CN217734278U - Positioning and mounting bracket for pipeline construction - Google Patents

Positioning and mounting bracket for pipeline construction Download PDF

Info

Publication number
CN217734278U
CN217734278U CN202222154643.4U CN202222154643U CN217734278U CN 217734278 U CN217734278 U CN 217734278U CN 202222154643 U CN202222154643 U CN 202222154643U CN 217734278 U CN217734278 U CN 217734278U
Authority
CN
China
Prior art keywords
pipeline
mounting
positioning
groups
shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222154643.4U
Other languages
Chinese (zh)
Inventor
程鸽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222154643.4U priority Critical patent/CN217734278U/en
Application granted granted Critical
Publication of CN217734278U publication Critical patent/CN217734278U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model provides a positioning mounting bracket for pipeline construction, which comprises a mounting plate, a first pipeline clamp and a second pipeline clamp are arranged on the mounting plate, the first pipeline clamp is connected with the mounting plate through a support frame, one end of the first pipeline clamp is provided with a mounting shell, a connecting shaft at one end of the second pipeline clamp is arranged in a connecting seat arranged on the mounting shell in a penetrating way, both ends of the connecting shaft are provided with ratchet wheels, ratchet blocks are arranged in the mounting shell, the ratchet blocks are clamped on two groups of ratchet wheels, the bottom of each ratchet block is provided with an opening ring connected through a pull rod, three groups of reset springs are arranged between each ratchet block and the mounting shell, the pull rod is arranged in a mounting hole arranged at the bottom of the mounting shell in a penetrating way, and one side of the first pipeline clamp and one side of the second pipeline clamp are both provided with protective pads made of rubber materials; the bottom of the mounting plate is provided with a translation mechanism. The positioning and mounting support is convenient and quick to clamp pipelines with different sizes, and improves the working efficiency of pipeline construction positioning.

Description

Positioning mounting bracket for pipeline construction
Technical Field
The utility model belongs to the technical field of the pipeline construction, more specifically says, in particular to pipeline construction is with location installing support.
Background
The water supply and drainage system of the building is used as an important component of the building and determines the service performance of the building to a certain extent. In a water supply and drainage system, a drainage pipeline is of great importance, and a positioning mounting support is required to be used for carrying out auxiliary support on the pipeline in the installation and construction process of the drainage pipeline, so that the smooth operation of pipeline installation is ensured.
Chinese utility model patent for patent No. 202121385776.1 provides a pipeline location installing support for municipal water supply and drainage construction, connects the inserted bar and can pass the round hole on the connecting block down and stretch out downwards during this installing support equipment, and the connecting block can play the supporting role to the bottom of connecting the inserted bar down, avoids connecting the inserted bar when pressing from both sides tight pipeline and produces and buckle. However, the traditional positioning and mounting bracket is inconvenient for fixing pipelines, especially when pipelines with different sizes need to be fixed, the fixing process is more complicated, and the traditional positioning and mounting bracket is inconvenient and quick for clamping pipelines with different diameters, so that the construction efficiency is reduced to some extent.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a pipeline construction is with location installing support to among the solution prior art, traditional pipeline construction carries out the centre gripping with the pipeline of location installing support inconvenient quick to different diameters, leads to the technical problem that the efficiency of construction descends to some extent.
The utility model discloses a purpose and efficiency of pipeline construction with location installing support are reached by following concrete technological means:
a positioning mounting bracket for pipeline construction comprises a mounting plate, wherein a first pipeline clamp and a second pipeline clamp are arranged on the mounting plate, the first pipeline clamp is connected with the mounting plate through a support frame, a mounting shell is arranged at one end of the first pipeline clamp, a connecting shaft at one end of the second pipeline clamp is arranged in a connecting seat on the mounting shell in a penetrating manner, ratchet wheels are arranged at two ends of the connecting shaft, ratchet blocks are arranged in the mounting shell and clamped on two groups of ratchet wheels, an opening ring connected through a pull rod is arranged at the bottom of each ratchet block, three groups of reset springs are arranged between each ratchet block and the mounting shell, the pull rod is arranged in a mounting hole formed in the bottom of the mounting shell in a penetrating manner, and a protective pad made of rubber is arranged on one side of each of the first pipeline clamp and the second pipeline clamp; the bottom of the mounting plate is provided with a translation mechanism.
In a preferred embodiment, the translation mechanism includes a bottom shell and two sets of bottom plates connected with the mounting plate through a support plate, a threaded seat is arranged between the two sets of bottom plates, a rotatable threaded rod is arranged in the bottom shell in a penetrating manner, a rocking wheel is arranged at one end of the threaded rod, and the threaded rod is arranged in the threaded seat in a penetrating manner and is in threaded fit with the threaded seat.
In a preferred embodiment, two sets of bottom plates are provided with T-shaped positioning rails at the bottom, four sets of T-shaped grooves are formed in the bottom shell, and the bottom plates are clamped in the two sets of T-shaped grooves through the T-shaped positioning rails and are connected with the bottom shell in a sliding manner.
In a preferred embodiment, the bottom of the bottom shell is provided with four groups of universal wheels.
In a preferred embodiment, two sets of positioning rods are arranged in the mounting shell, positioning rings are arranged at two ends of the ratchet block, the two sets of positioning rings are respectively sleeved on the two sets of positioning rods, two sets of return springs are sleeved on the two sets of positioning rods, and the other set of return springs is sleeved on the pull rod.
In a preferred embodiment, a first pull ring is disposed on one side of the second pipe clamp, a baffle plate connected by a bolt is disposed on one side of the mounting shell, a second pull ring is disposed on one side of the baffle plate, and the first pull ring and the second pull ring are connected by a return tension spring.
In a preferred embodiment, two sets of first limiting blocks are arranged on the mounting shell, and second limiting blocks are arranged on one sides of the two sets of ratchet wheels.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. this location installing support can place the pipeline on first pipe clamp when using, it is fixed to rotate the second pipe clamp along the connecting axle again and carry out the centre gripping to the pipeline of treating the installation, the second pipe clamp promotes ratchet piece downstream through the inclined plane of ratchet in the in-process of motion, and move at the second pipe clamp to carrying out the centre gripping to the pipeline under three reset spring's of group effect with fixed back ratchet piece of pipe clamp centre gripping fixed, convenient quick pipeline to various size differences carries out the centre gripping, the work efficiency of pipeline construction location has been improved.
2. This location installing support still can drive the threaded rod through rotating rocking wheel and rotate carrying out the centre gripping to the pipeline and fixing the back, because the motion of two sets of bottom plates all receives the location in T type location track and T type groove to make the screw thread seat along threaded rod rectilinear motion at threaded rod pivoted in-process, drive the pipeline transverse translation after the centre gripping, thereby convenient quick two sets of pipelines of treating the installation fix a position, further improvement pipeline construction's work efficiency.
Drawings
Fig. 1 is the utility model discloses a pipeline construction is with location installing support assembled structural schematic diagram.
Fig. 2 is the utility model discloses a pipeline construction is with the structure sketch map after location installing support split.
Fig. 3 is a schematic structural view of the first pipe clamp in the positioning and mounting bracket for pipe construction of the present invention.
Fig. 4 is a schematic structural view of the second pipe clamp in the positioning and mounting bracket for pipe construction of the present invention.
Fig. 5 is an enlarged schematic view of the region a in fig. 2.
In the drawings, the corresponding relationship between the component names and the reference numbers is as follows:
101. mounting a plate; 102. a first pipe clamp; 103. a support frame; 104. mounting a shell; 105. positioning a rod; 106. a first stopper; 107. a connecting seat; 108. mounting holes; 201. a second pipe clamp; 202. a connecting shaft; 203. a ratchet wheel; 204. a second limiting block; 205. a first pull ring; 207. a positioning ring; 208. a pull rod; 209. a return spring; 210. a ratchet block; 301. opening the ring; 302. a baffle plate; 303. a second tab; 304. a return tension spring; 401. a support plate; 402. a base plate; 403. a T-shaped positioning track; 404. a threaded seat; 501. a bottom case; 502. a T-shaped groove; 503. a threaded rod; 504. shaking the wheel; 505. a universal wheel; 601. a protective pad.
Detailed Description
The following describes embodiments of the present invention in further detail with reference to the accompanying drawings and examples. The following examples are provided to illustrate the technical solutions of the present invention, but should not be used to limit the scope of the present invention.
Example (b):
as shown in fig. 1 to 5, the utility model provides a pipeline construction is with location installing support, including mounting panel 101, be provided with first pipe clamp 102 and second pipe clamp 201 on the mounting panel 101, first pipe clamp 102 is connected through support frame 103 with mounting panel 101, and the one end of first pipe clamp 102 is provided with installation shell 104, and the connecting axle 202 of second pipe clamp 201 one end is worn to establish in the connecting seat 107 on installation shell 104.
This location installing support accessible first pipe clamp 102 carries out the bearing to the pipeline when using, and first pipe clamp 102 installs through support frame 103, has improved first pipe clamp 102's bearing capacity. After the pipe is placed on the first pipe clamp 102, the second pipe clamp 201 can be rotated along the connecting shaft 202, so that one end of the second pipe clamp 201 moves to the opening of the first pipe clamp 102, and the pipe is clamped and fixed through the matching of the first pipe clamp 102 and the second pipe clamp 201.
The two ends of the connecting shaft 202 are respectively provided with a ratchet wheel 203, a ratchet block 210 is arranged in the mounting shell 104, the ratchet block 210 is clamped on the two groups of ratchet wheels 203, the bottom of the ratchet block 210 is provided with an opening ring 301 which is connected through a pull rod 208, three groups of reset springs 209 are arranged between the ratchet block 210 and the mounting shell 104, the pull rod 208 penetrates through a mounting hole 108 formed in the bottom of the mounting shell 104, and one side of each of the first pipeline clamp 102 and the second pipeline clamp 201 is provided with a rubber protective pad 601; the bottom of the mounting plate 101 is provided with a translation mechanism.
Second pipe clamp 201 drives ratchet 203 and rotates along the in-process that connecting axle 202 rotated and closes, thereby the inclined plane through ratchet 203 promotes ratchet piece 210 downstream, ratchet piece 210 blocks all the time and establishes on ratchet 203 under the effect of three reset spring 209 of group, thereby prevent that ratchet 203 from taking place the reversal, the effectual second pipe clamp 201 of avoiding is opened, and can carry out stable centre gripping fixed to the pipeline through the cooperation of two sets of protection pads 601, if need remove the fixed to the pipeline, only need stimulate downwards and open ring 301 and make ratchet piece 210 downstream break away from ratchet 203, alright open second pipe clamp 201. The positioning and mounting support is very convenient and fast to fix and detach the pipeline, and the working efficiency of pipeline construction is improved.
As shown in fig. 1, 2, and 3, the translation mechanism includes a bottom case 501 and two sets of bottom plates 402 connected to the mounting plate 101 through a supporting plate 401, a screw base 404 is disposed between the two sets of bottom plates 402, a rotatable threaded rod 503 is disposed in the bottom case 501 in a penetrating manner, a rocking wheel 504 is disposed at one end of the threaded rod 503, and the threaded rod 503 is disposed in the screw base 404 in a penetrating manner and is in threaded engagement with the threaded base.
This location installing support is carrying out the centre gripping to the pipeline and is fixing the back, still can shake wheel 504 through rotating and drive threaded rod 503 rotation, because the motion of two sets of bottom plates 402 all receives the location of T type location track 403 and T type groove 502 to make screw thread seat 404 follow threaded rod 503 linear motion at threaded rod 503 pivoted in-process, drive the pipeline lateral translation after the centre gripping, thereby convenient quick two sets of pipelines of treating the installation fix a position, further improvement pipeline construction's work efficiency. The bottom of the bottom shell 501 is provided with universal wheels 505, and the universal wheels 505 are provided with four groups. The positioning and mounting bracket can also move on the ground through four groups of universal wheels 505, so that the positioning and mounting bracket is convenient to rapidly transfer.
As shown in fig. 3 and 5, two sets of positioning rods 105 are disposed in the mounting housing 104, positioning rings 207 are disposed at two ends of the ratchet block 210, the two sets of positioning rings 207 are respectively sleeved on the two sets of positioning rods 105, two sets of return springs 209 are sleeved on the two sets of positioning rods 105, and the other set of return springs 209 are sleeved on the pull rod 208. The movement of the ratchet block 210 is positioned by matching the positioning rod 105 and the positioning ring 207, so that the movement of the ratchet block 210 is prevented from deviating, the stability of fixing the ratchet wheel 203 is improved, and the stability of clamping the pipeline is improved.
As shown in fig. 3, 4 and 5, a first pull ring 205 is disposed on one side of the second pipe clamp 201, a baffle plate 302 connected by a bolt is disposed on one side of the mounting shell 104, a second pull ring 303 is disposed on one side of the baffle plate 302, and the first pull ring 205 and the second pull ring 303 are connected by a return tension spring 304. Two sets of first limit blocks 106 are arranged on the mounting shell 104, and one side of each set of ratchet wheels 203 is provided with a second limit block 204.
After the opening ring 301 is pulled to release the fixation of the second pipe clamp 201, the second pipe clamp 201 can be controlled to be automatically opened under the action of the reset tension spring 304, the second pipe clamp 201 does not need to be manually moved, and the working efficiency of pipe construction is further improved. And the second pipe clamp 201 rotates to the extreme position and then the second limiting block 204 contacts with the first limiting block 106, so that the phenomenon that the rotating amplitude of the second pipe clamp 201 is too large to cause injury to workers is avoided.
The specific use mode and function of the embodiment are as follows:
this location installing support can place the pipeline on first pipe clamp 102 when using, it is fixed to rotate second pipe clamp 201 along connecting axle 202 again and carries out the centre gripping to the pipeline of treating the installation, second pipe clamp 201 promotes ratchet piece 210 downstream at the inclined plane of the in-process through ratchet 203 of motion, and move at second pipe clamp 201 and to carry out the centre gripping to the pipeline under the effect of three reset spring 209 with fixed back ratchet piece 210 of pipe clamp centre gripping at second pipe clamp 201, convenient quick pipeline to various size differences carries out the centre gripping, the work efficiency of pipeline construction location has been improved.
The basic principles and main features of the invention and the advantages of the invention have been shown and described above, it is obvious to a person skilled in the art that the invention is not limited to the details of the above-described exemplary embodiments.

Claims (7)

1. Pipeline construction is with location installing support, its characterized in that: the pipeline clamping device comprises a mounting plate (101), a first pipeline clamp (102) and a second pipeline clamp (201) are arranged on the mounting plate (101), the first pipeline clamp (102) is connected with the mounting plate (101) through a supporting frame (103), a mounting shell (104) is arranged at one end of the first pipeline clamp (102), a connecting shaft (202) at one end of the second pipeline clamp (201) penetrates through a connecting seat (107) on the mounting shell (104), ratchet wheels (203) are arranged at two ends of the connecting shaft (202), a tooth block (210) is arranged in the mounting shell (104), the ratchet blocks (210) are clamped on the two groups of ratchet wheels (203), an opening ring (301) connected through a pull rod (208) is arranged at the bottom of each ratchet block (210), three groups of reset springs (209) are arranged between each ratchet block (210) and the mounting shell (104), the pull rod (208) penetrates through a mounting hole (108) formed in the bottom of the mounting shell (104), and protective pads (601) are arranged on one side of the first pipeline clamp (102) and the second pipeline clamp (201); the bottom of the mounting plate (101) is provided with a translation mechanism.
2. The positioning and mounting bracket for pipeline construction according to claim 1, wherein: translation mechanism including drain pan (501) and two sets of with mounting panel (101) carry out bottom plate (402) of connecting through backup pad (401), two sets of be provided with between bottom plate (402) screw thread seat (404), wear to be equipped with rotatable threaded rod (503) in drain pan (501), the one end of threaded rod (503) is provided with rocking wheel (504), threaded rod (503) are worn to establish in screw thread seat (404) and pass through screw-thread fit with it.
3. The positioning and mounting bracket for pipeline construction according to claim 2, wherein: the bottom of the two groups of bottom plates (402) is provided with T-shaped positioning rails (403), the bottom shell (501) is provided with four groups of T-shaped grooves (502), and the bottom plates (402) are clamped in the two groups of T-shaped grooves (502) through the T-shaped positioning rails (403) and are connected with the bottom shell (501) in a sliding manner.
4. The positioning and mounting bracket for pipeline construction according to claim 2, wherein: the bottom of the bottom shell (501) is provided with four universal wheels (505), and the four universal wheels (505) are provided with four groups.
5. The positioning and mounting bracket for pipeline construction according to claim 1, wherein: two groups of positioning rods (105) are arranged in the installation shell (104), positioning rings (207) are arranged at two ends of the ratchet block (210), the two groups of positioning rings (207) are respectively sleeved on the two groups of positioning rods (105), the two groups of reset springs (209) are sleeved on the two groups of positioning rods (105), and the other group of reset springs (209) are sleeved on the pull rod (208).
6. The positioning and mounting bracket for pipeline construction according to claim 1, wherein: one side of second pipe clamp (201) is provided with first pull ring (205), one side of installation shell (104) is provided with baffle (302) that carry out the connection through the bolt, one side of baffle (302) is provided with second pull ring (303), first pull ring (205) with second pull ring (303) are connected through extension spring (304) that resets.
7. The positioning and mounting bracket for pipeline construction according to claim 1, wherein: two sets of first limiting blocks (106) are arranged on the mounting shell (104), and second limiting blocks (204) are arranged on one sides of the two sets of ratchet wheels (203).
CN202222154643.4U 2022-08-16 2022-08-16 Positioning and mounting bracket for pipeline construction Active CN217734278U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222154643.4U CN217734278U (en) 2022-08-16 2022-08-16 Positioning and mounting bracket for pipeline construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222154643.4U CN217734278U (en) 2022-08-16 2022-08-16 Positioning and mounting bracket for pipeline construction

Publications (1)

Publication Number Publication Date
CN217734278U true CN217734278U (en) 2022-11-04

Family

ID=83813687

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222154643.4U Active CN217734278U (en) 2022-08-16 2022-08-16 Positioning and mounting bracket for pipeline construction

Country Status (1)

Country Link
CN (1) CN217734278U (en)

Similar Documents

Publication Publication Date Title
CN208516905U (en) A kind of pipe burying device of hydraulic engineering
CN211853008U (en) Pipeline fixing device is used in hydraulic engineering construction
CN112856047A (en) Ocean engineering pipeline erecting device
CN217734278U (en) Positioning and mounting bracket for pipeline construction
CN210736091U (en) Laying and hoisting construction device for water supply and drainage pipeline
CN208965589U (en) A kind of connection structure for preventing well lid from falling off
CN212113377U (en) Transformer easy to assemble
CN208200408U (en) A kind of countryside sewage treatment equipment being easily installed
CN214579335U (en) Water conservancy water and electricity construction fastening processing apparatus
CN219912031U (en) Water conservancy hydropower construction fastener
CN210232729U (en) Clamp for pre-embedding installation of underground pipeline
CN207655411U (en) A kind of natural gas line automatic oiling device
CN213225155U (en) Building steel construction cutting device of dust-proof type
CN209328363U (en) A kind of plumbing well sample plate
CN221150773U (en) Electric power engineering pipeline installation equipment
CN215528444U (en) Municipal works interlude cable special stand
CN214446181U (en) Pipeline installation fixing device for hydraulic engineering construction
CN219471580U (en) Building construction installation device
CN220481511U (en) Auxiliary fixing device with protection architecture
CN220782984U (en) Tee bend joint adds clamping apparatus
CN221258078U (en) Tee pipe fitting convenient to clamp
CN218863446U (en) Efficient pipeline supporting and hanging frame
CN209380525U (en) A kind of guiding arm support processing aid fixture
CN213753919U (en) Traction device of bus bridge
CN217762390U (en) Safety device for hydraulic and hydroelectric engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant