling machine | |
| CN201972597U (en) | Tower crane and crawler belt integrated core drilling rig with drill tower arranged on front side thereof | |
| CN114162730A (en) | A large-scale hoisting platform for prefabricated construction | |
| CN209838339U (en) | Pile machine drill rod grabbing and moving mechanism | |
| CN220596852U (en) | A kind of auxiliary tool for four-corner drilling tower wheel lifting | |
| CN202031488U (en) | Supporting device and engineering machine | |
| CN223634017U (en) | Excavator motor support that stability is strong | |
| CN207436933U (en) | A kind of rotary pile-digging machine convenient for fixed drilling tool | |
| CN209724218U (en) | A kind of rotary drilling rig of the fixation device good with stability | |
| CN201794523U (en) | Gantry supporting structure for drilling machine | |
| CN201972151U (en) | Inclinable compound truss for pile machine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A central-mounted self-balancing double-track pile frame Granted publication date: 20221118 Pledgee: Agricultural Bank of China Limited Shanghai pilot Free Trade Zone New Area Branch Pledgor: Shanghai Zhenzhong Construction Machinery Technology Co.,Ltd. Registration number: Y2025980044891 |
