CN217729112U - Be used for processing of cement prefab to use quick mould - Google Patents

Be used for processing of cement prefab to use quick mould Download PDF

Info

Publication number
CN217729112U
CN217729112U CN202221187769.5U CN202221187769U CN217729112U CN 217729112 U CN217729112 U CN 217729112U CN 202221187769 U CN202221187769 U CN 202221187769U CN 217729112 U CN217729112 U CN 217729112U
Authority
CN
China
Prior art keywords
plate
block
fixedly connected
frame
plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221187769.5U
Other languages
Chinese (zh)
Inventor
孙云雷
田建忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Zhongxinlong Precision Technology Co ltd
Original Assignee
Qingdao Zhongxinlong Precision Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Zhongxinlong Precision Technology Co ltd filed Critical Qingdao Zhongxinlong Precision Technology Co ltd
Priority to CN202221187769.5U priority Critical patent/CN217729112U/en
Application granted granted Critical
Publication of CN217729112U publication Critical patent/CN217729112U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

本实用新型提供一种用于水泥预制件加工用快速模具。所述用于水泥预制件加工用快速模具包括底板、成型装置、第一连接块、第二连接块以及限位装置。本实用新型提供的用于水泥预制件加工用快速模具通过第一连接板、螺丝、第二连接板、连接架以及第一螺纹架的相互配合,使得模具的组装工作更加方便,此外,通过第一移动板、第一压块、第二移动板、第二螺纹架以及第二压块的相互配合,启动两个电机,丝杆发生转动,传动块带动着承接板向下移动,限位装置在两侧承接板的作用下移动,最后,第一压块与第一连接块贴合,第二压块与第二连接块贴合,由此即可使得第一连接板及第二连接板在倒入水泥时更加稳固,不易发生偏移。

Figure 202221187769

The utility model provides a quick mold for the processing of cement prefabricated parts. The quick mold for cement prefab processing includes a bottom plate, a forming device, a first connecting block, a second connecting block and a limiting device. The quick mold for cement prefab processing provided by the utility model makes the assembly of the mold more convenient through the cooperation of the first connecting plate, the screw, the second connecting plate, the connecting frame and the first threaded frame. A moving plate, a first pressing block, a second moving plate, a second screw frame and a second pressing block cooperate with each other, start the two motors, the screw rod rotates, the transmission block drives the receiving plate to move down, and the limit device It moves under the action of the bearing plates on both sides. Finally, the first pressure block is attached to the first connection block, and the second pressure block is attached to the second connection block, so that the first connection plate and the second connection plate can be made. It is more stable when pouring cement and is less prone to drift.

Figure 202221187769

Description

一种用于水泥预制件加工用快速模具A rapid mold for processing cement prefabricated parts

技术领域technical field

本实用新型涉及水泥预制件领域,尤其涉及一种用于水泥预制件加工用快速模具。The utility model relates to the field of cement prefabricated parts, in particular to a rapid mold for processing cement prefabricated parts.

背景技术Background technique

预制板是在预制场生产加工成型的混凝土预制件,直接运到施工现场进行安装。制作预制板时,先用木板钉制空心模型,在模型的空心部分布上钢筋后,用水泥灌满空心部分,等干后敲去木板,剩下的就是预制板了。目前的水泥预制板模具成型模具普遍由各个模板拼接而成,从而形成空心模具。现有的水泥预制件模具在使用时不方便安装及拆卸,从而降低了生产效率。Prefabricated slabs are concrete prefabricated parts produced and processed in the prefabricated field, which are directly transported to the construction site for installation. When making prefabricated panels, first use wooden boards to nail the hollow model, after distributing steel bars in the hollow part of the model, fill the hollow part with cement, knock off the wooden board after it dries, and the rest is the prefabricated board. The current cement prefabricated slab molding molds are generally spliced by various templates to form a hollow mold. The existing cement prefabricated part mold is inconvenient to install and disassemble during use, thereby reducing production efficiency.

因此,有必要提供一种新的用于水泥预制件加工用快速模具解决上述技术问题。Therefore, it is necessary to provide a new rapid die for cement prefabricated parts processing to solve the above technical problems.

实用新型内容Utility model content

为解决上述技术问题,本实用新型提供一种用于水泥预制件加工用快速模具。In order to solve the above-mentioned technical problems, the utility model provides a rapid mold for processing cement prefabricated parts.

本实用新型提供的用于水泥预制件加工用快速模具包括:底板、成型装置、第一连接块、第二连接块以及限位装置,底板的顶部固定连接有放置板,成型装置设于放置板的顶部,成型装置包括第一连接板、螺丝、第二连接板、连接架以及第一螺纹架,第一连接板设有两个,且第一连接板的底部设于放置板顶部开设的凹槽内,螺丝螺纹连接于放置板凹槽侧壁开设的通孔内壁及第一连接板的通孔内壁,两个第一连接板之间设有两个第二连接板,第二连接板的两端均固定连接有连接架,连接架为“U”型结构,第一连接板的两端设于连接架的内侧,连接架上螺纹连接有第一螺纹架,第一螺纹架的一端螺纹连接于第一连接板开设的凹槽内壁,第一连接块设有两个,且两个第一连接块均固定连接于两个第一连接板,第二连接块设有四个,且两个第二连接板侧壁均固定连接有两个第二连接块,限位装置设于成型装置外侧,限位装置包括第一移动板、第一压块、第二移动板、第二螺纹架以及第二压块,第一移动板设有两个,且两个第一移动板相对的侧壁均固定连接有第一压块,第一压块与第一连接块相贴合,两个第一移动板之间固定连接有两个第二移动板,第二移动板上螺纹连接有两个第二螺纹架,第二螺纹架一端通过轴承连接有第二压块,第二压块与第二连接块相贴合。The rapid mold for cement prefabricated parts processing provided by the utility model includes: a base plate, a forming device, a first connecting block, a second connecting block and a limiting device, the top of the base plate is fixedly connected with a placing plate, and the forming device is arranged on the placing plate The top of the molding device includes a first connecting plate, screws, a second connecting plate, a connecting frame and a first threaded frame. In the groove, the screw thread is connected to the inner wall of the through hole provided on the side wall of the groove of the placement plate and the inner wall of the through hole of the first connecting plate. Two second connecting plates are arranged between the two first connecting plates. Both ends are fixedly connected with a connecting frame, the connecting frame is a "U"-shaped structure, the two ends of the first connecting plate are arranged on the inner side of the connecting frame, the connecting frame is threaded with a first threaded frame, and one end of the first threaded frame is threaded Connected to the inner wall of the groove opened by the first connecting plate, the first connecting block is provided with two, and the two first connecting blocks are fixedly connected to the two first connecting plates, the second connecting block is provided with four, and the two The side walls of each second connecting plate are fixedly connected with two second connecting blocks, and the limiting device is arranged on the outside of the forming device, and the limiting device includes a first moving plate, a first pressure block, a second moving plate, and a second threaded frame As well as the second pressing block, the first moving plate is provided with two, and the opposite side walls of the two first moving plates are fixedly connected with the first pressing block, the first pressing block fits with the first connecting block, and the two Two second moving plates are fixedly connected between the first moving plates, and two second threaded frames are screwed on the second moving plates, and one end of the second threaded frame is connected with a second pressing block through a bearing, and the second pressing block and The second connection block fits together.

优选的,底板顶部两端均固定连接有一个固定架,固定架处设有丝杆,丝杆一端转动连接于底板,丝杆另一端转动连接于固定架,固定架顶部固定连接有电机,电机的输出端固定连接于丝杆。Preferably, both ends of the top of the bottom plate are fixedly connected with a fixing frame, the fixing frame is provided with a screw rod, one end of the screw rod is rotatably connected to the bottom plate, the other end of the screw rod is rotatably connected to the fixing frame, the top of the fixing frame is fixedly connected with a motor, and the motor The output end is fixedly connected to the screw rod.

优选的,丝杆上螺纹连接有传动块,传动块一端固定连接有承接板。Preferably, the screw rod is threadedly connected with a transmission block, and one end of the transmission block is fixedly connected with a receiving plate.

优选的,承接板远离传动块的一端固定连接于第一移动板。Preferably, the end of the receiving plate away from the transmission block is fixedly connected to the first moving plate.

优选的,传动块两侧均设有滑动块,滑动块一端滑动连接于固定架内壁开设的凹槽。Preferably, sliding blocks are provided on both sides of the transmission block, and one end of the sliding block is slidably connected to the groove provided on the inner wall of the fixing frame.

优选的,第二螺纹架两侧均设有限位杆,限位杆一端固定连接于第二压块,且限位杆穿插于第二移动板开设的通孔内。Preferably, both sides of the second threaded frame are provided with limit rods, one end of the limit rod is fixedly connected to the second pressure block, and the limit rod is inserted into the through hole opened by the second moving plate.

与相关技术相比较,本实用新型提供的用于水泥预制件加工用快速模具具有如下有益效果:Compared with related technologies, the rapid mold for cement prefabricated parts processing provided by the utility model has the following beneficial effects:

本实用新型提供一种用于水泥预制件加工用快速模具,在具体实施时,通过第一连接板、螺丝、第二连接板、连接架以及第一螺纹架的相互配合,将第一连接板底部放置于放置板顶部凹槽内,并用螺丝将第一连接板与放置板连接起来,接着,将第二连接板及连接架放置于两个第一连接板处,根据所需水泥预制件的尺寸调整第二连接板的位置,然后,转动第一螺纹架,将第一螺纹架一端转动进第一连接板凹槽内,由此即可完成模具的组装工作,操作起来较方便,节约了工作人员的时间,一定程度上,提高了生产效率,通过第一移动板、第一压块、第二移动板、第二螺纹架以及第二压块的相互配合,启动两个电机,丝杆发生转动,传动块带动着承接板向下移动,限位装置在两侧承接板的作用下移动,最后,第一压块与第一连接块贴合,第二压块与第二连接块贴合,由此即可使得第一连接板及第二连接板在倒入水泥时更加稳固,不易发生偏移。The utility model provides a rapid mold for processing cement prefabricated parts. During specific implementation, the first connecting plate is connected to the The bottom is placed in the top groove of the placing board, and the first connecting board and the placing board are connected with screws, and then the second connecting board and the connecting frame are placed on the two first connecting boards, according to the required cement prefabricated parts Size adjust the position of the second connecting plate, then turn the first threaded frame, and turn one end of the first threaded frame into the groove of the first connecting plate, thus the assembly of the mold can be completed, which is more convenient to operate and saves The staff’s time, to a certain extent, improves the production efficiency. Through the mutual cooperation of the first moving plate, the first pressing block, the second moving plate, the second thread frame and the second pressing block, the two motors are started, and the screw rod Rotation occurs, the transmission block drives the receiving plate to move downward, and the limit device moves under the action of the receiving plates on both sides. Finally, the first pressing block is attached to the first connecting block, and the second pressing block is attached to the second connecting block. In this way, the first connecting plate and the second connecting plate can be made more stable when pouring cement, and are less likely to be shifted.

附图说明Description of drawings

图1为本实用新型提供的用于水泥预制件加工用快速模具的一种较佳实施例的结构示意图;Fig. 1 is the structural representation of a kind of preferred embodiment that is used for cement prefabricated part processing fast mold provided by the utility model;

图2为图1所示的放置及成型装置的结构示意图;Fig. 2 is the structural representation of placement and forming device shown in Fig. 1;

图3为图1所示的用于水泥预制件加工用快速模具的另一角度结构示意图;Fig. 3 is another angle structural representation of the rapid mold used for cement prefabricated part processing shown in Fig. 1;

图4为图1所示的限位装置的结构示意图。FIG. 4 is a schematic structural diagram of the limiting device shown in FIG. 1 .

图中标号:1、底板;2、放置板;3、成型装置;4、第一连接板;5、螺丝;6、第二连接板;7、连接架;8、第一螺纹架;9、第一连接块;10、第二连接块;11、限位装置;12、第一移动板;13、第一压块;14、第二移动板;15、第二螺纹架;16、第二压块;17、固定架;18、丝杆;19、电机;20、传动块;21、承接板;22、滑动块;23、限位杆。Symbols in the figure: 1, bottom plate; 2, placing plate; 3, forming device; 4, first connecting plate; 5, screw; 6, second connecting plate; 7, connecting frame; 8, first threaded frame; 9, The first connecting block; 10, the second connecting block; 11, the limit device; 12, the first moving plate; 13, the first pressing block; 14, the second moving plate; 15, the second thread frame; 16, the second 17, fixed frame; 18, screw mandrel; 19, motor; 20, transmission block; 21, receiving plate; 22, sliding block; 23, limit rod.

具体实施方式Detailed ways

下面结合附图和实施方式对本实用新型作进一步说明。Below in conjunction with accompanying drawing and embodiment the utility model is further described.

请结合参阅图1、图2、图3和图4,其中,图1为本实用新型提供的用于水泥预制件加工用快速模具的一种较佳实施例的结构示意图;图2为图1所示的放置及成型装置3的结构示意图;图3为图1所示的用于水泥预制件加工用快速模具的另一角度结构示意图;图4为图1所示的限位装置11的结构示意图。包括:底板1、成型装置3、第一连接块9、第二连接块10以及限位装置11。Please refer to Fig. 1, Fig. 2, Fig. 3 and Fig. 4 in conjunction with Fig. 1, wherein Fig. 1 is a structural schematic diagram of a preferred embodiment of a rapid mold for cement prefabricated part processing provided by the utility model; Fig. 2 is Fig. 1 The schematic structural view of the placement and forming device 3 shown; Fig. 3 is a schematic structural view of another angle of the rapid mold used for cement prefabricated part processing shown in Fig. 1; Fig. 4 is the structure of the limiting device 11 shown in Fig. 1 schematic diagram. It includes: a bottom plate 1 , a forming device 3 , a first connecting block 9 , a second connecting block 10 and a limiting device 11 .

在具体实施过程中,如图1、图2、图3和图4所示,底板1的顶部固定连接有放置板2,成型装置3设于放置板2的顶部,成型装置3包括第一连接板4、螺丝5、第二连接板6、连接架7以及第一螺纹架8,第一连接板4设有两个,且第一连接板4的底部设于放置板2顶部开设的凹槽内,螺丝5螺纹连接于放置板2凹槽侧壁开设的通孔内壁及第一连接板4的通孔内壁,两个第一连接板4之间设有两个第二连接板6,第二连接板6的两端均固定连接有连接架7,连接架7为“U”型结构,第一连接板4的两端设于连接架7的内侧,连接架7上螺纹连接有第一螺纹架8,第一螺纹架8的一端螺纹连接于第一连接板4开设的凹槽内壁,通过第一连接板4、螺丝5、第二连接板6、连接架7以及第一螺纹架8的相互配合,将第一连接板4底部放置于放置板2顶部凹槽内,并用螺丝5将第一连接板4与放置板2连接起来,接着,将第二连接板6及连接架7放置于两个第一连接板4处,根据所需水泥预制件的尺寸调整第二连接板6的位置,然后,转动第一螺纹架8,将第一螺纹架8一端转动进第一连接板4凹槽内,由此即可完成模具的组装工作,操作起来较方便,节约了工作人员的时间,一定程度上,提高了生产效率,第一连接块9设有两个,且两个第一连接块9均固定连接于两个第一连接板4,第二连接块10设有四个,且两个第二连接板6侧壁均固定连接有两个第二连接块10,限位装置11设于成型装置3外侧,限位装置11包括第一移动板12、第一压块13、第二移动板14、第二螺纹架15以及第二压块16,第一移动板12设有两个,且两个第一移动板12相对的侧壁均固定连接有第一压块13,第一压块13与第一连接块9相贴合,两个第一移动板12之间固定连接有两个第二移动板14,第二移动板14上螺纹连接有两个第二螺纹架15,第二螺纹架15一端通过轴承连接有第二压块16,第二压块16与第二连接块10相贴合,通过第一移动板12、第一压块13、第二移动板14、第二螺纹架15以及第二压块16的相互配合,启动两个电机19,丝杆18发生转动,传动块20带动着承接板21向下移动,限位装置11在两侧承接板21的作用下移动,最后,第一压块13与第一连接块9贴合,第二压块16与第二连接块10贴合,由此即可使得第一连接板4及第二连接板6在倒入水泥时更加稳固,不易发生偏移。In the specific implementation process, as shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, the top of the bottom plate 1 is fixedly connected with the placement plate 2, and the forming device 3 is arranged on the top of the placing plate 2, and the forming device 3 includes a first connection Plate 4, screw 5, second connecting plate 6, connecting frame 7 and first threaded frame 8, the first connecting plate 4 is provided with two, and the bottom of the first connecting plate 4 is arranged on the groove that the top of the placing plate 2 is opened Inside, the screw 5 is threadedly connected to the through-hole inner wall provided on the groove side wall of the placement plate 2 and the through-hole inner wall of the first connecting plate 4, two second connecting plates 6 are arranged between the two first connecting plates 4, and the second connecting plate 6 is arranged between the two first connecting plates 4. Both ends of the two connecting plates 6 are fixedly connected with a connecting frame 7, and the connecting frame 7 is a "U"-shaped structure. Threaded frame 8, one end of the first threaded frame 8 is threadedly connected to the groove inner wall provided by the first connecting plate 4, through the first connecting plate 4, the screw 5, the second connecting plate 6, the connecting frame 7 and the first threaded frame 8 Cooperate with each other, place the bottom of the first connecting plate 4 in the top groove of the placing plate 2, and connect the first connecting plate 4 and the placing plate 2 with screws 5, then place the second connecting plate 6 and the connecting frame 7 At the two first connecting plates 4, adjust the position of the second connecting plate 6 according to the size of the required cement prefabricated part, then turn the first threaded frame 8, and rotate one end of the first threaded frame 8 into the first connecting plate 4 In the groove, the assembly work of the mold can be completed, the operation is more convenient, the time of the staff is saved, and the production efficiency is improved to a certain extent. The first connecting block 9 is provided with two, and the two first The connecting blocks 9 are all fixedly connected to the two first connecting plates 4, and there are four second connecting blocks 10, and the side walls of the two second connecting plates 6 are fixedly connected with two second connecting blocks 10, and the limiting device 11 is located on the outside of the forming device 3, the limiting device 11 includes a first moving plate 12, a first pressing block 13, a second moving plate 14, a second threaded frame 15 and a second pressing block 16, the first moving plate 12 is provided with Two, and the opposite side walls of the two first moving plates 12 are fixedly connected with the first pressing block 13, the first pressing block 13 is attached to the first connecting block 9, and the two first moving plates 12 are fixed Two second moving plates 14 are connected, and two second threaded frames 15 are threadedly connected on the second moving plate 14, and one end of the second threaded frame 15 is connected with a second pressing block 16 through a bearing, and the second pressing block 16 is connected to the second pressing block 16. The two connecting blocks 10 fit together, and through the mutual cooperation of the first moving plate 12, the first pressing block 13, the second moving plate 14, the second threaded frame 15 and the second pressing block 16, two motors 19 are started, and the screw rod 18 rotates, the transmission block 20 drives the receiving plate 21 to move downward, and the limit device 11 moves under the action of the receiving plates 21 on both sides. Finally, the first pressing block 13 is attached to the first connecting block 9, and the second pressing block 13 The block 16 is attached to the second connecting block 10, so that the first connecting plate 4 and the second connecting plate 6 are more stable when pouring cement, and are less likely to be shifted.

参考图3所示,述底板1顶部两端均固定连接有一个固定架17,固定架17处设有丝杆18,丝杆18一端转动连接于底板1,丝杆18另一端转动连接于固定架17,固定架17顶部固定连接有电机19,电机19的输出端固定连接于丝杆18,丝杆18上螺纹连接有传动块20,传动块20两侧均设有滑动块22,滑动块22一端滑动连接于固定架17内壁开设的凹槽,传动块20一端固定连接有承接板21,承接板21远离传动块20的一端固定连接于第一移动板12,通过设置固定架17、丝杆18、电机19、传动块20、承接板21以及滑动块22,使得限位装置11方便移动。As shown in Fig. 3, a fixed frame 17 is fixedly connected to both ends of the top of the bottom plate 1, and the fixed frame 17 is provided with a screw rod 18, one end of the screw rod 18 is rotatably connected to the base plate 1, and the other end of the screw rod 18 is rotatably connected to the fixed frame 1. Frame 17, fixed frame 17 top is fixedly connected with motor 19, and the output end of motor 19 is fixedly connected with screw mandrel 18, and screw mandrel 18 is screwed with transmission block 20, and transmission block 20 both sides are all provided with sliding block 22, and sliding block One end of 22 is slidingly connected to the groove provided on the inner wall of the fixed frame 17, one end of the transmission block 20 is fixedly connected with a receiving plate 21, and the end of the receiving plate 21 away from the transmission block 20 is fixedly connected to the first moving plate 12, by setting the fixed frame 17, the wire The rod 18, the motor 19, the transmission block 20, the receiving plate 21 and the sliding block 22 make the position limiting device 11 easy to move.

参考图4所示,第二螺纹架15两侧均设有限位杆23,限位杆23一端固定连接于第二压块16,且限位杆23穿插于第二移动板14开设的通孔内。As shown in FIG. 4 , both sides of the second threaded frame 15 are provided with limit rods 23 , one end of the limit rod 23 is fixedly connected to the second pressure block 16 , and the limit rod 23 is inserted into the through hole provided by the second moving plate 14 Inside.

本实用新型提供的工作原理如下:工作人员将第一连接板4底部放置于放置板2顶部凹槽内,并用螺丝5将第一连接板4与放置板2连接起来,接着,将第二连接板6及连接架7放置于两个第一连接板4处,根据所需水泥预制件的尺寸调整第二连接板6的位置,然后,转动第一螺纹架8,将第一螺纹架8一端转动进第一连接板4凹槽内,接着,启动两个电机19,丝杆18发生转动,传动块20带动着承接板21向下移动,限位装置11在两侧承接板21的作用下移动,最后,第一压块13与第一连接块9贴合,第二压块16与第二连接块10贴合,此时,工作人员向第一连接板4及第二连接板6内倒入水泥即可。The working principle provided by the utility model is as follows: the staff places the bottom of the first connecting plate 4 in the top groove of the placing plate 2, and connects the first connecting plate 4 with the placing plate 2 with screws 5, and then, connects the second connecting plate 4 The plate 6 and the connecting frame 7 are placed on the two first connecting plates 4, the position of the second connecting plate 6 is adjusted according to the size of the required cement prefabricated part, then, the first threaded frame 8 is rotated, and one end of the first threaded frame 8 is Rotate into the groove of the first connecting plate 4, then start the two motors 19, the screw rod 18 rotates, the transmission block 20 drives the receiving plate 21 to move downward, and the limit device 11 is under the action of the receiving plates 21 on both sides Move, at last, the first briquetting block 13 is attached to the first connecting block 9, and the second briquetting block 16 is attached to the second connecting block 10. At this time, the staff enters the first connecting plate 4 and the second connecting plate 6 Just pour in the cement.

本实用新型中涉及的电路以及控制均为现有技术,在此不进行过多赘述。The circuits and controls involved in the present invention are all prior art, and will not be repeated here.

以上所述仅为本实用新型的实施例,并非因此限制本实用新型的专利范围,凡是利用本实用新型说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其它相关的技术领域,均同理包括在本实用新型的专利保护范围内。The above descriptions are only examples of the utility model, and are not intended to limit the patent scope of the utility model. Any equivalent structure or equivalent process transformation made by using the utility model specification and accompanying drawings may be directly or indirectly used in other applications. Related technical fields are all included in the patent protection scope of the present utility model in the same way.

Claims (6)

1. A be used for quick mould for processing of cement prefab which characterized in that includes:
the top of the bottom plate (1) is fixedly connected with a placing plate (2);
the forming device (3) is arranged at the top of the placing plate (2), the forming device (3) comprises two first connecting plates (4), screws (5), second connecting plates (6), connecting frames (7) and first threaded frames (8), the bottoms of the first connecting plates (4) are arranged in grooves formed in the top of the placing plate (2), the screws (5) are in threaded connection with the inner walls of the through holes formed in the side walls of the grooves of the placing plate (2) and the inner walls of the through holes of the first connecting plates (4), the two second connecting plates (6) are arranged between the two first connecting plates (4), the connecting frames (7) are fixedly connected to the two ends of the second connecting plates (6), the connecting frames (7) are of U-shaped structures, the two ends of the first connecting plates (4) are arranged on the inner sides of the connecting frames (7), the first threaded frames (8) are in threaded connection with the connecting frames (7), and one ends of the first threaded frames (8) are in threaded connection with the inner walls of the grooves formed in the first connecting plates (4);
two first connecting blocks (9) are arranged, and the two first connecting blocks (9) are fixedly connected to the two first connecting plates (4);
the number of the second connecting blocks (10) is four, and the side walls of the two second connecting plates (6) are fixedly connected with the two second connecting blocks (10);
stop device (11), the forming device (3) outside is located in stop device (11), and stop device (11) includes first movable plate (12), first briquetting (13), second movable plate (14), second thread frame (15) and second briquetting (16), first movable plate (12) are equipped with two, and the equal fixedly connected with of lateral wall that two first movable plates (12) are relative first briquetting (13), and first briquetting (13) are laminated mutually with first connecting block (9), two second movable plates (14) of fixedly connected with between two first movable plates (12), and threaded connection has two second thread frames (15) on second movable plate (14), and second thread frame (15) one end is connected with second briquetting (16) through the bearing, and second briquetting (16) are laminated mutually with second connecting block (10).
2. The rapid mold for processing the cement prefabricated member as claimed in claim 1, wherein both ends of the top of the bottom plate (1) are fixedly connected with a fixing frame (17), a screw rod (18) is arranged at the fixing frame (17), one end of the screw rod (18) is rotatably connected to the bottom plate (1), the other end of the screw rod (18) is rotatably connected to the fixing frame (17), a motor (19) is fixedly connected to the top of the fixing frame (17), and the output end of the motor (19) is fixedly connected to the screw rod (18).
3. The rapid mold for processing a cement prefabricated member as claimed in claim 2, wherein a driving block (20) is connected to the screw rod (18) in a threaded manner, and a bearing plate (21) is fixedly connected to one end of the driving block (20).
4. The rapid mould for processing cement prefabricated parts as claimed in claim 3, wherein one end of the bearing plate (21) far away from the transmission block (20) is fixedly connected to the first moving plate (12).
5. The rapid mold for processing the cement prefabricated member as claimed in claim 3, wherein sliding blocks (22) are arranged on both sides of the transmission block (20), and one end of each sliding block (22) is slidably connected with a groove formed in the inner wall of the fixing frame (17).
6. The rapid mold for processing the cement prefabricated member according to claim 1, wherein limiting rods (23) are arranged on two sides of the second thread frame (15), one end of each limiting rod (23) is fixedly connected to the second pressing block (16), and the limiting rods (23) are inserted into through holes formed in the second moving plate (14).
CN202221187769.5U 2022-05-18 2022-05-18 Be used for processing of cement prefab to use quick mould Expired - Fee Related CN217729112U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221187769.5U CN217729112U (en) 2022-05-18 2022-05-18 Be used for processing of cement prefab to use quick mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221187769.5U CN217729112U (en) 2022-05-18 2022-05-18 Be used for processing of cement prefab to use quick mould

Publications (1)

Publication Number Publication Date
CN217729112U true CN217729112U (en) 2022-11-04

Family

ID=83836877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221187769.5U Expired - Fee Related CN217729112U (en) 2022-05-18 2022-05-18 Be used for processing of cement prefab to use quick mould

Country Status (1)

Country Link
CN (1) CN217729112U (en)

Similar Documents

Publication Publication Date Title
CN205600936U (en) Self preservation temperature concrete hollow block mould
CN215038568U (en) Mould for manufacturing kerbstone with backrest
CN213226755U (en) Assembled building mould for wallboard
CN118514204A (en) Prefabrication equipment for processing prefabricated concrete wall panels
CN107214819B (en) Building constructional column shaping moulding box
CN208305325U (en) A kind of precast concrete mold
CN219543539U (en) Concrete prefabricated member mold convenient for demolding for green building construction
CN217992905U (en) Building wallboard preparation mould
CN207290398U (en) A kind of building structural post molding machine
CN216465322U (en) Fixed frock of mobilizable pc component built-in fitting
CN212312306U (en) Novel bench formwork for manufacturing prefabricated laminated slab
CN214187670U (en) Prefabricated plate mould with adjustable
CN114856036A (en) Recycled concrete ribbed diaphragm shell concrete shear wall
CN219153251U (en) Prefabricated cement room fixed mold
CN220784336U (en) Precast concrete U-shaped ditch ground die template device
CN221659615U (en) A mould that is arranged in road bed protection engineering slope toe slope top brick to produce fast
CN223820759U (en) A type of precast concrete mold for prefabricated buildings
CN222904398U (en) Autoclaved aerated concrete forming device
CN218375210U (en) Mould for construction
CN214834703U (en) Assembled building shear force wallboard knurling aluminium mould
CN220377814U (en) A kind of building aluminum formwork
CN220218946U (en) Mould for precast concrete box girder
CN221118909U (en) Steel bar truss floor carrier plate limit structure
CN222350239U (en) Fixing equipment for template convenient to equipment
CN218518860U (en) Wallboard production mould mounting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221104