CN217801638U - Material storage rack assembly for building engineering management - Google Patents

Material storage rack assembly for building engineering management Download PDF

Info

Publication number
CN217801638U
CN217801638U CN202221031657.0U CN202221031657U CN217801638U CN 217801638 U CN217801638 U CN 217801638U CN 202221031657 U CN202221031657 U CN 202221031657U CN 217801638 U CN217801638 U CN 217801638U
Authority
CN
China
Prior art keywords
fixed
storage rack
engineering management
material storage
movable plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221031657.0U
Other languages
Chinese (zh)
Inventor
陈龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221031657.0U priority Critical patent/CN217801638U/en
Application granted granted Critical
Publication of CN217801638U publication Critical patent/CN217801638U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

The utility model relates to a technical field is deposited in the material management, specifically is a material storage rack subassembly for building engineering management, including two backup pads with be located two fixed three boards, two of placing between the backup pad the top of backup pad all is fixed with the mounting panel, installs the lifting unit on two mounting panels, two the spout has all been seted up in the front of backup pad, spout internal connection's slider is fixed with the movable plate between two sliders, and the both sides of movable plate all are connected with the connecting block, the top of movable plate is provided with the promotion subassembly. This goods and materials storage rack subassembly for building engineering management through the cooperation between the structure in lifting unit spare and the promotion subassembly, can drive the goods and materials through the movable plate and reciprocate, also can be electronic simultaneously with the goods and materials to reduce managers's the amount of labour, can be electronic simultaneously with goods and materials propelling movement to place the board on, the cooperation between the subassembly can move the universal wheel through the board down and receive and release simultaneously in the adjusting part.

Description

Material storage rack assembly for building engineering management
Technical Field
The utility model relates to a technical field is deposited in the material management, specifically is a material storage rack subassembly for building engineering management.
Background
The building engineering is the project entity of planning, investigation, design and construction, completion and other various technical works and completion and the supporting circuit, pipeline, equipment that carry out for newly-built, reconstructed or enlarged housing construction and affiliated structures facility, in the building construction, can use a large amount of building materials, and some unused building materials need to be fixed a position and deposited to can take fast, accurately when using subsequently, consequently just need use and store the frame and manage and deposit.
At present, the existing material storage rack assembly for building engineering management has certain defects in Shanghai warriors, and as the material storage rack assembly for general building engineering management is inconvenient for managers to move, so that the positions of the materials cannot be adjusted according to the field condition to enlarge the field range, and meanwhile, most of the materials of the building engineering are heavy, so that the materials need to be carried manually, the labor capacity of managers is increased, and the safety is reduced.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a goods and materials storage rack subassembly for building engineering management has possessed and has been convenient for remove and reduce the amount of labour, improves advantages such as security, has solved current goods and materials storage rack subassembly for building engineering management and has not been convenient for remove and need the artifical problem of carrying the goods and materials.
(II) technical scheme
For realizing above-mentioned removal of being convenient for and reduction amount of labour, improve the security purpose, the utility model provides a following technical scheme: the utility model provides a goods and materials storage rack subassembly for building engineering management, includes two backup pads and is located the fixed three board of placing between two backup pads, two the top of backup pad all is fixed with the mounting panel, installs the promotion subassembly on two mounting panels, two the spout has all been seted up in the front of backup pad, spout internal connection's slider is fixed with the movable plate between two sliders, and the both sides of movable plate all are connected with the connecting block, the top of movable plate is provided with the promotion subassembly, two be connected with fixed box between the backup pad, the inside of fixed box is provided with adjusting part, and adjusting part's bottom is connected with two and moves down the board, and the bottom that moves down the board is fixed with two universal wheels.
Furthermore, the lifting assembly comprises a bearing, two bearings, a rotating column, a gear, a motor, two rollers and a rope body, wherein the bearing is located on one side of the two mounting plates and is fixed, the rotating column is connected between the inside of the two bearings, the gear is fixed outside the rotating column, the motor is mounted at the top of the left mounting plate, the two gears are fixed on the output shaft of the motor, the two rollers are fixed outside the rotating column, and the rope body is wound on the rollers.
Furthermore, the pushing assembly comprises an inner groove formed in the top of the moving plate, an inner block connected with the inner groove, a positioning plate fixed to the top of the inner block, an electric push rod arranged on one side of the positioning plate, and a push plate fixed to the output end of the electric push rod.
Furthermore, the adjusting part comprises two bearings which are positioned on the left side wall and the right side wall of the fixing box and are fixed, a screw rod connected between the inner sides of the two bearings, two nuts connected outside the screw rod, an articulated piece fixed at the bottoms of the four nuts, and a transmission assembly arranged between the two screw rods.
Furthermore, the transmission assembly comprises transmission wheels which are positioned outside the two screw rods and are fixed, transmission belts which are externally connected with the two transmission wheels, and a second motor which is arranged at one end of the front screw rod.
Furthermore, the outside of the first gear is meshed with the outside of the second gear, and two ends of the rope body are respectively connected with the roller and the connecting block.
Furthermore, the outside of the screw rod is provided with two sections of threads in opposite directions, the two sections of threads outside the screw rod are both connected with nuts, and the bottoms of the front two hinged pieces and the bottoms of the back two hinged pieces are respectively connected with the two lower moving plates.
(III) advantageous effects
Compared with the prior art, the technical scheme of the application has the following beneficial effects:
this goods and materials storage rack subassembly for building engineering management through the cooperation between the structure in lifting unit spare and the promotion subassembly, can drive the goods and materials through the movable plate and reciprocate, also can be electronic simultaneously with the goods and materials to reduce managers's the amount of labour, can be electronic simultaneously with goods and materials propelling movement to place the board on, the cooperation between the subassembly can move the universal wheel through the board down and receive and release simultaneously in the adjusting part.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a front sectional view of the fixing box connecting structure according to the present invention;
FIG. 3 is a left sectional view of the connection structure of the middle and lower shift plate of the present invention;
fig. 4 is a left side view of the structure of the present invention.
In the figure: the device comprises a supporting plate 1, a placing plate 2, a mounting plate 3, a bearing 4, a rotary column 5, a gear 6, a motor 7, a gear 8, a roller 9, a rope 10, a sliding groove 11, a sliding block 12, a moving plate 13, a connecting block 14, an internal groove 15, an internal block 16, a positioning plate 17, an electric push rod 18, a push plate 19, a fixing box 20, a bearing 21 II, a lead screw 22, a nut 23, a hinge element 24, a downward moving plate 25, a universal wheel 26, a driving wheel 27, a driving belt 28 and a motor 29 II.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Please refer to fig. 1-4, the material storage rack assembly for building engineering management in this embodiment includes two support plates 1 and three fixed placing plates 2 located between the two support plates 1, the bottoms of the two support plates 1 are fixedly connected with non-slip mats, the tops of the two support plates 1 are fixedly connected with mounting plates 3, lifting assemblies are installed on the two mounting plates 3, chutes 11 are respectively formed in the front surfaces of the two support plates 1, sliders 12 slidably connected inside the chutes 11, the sliders 12 and the chutes 11 are both in a shape of a Chinese character 'tu', a movable plate 13 is fixedly connected between the front surfaces of the two sliders 12, connecting blocks 14 are respectively fixedly connected to the left and right sides of the movable plate 13, pushing assemblies are arranged at the tops of the movable plates 13, fixed boxes 20 are fixedly connected between the two support plates 1 and are opposite, adjusting assemblies are arranged inside the fixed boxes 20, two downward moving plates 25 are fixedly connected to the bottoms of the adjusting assemblies, two universal wheels 26 are fixedly connected to the bottoms of the downward moving plates 25, and springs are arranged on the universal wheels 26.
In addition, through the cooperation between the above-mentioned subassembly, can improve the stability of placing through the slipmat of backup pad 1, simultaneously under the effect of promotion subassembly, can drive movable plate 13 and reciprocate, simultaneously under the effect that promotes the subassembly, can deposit on placing board 2 with the goods and materials propelling movement to under the effect of adjusting part, can adjust receiving and releasing of universal wheel 26, simultaneously under the spring action of universal wheel 26, can effectively improve the shock resistance of removal.
Wherein, the hoisting component is including being located the equal fixed connection's in the relative one side bearing 4 of two mounting panels 3, fixed connection's rotary column 5 between two 4 inboards of bearing, a rotary column 5 outside fixed connection's gear 6, a left side mounting panel 3 top fixed mounting's motor 7, a motor 7 output shaft outside fixed connection's No. two gear 8, no. two gear 8's the outside meshes with a gear 6's the outside mutually, two running rollers 9 of 5 outside fixed connection of rotary column, and the winding rope body 10 in the running roller 9 outside, the bottom and the 14 fixed connection of connecting block of rope body 10.
In addition, through the cooperation between the above-mentioned components, can pass through the transmission of a motor 7, through the meshing of a number of gears 6 and a number of gears 8 to can drive the rotary column 5 and rotate, receive and release the rope body 10 through the running roller 9 simultaneously, consequently can drive the movable plate 13 and carry out the vertical movement regulation.
The pushing assembly comprises an inner groove 15 formed in the top of the moving plate 13, an inner block 16 slidably connected inside the inner groove 15, a positioning plate 17 fixedly connected with the top of the inner block 16 and the inner groove 15, an electric push rod 18 fixedly installed on the front surface of the positioning plate 17, and a push plate 19 fixedly connected with the output end of the electric push rod 18.
In addition, the position of the positioning plate 17 can be adjusted through the matching of the inner groove 15 and the inner block 16 through the matching of the components, and materials can be pushed and placed through the electric push rod 18 and the push plate 19.
The adjusting assembly comprises two second bearings 21 which are fixedly connected with the left side wall and the right side wall of the fixing box 20, a screw rod 22 which is fixedly connected between the inner sides of the two second bearings 21 on the front side and between the inner sides of the two second bearings 21 on the back side, two threads in opposite directions are arranged outside the screw rod 22, nuts 23 which are in threaded connection with the two threads on the outer side of the screw rod 22, hinged parts 24 which are fixedly connected with the bottoms of the four nuts 23, the bottoms of the two hinged parts 24 on the front side and the bottoms of the two hinged parts 24 on the back side are fixedly connected with two lower moving plates 25 respectively, and a transmission assembly is arranged between the two screw rods 22 and comprises transmission wheels 27 which are fixedly connected with the outer sides of the two screw rods 22, a transmission belt 28 which is in transmission connection between the outer sides of the two transmission wheels 27, and a second motor 29 which is fixedly installed at the right end of the screw rod 22, wherein the bottom of the second motor 29 is connected with the right side supporting plate 1 through a base plate.
In addition, through the cooperation between the above-mentioned components, can drive two lead screws 22 to rotate simultaneously through the transmission of No. two motor 29, under the effect of drive belt 28 and drive wheel 27 simultaneously, can drive two nuts 23 at lead screw 22 and move in the opposite or back-to-back direction simultaneously, consequently can drive down moving plate 25 and move up and down and adjust to the realization is received and released universal wheel 26.
The working principle of the above embodiment is as follows:
through placing the goods and materials on the movable plate 13, start a motor 7, a motor 7 drives a gear 6 through a gear 8 for two numbers to rotate, consequently, can drive rotary column 5 and rotate, simultaneously can pass through running roller 9, rope 10 and connecting block 14 drive movable plate 13 and move, when movable plate 13 moves on the suitable board 2 of placing, drive locating plate 17 through inside groove 15 and inside block 16 and move, starting electric putter 18, consequently, can drive push pedal 19 with goods and materials propelling movement to place on the board 2, thereby accomplish and deposit, when needing to move, start No. two motor 29, under the cooperation of drive wheel 27 and drive belt 28, no. two motor 29 drives two lead screws 22 simultaneously and rotates, consequently, can drive nut 23 and move in opposite or back to back of the body direction, simultaneously under the effect of articulated elements 24, can drive universal wheel 26 through board 25 that moves down and receive and release, simultaneously the shock resistance when moving can improve on the universal wheel 26, simultaneously under the slipmat effect of backup pad 1, can improve the stability of placing.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising a … …" does not exclude the presence of another identical element in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a goods and materials storage rack subassembly for building engineering management, includes two backup pads (1) and is located fixed three between two backup pads (1) and places board (2), its characterized in that: two the top of backup pad (1) all is fixed with mounting panel (3), installs lifting unit on two mounting panels (3), two spout (11) have all been seted up in the front of backup pad (1), and spout (11) internal connection's slider (12) are fixed with movable plate (13) between two slider (12), and the both sides of movable plate (13) all are connected with connecting block (14), the top of movable plate (13) is provided with the promotion subassembly, two be connected with between backup pad (1) fixed box (20), the inside of fixed box (20) is provided with adjusting part, and adjusting part's bottom is connected with two and moves down board (25), and the bottom of moving down board (25) is fixed with two universal wheels (26).
2. A material storage rack assembly for construction engineering management as claimed in claim 1, wherein: the lifting assembly comprises a bearing (4) which is located on one side of two mounting plates (3) and is fixed, a rotary column (5) which is connected between the two bearings (4) and is arranged inside, a gear (6) which is fixed outside the rotary column (5), a motor (7) which is installed on the top of the left mounting plate (3), a gear (8) which is fixed on an output shaft of the motor (7), two rollers (9) which are fixed outside the rotary column (5), and a rope body (10) which is wound on the rollers (9).
3. A material storage rack assembly for construction engineering management as claimed in claim 1, wherein: the pushing assembly comprises an inner groove (15) formed in the top of the moving plate (13), an inner block (16) connected with the inner groove (15) inside, a positioning plate (17) fixed to the top of the inner block (16), an electric push rod (18) installed on one side of the positioning plate (17), and a push plate (19) fixed to the output end of the electric push rod (18).
4. A material storage rack assembly for construction engineering management as claimed in claim 1, wherein: the adjusting assembly comprises two bearings (21) which are located on the left side wall and the right side wall of the fixing box (20) and are fixed, a screw rod (22) which is connected between the inner sides of the two bearings (21), two nuts (23) which are connected with the outer sides of the screw rod (22), a hinge piece (24) which is fixed at the bottoms of the four nuts (23) and a transmission assembly which is arranged between the two screw rods (22).
5. A material storage rack assembly for construction engineering management as claimed in claim 4, wherein: the transmission assembly comprises transmission wheels (27) which are positioned outside the two screw rods (22) and are fixed, transmission belts (28) which are connected with the outside of the two transmission wheels (27), and a second motor (29) which is arranged at one end of the front screw rod (22).
6. A material storage rack assembly for construction engineering management as claimed in claim 2, wherein: the outer part of the first gear (6) is meshed with the outer part of the second gear (8), and two ends of the rope body (10) are respectively connected with the roller (9) and the connecting block (14).
7. A material storage rack assembly for construction engineering management as claimed in claim 5, wherein: the outer part of the screw rod (22) is provided with two sections of threads in opposite directions, the two sections of threads on the outer part of the screw rod (22) are both connected with nuts (23), and the bottoms of the two hinge pieces (24) on the front side and the bottoms of the two hinge pieces (24) on the back side are respectively connected with two lower moving plates (25).
CN202221031657.0U 2022-04-29 2022-04-29 Material storage rack assembly for building engineering management Expired - Fee Related CN217801638U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221031657.0U CN217801638U (en) 2022-04-29 2022-04-29 Material storage rack assembly for building engineering management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221031657.0U CN217801638U (en) 2022-04-29 2022-04-29 Material storage rack assembly for building engineering management

Publications (1)

Publication Number Publication Date
CN217801638U true CN217801638U (en) 2022-11-15

Family

ID=83981806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221031657.0U Expired - Fee Related CN217801638U (en) 2022-04-29 2022-04-29 Material storage rack assembly for building engineering management

Country Status (1)

Country Link
CN (1) CN217801638U (en)

Similar Documents

Publication Publication Date Title
CN112249580B (en) Intelligent storage goods shelf lifting device
CN217801638U (en) Material storage rack assembly for building engineering management
CN112124393A (en) Moving stator conveying device and conveying method
CN212303814U (en) Automobile storage battery fixing support
CN209945715U (en) Automobile air conditioner clutch work demonstration experiment table
CN211021700U (en) Workstation is used in software development
CN105680778A (en) Two-dimensional movement mechanism of balancing weight
CN214991942U (en) Can spacing panel beating positioning device for electrophoresis spraying of multidirectional clamping
CN213550549U (en) Novel rocker transmission mechanism for compact shelf
CN209922794U (en) Portable lifting goods elevator for supermarket
CN215208063U (en) Machine tool hoisting tool
CN220733128U (en) Movable cabinet
CN214427311U (en) LCM defect intelligent detection equipment convenient to remove
CN218693246U (en) Cold-rolled sheet fixing device
CN220906762U (en) Cable rack
CN216643566U (en) Big data management building structure convenient for enterprise consultation management
CN217647660U (en) Triaxial full-automatic soldering machine
CN216972347U (en) High strength glass surface coating device
CN211141189U (en) Cable winding and unwinding devices for electric power test
CN210517635U (en) Wiring device for architectural decoration engineering
CN215154862U (en) Mechanical equipment removes conveyer
CN212456166U (en) Mobile bracket of electronic equipment
CN218683311U (en) Three-dimensional animation design model display device
CN221134270U (en) Cable bridge cutting equipment for constructional engineering
CN219284462U (en) Outdoor noise monitoring device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221115