CN217762530U - Heating pipeline mounting structure - Google Patents

Heating pipeline mounting structure Download PDF

Info

Publication number
CN217762530U
CN217762530U CN202221701854.9U CN202221701854U CN217762530U CN 217762530 U CN217762530 U CN 217762530U CN 202221701854 U CN202221701854 U CN 202221701854U CN 217762530 U CN217762530 U CN 217762530U
Authority
CN
China
Prior art keywords
pipeline
sealing
wall
heating
sealing ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221701854.9U
Other languages
Chinese (zh)
Inventor
李东博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Zhemiao Installation Service Co ltd
Original Assignee
Shenyang Zhemiao Installation Service Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Zhemiao Installation Service Co ltd filed Critical Shenyang Zhemiao Installation Service Co ltd
Priority to CN202221701854.9U priority Critical patent/CN217762530U/en
Application granted granted Critical
Publication of CN217762530U publication Critical patent/CN217762530U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Branch Pipes, Bends, And The Like (AREA)

Abstract

本实用新型公开了一种暖气管道安装结构,涉及管道技术领域,包括两个管道本体,所述管道本体包括管道、两个定位槽、两个定位块、密封圈一和密封圈二,两个所述定位槽均开设在管道的一侧,两个所述定位块均固定在管道远离定位槽的一侧,所述密封圈一固定套设在管道上。本实用新型提供一种暖气管道安装结构,通过设置连接机构,使得弧形安装块上的密封槽一和密封槽二对准管道上密封圈一和密封圈二,然后通过螺丝一和螺丝二将两个连接块一和两个连接块二进行固定,这样能够增加管道的密封性,避免暖气从两个管道连接处的缝隙中溢出的同时,也便于对管道本体进行维修,封闭连接处避免长时间使用后水渍让螺丝一和螺丝二锈蚀。

Figure 202221701854

The utility model discloses a heating pipe installation structure, which relates to the technical field of pipes, comprising two pipe bodies, wherein the pipe body comprises a pipe, two positioning grooves, two positioning blocks, a first sealing ring and a second sealing ring. The positioning grooves are all opened on one side of the pipe, the two positioning blocks are fixed on the side of the pipe away from the positioning groove, and the sealing ring is fixedly sleeved on the pipe. The utility model provides a heating pipe installation structure. By setting a connecting mechanism, the first sealing groove and the second sealing groove on the arc-shaped installation block are aligned with the first sealing ring and the second sealing ring on the pipe, and then the first screw and the second screw are used to connect the The two connecting blocks one and two connecting blocks are fixed, which can increase the tightness of the pipeline, prevent the heating from overflowing from the gap between the two pipelines, and also facilitate the maintenance of the pipeline body. After time use, the water stains make screw one and screw two rust.

Figure 202221701854

Description

一种暖气管道安装结构A heating pipe installation structure

技术领域technical field

本实用新型涉及管道技术领域,尤其涉及一种暖气管道安装结构。The utility model relates to the technical field of pipelines, in particular to a heating pipeline installation structure.

背景技术Background technique

管道是指用管子、管子联接件和阀门等联接成的用于输送气体、液体或带固体颗粒的流体的装置。通常,流体经鼓风机、压缩机、泵和锅炉等增压后,从管道的高压处流向低压处,也可利用流体自身的压力或重力输送。管道的用途很广泛,主要用在给水、排水、供热、供煤气、长距离输送石油和天然气、农业灌溉、水力工程和各种工业装置中。Pipeline refers to the device used to transport gas, liquid or fluid with solid particles connected by pipes, pipe connectors and valves. Usually, after the fluid is pressurized by blowers, compressors, pumps and boilers, it flows from the high-pressure part of the pipeline to the low-pressure part, and it can also be transported by the pressure or gravity of the fluid itself. Pipes are widely used, mainly in water supply, drainage, heat supply, gas supply, long-distance transportation of oil and natural gas, agricultural irrigation, hydraulic engineering and various industrial devices.

相关技术中,公开了专利号为CN202021586432.2一种暖气管道安装结构,该技术方案中两个暖气管道通过第一弧形夹板和第二弧形夹板将两个暖气管道的连接处包裹住,再通过螺丝进行固定,但是当冬天使用空气温较低暖气管道的温度较高时,温差会使管道上会发生凝水,水渍长时间浸泡螺丝后,会让螺丝产生锈蚀,如果需要对管道进行拆卸检修时,锈蚀的螺丝很难拆卸下来,给拆卸维修暖气管道造成不便。In the related technology, a heating pipe installation structure with the patent number CN202021586432.2 is disclosed. In this technical solution, the two heating pipes wrap the connection of the two heating pipes through the first arc-shaped splint and the second arc-shaped splint. Then fix it with screws, but when the air temperature is low in winter and the temperature of the heating pipe is high, the temperature difference will cause condensation on the pipe, and the water will soak the screw for a long time, which will cause the screw to rust. If you need to repair the pipe During disassembly and maintenance, the corroded screws are difficult to disassemble, which causes inconvenience to disassembly and maintenance of the heating pipe.

实用新型内容Utility model content

本实用新型提供一种暖气管道安装结构,解决了两个暖气管道通过第一弧形夹板和第二弧形夹板将两个暖气管道的连接处包裹住,再通过螺丝进行固定,但是当冬天使用空气温较低暖气管道的温度较高时,温差会使管道上会发生凝水,水渍长时间浸泡螺丝后,会让螺丝产生锈蚀,如果需要对管道进行拆卸检修时,锈蚀的螺丝很难拆卸下来,给拆卸维修暖气管道造成不便的问题。The utility model provides a heating pipe installation structure, which solves the problem that the connection of the two heating pipes is wrapped by the first arc-shaped splint and the second arc-shaped splint, and then fixed by screws, but when used in winter When the air temperature is low and the temperature of the heating pipe is high, the temperature difference will cause condensation on the pipe. After soaking the screw in water for a long time, the screw will rust. If the pipe needs to be disassembled and repaired, the rusted screw will be difficult Dismantle down, cause the problem of inconvenience to dismantling and maintenance heating pipe.

为解决上述技术问题,本实用新型提供的一种暖气管道安装结构,包括两个管道本体,所述管道本体包括管道、两个定位槽、两个定位块、密封圈一和密封圈二,两个所述定位槽均开设在管道的一侧,两个所述定位块均固定在管道远离定位槽的一侧,所述密封圈一固定套设在管道上,所述密封圈二固定套设在管道上,两个所述管道本体上设置有连接机构,两个所述管道本体上设置有防护机构。In order to solve the above technical problems, the utility model provides a heating pipeline installation structure, which includes two pipeline bodies, and the pipeline body includes a pipeline, two positioning grooves, two positioning blocks, sealing ring 1 and sealing ring 2, two The two positioning grooves are all set on one side of the pipeline, the two positioning blocks are fixed on the side of the pipeline away from the positioning groove, the first sealing ring is fixedly sleeved on the pipeline, and the second sealing ring is fixedly sleeved On the pipeline, the two pipeline bodies are provided with connecting mechanisms, and the two pipeline bodies are provided with protection mechanisms.

优选的,两个所述定位块分别延伸进对应的定位槽内并与对应的定位槽滑动连接。Preferably, the two positioning blocks respectively extend into the corresponding positioning slots and are slidably connected with the corresponding positioning slots.

优选的,所述密封圈一和密封圈二均为橡胶材质。Preferably, both the sealing ring 1 and the sealing ring 2 are made of rubber.

优选的,所述连接机构包括弧形安装块、橡胶层、密封槽一、密封槽二、连接块一和连接块二,所述橡胶层固定安装在弧形安装块靠近两个管道的一侧外壁上,所述密封槽一开设在橡胶层的一侧外壁上,所述密封槽二开设在橡胶层的一侧外壁上,所述连接块一固定安装在弧形安装块的外壁上,所述连接块二固定安装在弧形安装块的外壁上,两个所述连接块一通过螺丝一固定连接,两个所述连接块二通过螺丝二固定连接。Preferably, the connection mechanism includes an arc-shaped installation block, a rubber layer, a sealing groove 1, a sealing groove 2, a connection block 1 and a connection block 2, and the rubber layer is fixedly installed on the side of the arc-shaped installation block close to the two pipes On the outer wall, the first sealing groove is set on one side of the outer wall of the rubber layer, the second sealing groove is set on one side of the outer wall of the rubber layer, and the first connecting block is fixedly installed on the outer wall of the arc-shaped installation block. The second connecting block is fixedly installed on the outer wall of the arc-shaped installation block, the two connecting blocks one is fixedly connected by the first screw, and the two connecting blocks two are fixedly connected by the second screw.

优选的,所述密封圈一延伸进两个密封槽一并与两个密封槽一滑动连接,所述密封圈二延伸进两个密封槽二并与两个密封槽二滑动连接。Preferably, the sealing ring one extends into the two sealing grooves and is slidably connected with the two sealing grooves 1, and the sealing ring 2 extends into the two sealing grooves 2 and is slidably connected with the two sealing grooves 2.

优选的,所述防护机构包括防护壳一、两个橡胶垫一、两个安装板、防护壳二、两个橡胶垫二、两个凸块和两个卡槽,所述防护壳一设置在两个管道上,两个所述橡胶垫一均固定安装在防护壳一的底部,两个所述橡胶垫一分别与对应的管道的外壁滑动连接,两个所述安装板均固定安装在防护壳一的底部,所述防护壳二设置在两个管道上,两个所述橡胶垫二均固定安装在防护壳二的底部,两个所述橡胶垫二分别与对应的管道的外壁滑动连接,两个所述凸块分别固定安装在对应的安装板的一侧外壁,两个所述卡槽均开设在防护壳二的内壁上,两个所述凸块分别延伸进对应的卡槽内并与对应的卡槽滑动连接。Preferably, the protective mechanism includes a protective shell 1, two rubber pads 1, two mounting plates, a protective shell 2, two rubber pads 2, two protrusions and two slots, and the protective shell 1 is arranged on On the two pipelines, the two rubber pads are fixedly installed on the bottom of the protective shell one, and the two rubber pads are respectively connected to the outer wall of the corresponding pipeline by sliding, and the two mounting plates are fixedly installed on the protective shell. The bottom of the shell 1, the protective shell 2 is arranged on two pipes, the two rubber pads 2 are fixedly installed on the bottom of the protective shell 2, and the two rubber pads 2 are slidably connected with the outer walls of the corresponding pipes respectively , the two protrusions are respectively fixedly mounted on the outer wall of one side of the corresponding mounting plate, the two slots are opened on the inner wall of the protective shell 2, and the two protrusions respectively extend into the corresponding slots And be slidably connected with the corresponding card slot.

与相关技术相比较,本实用新型提供的一种暖气管道安装结构具有如下有益效果:Compared with related technologies, a heating pipe installation structure provided by the utility model has the following beneficial effects:

本实用新型提供一种暖气管道安装结构,通过设置定位块和定位槽,这样在安装时,将定位块对准定位槽,使得两个管道进行初步的连接,具有定位的作用使得两个管道不会在之后的安装步骤中转动,从而便于管道的安装。The utility model provides a heating pipeline installation structure. By setting a positioning block and a positioning groove, the positioning block is aligned with the positioning groove during installation, so that the two pipelines are initially connected, and the two pipelines have the function of positioning so that the two pipelines are not separated. Will turn during subsequent installation steps to facilitate pipe installation.

本实用新型提供一种暖气管道安装结构,通过设置连接机构,使得弧形安装块上的密封槽一和密封槽二对准管道上密封圈一和密封圈二,然后通过螺丝一和螺丝二将两个连接块一和两个连接块二进行连接,这样便将两个管道安装好,通过密封槽一、密封槽二、密封圈一和密封圈二,这样能够增加管道的密封性,避免暖气从两个管道连接处的缝隙中溢出,从而影响暖气的使用,也便于对管道本体进行维修。The utility model provides a heating pipeline installation structure. By setting a connecting mechanism, the sealing groove 1 and the sealing groove 2 on the arc-shaped installation block are aligned with the sealing ring 1 and the sealing ring 2 on the pipeline, and then the screw 1 and the screw 2 are connected Two connecting blocks one and two connecting blocks two are connected, so that the two pipes are installed, through sealing groove one, sealing groove two, sealing ring one and sealing ring two, this can increase the sealing of the pipes and avoid heating It overflows from the gap where the two pipes are connected, thereby affecting the use of heating, and is also convenient for the maintenance of the pipe body.

本实用新型提供一种暖气管道安装结构,通过设置防护机构,由于防护壳一和防护壳二外壳较薄,且具有一定的弹性,便可通凸块和卡槽将防护壳一和防护壳二卡在连接机构上,避免长时间使用后产生的水让螺丝一和螺丝二锈蚀,给维修管道造成不便。The utility model provides a heating pipe installation structure. By setting a protective mechanism, the first protective shell and the second protective shell are relatively thin and have a certain degree of elasticity, so that the first protective shell and the second protective shell can be connected through the protrusions and the card slots. It is stuck on the connecting mechanism to avoid the corrosion of screw 1 and screw 2 caused by the water generated after long-term use, which will cause inconvenience to the maintenance of pipelines.

附图说明Description of drawings

图1为本实用新型的整体立体结构示意图;Fig. 1 is the overall three-dimensional structure schematic diagram of the present utility model;

图2为本实用新型管道本体和连接机构的装配结构示意图;Fig. 2 is a schematic diagram of the assembly structure of the pipeline body and the connecting mechanism of the present invention;

图3为本实用新型连接机构的结构示意图;Fig. 3 is the structural representation of the utility model connecting mechanism;

图4为本实用新型一种暖气管道安装结构的正视剖视结构示意图;Fig. 4 is a front view sectional structural schematic diagram of a heating pipeline installation structure of the present invention;

图5为本实用新型图4中A处放大结构示意图;Fig. 5 is a schematic diagram of the enlarged structure at A in Fig. 4 of the present utility model;

图6为本实用新型一种暖气管道安装结构的侧视剖视结构示意图;Fig. 6 is a side view sectional structural schematic diagram of a heating pipeline installation structure of the present invention;

图7为本实用新型防护机构的结构示意图;Fig. 7 is a structural schematic diagram of the protection mechanism of the present invention;

图8为本实用新型图7中B处放大结构示意图。Fig. 8 is a schematic diagram of the enlarged structure at B in Fig. 7 of the present utility model.

图中标号:1、管道本体;101、管道;102、定位槽;103、定位块;104、密封圈一;105、密封圈二;2、连接机构;201、弧形安装块;202、橡胶层;203、密封槽一;204、密封槽二;205、连接块一;206、连接块二;3、防护机构;301、防护壳一;302、橡胶垫一;303、安装板;304、防护壳二;305、橡胶垫二;306、凸块;307、卡槽。Labels in the figure: 1, pipeline body; 101, pipeline; 102, positioning groove; 103, positioning block; 104, sealing ring one; 105, sealing ring two; 2, connecting mechanism; 201, arc-shaped installation block; 202, rubber Layer; 203, sealing groove one; 204, sealing groove two; 205, connecting block one; 206, connecting block two; 3, protective mechanism; 301, protective shell one; 302, rubber pad one; 303, mounting plate; 304, Two protective shells; 305, two rubber pads; 306, bumps; 307, slots.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例;基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Example: Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present utility model.

实施例一,由图1-8给出,本实用新型包括两个管道本体1,管道本体1包括管道101、两个定位槽102、两个定位块103、密封圈一104和密封圈二105,两个定位槽102均开设在管道101的一侧,两个定位块103均固定在管道101远离定位槽102的一侧,密封圈一104固定套设在管道101上,密封圈二105固定套设在管道101上,两个管道本体1上设置有连接机构2;Embodiment 1, given by Figures 1-8, the utility model includes two pipeline bodies 1, and the pipeline body 1 includes a pipeline 101, two positioning grooves 102, two positioning blocks 103, a sealing ring 104 and a sealing ring 2 105 , the two positioning grooves 102 are set on one side of the pipeline 101, the two positioning blocks 103 are fixed on the side of the pipeline 101 away from the positioning groove 102, the sealing ring one 104 is fixedly sleeved on the pipeline 101, and the sealing ring two 105 is fixed Sleeved on the pipeline 101, the two pipeline bodies 1 are provided with a connecting mechanism 2;

实施例二,两个定位块103分别延伸进对应的定位槽102内并与对应的定位槽102滑动连接,通过设置定位槽102和定位块103,这样便于管道本体1进行安装,增加管道本体1的稳定性;In the second embodiment, the two positioning blocks 103 respectively extend into the corresponding positioning grooves 102 and are slidably connected with the corresponding positioning grooves 102. By setting the positioning grooves 102 and the positioning blocks 103, it is convenient to install the pipeline body 1 and increase the pipeline body 1. stability;

实施例三,密封圈一104和密封圈二105均为橡胶材质,通过设置密封圈一104和密封圈二105,增加管道本体1与连接机构2之间摩擦力,避免管道本体1安装的不够稳定的同时,也增加管道本体1之间连接处的密封性;Embodiment 3, the first sealing ring 104 and the second sealing ring 105 are made of rubber, by setting the first sealing ring 104 and the second sealing ring 105, the friction force between the pipeline body 1 and the connecting mechanism 2 is increased to avoid insufficient installation of the pipeline body 1 While being stable, it also increases the sealing performance of the connection between the pipeline bodies 1;

实施例四,连接机构2包括弧形安装块201、橡胶层202、密封槽一203、密封槽二204、连接块一205和连接块二206,橡胶层202固定安装在弧形安装块201靠近两个管道101的一侧外壁上,密封槽一203开设在橡胶层202的一侧外壁上,密封槽二204开设在橡胶层202的一侧外壁上,连接块一205固定安装在弧形安装块201的外壁上,连接块二206固定安装在弧形安装块201的外壁上,两个连接块一205通过螺丝一固定连接,两个连接块二206通过螺丝二固定连接,通过设置连接机构2,这样便于管道本体1安装的同时,也便于日后对管道本体1进行维修;Embodiment 4, the connection mechanism 2 includes an arc-shaped mounting block 201, a rubber layer 202, a sealing groove 1 203, a sealing groove 2 204, a connecting block 1 205 and a connecting block 2 206, and the rubber layer 202 is fixedly installed on the curved mounting block 201 close to On one side of the outer wall of the two pipes 101, the first sealing groove 203 is set on one side of the outer wall of the rubber layer 202, the second sealing groove 204 is set on one side of the outer wall of the rubber layer 202, and the first connecting block 205 is fixedly installed on the arc. On the outer wall of block 201, connecting block 2 206 is fixedly installed on the outer wall of arc-shaped mounting block 201, two connecting blocks 1 205 are fixedly connected by screw 1, and two connecting block 2 206 are fixedly connected by screw 2, by setting the connecting mechanism 2. This facilitates the installation of the pipeline body 1 and facilitates maintenance of the pipeline body 1 in the future;

实施例五,密封圈一104延伸进两个密封槽一203并与两个密封槽一203滑动连接,密封圈二105延伸进两个密封槽二204并与两个密封槽二204滑动连接,通过密封圈一104、密封槽一203、密封圈二105和密封槽二204相互配合,增加连接处的密封性能;Embodiment 5, sealing ring one 104 extends into two sealing grooves one 203 and is slidably connected with two sealing grooves one 203, and sealing ring two 105 extends into two sealing groove two 204 and is slidingly connected with two sealing groove two 204, The sealing performance of the joint is increased through the cooperation of the first sealing ring 104, the first sealing groove 203, the second sealing ring 105 and the second sealing groove 204;

实施例六,防护机构3包括防护壳一301、两个橡胶垫一302、两个安装板303、防护壳二304、两个橡胶垫二305、两个凸块306和两个卡槽307,防护壳一301设置在两个管道101上,两个橡胶垫一302均固定安装在防护壳一301的底部,两个橡胶垫一302分别与对应的管道101的外壁滑动连接,两个安装板303均固定安装在防护壳一301的底部,防护壳二304设置在两个管道101上,两个橡胶垫二305均固定安装在防护壳二304的底部,两个橡胶垫二305分别与对应的管道101的外壁滑动连接,两个凸块306分别固定安装在对应的安装板303的一侧外壁,两个卡槽307均开设在防护壳二304的内壁上,两个凸块306分别延伸进对应的卡槽307内并与对应的卡槽307滑动连接,通过设置防护机构3,避免室温较低但管道101的温度较高时在空气中凝结的水汽会让螺丝一和螺丝二锈蚀。Embodiment 6, the protection mechanism 3 includes a protective shell 1 301, two rubber pads 1 302, two mounting plates 303, a protective shell 2 304, two rubber pads 2 305, two protrusions 306 and two card slots 307, The protective case one 301 is arranged on the two pipes 101, and the two rubber pads one 302 are fixedly installed on the bottom of the protective case one 301, and the two rubber pads one 302 are slidingly connected with the outer walls of the corresponding pipes 101 respectively. 303 are all fixedly installed on the bottom of protective shell 1 301, protective shell 2 304 is arranged on two pipelines 101, and two rubber pads 2 305 are all fixedly installed on the bottom of protective shell 2 304, and two rubber pads 2 305 respectively correspond to The outer wall of the pipeline 101 is slidingly connected, and the two protrusions 306 are respectively fixedly installed on the outer wall of one side of the corresponding mounting plate 303. Into the corresponding card slot 307 and slidingly connected with the corresponding card slot 307, by setting the protective mechanism 3, avoiding the water vapor condensed in the air when the room temperature is low but the temperature of the pipeline 101 is high will make the screw one and the screw two corrode.

工作原理:对于一种暖气管道安装结构,首先通过将定位块103对准定位槽102,使得两个管道101进行初步的连接,具有定位的作用使得两个管道101不会在之后的安装步骤中转动,从而便于管道101的安装,再将弧形安装块201上的密封槽一203和密封槽二204对准管道101上密封圈一104和密封圈二105,然后通过螺丝一和螺丝二将两个连接块一205和两个连接块二206进行连接,这样便将两个管道101安装好,通过密封槽一203、密封槽二204、密封圈一104和密封圈二105,这样能够增加管道101的密封性,避免暖气从两个管道101连接处的缝隙中溢出,从而影响暖气的使用,由于防护壳一301和防护壳二304外壳较薄,且具有一定的弹性,便可通凸块306和卡槽307将防护壳一301和防护壳二304卡在连接机构2上,从而隔绝连接处空气,避免长时间使用后产生的凝水让螺丝一和螺丝二锈蚀,给维修管道101造成不便。Working principle: For a heating pipe installation structure, firstly, by aligning the positioning block 103 with the positioning groove 102, the two pipes 101 are initially connected, which has the function of positioning so that the two pipes 101 will not be in the subsequent installation steps. Rotate so as to facilitate the installation of the pipeline 101, and then align the sealing groove 1 203 and the sealing groove 2 204 on the arc-shaped installation block 201 with the sealing ring 1 104 and the sealing ring 2 105 on the pipeline 101, and then screw the screw 1 and the screw 2 Two connection blocks one 205 and two connection blocks two 206 are connected, so that two pipelines 101 are installed, through seal groove one 203, seal groove two 204, seal ring one 104 and seal ring two 105, this can increase The tightness of the pipeline 101 prevents heating from overflowing from the gap between the two pipelines 101, thereby affecting the use of heating. Since the protective shell 301 and the protective shell 2 304 are thin and have a certain degree of elasticity, they can pass convex The block 306 and the draw-in groove 307 clamp the protective shell 1 301 and the protective shell 2 304 on the connection mechanism 2, thereby isolating the air at the joint, avoiding the condensation water produced after long-term use to make the screw 1 and the screw 2 rust, and to repair the pipeline 101 cause inconvenience.

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is a relationship between these entities or operations. There is no such actual relationship or order between them. Furthermore, the term "comprises", "comprises" or any other variation thereof is intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus comprising a set of elements includes not only those elements, but also includes elements not expressly listed. other elements of or also include elements inherent in such a process, method, article, or device.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , replacements and modifications, the scope of the present utility model is defined by the appended claims and their equivalents.

Claims (6)

1. The utility model provides a heating pipeline mounting structure, includes two pipeline bodies (1), its characterized in that: pipeline body (1) includes pipeline (101), two constant head tank (102), two locating piece (103), sealing washer (104) and sealing washer two (105), two one side at pipeline (101) is all seted up in constant head tank (102), two one side of keeping away from constant head tank (102) in pipeline (101) is all fixed in locating piece (103), the fixed cover of sealing washer (104) is established on pipeline (101), two are established on pipeline (101) to the fixed cover of sealing washer two (105) is provided with coupling mechanism (2), two on pipeline body (1) be provided with protection machanism (3) on pipeline body (1).
2. A heating duct installation structure according to claim 1, wherein two positioning blocks (103) respectively extend into the corresponding positioning grooves (102) and are slidably connected with the corresponding positioning grooves (102).
3. A heating duct installation structure according to claim 2, wherein the first seal ring (104) and the second seal ring (105) are made of rubber.
4. A heating pipeline installation structure according to claim 1, wherein the connection mechanism (2) includes an arc-shaped installation block (201), a rubber layer (202), a first sealing groove (203), a second sealing groove (204), a first connection block (205), and a second connection block (206), the rubber layer (202) is fixedly installed on an outer wall of one side of the arc-shaped installation block (201) close to the two pipelines (101), the first sealing groove (203) is installed on an outer wall of one side of the rubber layer (202), the second sealing groove (204) is installed on an outer wall of one side of the rubber layer (202), the first connection block (205) is fixedly installed on an outer wall of the arc-shaped installation block (201), the second connection block (206) is fixedly installed on an outer wall of the arc-shaped installation block (201), the first connection blocks (205) are fixedly connected through a first screw, and the second connection blocks (206) are fixedly connected through a second screw.
5. A heating pipe installation structure according to claim 4, wherein the first sealing ring (104) extends into and is slidably connected with the first two sealing grooves (203), and the second sealing ring (105) extends into and is slidably connected with the second two sealing grooves (204).
6. A heating duct installation structure according to claim 1, wherein the protection mechanism (3) includes a first protection housing (301), two first rubber pads (302), two installation plates (303), a second protection housing (304), two second rubber pads (305), two protrusions (306) and two slots (307), the first protection housing (301) is disposed on the two ducts (101), the two first rubber pads (302) are both fixedly mounted on the bottom of the first protection housing (301), the two first rubber pads (302) are respectively slidably connected with the outer wall of the corresponding duct (101), the two installation plates (303) are both fixedly mounted on the bottom of the first protection housing (301), the second protection housing (304) is disposed on the two ducts (101), the two second rubber pads (305) are both fixedly mounted on the bottom of the second protection housing (304), the two second rubber pads (305) are respectively slidably connected with the outer wall of the corresponding duct (101), the two protrusions (306) are respectively fixedly mounted on the outer wall of the corresponding installation plate (303), the two rubber pads (307) are both provided on the inner wall of the corresponding mounting plate (304), and the two slots (307) extend into the corresponding slots (307).
CN202221701854.9U 2022-07-04 2022-07-04 Heating pipeline mounting structure Expired - Fee Related CN217762530U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221701854.9U CN217762530U (en) 2022-07-04 2022-07-04 Heating pipeline mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221701854.9U CN217762530U (en) 2022-07-04 2022-07-04 Heating pipeline mounting structure

Publications (1)

Publication Number Publication Date
CN217762530U true CN217762530U (en) 2022-11-08

Family

ID=83897057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221701854.9U Expired - Fee Related CN217762530U (en) 2022-07-04 2022-07-04 Heating pipeline mounting structure

Country Status (1)

Country Link
CN (1) CN217762530U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117628514A (en) * 2023-11-29 2024-03-01 扬州永锋工业设备安装有限公司 A highly sealed regenerative incinerator

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117628514A (en) * 2023-11-29 2024-03-01 扬州永锋工业设备安装有限公司 A highly sealed regenerative incinerator

Similar Documents

Publication Publication Date Title
CN110748722A (en) An elastic seal for pipe connection
CN214500499U (en) Pressure pipeline plugging device
CN214248694U (en) Valve expansion piece lined with anti-corrosion rubber
CN215596620U (en) Heat preservation type pipeline
CN2344636Y (en) Universal corrugated expansion joint for pressure steel pipe of hydraulic power station
CN223754881U (en) Pipeline connecting device
CN2323231Y (en) Expansion joint resisting corrosion in high chlorion concentration environment
CN210623851U (en) Backflow pipeline convenient to install
CN220337713U (en) Sealing ring for pipeline connection
CN212960395U (en) A well wall sealing device
CN222881769U (en) Medium-deep geothermal energy metal heat exchanger
CN216789453U (en) Water power pipeline with good waterproof performance
CN218543459U (en) Anti-corrosion heat-insulation pipeline
CN219933235U (en) Pipeline joint convenient to install fast
CN217441032U (en) Pipe connecting device for water supply and drainage
CN211040031U (en) A water conservancy pipeline connection structure for hydraulic engineering
CN219549850U (en) Leak protection liquid flange subassembly
CN216619001U (en) Quick assembly disassembly structure of water conservancy pipeline
CN207740610U (en) A kind of anticorrosion steam conveying pipe being easily installed
CN217999828U (en) Pipeline structure for vacuum pump
CN210661783U (en) Evaporimeter steam transmission pipeline heat preservation device for bio-pharmaceuticals
CN223740380U (en) High-strength petroleum conveying pipe
CN214889329U (en) Cooling pipeline with explosion-proof function
CN220453051U (en) Municipal administration pipeline structure of buckling
CN210716320U (en) Air pipe fixing support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221108