CN217824153U - Easily install rectangle bus duct based on wind-powered electricity generation distribution - Google Patents

Easily install rectangle bus duct based on wind-powered electricity generation distribution Download PDF

Info

Publication number
CN217824153U
CN217824153U CN202221645818.5U CN202221645818U CN217824153U CN 217824153 U CN217824153 U CN 217824153U CN 202221645818 U CN202221645818 U CN 202221645818U CN 217824153 U CN217824153 U CN 217824153U
Authority
CN
China
Prior art keywords
bus duct
duct body
movable mounting
installation
wind power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221645818.5U
Other languages
Chinese (zh)
Inventor
郭昌松
杨力强
张健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhenjiang Baikal Electric Co ltd
Original Assignee
Zhenjiang Baikal Electric Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhenjiang Baikal Electric Co ltd filed Critical Zhenjiang Baikal Electric Co ltd
Priority to CN202221645818.5U priority Critical patent/CN217824153U/en
Application granted granted Critical
Publication of CN217824153U publication Critical patent/CN217824153U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Installation Of Bus-Bars (AREA)

Abstract

The utility model discloses an easily-installed rectangular bus duct based on wind power distribution, which comprises a bus duct body, wherein a movable mounting plate for installing the bus duct body is arranged on the bus duct body, and an installation limiting part is arranged on the movable mounting plate; the installation limiting part comprises an installation part and a positioning part; the movable mounting plate is fixed on the bus duct body through the positioning portion, and is connected with the inner wall of the wind power tower barrel through the mounting portion, so that the bus duct body is mounted. Through setting up inserted bar, go-between and spring, under the elastic drive of spring to insert the inserted bar to spacing downthehole, make things convenient for movable mounting panel's removal and installation, and then conveniently with the installation of bus duct body and dismantle in wind power tower section of thick bamboo inner wall, easy operation increases the practicality.

Description

Easily install rectangle bus duct based on wind-powered electricity generation distribution
Technical Field
The utility model belongs to the technical field of the bus duct, concretely relates to easily install rectangle bus duct based on wind-powered electricity generation distribution.
Background
The bus duct is a closed metal device formed from copper and aluminium bus posts, and is used for distributing large power for every element of dispersion system. Wire and cable have been increasingly replaced in indoor low voltage power transmission mains engineering projects.
The tubular bus duct used in the field of wind power at present adopts a mode of welding the surface of a bus duct body and the inner wall of a wind power tower barrel when being installed, is single in installation method, is not beneficial to installation and disassembly, influences the installation and use efficiency of the tubular bus duct, and cannot meet the requirements of people.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an easily install rectangle bus duct based on wind-powered electricity generation distribution to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above purpose, the utility model provides a following technical scheme: an easily-installed rectangular bus duct based on wind power distribution comprises a bus duct body, wherein a movable installation plate for installing the bus duct body is arranged on the bus duct body, and an installation limiting part is arranged on the movable installation plate; the installation limiting part comprises an installation part and a positioning part;
wherein, on being fixed in the bus duct body with the movable mounting panel through the locating part, be connected movable mounting panel and wind power tower section of thick bamboo inner wall through the installation department, realize the installation of bus duct body, location portion is including seting up the through-hole at the movable mounting panel upper surface, it has the inserted bar to peg graft in the through-hole, the cover is equipped with the spring in the inserted bar outside, set up the spacing hole with inserted bar looks adaptation in the first spout, spacing hole is used for the inserted bar to insert, will the movable mounting panel is fixed, the installation department is including setting up in the backup pad of inserted bar upper surface, be provided with the go-between in the backup pad, the go-between is used for linking up mutually with wind power tower section of thick bamboo inner wall.
Preferably, the upper surface is provided with first slider in the movable mounting board, the first spout with first slider looks adaptation is seted up to bus duct body upper surface, be provided with the second slider on the movable mounting board inside wall, the second spout with second slider looks adaptation is seted up in the bus duct body outside.
Preferably, the cross-sections of the second sliding block and the second sliding groove are triangular, wherein the first sliding block and the second sliding block slide along the length direction of the first sliding groove and the length direction of the second sliding groove respectively, so that the movable mounting plate is mounted on the bus duct body.
Preferably, the bus duct body is internally provided with a plurality of conductive copper bars.
Preferably, the movable mounting plate sets up to two, and two movable mounting plates use bus duct body center to personally submit the mirror image setting as the mirror image.
Preferably, threaded holes are formed in the movable mounting plate, the bus duct body, the first sliding block and the inserting rod, and limiting bolts are inserted into the threaded holes.
The utility model discloses a technological effect and advantage: this easily install rectangle bus duct based on wind-powered electricity generation field through setting up inserted bar, go-between and spring, under the elastic drive of spring to insert the inserted bar to spacing downthehole, make things convenient for movable mounting panel's removal and installation, and then conveniently with bus duct body installation and dismantlement in wind power tower section of thick bamboo inner wall, easy operation increases the practicality.
Drawings
Fig. 1 is an overall structural schematic diagram of the present invention;
fig. 2 is a schematic sectional structure view of the installation limiting member of the present invention;
fig. 3 is a schematic structural view of the installation limiting member of the present invention;
fig. 4 is a schematic structural view of the limiting hole of the present invention.
In the figure: 1. the bus duct body; 2. a movable mounting plate; 3. installing a limiting piece; 301. a connecting ring; 302. A support plate; 303. a spring; 304. inserting a rod; 4. a conductive copper bar; 5. a first chute; 6. a first slider; 7. a second slider; 8. a limiting hole; 9. a second runner.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
In order to facilitate the installation of the bus duct body 1, referring to fig. 1, 2 and 3, the wind power generation bus duct comprises a bus duct body 1, wherein a movable mounting plate 2 used for installing the bus duct body 1 is arranged on the bus duct body 1, and is connected with the inner wall of a wind power tower through the movable mounting plate 2, so that the bus duct body 1 is installed. Activity mounting panel 2 sets up to two, and two activity mounting panels 2 use bus duct body 1 center to personally submit the mirror image setting as the mirror image, and two activity mounting panels 2 support bus duct body 1 simultaneously, promote the stability of installation back bus duct body 1. The movable mounting plate 2 is provided with a mounting limit part 3; installation locating part 3 comprises installation department and location portion, is fixed in movable mounting panel 2 through the locating part respectively on bus duct body 1, is being connected movable mounting panel 2 and wind power tower section of thick bamboo inner wall through the installation part, realizes quick installation and the dismantlement in bus duct body 1 later stage, and installation back stability is higher, promotes whole practicality.
For the convenience of the installation of movable mounting plate 2 in the dismantlement, refer to fig. 1, fig. 2, fig. 3 and fig. 4 show, inside formation is used for bus duct body 1 male cavity, and the interior upper surface of movable mounting plate 2 is provided with first slider 6, bus duct body 1 upper surface is seted up with first spout 5 of first slider 6 looks adaptation, be provided with second slider 7 on the 2 inside walls of movable mounting plate, bus duct body 1 outside is seted up with second spout 9 of second slider 7 looks adaptation, the cross-section of second slider 7 and second spout 9 is triangle-shaped, wherein the triangle-shaped one end in second spout 9 cross-section is the opening form, be convenient for insert of second slider 7. Along with first slider 6 and second slider 7 slide along the length direction of first spout 5 and second spout 9 respectively, slide movable mounting panel 2 in bus duct body 1 surface, realize movable mounting panel 2 and install on bus duct body 1. The location portion has inserted the inserted bar 304 including seting up the through-hole in 2 upper surfaces of movable mounting panel in the through-hole, and the cover is equipped with spring 303 in the inserted bar 304 outside, and movable mounting panel 2 slides in first spout 5 and second spout 9 along with first slider 6 and second slider 7. The inserted bar 304 is abutted with the upper surface of the bus duct body 1, so that the spring 303 deforms, and contracts, a limit hole 8 matched with the inserted bar 304 is formed in the first sliding groove 5, when the inserted bar 304 slides to the limit hole 8, the limit hole 8 is used for inserting the inserted bar 304, and finally an external limit bolt passes through the movable mounting plate 2, the bus duct body 1, threaded holes preset on the first slider 6 and the inserted bar 304, the inserted bar 304 is fixed in the limit hole 8, so that the movable mounting plate 2 is fixed on the bus duct body 1, the structure is simple, the operation is convenient, jacks for inserting the inserted bar 304 are also formed in the vertical direction of the first slider 6, the movable mounting plate 2 is quickly mounted on the inner wall of the wind power tower, the mounting part comprises a support plate 302 arranged on the upper surface of the inserted bar 304, a connecting ring 301 is arranged on the support plate 302, the bus duct 301 is used for being matched with the inner wall of the wind power tower, the connecting ring 301 is connected on the inner wall of the wind power tower, so that the movable mounting plate is fixed on the inner wall of the wind power tower, and the bus duct body can be mounted and dismounted by the connecting ring through the mounting part and the connecting ring 1. The conductive copper bar 4 is arranged in the bus duct body 1 and is connected with an external cable through the conductive copper bar 4, so that the bus duct body 1 is electrified.
During the use, at first pulling go-between 301, the extrusion spring 303, make spring 303 take place deformation, aim at first spout 5 and second spout 9 respectively with first slider 6 and second slider 7 afterwards, slip movable mounting board 2, along with first slider 6 and second slider 7 slide along the length direction of first spout 5 and second spout 9, inserted bar 304 removes to spacing hole 8 top, spring 303 is ejecting with inserted bar 304, make inserted bar 304 peg graft to spacing hole 8 in the back, external spacing bolt runs through movable mounting board 2 in proper order, peg graft in inserted bar 304 behind bus duct body 1 and the first slider 6, thereby be fixed in movable mounting board 2 on bus duct body 1, and make go-between 301 be connected with wind power tower section of thick bamboo inner wall, realize the swift installation of bus duct body 1.
Finally, it should be noted that: the above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention.

Claims (5)

1. An easily-installed rectangular bus duct based on wind power distribution is characterized by comprising a bus duct body (1), wherein a movable installation plate (2) used for installing the bus duct body (1) is arranged on the bus duct body (1), and an installation limiting part (3) is arranged on the movable installation plate (2); the installation limiting part (3) comprises an installation part and a positioning part;
wherein, be fixed in bus duct body (1) with movable mounting panel (2) through the locating part on, be connected movable mounting panel (2) with wind power tower section of thick bamboo inner wall through the installation part, realize the installation of bus duct body (1), the upper surface is provided with first slider (6) in movable mounting panel (2), first spout (5) with first slider (6) looks adaptation are seted up to bus duct body (1) upper surface, be provided with second slider (7) on movable mounting panel (2) inside wall, second spout (9) with second slider (7) looks adaptation are seted up in bus duct body (1) outside, locating part is including seting up in the through-hole of movable mounting panel (2) upper surface, it has inserted bar (304) to peg (304) outside cover is equipped with spring (303), set up spacing hole (8) with peg (304) looks adaptation in first spout (5), spacing hole (8) are used for peg (304) to insert, will movable mounting panel (2) are fixed, the installation department is including setting up in the backup pad (304) upper surface of peg (302), the go-between (301) are provided with wind power tower section of thick bamboo inner wall (302).
2. The rectangular bus duct easy to install based on wind power distribution of claim 1, characterized in that: the cross sections of the second sliding blocks (7) and the second sliding grooves (9) are triangular, wherein the movable mounting plate (2) is mounted on the bus duct body (1) along with the sliding of the first sliding blocks (6) and the second sliding blocks (7) along the length direction of the first sliding grooves (5) and the length direction of the second sliding grooves (9) respectively.
3. The wind power distribution-based rectangular bus duct easy to install according to claim 1, characterized in that: be provided with electrically conductive copper bar (4) in bus duct body (1), electrically conductive copper bar (4) set up to a plurality of.
4. The wind power distribution-based rectangular bus duct easy to install according to claim 1, characterized in that: the movable mounting plates (2) are arranged to be two, and the two movable mounting plates (2) are arranged in a mirror image mode by taking the center of the bus duct body (1) as a mirror image.
5. The wind power distribution-based rectangular bus duct easy to install according to claim 1, characterized in that: threaded holes are formed in the movable mounting plate (2), the bus duct body (1), the first sliding block (6) and the inserting rod (304), and limiting bolts are inserted in the threaded holes.
CN202221645818.5U 2022-06-29 2022-06-29 Easily install rectangle bus duct based on wind-powered electricity generation distribution Expired - Fee Related CN217824153U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221645818.5U CN217824153U (en) 2022-06-29 2022-06-29 Easily install rectangle bus duct based on wind-powered electricity generation distribution

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221645818.5U CN217824153U (en) 2022-06-29 2022-06-29 Easily install rectangle bus duct based on wind-powered electricity generation distribution

Publications (1)

Publication Number Publication Date
CN217824153U true CN217824153U (en) 2022-11-15

Family

ID=83960572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221645818.5U Expired - Fee Related CN217824153U (en) 2022-06-29 2022-06-29 Easily install rectangle bus duct based on wind-powered electricity generation distribution

Country Status (1)

Country Link
CN (1) CN217824153U (en)

Similar Documents

Publication Publication Date Title
CN217824153U (en) Easily install rectangle bus duct based on wind-powered electricity generation distribution
CN211295777U (en) Switch cabinet convenient to overhaul
CN219321877U (en) Energy-saving type outdoor power distribution cabinet installation locking assembly
CN215911767U (en) Integrated form module installation bracket
CN214479512U (en) Lightning arrester mounting bracket
CN213602305U (en) Wiring device for electric power installation
CN211399224U (en) All-round camera subassembly for monitoring of unmanned on duty transformer substation
CN213519814U (en) Plug-in circuit breaker
CN216892109U (en) Warning device for communication engineering
CN220273370U (en) Novel solar energy controller
CN216870643U (en) Novel intelligent electric meter
CN220628835U (en) Bus duct convenient to disassemble and assemble
CN219018719U (en) Photovoltaic equipment convenient to dismantle
CN220896076U (en) Internal wire arrangement mechanism of direct-current power supply screen
CN212751717U (en) Metal bridge connecting and supporting device for machine room assembly
CN221305795U (en) Solar bracket convenient for wire arrangement
CN218216175U (en) Easily install assembled high-voltage board
CN218678033U (en) Maintain fixed switchgear cabinet body of convenient GGD low pressure
CN212622743U (en) Ammeter case with line pressing and fixing functions
CN221102795U (en) Indoor concealed distribution box
CN220798129U (en) Fixing structure of photovoltaic module
CN220727667U (en) Solar power supply monitoring device with good stability
CN218828616U (en) Lighting distribution box based on mounting structure
CN221509062U (en) Photovoltaic collection flow box busbar
CN220544545U (en) Mounting structure of suspension type block terminal

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221115