CN217736929U - Carbon dioxide storage container for oil field CCUS system - Google Patents

Carbon dioxide storage container for oil field CCUS system Download PDF

Info

Publication number
CN217736929U
CN217736929U CN202222073782.4U CN202222073782U CN217736929U CN 217736929 U CN217736929 U CN 217736929U CN 202222073782 U CN202222073782 U CN 202222073782U CN 217736929 U CN217736929 U CN 217736929U
Authority
CN
China
Prior art keywords
tank
carbon dioxide
cooling
outer tank
buffer storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222073782.4U
Other languages
Chinese (zh)
Inventor
贾留英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longyun Innovation Technology Yangzhou Co ltd
Original Assignee
Longyun Innovation Technology Yangzhou Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longyun Innovation Technology Yangzhou Co ltd filed Critical Longyun Innovation Technology Yangzhou Co ltd
Priority to CN202222073782.4U priority Critical patent/CN217736929U/en
Application granted granted Critical
Publication of CN217736929U publication Critical patent/CN217736929U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本实用新型公开了一种用于油田CCUS系统的二氧化碳储存容器,涉及油田CCUS系统设备技术领域,包括固定支撑脚和冷却外罐,所述固定支撑脚安装固定在冷却外罐的下端位置上,所述冷却外罐的右端设置有输送管道。本实用新型通过设置有缓冲储存罐结构,从而便于缓冲放置,缓冲储存罐的圆环挡板通过下端若干个支撑弹簧焊接固定连接在冷却外罐的上端外侧,从而罐体外壳便于稳定套接在冷却外罐的内部,而罐体外壳在套接后,罐体外壳的下端因底部弹簧与冷却外罐内部底端接触,这样罐体外壳经过底部弹簧有效弹性支撑,使得罐体外壳在放置时具有很好的缓冲保护作用,这样有效避免罐体外壳的碰撞损坏,而罐体外壳便于储存二氧化碳进行放置。

Figure 202222073782

The utility model discloses a carbon dioxide storage container for an oil field CCUS system, which relates to the technical field of oil field CCUS system equipment, comprising a fixed support foot and a cooling outer tank, wherein the fixed support foot is installed and fixed on the lower end of the cooling outer tank, The right end of the outer cooling tank is provided with a conveying pipeline. The utility model is provided with a buffer storage tank structure, so as to facilitate buffer placement, and the annular baffle of the buffer storage tank is welded and fixedly connected to the outer side of the upper end of the outer cooling tank through a plurality of supporting springs at the lower end, so that the outer shell of the tank body is easy to be stably sleeved on the outer side of the outer cooling tank. The inside of the outer tank is cooled, and after the tank shell is sleeved, the lower end of the tank shell is in contact with the bottom end of the cooling outer tank due to the bottom spring, so that the tank shell is effectively elastically supported by the bottom spring, so that the tank shell is placed when placed. It has a good buffer protection effect, which effectively avoids the collision and damage of the tank shell, and the tank shell is convenient for storing carbon dioxide for placement.

Figure 202222073782

Description

一种用于油田CCUS系统的二氧化碳储存容器A carbon dioxide storage container for oil field CCUS system

技术领域technical field

本实用新型涉及油田CCUS系统设备技术领域,尤其涉及一种用于油田CCUS系统的二氧化碳储存容器。The utility model relates to the technical field of oil field CCUS system equipment, in particular to a carbon dioxide storage container used in the oil field CCUS system.

背景技术Background technique

CCUS碳捕获、利用与封存是应对全球气候变化的关键技术之一,受到世界各国的高度重视,纷纷加大研发力度,在CO2驱油等方面取得进展,但在产业化方面还存在困难。在油田CCUS系统中,从而需要对二氧化碳进行储存,这样就需要用到油田CCUS系统的二氧化碳储存容器。CCUS carbon capture, utilization and storage is one of the key technologies to deal with global climate change. It has been highly valued by countries all over the world. They have stepped up research and development efforts and made progress in CO2 flooding, but there are still difficulties in industrialization. In the oilfield CCUS system, carbon dioxide needs to be stored, so the carbon dioxide storage container of the oilfield CCUS system is required.

现有油田CCUS系统的二氧化碳储存容器在放置内部储存罐体时,整体不能有效稳定放置,而且不具有很好的缓冲能力,从而不具有很好的缓冲保护作用,这样在搬运时容易碰撞损坏的问题。The carbon dioxide storage container of the existing oil field CCUS system cannot be placed effectively and stably when the internal storage tank is placed, and it does not have a good buffer capacity, so it does not have a good buffer protection effect, so it is easy to be damaged by collision during transportation question.

实用新型内容Utility model content

本实用新型的目的是为了解决现有技术中存在的缺点,而提出的一种用于油田CCUS系统的二氧化碳储存容器,冷却外罐因下端的固定支撑脚,从而便于稳定放置,冷却外罐和缓冲储存罐具有很好的弹性缓冲作用,这样缓冲储存罐在放置时有效避免碰撞损坏。The purpose of this utility model is to solve the shortcomings in the prior art, and propose a carbon dioxide storage container for CCUS systems in oilfields. The cooling outer tank is convenient for stable placement due to the fixed support feet at the lower end, cooling the outer tank and The buffer storage tank has a good elastic buffer effect, so that the buffer storage tank can effectively avoid collision damage when placed.

为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:

一种用于油田CCUS系统的二氧化碳储存容器,包括固定支撑脚和冷却外罐,所述固定支撑脚安装固定在冷却外罐的下端位置上,所述冷却外罐的右端设置有输送管道,所述输送管道的外端设置有外部循环泵,所述冷却外罐的内部设置有缓冲储存罐,所述缓冲储存罐的上端中间设置有二氧化碳阀门进管,所述二氧化碳阀门进管的左侧位于缓冲储存罐上设置有CCUS系统压力测量仪表,所述二氧化碳阀门进管的右侧位于缓冲储存罐上设置有CCUS系统温度传感器,所述CCUS系统温度传感器的右侧位于缓冲储存罐上设置有CCUS系统二氧化碳气体检测器,所述冷却外罐的外侧设置有CCUS系统控制箱,所述CCUS系统压力测量仪表、CCUS系统温度传感器、CCUS系统二氧化碳气体检测器、外部循环泵和CCUS系统控制箱电性连接。A carbon dioxide storage container for CCUS systems in oilfields, comprising a fixed support foot and a cooling outer tank, the fixed support foot is installed and fixed on the lower end of the cooling outer tank, and a delivery pipeline is provided at the right end of the cooling outer tank, the The outer end of the delivery pipeline is provided with an external circulation pump, and the interior of the cooling outer tank is provided with a buffer storage tank, and a carbon dioxide valve inlet pipe is arranged in the middle of the upper end of the buffer storage tank, and the left side of the carbon dioxide valve inlet pipe is located The buffer storage tank is equipped with a CCUS system pressure measuring instrument, the right side of the carbon dioxide valve inlet pipe is located on the buffer storage tank, and a CCUS system temperature sensor is installed on the buffer storage tank, and the right side of the CCUS system temperature sensor is located on the buffer storage tank. System carbon dioxide gas detector, the outside of the cooling outer tank is provided with a CCUS system control box, the CCUS system pressure measuring instrument, CCUS system temperature sensor, CCUS system carbon dioxide gas detector, external circulation pump and CCUS system control box are electrically connect.

通过以上技术方案:冷却外罐因下端的固定支撑脚,从而便于稳定放置,冷却外罐和缓冲储存罐具有很好的弹性缓冲作用,这样缓冲储存罐在放置时有效避免碰撞损坏,通过CCUS系统控制箱便于接收数据进行处理,使得在温度过高时控制外部循环泵抽取外部冷却源,从而经过输送管道输送到冷却外罐中,使得冷却外罐冷却内部缓冲储存罐的温度,CCUS系统压力测量仪表和CCUS系统二氧化碳气体检测器的数据异常时,通过CCUS系统控制箱便于及时得知异常,从而便于提示人员进行处理,缓冲储存罐因二氧化碳阀门进管便于接收外部二氧化碳进行储存。Through the above technical solutions: the cooling outer tank is easy to place stably due to the fixed support feet at the lower end, the cooling outer tank and the buffer storage tank have a good elastic buffer effect, so that the buffer storage tank can effectively avoid collision damage when placed, through the CCUS system The control box is convenient for receiving data for processing, so that when the temperature is too high, the external circulation pump is controlled to extract the external cooling source, which is transported to the cooling outer tank through the delivery pipeline, so that the cooling outer tank cools the temperature of the internal buffer storage tank, and the pressure of the CCUS system is measured When the data of the instrument and the carbon dioxide gas detector of the CCUS system are abnormal, it is convenient to know the abnormality in time through the control box of the CCUS system, so that it is convenient to prompt personnel to deal with it. The buffer storage tank is easy to receive external carbon dioxide for storage because of the carbon dioxide valve entering the pipe.

本实用新型进一步设置为,所述缓冲储存罐包括圆环挡板、支撑弹簧、罐体外壳和底部弹簧,所述罐体外壳的下端设置有底部弹簧,所述罐体外壳的上端周侧设置有圆环挡板,所述圆环挡板的下端设置有支撑弹簧,所述支撑弹簧固定连接在冷却外罐上。The utility model is further provided that the buffer storage tank includes a ring baffle, a support spring, a tank shell and a bottom spring, the bottom spring is arranged at the lower end of the tank shell, and the upper end of the tank shell is provided with There is a ring baffle, the lower end of the ring baffle is provided with a supporting spring, and the supporting spring is fixedly connected to the cooling outer tank.

通过以上技术方案:因缓冲储存罐结构,使得便于缓冲放置储存使用。Through the above technical solution: due to the structure of the buffer storage tank, it is convenient for buffer storage and use.

本实用新型进一步设置为,所述冷却外罐包括进水管道、支撑圆环板、外罐壳体、底部封板、出水管道和罐体内腔,所述外罐壳体的上端右侧设置有进水管道,所述外罐壳体的下端左侧设置有出水管道,所述外罐壳体的下端设置有底部封板,所述外罐壳体的上端设置有支撑圆环板,所述外罐壳体的内部设置有罐体内腔,所述底部封板固定连接在固定支撑脚上,所述进水管道固定连接在输送管道上,所述支撑圆环板固定连接在缓冲储存罐上。The utility model is further provided that the cooling outer tank includes a water inlet pipe, a supporting ring plate, an outer tank shell, a bottom sealing plate, a water outlet pipeline and a tank inner cavity, and the upper right side of the outer tank shell is provided with a Water inlet pipe, the lower end of the outer tank shell is provided with a water outlet pipe on the left side, the lower end of the outer tank shell is provided with a bottom sealing plate, the upper end of the outer tank shell is provided with a supporting ring plate, the The inside of the outer tank shell is provided with a tank inner cavity, the bottom sealing plate is fixedly connected to the fixed support feet, the water inlet pipeline is fixedly connected to the delivery pipeline, and the support ring plate is fixedly connected to the buffer storage tank .

通过以上技术方案:因冷却外罐结构,从而有效包裹冷却,并且起到很好的包裹防护作用。Through the above technical solutions: due to the cooling of the outer tank structure, it can effectively wrap and cool, and play a good role in wrapping protection.

本实用新型进一步设置为,所述输送管道包括泵体连接管、输送竖管、连接短杆和上部连接管,所述输送竖管的外壁设置有连接短杆,所述输送竖管的上端设置有上部连接管,所述输送竖管的下端设置有泵体连接管,所述上部连接管固定连接在冷却外罐上。The utility model is further provided that the delivery pipeline includes a pump body connection pipe, a delivery vertical pipe, a connecting short rod and an upper connecting pipe, the outer wall of the delivery vertical pipe is provided with a connecting short rod, and the upper end of the delivery vertical pipe is provided with There is an upper connecting pipe, the lower end of the conveying vertical pipe is provided with a pump body connecting pipe, and the upper connecting pipe is fixedly connected to the cooling outer tank.

通过以上技术方案:因输送管道结构,从而便于稳定输送使用。Through the above technical solution: due to the structure of the conveying pipeline, it is convenient for stable conveying and use.

本实用新型进一步设置为,所述缓冲储存罐位于冷却外罐的内部中间,且所述缓冲储存罐和冷却外罐的圆心处于同一直线上。The utility model is further provided that the buffer storage tank is located in the middle of the cooling outer tank, and the centers of the buffer storage tank and the cooling outer tank are on the same straight line.

通过以上技术方案:因缓冲储存罐位于冷却外罐的内部中间,从而通过冷却外罐有效冷却和包裹防护缓冲储存罐,而缓冲储存罐和冷却外罐的圆心处于同一直线上,使得缓冲储存罐在放置时更加稳定。Through the above technical scheme: because the buffer storage tank is located in the middle of the cooling outer tank, the buffer storage tank is effectively cooled and wrapped by the cooling outer tank, and the centers of the buffer storage tank and the cooling outer tank are on the same straight line, so that the buffer storage tank More stable when placed.

本实用新型进一步设置为,所述二氧化碳阀门进管和缓冲储存罐通过焊接固定连接,且所述二氧化碳阀门进管和缓冲储存罐的连接处贯通。The utility model is further configured that the carbon dioxide valve inlet pipe and the buffer storage tank are fixedly connected by welding, and the connection between the carbon dioxide valve inlet pipe and the buffer storage tank is connected.

通过以上技术方案:因二氧化碳阀门进管和缓冲储存罐的连接处贯通,使得便于贯通输送二氧化碳气体,从而在输送时不会发生阻碍。Through the above technical solution: because the joint of the carbon dioxide valve inlet pipe and the buffer storage tank is connected, it is convenient to transport the carbon dioxide gas through, so that there will be no obstruction during the transport.

本实用新型进一步设置为,所述冷却外罐和输送管道通过螺钉固定连接,且所述冷却外罐和输送管道的连接处设置有密封胶垫。The utility model is further configured that the outer cooling tank and the delivery pipeline are fixedly connected by screws, and a sealing rubber pad is provided at the connection between the outer cooling tank and the delivery pipeline.

通过以上技术方案:因冷却外罐和输送管道通过螺钉固定连接,使得冷却外罐和输送管道便于安装固定住,而且冷却外罐和输送管道的连接处设置有密封胶垫,从而固定时更加紧密牢固。Through the above technical scheme: because the cooling outer tank and the delivery pipeline are fixedly connected by screws, the cooling outer tank and the delivery pipeline are easy to install and fix, and the joint between the cooling outer tank and the delivery pipeline is provided with a sealing rubber pad, so that it is more tightly fixed firm.

本实用新型进一步设置为,所述固定支撑脚共设置有四个,且所述固定支撑脚阵列分布在冷却外罐的下端上。The utility model is further provided that there are four fixed support feet in total, and the array of fixed support feet is distributed on the lower end of the cooling outer tank.

通过以上技术方案:因四个固定支撑脚阵列分布在冷却外罐的下端上,使得冷却外罐通过固定支撑脚便于稳定放置使用。Through the above technical solution: because the array of four fixed supporting feet is distributed on the lower end of the cooling outer tank, the cooling outer tank can be stably placed and used through the fixed supporting feet.

本实用新型的有益效果为:The beneficial effects of the utility model are:

1、通过设置有缓冲储存罐结构,从而便于缓冲放置,缓冲储存罐的圆环挡板通过下端若干个支撑弹簧焊接固定连接在冷却外罐的上端外侧,从而罐体外壳便于稳定套接在冷却外罐的内部,而罐体外壳在套接后,罐体外壳的下端因底部弹簧与冷却外罐内部底端接触,这样罐体外壳经过底部弹簧有效弹性支撑,使得罐体外壳在放置时具有很好的缓冲保护作用,这样有效避免罐体外壳的碰撞损坏,而罐体外壳便于储存二氧化碳进行放置。1. The buffer storage tank structure is provided to facilitate buffer placement. The ring baffle of the buffer storage tank is welded and fixedly connected to the outer side of the upper end of the cooling outer tank through several support springs at the lower end, so that the tank shell is convenient to be stably socketed in the cooling tank. The inside of the outer tank, and after the tank shell is socketed, the lower end of the tank shell is in contact with the bottom end of the cooling outer tank due to the bottom spring, so that the tank shell is effectively elastically supported by the bottom spring, so that the tank shell has a It has a good buffer protection effect, which effectively avoids the collision damage of the tank shell, and the tank shell is convenient for storing carbon dioxide for placement.

2、通过设置有冷却外罐结构,这样有效包裹冷却使用,冷却外罐的底部封板焊接固定连接在固定支撑脚上,使得底部封板通过固定支撑脚便于稳定支撑使用,外罐壳体的进水管道固定连接在输送管道上,从而便于接收外部冷却源输送到外罐壳体中,这样在经过外罐壳体的出水管道便于排出,使得有效降低外罐壳体的温度,从而外罐壳体在冷却时有效冷却罐体内腔内部的缓冲储存罐,这样有效控制缓冲储存罐的温度,避免出现高温状态,外罐壳体的上端因支撑圆环板的外侧形状,使得缓冲储存罐的支撑弹簧便于弹性支撑使用,从而缓冲储存罐在放置时更加稳定。2. By setting the cooling outer tank structure, it can be effectively wrapped and used for cooling. The bottom sealing plate of the cooling outer tank is welded and fixedly connected to the fixed support feet, so that the bottom sealing plate can be stably supported by the fixed support feet. The outer tank shell The water inlet pipe is fixedly connected to the delivery pipe, so that it is convenient to receive the external cooling source and transport it to the outer tank shell, so that the water outlet pipe passing through the outer tank shell is easy to discharge, so that the temperature of the outer tank shell can be effectively reduced, so that the outer tank When the shell is cooling, it effectively cools the buffer storage tank inside the inner cavity of the tank, thus effectively controlling the temperature of the buffer storage tank and avoiding high temperature conditions. The upper end of the outer tank shell supports the outer shape of the ring plate, so that the The support spring facilitates the use of elastic support, so that the buffer storage tank is more stable when placed.

附图说明Description of drawings

图1为本实用新型提出的一种用于油田CCUS系统的二氧化碳储存容器的立体结构示意图;Fig. 1 is a schematic diagram of a three-dimensional structure of a carbon dioxide storage container for an oilfield CCUS system proposed by the present invention;

图2为本实用新型提出的一种用于油田CCUS系统的二氧化碳储存容器的缓冲储存罐结构示意图;Fig. 2 is a structural schematic diagram of a buffer storage tank used for a carbon dioxide storage container of an oilfield CCUS system proposed by the utility model;

图3为本实用新型提出的一种用于油田CCUS系统的二氧化碳储存容器的冷却外罐结构示意图;Fig. 3 is a schematic structural diagram of a cooling outer tank used for a carbon dioxide storage container of an oil field CCUS system proposed by the utility model;

图4为本实用新型提出的一种用于油田CCUS系统的二氧化碳储存容器的输送管道结构示意图。Fig. 4 is a schematic structural diagram of a delivery pipeline used for a carbon dioxide storage container of an oil field CCUS system proposed by the utility model.

图中:1、CCUS系统压力测量仪表;2、二氧化碳阀门进管;3、CCUS系统温度传感器;4、CCUS系统二氧化碳气体检测器;5、缓冲储存罐;51、圆环挡板;52、支撑弹簧;53、罐体外壳;54、底部弹簧;6、输送管道;61、泵体连接管;62、输送竖管;63、连接短杆;64、上部连接管;7、外部循环泵;8、固定支撑脚;9、冷却外罐;91、进水管道;92、支撑圆环板;93、外罐壳体;94、底部封板;95、出水管道;96、罐体内腔;10、CCUS系统控制箱。In the figure: 1. Pressure measuring instrument of CCUS system; 2. Carbon dioxide valve inlet pipe; 3. Temperature sensor of CCUS system; 4. Carbon dioxide gas detector of CCUS system; 5. Buffer storage tank; 51. Ring baffle; 52. Support Spring; 53. Tank shell; 54. Bottom spring; 6. Delivery pipe; 61. Pump connecting pipe; 62. Delivery vertical pipe; 63. Connecting short rod; 64. Upper connecting pipe; 7. External circulation pump; , fixed support feet; 9, cooling outer tank; 91, water inlet pipe; 92, supporting ring plate; 93, outer tank shell; 94, bottom sealing plate; 95, outlet pipe; 96, tank inner cavity; 10, CCUS system control box.

具体实施方式Detailed ways

下面结合具体实施方式对本专利的技术方案作进一步详细地说明。The technical solution of this patent will be further described in detail below in conjunction with specific embodiments.

下面详细描述本专利的实施例,所述实施例的示例在附图中示出,其中自始至终相同或类似的标号表示相同或类似的元件或具有相同或类似功能的元件。下面通过参考附图描述的实施例是示例性的,仅用于解释本专利,而不能理解为对本专利的限制。Embodiments of the present patent are described in detail below, examples of which are shown in the drawings, wherein the same or similar reference numerals designate the same or similar elements or elements having the same or similar functions throughout. The embodiments described below by referring to the figures are exemplary and are only used for explaining the patent, and should not be construed as limiting the patent.

在本专利的描述中,需要理解的是,术语“中心”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本专利和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本专利的限制。In the description of this patent, it is to be understood that the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", The orientation or positional relationship indicated by "top", "bottom", "inner", "outer", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing this patent and simplifying the description, rather than indicating or implying References to devices or elements must have a particular orientation, be constructed, and operate in a particular orientation and therefore should not be construed as limiting on the patent.

在本专利的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“设置”应做广义理解,例如,可以是固定相连、设置,也可以是可拆卸连接、设置,或一体地连接、设置。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本专利中的具体含义。In the description of this patent, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection", "connection", and "setting" should be understood in a broad sense, for example, it can be fixed connection, setting , can also be detachably connected and set, or integrally connected and set. Those of ordinary skill in the art can understand the specific meanings of the above terms in this patent according to specific situations.

参照图1-图4,一种用于油田CCUS系统的二氧化碳储存容器,包括固定支撑脚8和冷却外罐9,固定支撑脚8安装固定在冷却外罐9的下端位置上,冷却外罐9的右端设置有输送管道6,输送管道6的外端设置有外部循环泵7,冷却外罐9的内部设置有缓冲储存罐5,缓冲储存罐5的上端中间设置有二氧化碳阀门进管2,二氧化碳阀门进管2的左侧位于缓冲储存罐5上设置有CCUS系统压力测量仪表1,二氧化碳阀门进管2的右侧位于缓冲储存罐5上设置有CCUS系统温度传感器3,CCUS系统温度传感器3的右侧位于缓冲储存罐5上设置有CCUS系统二氧化碳气体检测器4,冷却外罐9的外侧设置有CCUS系统控制箱10,CCUS系统压力测量仪表1、CCUS系统温度传感器3、CCUS系统二氧化碳气体检测器4、外部循环泵7和CCUS系统控制箱10电性连接,在使用时,冷却外罐9因下端的固定支撑脚8,从而便于稳定放置,冷却外罐9和缓冲储存罐5具有很好的弹性缓冲作用,这样缓冲储存罐5在放置时有效避免碰撞损坏,连接好CCUS系统压力测量仪表1、CCUS系统温度传感器3、CCUS系统二氧化碳气体检测器4、外部循环泵7和CCUS系统控制箱10的电性连接,这样通过CCUS系统控制箱10便于接收数据进行处理,使得在温度过高时控制外部循环泵7抽取外部冷却源,从而经过输送管道6输送到冷却外罐9中,使得冷却外罐9冷却内部缓冲储存罐5的温度,CCUS系统压力测量仪表1和CCUS系统二氧化碳气体检测器4的数据异常时,通过CCUS系统控制箱10便于及时得知异常,从而便于提示人员进行处理,缓冲储存罐5因二氧化碳阀门进管2便于接收外部二氧化碳进行储存。Referring to Fig. 1-Fig. 4, a carbon dioxide storage container for oil field CCUS system includes a fixed support foot 8 and a cooling outer tank 9, the fixed support foot 8 is installed and fixed on the lower end of the cooling outer tank 9, and the cooling outer tank 9 The right end of the tank is provided with a delivery pipeline 6, the outer end of the delivery pipeline 6 is provided with an external circulation pump 7, the inside of the cooling outer tank 9 is provided with a buffer storage tank 5, and the middle of the upper end of the buffer storage tank 5 is provided with a carbon dioxide valve inlet pipe 2, and the carbon dioxide The left side of the valve inlet pipe 2 is located on the buffer storage tank 5 with a CCUS system pressure measuring instrument 1, and the right side of the carbon dioxide valve inlet pipe 2 is located on the buffer storage tank 5 with a CCUS system temperature sensor 3, and the CCUS system temperature sensor 3 The buffer storage tank 5 on the right side is provided with a CCUS system carbon dioxide gas detector 4, and the outside of the cooling outer tank 9 is provided with a CCUS system control box 10, a CCUS system pressure measuring instrument 1, a CCUS system temperature sensor 3, and a CCUS system carbon dioxide gas detector The device 4, the external circulation pump 7 and the CCUS system control box 10 are electrically connected. When in use, the cooling outer tank 9 is easy to place stably due to the fixed support feet 8 at the lower end. The cooling outer tank 9 and the buffer storage tank 5 have a good In this way, the buffer storage tank 5 can effectively avoid collision damage when placed, and connect the CCUS system pressure measuring instrument 1, CCUS system temperature sensor 3, CCUS system carbon dioxide gas detector 4, external circulation pump 7 and CCUS system control box 10, so that the control box 10 of the CCUS system is convenient for receiving data for processing, so that when the temperature is too high, the external circulation pump 7 is controlled to extract the external cooling source, which is transported to the cooling outer tank 9 through the delivery pipeline 6, so that the cooling The outer tank 9 cools the temperature of the internal buffer storage tank 5, and when the data of the CCUS system pressure measuring instrument 1 and the CCUS system carbon dioxide gas detector 4 are abnormal, it is convenient to know the abnormality in time through the CCUS system control box 10, thereby facilitating prompting personnel to handle, The buffer storage tank 5 is convenient to receive external carbon dioxide for storage because the carbon dioxide valve enters the pipe 2 .

具体的,缓冲储存罐5包括圆环挡板51、支撑弹簧52、罐体外壳53和底部弹簧54,罐体外壳53的下端设置有底部弹簧54,罐体外壳53的上端周侧设置有圆环挡板51,圆环挡板51的下端设置有支撑弹簧52,支撑弹簧52固定连接在冷却外罐9上,缓冲储存罐5的圆环挡板51通过下端若干个支撑弹簧52焊接固定连接在冷却外罐9的上端外侧,从而罐体外壳53便于稳定套接在冷却外罐9的内部,而罐体外壳53在套接后,罐体外壳53的下端因底部弹簧54与冷却外罐9内部底端接触,这样罐体外壳53经过底部弹簧54有效弹性支撑,使得罐体外壳53在放置时具有很好的缓冲保护作用,这样有效避免罐体外壳53的碰撞损坏,而罐体外壳53便于储存二氧化碳进行放置。Specifically, the buffer storage tank 5 includes a ring baffle 51, a support spring 52, a tank shell 53 and a bottom spring 54, the bottom spring 54 is provided at the lower end of the tank shell 53, and a circle The ring baffle 51, the lower end of the ring baffle 51 is provided with a support spring 52, the support spring 52 is fixedly connected to the cooling outer tank 9, and the ring baffle 51 of the buffer storage tank 5 is welded and fixedly connected by several support springs 52 at the lower end On the outer side of the upper end of the cooling outer tank 9, the tank shell 53 is convenient to be stably socketed inside the cooling outer tank 9, and after the tank shell 53 is socketed, the lower end of the tank shell 53 is connected to the cooling outer tank by the bottom spring 54 9. The inner bottom is in contact, so that the tank shell 53 is effectively elastically supported by the bottom spring 54, so that the tank shell 53 has a good buffer protection effect when placed, so that the collision damage of the tank shell 53 is effectively avoided, and the tank shell 53 is convenient for storing carbon dioxide for placement.

具体的,冷却外罐9包括进水管道91、支撑圆环板92、外罐壳体93、底部封板94、出水管道95和罐体内腔96,外罐壳体93的上端右侧设置有进水管道91,外罐壳体93的下端左侧设置有出水管道95,外罐壳体93的下端设置有底部封板94,外罐壳体93的上端设置有支撑圆环板92,外罐壳体93的内部设置有罐体内腔96,底部封板94固定连接在固定支撑脚8上,进水管道91固定连接在输送管道6上,支撑圆环板92固定连接在缓冲储存罐5上,冷却外罐9的底部封板94焊接固定连接在固定支撑脚8上,使得底部封板94通过固定支撑脚8便于稳定支撑使用,外罐壳体93的进水管道91固定连接在输送管道6上,从而便于接收外部冷却源输送到外罐壳体93中,这样在经过外罐壳体93的出水管道95便于排出,使得有效降低外罐壳体93的温度,从而外罐壳体93在冷却时有效冷却罐体内腔96内部的缓冲储存罐5,这样有效控制缓冲储存罐5的温度,避免出现高温状态,外罐壳体93的上端因支撑圆环板92的外侧形状,使得缓冲储存罐5的支撑弹簧52便于弹性支撑使用,从而缓冲储存罐5在放置时更加稳定。Specifically, the cooling outer tank 9 includes a water inlet pipe 91, a supporting ring plate 92, an outer tank shell 93, a bottom sealing plate 94, an outlet pipe 95 and a tank inner cavity 96, and the upper right side of the outer tank shell 93 is provided with The water inlet pipe 91 is provided with an outlet pipe 95 on the left side of the lower end of the outer tank shell 93. The inside of the tank shell 93 is provided with a tank inner cavity 96, the bottom sealing plate 94 is fixedly connected to the fixed support foot 8, the water inlet pipe 91 is fixedly connected to the delivery pipe 6, and the support ring plate 92 is fixedly connected to the buffer storage tank 5 Above, the bottom sealing plate 94 of the cooling outer tank 9 is welded and fixedly connected to the fixed support feet 8, so that the bottom sealing plate 94 is convenient for stable support through the fixed support feet 8, and the water inlet pipe 91 of the outer tank shell 93 is fixedly connected to the Pipeline 6, so that it is convenient to receive an external cooling source and transport it to the outer tank shell 93, so that it is easy to discharge through the outlet pipe 95 of the outer tank shell 93, so that the temperature of the outer tank shell 93 is effectively reduced, so that the outer tank shell 93 effectively cools the buffer storage tank 5 inside the tank inner cavity 96 during cooling, effectively controls the temperature of the buffer storage tank 5 like this, and avoids a high temperature state. The support spring 52 of the buffer storage tank 5 is convenient for elastic support, so that the buffer storage tank 5 is more stable when placed.

具体的,输送管道6包括泵体连接管61、输送竖管62、连接短杆63和上部连接管64,输送竖管62的外壁设置有连接短杆63,输送竖管62的上端设置有上部连接管64,输送竖管62的下端设置有泵体连接管61,上部连接管64固定连接在冷却外罐9上,输送管道6的泵体连接管61连接在外部循环泵7上,这样外部循环泵7抽取的冷却源因泵体连接管61便于输送到输送竖管62中,在经过输送竖管62输送到上部连接管64中,从而在输送到冷却外罐9中,这样有效冷却冷却外罐9,输送竖管62在输送中因连接短杆63焊接在冷却外罐9的外壁上,使得输送竖管62在输送时更加稳定。Specifically, the conveying pipeline 6 includes a pump body connecting pipe 61, a conveying vertical pipe 62, a connecting short rod 63 and an upper connecting pipe 64. The outer wall of the conveying vertical pipe 62 is provided with a connecting short rod 63, and the upper end of the conveying vertical pipe 62 is provided with an upper The connecting pipe 64, the lower end of the conveying vertical pipe 62 is provided with a pump body connecting pipe 61, and the upper connecting pipe 64 is fixedly connected to the cooling outer tank 9, and the pump body connecting pipe 61 of the conveying pipeline 6 is connected to the external circulation pump 7, so that the external The cooling source extracted by the circulating pump 7 is conveniently transported to the delivery vertical pipe 62 because of the pump body connecting pipe 61, and then delivered to the upper connecting pipe 64 through the delivery vertical pipe 62, so as to be delivered to the cooling outer tank 9, so that the cooling is effectively cooled. The outer tank 9 and the conveying vertical pipe 62 are welded on the outer wall of the cooling outer tank 9 because of the connecting short rod 63 during transportation, so that the conveying vertical pipe 62 is more stable when conveying.

具体的,缓冲储存罐5位于冷却外罐9的内部中间,且缓冲储存罐5和冷却外罐9的圆心处于同一直线上,因缓冲储存罐5位于冷却外罐9的内部中间,从而通过冷却外罐9有效冷却和包裹防护缓冲储存罐5,而缓冲储存罐5和冷却外罐9的圆心处于同一直线上,使得缓冲储存罐5在放置时更加稳定。Specifically, the buffer storage tank 5 is located in the middle of the cooling outer tank 9, and the centers of the buffer storage tank 5 and the cooling outer tank 9 are on the same straight line, because the buffer storage tank 5 is located in the inner middle of the cooling outer tank 9, thereby cooling The outer tank 9 effectively cools and wraps the protective buffer storage tank 5, and the centers of the buffer storage tank 5 and the cooling outer tank 9 are on the same straight line, so that the buffer storage tank 5 is more stable when placed.

具体的,二氧化碳阀门进管2和缓冲储存罐5通过焊接固定连接,且二氧化碳阀门进管2和缓冲储存罐5的连接处贯通,因二氧化碳阀门进管2和缓冲储存罐5的连接处贯通,使得便于贯通输送二氧化碳气体,从而在输送时不会发生阻碍。Specifically, the carbon dioxide valve inlet pipe 2 and the buffer storage tank 5 are fixedly connected by welding, and the connection between the carbon dioxide valve inlet pipe 2 and the buffer storage tank 5 is connected, because the connection between the carbon dioxide valve inlet pipe 2 and the buffer storage tank 5 is connected, It makes it easy to transport carbon dioxide gas through, so that there will be no obstruction during the transport.

具体的,冷却外罐9和输送管道6通过螺钉固定连接,且冷却外罐9和输送管道6的连接处设置有密封胶垫,因冷却外罐9和输送管道6通过螺钉固定连接,使得冷却外罐9和输送管道6便于安装固定住,而且冷却外罐9和输送管道6的连接处设置有密封胶垫,从而固定时更加紧密牢固。Specifically, the cooling outer tank 9 and the delivery pipeline 6 are fixedly connected by screws, and the joint between the cooling outer tank 9 and the delivery pipeline 6 is provided with a sealing rubber pad, because the cooling outer tank 9 and the delivery pipeline 6 are fixedly connected by screws, so that the cooling The outer tank 9 and the conveying pipeline 6 are convenient to install and fix, and the connection between the cooling outer tank 9 and the conveying pipeline 6 is provided with a sealing rubber pad, so that it is more compact and firm when fixed.

具体的,固定支撑脚8共设置有四个,且固定支撑脚8阵列分布在冷却外罐9的下端上,因四个固定支撑脚8阵列分布在冷却外罐9的下端上,使得冷却外罐9通过固定支撑脚8便于稳定放置使用。Specifically, there are four fixed support feet 8, and the array of fixed support feet 8 is distributed on the lower end of the cooling outer tank 9. Because the array of four fixed support feet 8 is distributed on the lower end of the cooling outer tank 9, the cooling outer tank The tank 9 is convenient for stable placement and use by fixing the supporting feet 8.

工作原理:在使用时,冷却外罐9因下端的固定支撑脚8,从而便于稳定放置,冷却外罐9和缓冲储存罐5具有很好的弹性缓冲作用,这样缓冲储存罐5在放置时有效避免碰撞损坏,连接好CCUS系统压力测量仪表1、CCUS系统温度传感器3、CCUS系统二氧化碳气体检测器4、外部循环泵7和CCUS系统控制箱10的电性连接,这样通过CCUS系统控制箱10便于接收数据进行处理,使得在温度过高时控制外部循环泵7抽取外部冷却源,从而经过输送管道6输送到冷却外罐9中,使得冷却外罐9冷却内部缓冲储存罐5的温度,CCUS系统压力测量仪表1和CCUS系统二氧化碳气体检测器4的数据异常时,通过CCUS系统控制箱10便于及时得知异常,从而便于提示人员进行处理,缓冲储存罐5因二氧化碳阀门进管2便于接收外部二氧化碳进行储存。Working principle: when in use, the cooling outer tank 9 is easy to place stably due to the fixed support feet 8 at the lower end, and the cooling outer tank 9 and the buffer storage tank 5 have a good elastic buffering effect, so that the buffer storage tank 5 is effective when placed To avoid collision damage, connect the CCUS system pressure measuring instrument 1, the CCUS system temperature sensor 3, the CCUS system carbon dioxide gas detector 4, the external circulation pump 7 and the electrical connection of the CCUS system control box 10, so that the CCUS system control box 10 is convenient The received data is processed, so that when the temperature is too high, the external circulation pump 7 is controlled to extract the external cooling source, which is transported to the cooling outer tank 9 through the delivery pipeline 6, so that the cooling outer tank 9 cools the temperature of the internal buffer storage tank 5, and the CCUS system When the data of the pressure measuring instrument 1 and the carbon dioxide gas detector 4 of the CCUS system are abnormal, it is convenient to know the abnormality in time through the CCUS system control box 10, so as to facilitate prompting personnel to handle it. to store.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above is only a preferred embodiment of the utility model, but the scope of protection of the utility model is not limited thereto. The equivalent replacement or change of the new technical solution and the concept of the utility model shall be covered by the protection scope of the utility model.

Claims (8)

1.一种用于油田CCUS系统的二氧化碳储存容器,包括固定支撑脚(8)和冷却外罐(9),其特征在于,所述固定支撑脚(8)安装固定在冷却外罐(9)的下端位置上,所述冷却外罐(9)的右端设置有输送管道(6),所述输送管道(6)的外端设置有外部循环泵(7),所述冷却外罐(9)的内部设置有缓冲储存罐(5),所述缓冲储存罐(5)的上端中间设置有二氧化碳阀门进管(2),所述二氧化碳阀门进管(2)的左侧位于缓冲储存罐(5)上设置有CCUS系统压力测量仪表(1),所述二氧化碳阀门进管(2)的右侧位于缓冲储存罐(5)上设置有CCUS系统温度传感器(3),所述CCUS系统温度传感器(3)的右侧位于缓冲储存罐(5)上设置有CCUS系统二氧化碳气体检测器(4),所述冷却外罐(9)的外侧设置有CCUS系统控制箱(10),所述CCUS系统压力测量仪表(1)、CCUS系统温度传感器(3)、CCUS系统二氧化碳气体检测器(4)、外部循环泵(7)和CCUS系统控制箱(10)电性连接。1. A carbon dioxide storage container for an oil field CCUS system, comprising a fixed support foot (8) and a cooling outer tank (9), characterized in that the fixed support foot (8) is installed and fixed on the cooling outer tank (9) At the lower end position of the cooling outer tank (9), the right end of the cooling outer tank (9) is provided with a delivery pipeline (6), and the outer end of the delivery pipeline (6) is provided with an external circulation pump (7), and the cooling outer tank (9) The interior of the buffer storage tank (5) is provided with a carbon dioxide valve inlet pipe (2) in the middle of the upper end of the buffer storage tank (5), and the left side of the carbon dioxide valve inlet pipe (2) is located in the buffer storage tank (5) ) is provided with a CCUS system pressure measuring instrument (1), the right side of the carbon dioxide valve inlet pipe (2) is located on the buffer storage tank (5) and is provided with a CCUS system temperature sensor (3), and the CCUS system temperature sensor ( 3) The right side of the buffer storage tank (5) is provided with a CCUS system carbon dioxide gas detector (4), and the outside of the cooling outer tank (9) is provided with a CCUS system control box (10), and the CCUS system pressure The measuring instrument (1), the CCUS system temperature sensor (3), the CCUS system carbon dioxide gas detector (4), the external circulation pump (7) and the CCUS system control box (10) are electrically connected. 2.根据权利要求1所述的一种用于油田CCUS系统的二氧化碳储存容器,其特征在于,所述缓冲储存罐(5)包括圆环挡板(51)、支撑弹簧(52)、罐体外壳(53)和底部弹簧(54),所述罐体外壳(53)的下端设置有底部弹簧(54),所述罐体外壳(53)的上端周侧设置有圆环挡板(51),所述圆环挡板(51)的下端设置有支撑弹簧(52),所述支撑弹簧(52)固定连接在冷却外罐(9)上。2. A kind of carbon dioxide storage container for oil field CCUS system according to claim 1, is characterized in that, described buffer storage tank (5) comprises annular baffle plate (51), support spring (52), tank body Shell (53) and bottom spring (54), the lower end of described tank shell (53) is provided with bottom spring (54), and the upper end peripheral side of described tank shell (53) is provided with ring baffle (51) , the lower end of the circular baffle (51) is provided with a support spring (52), and the support spring (52) is fixedly connected to the cooling outer tank (9). 3.根据权利要求1所述的一种用于油田CCUS系统的二氧化碳储存容器,其特征在于,所述冷却外罐(9)包括进水管道(91)、支撑圆环板(92)、外罐壳体(93)、底部封板(94)、出水管道(95)和罐体内腔(96),所述外罐壳体(93)的上端右侧设置有进水管道(91),所述外罐壳体(93)的下端左侧设置有出水管道(95),所述外罐壳体(93)的下端设置有底部封板(94),所述外罐壳体(93)的上端设置有支撑圆环板(92),所述外罐壳体(93)的内部设置有罐体内腔(96),所述底部封板(94)固定连接在固定支撑脚(8)上,所述进水管道(91)固定连接在输送管道(6)上,所述支撑圆环板(92)固定连接在缓冲储存罐(5)上。3. A carbon dioxide storage container for an oil field CCUS system according to claim 1, characterized in that, the cooling outer tank (9) comprises a water inlet pipe (91), a supporting ring plate (92), an outer Tank shell (93), bottom sealing plate (94), outlet pipe (95) and tank inner cavity (96), the upper right side of the outer tank shell (93) is provided with a water inlet pipe (91), so The left side of the lower end of the outer tank shell (93) is provided with an outlet pipe (95), and the lower end of the outer tank shell (93) is provided with a bottom sealing plate (94). The upper end is provided with a supporting ring plate (92), the inside of the outer tank shell (93) is provided with a tank inner cavity (96), and the bottom sealing plate (94) is fixedly connected to the fixed support foot (8), The water inlet pipe (91) is fixedly connected to the delivery pipe (6), and the support ring plate (92) is fixedly connected to the buffer storage tank (5). 4.根据权利要求1所述的一种用于油田CCUS系统的二氧化碳储存容器,其特征在于,所述输送管道(6)包括泵体连接管(61)、输送竖管(62)、连接短杆(63)和上部连接管(64),所述输送竖管(62)的外壁设置有连接短杆(63),所述输送竖管(62)的上端设置有上部连接管(64),所述输送竖管(62)的下端设置有泵体连接管(61),所述上部连接管(64)固定连接在冷却外罐(9)上。4. A carbon dioxide storage container for an oil field CCUS system according to claim 1, characterized in that, the delivery pipeline (6) includes a pump body connecting pipe (61), a delivery standpipe (62), a connecting short Rod (63) and upper connecting pipe (64), the outer wall of described conveying vertical pipe (62) is provided with connecting short rod (63), and the upper end of described conveying vertical pipe (62) is provided with upper connecting pipe (64), The lower end of the conveying vertical pipe (62) is provided with a pump body connecting pipe (61), and the upper connecting pipe (64) is fixedly connected to the cooling outer tank (9). 5.根据权利要求1所述的一种用于油田CCUS系统的二氧化碳储存容器,其特征在于,所述缓冲储存罐(5)位于冷却外罐(9)的内部中间,且所述缓冲储存罐(5)和冷却外罐(9)的圆心处于同一直线上。5. A carbon dioxide storage container for an oil field CCUS system according to claim 1, characterized in that, the buffer storage tank (5) is located in the middle of the cooling outer tank (9), and the buffer storage tank (5) and the center of circle of the cooling outer tank (9) are on the same straight line. 6.根据权利要求1所述的一种用于油田CCUS系统的二氧化碳储存容器,其特征在于,所述二氧化碳阀门进管(2)和缓冲储存罐(5) 通过焊接固定连接,且所述二氧化碳阀门进管(2)和缓冲储存罐(5)的连接处贯通。6. A kind of carbon dioxide storage container for oilfield CCUS system according to claim 1, is characterized in that, described carbon dioxide valve inlet pipe (2) and buffer storage tank (5) are fixedly connected by welding, and described carbon dioxide The junction of the valve inlet pipe (2) and the buffer storage tank (5) is connected. 7.根据权利要求1所述的一种用于油田CCUS系统的二氧化碳储存容器,其特征在于,所述冷却外罐(9)和输送管道(6)通过螺钉固定连接,且所述冷却外罐(9)和输送管道(6)的连接处设置有密封胶垫。7. A carbon dioxide storage container for oil field CCUS systems according to claim 1, characterized in that, the outer cooling tank (9) and the delivery pipeline (6) are fixedly connected by screws, and the outer cooling tank (9) and the joint of the delivery pipeline (6) are provided with a sealing rubber pad. 8.根据权利要求1所述的一种用于油田CCUS系统的二氧化碳储存容器,其特征在于,所述固定支撑脚(8)共设置有四个,且所述固定支撑脚(8)阵列分布在冷却外罐(9)的下端上。8. A carbon dioxide storage container for an oil field CCUS system according to claim 1, characterized in that there are four fixed support feet (8) in total, and the fixed support feet (8) are distributed in an array On the lower end of the cooling outer tank (9).
CN202222073782.4U 2022-08-08 2022-08-08 Carbon dioxide storage container for oil field CCUS system Active CN217736929U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222073782.4U CN217736929U (en) 2022-08-08 2022-08-08 Carbon dioxide storage container for oil field CCUS system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222073782.4U CN217736929U (en) 2022-08-08 2022-08-08 Carbon dioxide storage container for oil field CCUS system

Publications (1)

Publication Number Publication Date
CN217736929U true CN217736929U (en) 2022-11-04

Family

ID=83813239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222073782.4U Active CN217736929U (en) 2022-08-08 2022-08-08 Carbon dioxide storage container for oil field CCUS system

Country Status (1)

Country Link
CN (1) CN217736929U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116928592A (en) * 2023-09-05 2023-10-24 惠州市和成机械设备有限公司 Carbon dioxide utilization and storage equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116928592A (en) * 2023-09-05 2023-10-24 惠州市和成机械设备有限公司 Carbon dioxide utilization and storage equipment
CN116928592B (en) * 2023-09-05 2024-01-30 惠州市和成机械设备有限公司 Carbon dioxide utilization and storage equipment

Similar Documents

Publication Publication Date Title
US12546245B2 (en) Systems and methods for backhaul transportation of liquefied gas and CO2 using liquefied gas carriers
US9835294B2 (en) Dual pressure-retaining manway system
US20150276130A1 (en) Method and System for a Submerged Pump
CN111225872B (en) Civil alcohol-based fuel supply system
CN110553137A (en) High-pressure hydrogen storage tank for hydrogen storage device
WO2019205581A1 (en) Heat recovery device for air compressor
CN209117784U (en) A detection and protection device for an automatic winder
CN221258534U (en) Hydrogen compression storage device
JP6742351B2 (en) Fuel cell device
BR102013009938A2 (en) fuel distribution module
CN111271598A (en) Hydrogenation device
CN207065064U (en) A kind of new type low temperature tank case
CN217030792U (en) LNG full-skid gas station
CN214467943U (en) Pressure monitoring device of VOCs treatment facility
CN216091768U (en) Medical center oxygen system
CN208967463U (en) A kind of novel low-temperature liquid storage tank
CN117023494A (en) Automatic skip medicine box for medicine filling
CN220997739U (en) Anti-leakage disinfectant storage device
CN208763869U (en) A kind of pressurized equipment duplicate protection detection device
CN216868162U (en) Frame, winder frame and winder device that can be used to gas holder
CN220911099U (en) Inflammable gas's thermal-insulated holding vessel
CN218736827U (en) Portable fruit tree scion is accomodate and is stored fortune ware
CN111806657A (en) Diving air device
CN221650627U (en) A positioning device
CN210021210U (en) An improved distillation device for the production of 2,3-difluoro-5-chloropyridine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant