CN217812739U - Town road construction guardrail - Google Patents
Town road construction guardrail Download PDFInfo
- Publication number
- CN217812739U CN217812739U CN202221432639.3U CN202221432639U CN217812739U CN 217812739 U CN217812739 U CN 217812739U CN 202221432639 U CN202221432639 U CN 202221432639U CN 217812739 U CN217812739 U CN 217812739U
- Authority
- CN
- China
- Prior art keywords
- installation
- connecting rod
- fixedly connected
- thick bamboo
- road construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
本实用新型公开了一种市政道路施工护栏,包括安装立筒,所述安装立筒内壁的顶部和底部之间固定连接有安装立柱,所述安装立柱的表面滑动连接有安装套筒,所述安装套筒与安装立柱之间设置有限位机构,所述安装立柱的下部转动连接有第一连接杆,安装套筒的表面转动连接有第二连接杆,第一连接杆和第二连接杆的中部转动连接,限位机构包括安装筒,本实用新型涉及施工护栏技术领域。该市政道路施工护栏,通过限位机构的设置,方便第一连接杆和第二连接杆的调节和固定,不仅可以折叠收缩,方便运输,极大的减少了运输途中占用的空间,而且通过调节第一连接杆与第二连接杆之间的夹角,改变护栏的整体长度,以适应不同施工需求。
The utility model discloses a municipal road construction guardrail, which comprises an installation vertical tube, an installation column is fixedly connected between the top and the bottom of the inner wall of the installation column, and the surface of the installation column is slidably connected with an installation sleeve. A limit mechanism is arranged between the installation sleeve and the installation column, the bottom of the installation column is rotatably connected with a first connecting rod, the surface of the installation sleeve is rotatably connected with a second connecting rod, the first connecting rod and the second connecting rod The middle part is rotationally connected, and the position-limiting mechanism includes a mounting cylinder. The utility model relates to the technical field of construction guardrails. The municipal road construction guardrail, through the setting of the limit mechanism, facilitates the adjustment and fixing of the first connecting rod and the second connecting rod. The included angle between the first connecting rod and the second connecting rod changes the overall length of the guardrail to meet different construction requirements.
Description
技术领域technical field
本实用新型涉及施工护栏技术领域,具体为一种市政道路施工护栏。The utility model relates to the technical field of construction guardrails, in particular to a municipal road construction guardrail.
背景技术Background technique
市政设施是指在城市区、镇(乡)规划建设范围内设置、基于政府责任和义务为居民提供有偿或无偿公共产品和服务的各种建筑物、构筑物、设备等。城市生活配套的各种公共基础设施建设都属于市政工程范畴,比如常见的城市道路,桥梁,地铁,比如与生活紧密相关的各种管线:雨水,污水,上水,中水,电力(红线以外部分),电信,热力,燃气等,还有广场,城市绿化等的建设,都属于市政工程范畴。现有技术中,在施工时,一般会在施工地外部设置护栏,用以将整个施工地围成一个施工现场,防止无关人员进入。Municipal facilities refer to various buildings, structures, equipment, etc. that are set up within the planning and construction scope of urban areas, towns (townships), and provide residents with paid or unpaid public products and services based on government responsibilities and obligations. The construction of various public infrastructure supporting urban life belongs to the category of municipal engineering, such as common urban roads, bridges, subways, such as various pipelines closely related to life: rainwater, sewage, water supply, reclaimed water, electricity (outside the red line) Partial), telecommunications, heat, gas, etc., as well as the construction of squares, urban greening, etc., all belong to the category of municipal engineering. In the prior art, during construction, guardrails are generally set outside the construction site to enclose the entire construction site into a construction site and prevent irrelevant personnel from entering.
施工护栏是一种铁管制成,经过无缝铁管折弯,焊接,打磨抛光,高压烤漆,贴膜等层层工艺加工制成。一般被广泛应用于施工场所的隔离与警示。在道路施工过程中,经常需要使用围护栏将施工区域与非施工区域进行分隔,以及施工道路的临时围护,围护栏不仅能够保证施工人员的安全,而且也是安全文明施工的要求,能够有效提升工地形象。现有的施工护栏通常采用拼接式设计,护栏的在运输过程中占据了大量的空间,携带起来十分不方便,且在携带过程中需要多人一起搬运,费时费力,实用性较差。The construction guardrail is made of iron pipe, which is processed by layers of seamless iron pipe bending, welding, grinding and polishing, high-pressure baking paint, and filming. It is generally widely used in the isolation and warning of construction sites. In the process of road construction, it is often necessary to use fences to separate the construction area from the non-construction area, as well as the temporary enclosure of the construction road. The fence can not only ensure the safety of construction personnel, but also is a requirement for safe and civilized construction, which can effectively improve Construction site image. Existing construction guardrails usually adopt splicing design. The guardrails occupy a lot of space during transportation and are very inconvenient to carry. In addition, many people are required to carry them together during the carrying process, which is time-consuming and laborious, and has poor practicability.
实用新型内容Utility model content
针对现有技术的不足,本实用新型提供了一种市政道路施工护栏,解决了现有的施工护栏通常采用拼接式设计,护栏的在运输过程中占据了大量的空间,携带起来十分不方便,且在携带过程中需要多人一起搬运,费时费力,实用性较差的问题。Aiming at the deficiencies of the prior art, the utility model provides a municipal road construction guardrail, which solves the problem that the existing construction guardrail usually adopts a splicing design, and the guardrail occupies a large amount of space during transportation, which is very inconvenient to carry. And in the carrying process, many people need to carry it together, which is time-consuming and labor-intensive, and the problem of poor practicability.
为实现以上目的,本实用新型通过以下技术方案予以实现:一种市政道路施工护栏,包括安装立筒,所述安装立筒内壁的顶部和底部之间固定连接有安装立柱,所述安装立柱的表面滑动连接有安装套筒,所述安装套筒与安装立柱之间设置有限位机构,所述安装立柱的下部转动连接有第一连接杆,所述安装套筒的表面转动连接有第二连接杆,所述第一连接杆和第二连接杆的中部转动连接,所述限位机构包括安装筒,所述安装筒内壁的顶部和底部之间滑动连接有活动板,所述活动板靠近安装立柱的一侧固定连接有限位杆,所述限位杆远离活动板的一侧贯穿安装筒和安装套筒并延伸至安装套筒的内部,所述安装立柱的表面开设有与限位杆相适配的限位槽,所述活动板的另一侧固定连接有调节杆,所述调节杆远离活动板的一侧贯穿安装筒并延伸至安装筒的外部。In order to achieve the above purpose, the utility model is realized through the following technical proposals: a construction guardrail for municipal roads, including an installation column, and an installation column is fixedly connected between the top and the bottom of the inner wall of the installation column, and the installation column The surface is slidingly connected with an installation sleeve, and a limit mechanism is set between the installation sleeve and the installation column. The lower part of the installation column is rotatably connected with a first connecting rod, and the surface of the installation sleeve is rotatably connected with a second connection rod. Rod, the middle part of the first connecting rod and the second connecting rod is rotationally connected, the limit mechanism includes a mounting cylinder, a movable plate is slidably connected between the top and the bottom of the inner wall of the mounting cylinder, and the movable plate is close to the installation One side of the column is fixedly connected with a limit rod, and the side of the limit rod away from the movable plate passes through the installation sleeve and the installation sleeve and extends to the inside of the installation sleeve. The other side of the movable plate is fixedly connected with an adjusting rod, and the side of the adjusting rod away from the movable plate penetrates the installation cylinder and extends to the outside of the installation cylinder.
优选的,所述活动板的侧面且位于调节杆的表面固定连接有第一弹簧,所述第一弹簧远离活动板的一端与安装筒的内壁固定连接。Preferably, a first spring is fixedly connected to the side of the movable plate and the surface of the adjusting rod, and the end of the first spring away from the movable plate is fixedly connected to the inner wall of the installation cylinder.
优选的,所述安装筒的一侧固定连接有支撑杆,所述支撑杆远离安装筒的一端转动连接有调节板,所述调节板与调节杆转动连接。Preferably, a support rod is fixedly connected to one side of the installation cylinder, and an adjustment plate is rotatably connected to an end of the support rod away from the installation cylinder, and the adjustment plate is rotatably connected to the adjustment rod.
优选的,所述调节板的表面贯穿开设有滑动槽,所述调节杆通过滑动槽与调节板转动连接。Preferably, a sliding groove is formed through the surface of the adjusting plate, and the adjusting rod is rotatably connected with the adjusting plate through the sliding groove.
优选的,所述安装立筒的两侧均贯穿开设有活动槽,所述第一连接杆和第二连接杆均通过活动槽贯穿安装立筒。Preferably, movable slots are formed on both sides of the installation vertical cylinder, and both the first connecting rod and the second connecting rod pass through the installation vertical cylinder through the movable grooves.
优选的,所述安装立筒的底端固定连接有安装底座,所述安装立柱的顶部固定连接有警示牌。Preferably, the bottom end of the installation column is fixedly connected with an installation base, and the top of the installation column is fixedly connected with a warning sign.
有益效果Beneficial effect
本实用新型提供了一种市政道路施工护栏。与现有技术相比具备以下有益效果:The utility model provides a municipal road construction guardrail. Compared with the prior art, it has the following beneficial effects:
(1)、该市政道路施工护栏,通过安装立筒内壁的顶部和底部之间固定连接有安装立柱,安装立柱的表面滑动连接有安装套筒,安装套筒与安装立柱之间设置有限位机构,安装立柱的下部转动连接有第一连接杆,安装套筒的表面转动连接有第二连接杆,第一连接杆和第二连接杆的中部转动连接,限位机构包括安装筒,安装筒内壁的顶部和底部之间滑动连接有活动板,活动板靠近安装立柱的一侧固定连接有限位杆,限位杆远离活动板的一侧贯穿安装筒和安装套筒并延伸至安装套筒的内部,安装立柱的表面开设有与限位杆相适配的限位槽,活动板的另一侧固定连接有调节杆,调节杆远离活动板的一侧贯穿安装筒并延伸至安装筒的外部,通过限位机构的设置,方便第一连接杆和第二连接杆的调节和固定,不仅可以折叠收缩,方便运输,极大的减少了运输途中占用的空间,而且通过调节第一连接杆与第二连接杆之间的夹角,改变护栏的整体长度,以适应不同施工需求。(1) The municipal road construction guardrail is fixedly connected with the installation column between the top and the bottom of the inner wall of the installation column, the surface of the installation column is slidingly connected with the installation sleeve, and a limit mechanism is set between the installation sleeve and the installation column , the lower part of the installation column is rotatably connected with the first connecting rod, the surface of the mounting sleeve is rotatably connected with the second connecting rod, the middle part of the first connecting rod and the second connecting rod is rotatably connected, the limit mechanism includes a mounting cylinder, and the inner wall of the mounting cylinder A movable plate is slidably connected between the top and bottom, and the side of the movable plate close to the installation column is fixedly connected with a limit rod, and the side of the limit rod away from the movable plate penetrates the installation tube and the installation sleeve and extends to the inside of the installation sleeve , the surface of the installation column is provided with a limit groove matching the limit rod, the other side of the movable plate is fixedly connected with an adjustment rod, and the side of the adjustment rod away from the movable plate penetrates the installation cylinder and extends to the outside of the installation cylinder, Through the setting of the limit mechanism, it is convenient to adjust and fix the first connecting rod and the second connecting rod. The included angle between the two connecting rods changes the overall length of the guardrail to meet different construction requirements.
(2)、该市政道路施工护栏,通过安装筒的一侧固定连接有支撑杆,支撑杆远离安装筒的一端转动连接有调节板,调节板与调节杆转动连接,调节板的表面贯穿开设有滑动槽,调节杆通过滑动槽与调节板转动连接,通过调节板的设置,通过支撑杆和调节板之间的配合,方便将限位杆与限位槽脱离,便于调节护栏的整体长度。(2) The municipal road construction guardrail is fixedly connected with a support rod through one side of the installation cylinder, and the end of the support rod away from the installation cylinder is rotatably connected with an adjustment plate, and the adjustment plate is rotatably connected with the adjustment rod, and the surface of the adjustment plate runs through. The sliding groove and the adjusting rod are rotationally connected with the adjusting plate through the sliding groove, and through the setting of the adjusting plate, through the cooperation between the support rod and the adjusting plate, it is convenient to disengage the limiting rod from the limiting groove, so as to adjust the overall length of the guardrail.
附图说明Description of drawings
图1为本实用新型结构的主视图;Fig. 1 is the front view of structure of the present utility model;
图2为本实用新型安装立筒的剖视图;Fig. 2 is the cross-sectional view of the installation vertical tube of the utility model;
图3为本实用新型图2中A处的局部放大图。Fig. 3 is a partially enlarged view of A in Fig. 2 of the present invention.
图中:1安装立筒、2安装立柱、3安装套筒、4限位机构、41安装筒、42活动板、43限位杆、44限位槽、45调节杆、46第一弹簧、47支撑杆、48调节板、49滑动槽、5第一连接杆、6第二连接杆、7活动槽、8安装底座、9警示牌。In the figure: 1 installation vertical cylinder, 2 installation column, 3 installation sleeve, 4 limit mechanism, 41 installation cylinder, 42 movable plate, 43 limit rod, 44 limit groove, 45 adjustment rod, 46 first spring, 47 Support rod, 48 adjustment plate, 49 slide groove, 5 first connecting rod, 6 second connecting rod, 7 movable groove, 8 installation base, 9 warning sign.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
请参阅图1-3,本实用新型提供一种技术方案:一种市政道路施工护栏,包括安装立筒1,安装立筒1的底端固定连接有安装底座8,安装立柱2的顶部固定连接有警示牌9,警示牌9的表面涂有反光材料,方便引起夜晚过往的车辆驾驶员注意,安装立筒1内壁的顶部和底部之间固定连接有安装立柱2,安装立柱2的表面滑动连接有安装套筒3,安装套筒3与安装立柱2之间设置有限位机构4,安装立柱2的下部转动连接有第一连接杆5,安装套筒3的表面转动连接有第二连接杆6,第一连接杆5和第二连接杆6的中部转动连接,安装立筒1的两侧均贯穿开设有活动槽7,第一连接杆5和第二连接杆6均通过活动槽7贯穿安装立筒1,限位机构4包括安装筒41,安装筒41内壁的顶部和底部之间滑动连接有活动板42,活动板42靠近安装立柱2的一侧固定连接有限位杆43,限位杆43远离活动板42的一侧贯穿安装筒41和安装套筒3并延伸至安装套筒3的内部,安装立柱2的表面开设有与限位杆43相适配的限位槽44,安装立柱2的表面等距开设有多个限位槽44,活动板42的另一侧固定连接有调节杆45,调节杆45远离活动板42的一侧贯穿安装筒41并延伸至安装筒41的外部,活动板42的侧面且位于调节杆45的表面固定连接有第一弹簧46,第一弹簧46处于压缩状态,第一弹簧46远离活动板42的一端与安装筒41的内壁固定连接,安装筒41的一侧固定连接有支撑杆47,支撑杆47远离安装筒41的一端转动连接有调节板48,调节板48与调节杆45转动连接,调节板48的表面贯穿开设有滑动槽49,通过滑动槽49避免调节杆45与调节板48之间发生运动干涉,调节杆45通过滑动槽49与调节板48转动连接。Please refer to Figures 1-3, the utility model provides a technical solution: a municipal road construction guardrail, including an installation
使用时,按压调节板48,使调节板48绕支撑杆47转动,调节板48转动带动调节杆45运动,调节杆45运动带动活动板42压缩第一弹簧46,同时带动限位杆43脱离限位槽44,即可沿安装立柱2的表面滑动安装套筒3,安装套筒3滑动带动第二连接杆6转动,第二连接杆6转动带动第一连接杆5绕安装立柱2的表面转动,第一连接杆5与第二连接杆6之间的夹角随之变化,使护栏的整体长度改变,护栏整体的长度调节好后,松开调节板48,限位杆43在第一弹簧46的作用下插入限位槽44内,对安装套筒3进行固定。During use, press the
需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is a relationship between these entities or operations. There is no such actual relationship or order between them. Furthermore, the term "comprises", "comprises" or any other variation thereof is intended to cover a non-exclusive inclusion such that a process, method, article or apparatus comprising a set of elements includes not only those elements, but also includes elements not expressly listed. other elements of or also include elements inherent in such a process, method, article, or apparatus.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , replacements and modifications, the scope of the present utility model is defined by the appended claims and their equivalents.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202221432639.3U CN217812739U (en) | 2022-06-09 | 2022-06-09 | Town road construction guardrail |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202221432639.3U CN217812739U (en) | 2022-06-09 | 2022-06-09 | Town road construction guardrail |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN217812739U true CN217812739U (en) | 2022-11-15 |
Family
ID=83989655
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202221432639.3U Expired - Fee Related CN217812739U (en) | 2022-06-09 | 2022-06-09 | Town road construction guardrail |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN217812739U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116006020A (en) * | 2022-12-05 | 2023-04-25 | 河南一航工程建设有限公司 | Road foundation pit enclosing structure for road construction |
-
2022
- 2022-06-09 CN CN202221432639.3U patent/CN217812739U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116006020A (en) * | 2022-12-05 | 2023-04-25 | 河南一航工程建设有限公司 | Road foundation pit enclosing structure for road construction |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN217812739U (en) | Town road construction guardrail | |
| CN215830165U (en) | Municipal works are with portable protection rail with accomodate function | |
| CN209942367U (en) | Interim isolated column of municipal works | |
| CN210714085U (en) | Building construction site installation dust fall rail guard | |
| CN207160743U (en) | A kind of job site safe fence | |
| CN208545689U (en) | A kind of municipal construction alarming device | |
| CN214831607U (en) | Municipal works road pavement structure | |
| CN213449777U (en) | A safety device for municipal construction | |
| CN211312348U (en) | Road isolated column for municipal works | |
| CN213509916U (en) | Novel municipal garden construction fast-assembling protection device | |
| CN219412149U (en) | Municipal works isolation fence | |
| CN218991116U (en) | A guardrail for road construction | |
| CN216341399U (en) | Temporary guard railing of municipal works of convenient transportation | |
| CN221941202U (en) | Municipal road guardrail | |
| CN219671130U (en) | A kind of combined road pile | |
| CN216767000U (en) | A kind of safety protection device for foundation pit of municipal engineering | |
| CN218175641U (en) | Novel town road current-limiting device | |
| CN222797231U (en) | A kind of guardrail for municipal engineering | |
| CN219864258U (en) | Municipal construction template support frame | |
| CN210420918U (en) | Municipal works construction is with warning device of buildding temporarily | |
| CN222686332U (en) | Protective fence | |
| CN215807323U (en) | Advertisement putting device for municipal works | |
| CN212865719U (en) | Civil engineering rail guard | |
| CN215806779U (en) | Municipal works are with interim pipeline bracket convenient to remove | |
| CN222542195U (en) | A kind of road enclosure that can be lifted and lowered for engineering construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20221115 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |
