CN217729241U - House building slope and wall body handing-over department fluting construction equipment - Google Patents

House building slope and wall body handing-over department fluting construction equipment Download PDF

Info

Publication number
CN217729241U
CN217729241U CN202221336317.9U CN202221336317U CN217729241U CN 217729241 U CN217729241 U CN 217729241U CN 202221336317 U CN202221336317 U CN 202221336317U CN 217729241 U CN217729241 U CN 217729241U
Authority
CN
China
Prior art keywords
mounting panel
wall body
pressure spring
electric drill
slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221336317.9U
Other languages
Chinese (zh)
Inventor
徐门英
徐元康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Huihong Construction Co ltd
Original Assignee
Kaihua Youyun Power Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kaihua Youyun Power Engineering Co ltd filed Critical Kaihua Youyun Power Engineering Co ltd
Priority to CN202221336317.9U priority Critical patent/CN217729241U/en
Application granted granted Critical
Publication of CN217729241U publication Critical patent/CN217729241U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model is suitable for a construction technical field provides a housing construction slope and wall body handing-over department fluting construction equipment, including first mounting panel and second mounting panel, just first mounting panel and second mounting panel rotate to be connected, still include: the clamping device comprises a connecting frame, a tension spring, a guide shaft, a first pressure spring, a guide plate and a clamping assembly; and the second mounting plate is provided with a avoiding hole. According to the contained angle between housing construction slope and the wall body, adjust the angle between first mounting panel and the second mounting panel, make first mounting panel and second mounting panel laminate respectively on housing construction slope and wall body, then the centre gripping subassembly is used for carrying out the centre gripping to the electric drill, the electric drill rocks when avoiding slotting, improve grooved precision, upwards promote the electric drill, the electric drill drives the deflector upward movement, the deflector passes upward movement under the guide effect of guiding axle, the drill bit of electric drill passes after dodging the hole, to housing construction slope and wall body handing-over department fluting, and then improve grooved precision.

Description

House building slope and wall body handing-over department fluting construction equipment
Technical Field
The utility model belongs to the technical field of the construction, especially, relate to a housing construction slope and wall body handing-over department fluting construction equipment.
Background
When the joint of the slope surface and the wall body of the house building is constructed, the slotted holes are required to be formed, then the expansion screws are installed in the slotted holes, and various prefabricated parts or hanging parts can be installed through the slotted holes.
The slotting construction device for the joint of the slope surface and the wall body of the existing house building cannot clamp an electric drill when in use, the electric drill is held manually and then pushed upwards, the electric drill needs to be held by hands in the pushing process, so that the electric drill is easy to shake in the slotting process, and the slotting precision is low.
SUMMERY OF THE UTILITY MODEL
An object of the embodiment of the utility model is to provide a housing construction slope and wall body handing-over department fluting construction equipment aims at solving the promotion process and need hold up the electric drill with the hand, causes at the fluting in-process, and the electric drill rocks easily, problem that the fluting precision is low.
The embodiment of the utility model provides a so realize, a housing construction slope and wall body handing-over department fluting construction equipment, including first mounting panel and second mounting panel, just first mounting panel and second mounting panel rotate to be connected, still include:
the clamping device comprises a connecting frame, a tension spring, a guide shaft, a first pressure spring, a guide plate and a clamping assembly;
be provided with on the second mounting panel and dodge the hole, all be provided with first spout on first mounting panel and the second mounting panel, sliding connection has first slider in the first spout, the both sides that the link is relative rotate with two first sliders respectively and are connected, guiding axle fixed mounting is on the link, deflector and sliding connection are on the guiding axle, first pressure spring cover is established on the guiding axle, the both ends of first pressure spring are connected with link and deflector respectively, guiding axle and first pressure spring are provided with four groups, the centre gripping subassembly sets up on the deflector, the centre gripping subassembly is used for carrying out the centre gripping to the electric drill.
According to a further technical scheme, anti-slip pads used for increasing friction force are fixedly mounted on the first mounting plate and the second mounting plate.
According to the further technical scheme, an adjusting shaft is connected in the first sliding groove in a rotating mode, the adjusting shaft is in threaded connection with the first sliding block, a fastening nut is connected to the adjusting shaft in a threaded mode, and a knob is fixedly mounted at the tail end of the adjusting shaft.
According to the technical scheme, the number of the clamping assemblies is two, and the two clamping assemblies are symmetrically arranged on the guide plate.
According to the technical scheme, the clamping assembly comprises a second sliding groove, a second sliding block, a connecting rod, a clamping block and a second pressure spring, the second sliding groove is formed in the anti-slip mat, the second sliding block is connected in the anti-slip mat in a sliding mode, two ends of the connecting rod are connected with the second sliding block and the clamping block respectively, the second pressure spring is arranged in the second sliding groove, and two ends of the second pressure spring are connected with the second sliding block and the second sliding groove respectively.
An embodiment of the utility model provides a pair of housing construction slope and wall body handing-over department fluting construction equipment, in use, according to the contained angle between housing construction slope and the wall body, adjust the angle between first mounting panel and the second mounting panel, make first mounting panel and second mounting panel laminate respectively on housing construction slope and wall body, then the centre gripping subassembly is used for carrying out the centre gripping to the electric drill, the electric drill rocks when avoiding slotting, improve grooved precision, upwards promote the electric drill, the electric drill drives the deflector upward movement, the deflector passes the guiding action of guiding axle and moves up down, the drill bit of electric drill passes and dodges the hole back, it slots to housing construction slope and wall body handing-over department, and then improve grooved precision.
Drawings
Fig. 1 is a schematic structural view of a slotting construction device at a joint of a slope and a wall of a building according to an embodiment of the present invention;
fig. 2 is a schematic view of a connection structure of the first mounting plate and the second mounting plate 2 in fig. 1 according to an embodiment of the present invention;
fig. 3 is an enlarged schematic structural diagram of a in fig. 1 according to an embodiment of the present invention.
In the drawings: the anti-slip device comprises a first mounting plate 1, a second mounting plate 2, an anti-slip pad 3, a connecting frame 4, a first sliding groove 5, a first sliding block 6, an adjusting shaft 7, a tension spring 8, a knob 9, a fastening nut 10, a guide shaft 11, a first compression spring 12, a guide plate 13, a second sliding groove 14, a second sliding block 15, a connecting rod 16, a clamping block 17, a second compression spring 18 and an avoiding hole 19.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention will be further described in detail with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
The following detailed description is provided for the specific embodiments of the present invention.
As shown in fig. 1 and fig. 2, for the utility model discloses a housing construction slope and wall body handing-over department fluting construction equipment that embodiment provided, including first mounting panel 1 and second mounting panel 2, just first mounting panel 1 and second mounting panel 2 rotate to be connected, still include:
the clamping device comprises a connecting frame 4, a tension spring 8, a guide shaft 11, a first compression spring 12, a guide plate 13 and a clamping assembly;
be provided with on the second mounting panel 2 and dodge hole 19, all be provided with first spout 5 on first mounting panel 1 and the second mounting panel 2, sliding connection has first slider 6 in first spout 5, the both sides that the connection frame 4 is relative rotate with two first sliders 6 respectively and are connected, 11 fixed mounting of guiding axle is on connection frame 4, deflector 13 and sliding connection are on guiding axle 11, the 12 covers of first pressure spring are established on guiding axle 11, the both ends of first pressure spring 12 are connected with connection frame 4 and deflector 13 respectively, guiding axle 11 and first pressure spring 12 are provided with four groups, the centre gripping subassembly sets up on deflector 13, the centre gripping subassembly is used for carrying out the centre gripping to the electric drill.
The embodiment of the utility model provides an in, during the use, according to the contained angle between housing construction slope and the wall body, adjust the angle between first mounting panel 1 and the second mounting panel 2, make first mounting panel 1 and second mounting panel 2 laminate respectively on housing construction slope and wall body, then the centre gripping subassembly is used for carrying out the centre gripping to the electric drill, the electric drill rocks when avoiding slotting, improve grooved precision, upwards promote the electric drill, the electric drill drives deflector 13 upward movement, deflector 13 upward movement under the guide effect through guiding shaft 11, the drill bit of electric drill passes after dodging hole 19, to housing construction slope and wall body handing-over department fluting, and then improve grooved precision.
As shown in fig. 1 and fig. 2, as a preferred embodiment of the present invention, non-slip mats 3 for increasing friction force are fixedly mounted on the first mounting plate 1 and the second mounting plate 2.
The embodiment of the utility model provides an in, equal fixed mounting has the slipmat 3 that is used for increasing frictional force on first mounting panel 1 and the second mounting panel 2 for first mounting panel 1 and second mounting panel 2 are laminated respectively on housing construction slope and wall body, and first mounting panel 1 and second mounting panel 2 take place to remove when preventing to slot.
As shown in fig. 1 and fig. 2, as a preferred embodiment of the present invention, an adjusting shaft 7 is rotatably connected in the first sliding groove 5, the adjusting shaft 7 is connected with the first slider 6 by a screw thread, a fastening nut 10 is connected on the adjusting shaft 7 by a screw thread, and a knob 9 is fixedly mounted at the end of the adjusting shaft 7.
The embodiment of the utility model provides an in, rotate knob 9, knob 9 drives regulating spindle 7 and rotates, and regulating spindle 7 moves in first spout 5 through threaded connection's mode drive first slider 6, then screws up fastening nut 10 again, and then fixes the angle between first mounting panel 1 and the second mounting panel 2.
As shown in fig. 1 and fig. 3, as a preferred embodiment of the present invention, the clamping assembly is provided with two, two the clamping assembly symmetry sets up on deflector 13, the clamping assembly includes second spout 14, second slider 15, connecting rod 16, grip block 17 and second pressure spring 18, second spout 14 sets up on non-slip mat 3, second slider 15 sliding connection is in non-slip mat 3, the both ends of connecting rod 16 are connected with second slider 15 and grip block 17 respectively, second pressure spring 18 sets up in second spout 14, the both ends of second pressure spring 18 are connected with second slider 15 and second spout 14 respectively.
The embodiment of the utility model provides an in, two grip blocks 17 of opposite direction pulling, then place the electric drill between two grip blocks 17, then loosen grip block 17, second pressure spring 18 promotes two second sliders 15 motion in opposite directions, and two second sliders 15 drive two grip blocks 17 motion in opposite directions through connecting rod 16, and then carry out the centre gripping to the electric drill.
The utility model provides an in the above-mentioned embodiment, a housing construction slope and wall body handing-over department fluting construction equipment is provided, during the use, according to the contained angle between housing construction slope and the wall body, adjust the angle between first mounting panel 1 and the second mounting panel 2, rotate knob 9, knob 9 drives regulating spindle 7 and rotates, regulating spindle 7 drives first slider 6 through threaded connection's mode and removes in first spout 5, then screw up fastening nut 10 again, and then fix the angle between first mounting panel 1 and the second mounting panel 2, make first mounting panel 1 and second mounting panel 2 laminate respectively on housing construction slope and wall body, two grip blocks 17 of opposite direction pulling, then place the electric drill between two grip blocks 17, then loosen grip block 17, second pressure spring 18 promotes two second slider 15 opposite directions, two second slider 15 drive two grip blocks 17 through connecting rod 16 and move in opposite directions, and then carry out the centre gripping to the electric drill, rock when avoiding the fluting, the precision of improvement, promote upwards, drive deflector 13 upward movement, deflector 13 passes through the effect of guide shaft 11, and the electric drill bit of the wall body handing-over behind the fluting precision of the electric drill, and the grooving of the electric drill bit 19, the building that the effect of the electric drill hole that dodges.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.

Claims (5)

1. The utility model provides a housing construction slope and wall body handing-over department fluting construction equipment, includes first mounting panel and second mounting panel, just first mounting panel and second mounting panel rotate to be connected, its characterized in that still includes:
the clamping device comprises a connecting frame, a tension spring, a guide shaft, a first pressure spring, a guide plate and a clamping assembly;
be provided with on the second mounting panel and dodge the hole, all be provided with first spout on first mounting panel and the second mounting panel, sliding connection has first slider in the first spout, the both sides that the carriage is relative rotate with two first sliders respectively and be connected, guiding axle fixed mounting is on the carriage, deflector and sliding connection are on the guiding axle, first pressure spring cover is established on the guiding axle, the both ends of first pressure spring are connected with carriage and deflector respectively, guiding axle and first pressure spring are provided with four groups, the centre gripping subassembly sets up on the deflector, the centre gripping subassembly is used for carrying out the centre gripping to the electric drill.
2. The building construction slope and wall body joint slotting construction device according to claim 1, wherein the first mounting plate and the second mounting plate are fixedly provided with anti-slip pads for increasing friction force.
3. The building construction slope and wall body joint slotting construction device according to claim 1, wherein an adjusting shaft is connected in the first sliding groove in a rotating mode, the adjusting shaft is in threaded connection with the first sliding block, a fastening nut is in threaded connection with the adjusting shaft, and a knob is fixedly mounted at the tail end of the adjusting shaft.
4. The housing construction slope and wall body joint slotting device according to claim 1, wherein two clamping assemblies are arranged, and the two clamping assemblies are symmetrically arranged on the guide plate.
5. The building construction slope and wall body joint slotting construction device according to claim 4, wherein the clamping assembly comprises a second sliding groove, a second sliding block, a connecting rod, a clamping block and a second pressure spring, the second sliding groove is arranged on the non-slip mat, the second sliding block is connected in the non-slip mat in a sliding manner, two ends of the connecting rod are respectively connected with the second sliding block and the clamping block, the second pressure spring is arranged in the second sliding groove, and two ends of the second pressure spring are respectively connected with the second sliding block and the second sliding groove.
CN202221336317.9U 2022-05-31 2022-05-31 House building slope and wall body handing-over department fluting construction equipment Active CN217729241U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221336317.9U CN217729241U (en) 2022-05-31 2022-05-31 House building slope and wall body handing-over department fluting construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221336317.9U CN217729241U (en) 2022-05-31 2022-05-31 House building slope and wall body handing-over department fluting construction equipment

Publications (1)

Publication Number Publication Date
CN217729241U true CN217729241U (en) 2022-11-04

Family

ID=83837563

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221336317.9U Active CN217729241U (en) 2022-05-31 2022-05-31 House building slope and wall body handing-over department fluting construction equipment

Country Status (1)

Country Link
CN (1) CN217729241U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN120193742A (en) * 2025-05-27 2025-06-24 中国水利水电第五工程局有限公司 A blasthole drilling device suitable for slope surface

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN120193742A (en) * 2025-05-27 2025-06-24 中国水利水电第五工程局有限公司 A blasthole drilling device suitable for slope surface

Similar Documents

Publication Publication Date Title
CN217729241U (en) House building slope and wall body handing-over department fluting construction equipment
CN108736379B (en) Electric power construction leading truck
CN211958598U (en) An easy-to-position limit device for electric wires used in electric power engineering
CN213460945U (en) Safe cable channel gallows that takes precautions against earthquakes
CN209709634U (en) A kind of power circuit fixed frame being easily installed
CN215483864U (en) Curtain wall connecting piece
CN208163288U (en) Electronic circuit board grinds board device
CN215526582U (en) Equipment integration device for electric power informatization
CN212191498U (en) A metal pipe cutting machine
CN215185471U (en) Closing interlocking mechanism special for drawer of power distribution cabinet
CN223583677U (en) A cable bracket
CN210414265U (en) Pipe fitting clamp
CN221886962U (en) Colliery website communication cabinet
CN211371136U (en) Shock absorption device for building electromechanical equipment
CN211945975U (en) Well lid device of taking for communication engineering with adjustable
CN210379014U (en) Push plate device is used in solar panel production
CN215444780U (en) Mounting structure of shock attenuation guide rail
CN115504354A (en) Household speed-adjustable high-performance elevator traction machine
CN221967856U (en) Beryllium is fixture for copper sheet processing
CN214870161U (en) Small-size electric screwdriver fixed bolster
CN221481815U (en) Roller shutter door guiding device
CN222763512U (en) Computer wire harness management mechanism
CN222747042U (en) A cloud desktop monitoring multi-angle free adjustment base device
CN221162542U (en) Vehicle positioning device
CN212144731U (en) A cutting and clamping device for metal pipes

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No. 80 Guxi Road, Huabu Town, Kaihua County, Quzhou City, Zhejiang Province (self declared)

Patentee after: Zhejiang Huihong Construction Co.,Ltd.

Country or region after: China

Address before: Room 1-401, Building 2, No. 3, Nanhu Road, Qinyang Office, Kaihua County, Quzhou City, Zhejiang Province 324000

Patentee before: Kaihua Youyun Power Engineering Co.,Ltd.

Country or region before: China