CN217705867U - Civil engineering construction stake of convenient removal - Google Patents

Civil engineering construction stake of convenient removal Download PDF

Info

Publication number
CN217705867U
CN217705867U CN202221461706.4U CN202221461706U CN217705867U CN 217705867 U CN217705867 U CN 217705867U CN 202221461706 U CN202221461706 U CN 202221461706U CN 217705867 U CN217705867 U CN 217705867U
Authority
CN
China
Prior art keywords
bottom plate
civil engineering
engineering construction
fixed mounting
make
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221461706.4U
Other languages
Chinese (zh)
Inventor
王守忠
屈诚诚
刘志和
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221461706.4U priority Critical patent/CN217705867U/en
Application granted granted Critical
Publication of CN217705867U publication Critical patent/CN217705867U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to a civil engineering technical field just discloses a civil engineering construction pile of convenient removal, including construction pile body and bottom plate, one side fixed mounting of bottom plate has fixture, the opposite side fixed mounting of bottom plate has buffer gear, the below of bottom plate is provided with deflection mechanism, deflection mechanism's below fixed mounting has the backup pad, deflection mechanism includes connecting axle, electric putter, loose axle, fixed cover and back shaft, one side swing joint of connecting axle has electric putter. This civil engineering construction stake of convenient removal drives the loose axle through electric putter and rotates to make with bottom plate jack-up, make the bottom plate drive the back shaft and rotate, thereby make the bottom plate angle deflect, make the slow landing of construction stake body, thereby made things convenient for to remove the transfer to construction stake body, make it laborsaving convenience more when removing, bring very big facility for removal work, great improvement work efficiency.

Description

Civil engineering construction stake of convenient removal
Technical Field
The utility model relates to a civil engineering technical field specifically is a civil engineering construction stake of convenient removal.
Background
Wood engineering is a general term for the scientific and technological process of building various land engineering facilities. It refers to both the materials, equipment used and the technical activities carried out such as surveying, designing, construction, maintenance, repair, etc., as well as the objects of engineering construction. I.e. various engineering facilities, such as houses, roads, railways, pipelines, tunnels, bridges, canals, dams, ports, power stations, airports, ocean platforms, water supply and drainage and protection projects, which are built on or under the ground, on land and directly or indirectly serve human life, production, military affairs and scientific research. The civil engineering refers to the engineering practice of various technical works such as investigation, planning, design, construction, installation and maintenance and the like carried out for newly building, rebuilding or expanding buildings, structures and related supporting facilities of various projects and the like except for house buildings, and during civil engineering construction, a construction pile is generally needed, and is difficult to move, so that the civil engineering construction pile convenient to move is designed.
The civil engineering construction pile convenient to move at present is relatively heavy, and is difficult to move mostly, so that the working difficulty is increased, the working efficiency is reduced, and the practicability is reduced.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The not enough to prior art, the utility model provides a civil engineering construction stake of convenient removal to propose in solving above-mentioned background art because the construction stake is heavier, most of them are more difficult when removing it, thereby increased the work degree of difficulty, reduced work efficiency, thereby make its practicality obtain the problem that reduces.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a civil engineering construction pile convenient to move comprises a construction pile body and a bottom plate, wherein a clamping mechanism is fixedly installed on one side of the bottom plate, a buffer mechanism is fixedly installed on the other side of the bottom plate, a deflection mechanism is arranged below the bottom plate, a supporting plate is fixedly installed below the deflection mechanism, and the deflection mechanism comprises a connecting shaft, an electric push rod, a movable shaft, a fixed sleeve and a supporting shaft;
one side swing joint of connecting axle has electric putter, electric putter's one end swing joint has the loose axle, the top fixed mounting of backup pad has fixed cover, one side swing joint of fixed cover has the back shaft.
Preferably, the outer wall of loose axle and the bottom swing joint of bottom plate, the construction stake body is placed in the top of bottom plate, can conveniently make the angle of bottom plate deflect for the slow landing of construction stake body has made things convenient for and has removed the transfer to the construction stake body, makes it more laborsaving convenient when removing.
Preferably, fixture includes fixed plate, spout, electronic slider, flexible loop bar and centre gripping frame, the equal fixed mounting of fixed plate is in one side of bottom plate, the spout has been seted up to one side of fixed plate, the inside swing joint of spout has electronic slider, one side fixed mounting of electronic slider has flexible loop bar, the one end fixed mounting of flexible loop bar has the centre gripping frame, through adjusting the length of flexible loop bar to make the position change of centre gripping frame, make the centre gripping frame press from both sides the construction pile body tightly fixed, make it avoid rocking at the in-process that removes, make it more stable.
Preferably, the electric sliding block and the sliding chute form a sliding structure, the outer diameter of the electric sliding block is matched with the inner diameter of the sliding chute, the electric sliding block slides along the inner wall of the sliding chute, so that the position of the clamping frame is conveniently adjusted, and the clamping frame is lifted when clamping is not needed, so that the blockage of discharging is avoided.
Preferably, the centre gripping frame constitutes extending structure with flexible loop bar, and the centre gripping frame is connected through the welding with flexible loop bar, through the length of adjusting flexible loop bar for press from both sides tightly fixedly with the construction stake body between the centre gripping frame, thereby avoid rocking when removing.
Preferably, buffer gear includes first stationary blade, pivot, second stationary blade and buffer board, first stationary blade fixed mounting is in one side of bottom plate, one side swing joint of first stationary blade has the pivot, outer wall one side swing joint of pivot has the second stationary blade, one side fixed mounting of second stationary blade has the buffer board, makes the position of adjusting the buffer board through the pivot, when unloading to the construction stake body to can play fine cushioning effect, prevent to cause the striking to the construction stake body and damage, the buffer board also can prevent that the construction stake body from removing the in-process landing simultaneously, plays fine guard action, sets up like this and makes the device's practicality obtain great promotion.
Preferably, constitute detachable construction through the screw between first stationary blade and the bottom plate, outer wall one side of pivot and one side swing joint of first stationary blade can be so that the convenience is installed it and is dismantled, also conveniently adjusts the position of buffer board simultaneously to it is more convenient when using.
Preferably, there is the bracing piece outer wall one side threaded connection of backup pad, the one end fixed mounting of bracing piece has the handle, the bottom fixed mounting of backup pad has the gyro wheel for be convenient for promote the removal to the device, make it more laborsaving when removing, saved a large amount of time, satisfied user's user demand.
(III) advantageous effects
Compared with the prior art, the utility model provides a civil engineering construction stake of convenient removal possesses following beneficial effect:
1. this civil engineering construction stake of convenient removal, through being provided with the connecting axle, electric putter, the loose axle, fixed cover and back shaft, it rotates to drive the loose axle through electric putter, thereby make with bottom plate jack-up, make the bottom plate drive the back shaft and rotate, thereby make the bottom plate angle deflect, make the slow landing of construction stake body, thereby made things convenient for and removed the transfer to the construction stake body, make it more laborsaving convenient when removing, bring very big facility for removal work, great improvement work efficiency.
2. This civil engineering construction stake of convenient removal through being provided with fixed plate, spout, electronic slider, flexible loop bar and centre gripping frame, through the length of adjusting flexible loop bar to make the position of centre gripping frame change, make the centre gripping frame tightly press from both sides the construction stake body and press from both sides fixedly, make its in-process of removing avoid rocking, make it more stable.
3. This civil engineering construction pile convenient to remove, through being provided with first stationary blade, the apparatus further comprises a rotating shaft, second stationary blade and buffer board, make the position of adjusting the buffer board through the pivot, when unloading to the construction pile body, thereby can play fine cushioning effect, prevent to cause the striking damage to the construction pile body, the buffer board also can prevent that the construction pile body from removing the in-process landing simultaneously, play fine guard action, the practicality that sets up like this and make the device has obtained great promotion.
Drawings
Fig. 1 is a schematic view of the front cross-sectional structure of the present invention;
FIG. 2 is a schematic view of the deflecting mechanism of the present invention;
FIG. 3 is a schematic view of the structure of the buffering mechanism of the present invention;
fig. 4 is a schematic structural view of the clamping mechanism of the present invention.
In the figure: 1. constructing a pile body; 2. a base plate; 3. a clamping mechanism; 301. a fixing plate; 302. a chute; 303. an electric slider; 304. a telescopic loop bar; 305. a clamping frame; 4. a buffer mechanism; 401. a first fixing sheet; 402. a rotating shaft; 403. a second fixing sheet; 404. a buffer plate; 5. a deflection mechanism; 501. a connecting shaft; 502. an electric push rod; 503. a movable shaft; 504. fixing a sleeve; 505. a support shaft; 6. a support plate; 7. a support bar; 8. a handle; 9. and a roller.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
The utility model provides a civil engineering construction stake's that conveniently removes preferred embodiment is shown in fig. 1 to fig. 4: a civil engineering construction pile convenient to move comprises a construction pile body 1 and a bottom plate 2, wherein one side of the bottom plate 2 is fixedly provided with a clamping mechanism 3, the other side of the bottom plate 2 is fixedly provided with a buffer mechanism 4, a deflection mechanism 5 is arranged below the bottom plate 2, a supporting plate 6 is fixedly arranged below the deflection mechanism 5, and the deflection mechanism 5 comprises a connecting shaft 501, an electric push rod 502, a movable shaft 503, a fixed sleeve 504 and a supporting shaft 505;
one side swing joint of connecting axle 501 has electric putter 502, electric putter 502's one end swing joint has loose axle 503, the top fixed mounting of backup pad 6 has fixed cover 504, one side swing joint of fixed cover 504 has back shaft 505, it rotates to drive loose axle 503 through electric putter 502, thereby make 2 jack-ups of bottom plate, make bottom plate 2 drive back shaft 505 rotate, thereby make 2 angles of bottom plate deflect, make the slow landing of construction stake body 1, thereby made things convenient for and removed the transfer to construction stake body 1, make it more laborsaving convenient when removing, bring very big facility for removal work, great improvement work efficiency.
In this embodiment, the outer wall of loose axle 503 and the bottom swing joint of bottom plate 2, construction stake body 1 is placed in bottom plate 2's top, can conveniently make bottom plate 2's angle deflect for construction stake body 1 slowly landing, thereby made things convenient for to remove the transfer to construction stake body 1, make it more laborsaving convenient when removing.
Example 2
On the basis of embodiment 1, the present invention provides a preferred embodiment of a civil engineering construction pile convenient to move, as shown in fig. 1 to 4: fixture 3 includes fixed plate 301, spout 302, electronic slider 303, flexible loop bar 304 and centre gripping frame 305, the equal fixed mounting of fixed plate 301 is in one side of bottom plate 2, spout 302 has been seted up to one side of fixed plate 301, the inside swing joint of spout 302 has electronic slider 303, one side fixed mounting of electronic slider 303 has flexible loop bar 304, the one end fixed mounting of flexible loop bar 304 has centre gripping frame 305, length through adjusting flexible loop bar 304, thereby make the position of centre gripping frame 305 change, make centre gripping frame 305 press from both sides construction stake body 1 tight fixed, make it avoid rocking carrying out the in-process that removes, make it more stable, electronic slider 303 and spout 302 constitute sliding construction, and the external diameter of electronic slider 303 and the internal diameter of spout 302 match each other, through the electronic slider 303 of inner wall slip along spout 302, thereby conveniently adjust the position of centre gripping frame 305, when not needing the centre gripping, rise it, avoid unloading the hindrance.
In this embodiment, centre gripping frame 305 constitutes extending structure with flexible loop bar 304, and centre gripping frame 305 is connected through the welding with flexible loop bar 304, through the length of adjusting flexible loop bar 304 for it is fixed to press from both sides construction stake body 1 between the centre gripping frame 305, thereby avoids rocking when removing.
Further, buffer gear 4 includes first stationary blade 401, pivot 402, second stationary blade 403 and buffer board 404, first stationary blade 401 fixed mounting is in one side of bottom plate 2, one side swing joint of first stationary blade 401 has pivot 402, outer wall one side swing joint of pivot 402 has second stationary blade 403, one side fixed mounting of second stationary blade 403 has buffer board 404, make the position of adjusting buffer board 404 through pivot 402, when unloading to construction stake body 1, thereby can play fine cushioning effect, prevent to cause the striking damage to construction stake body 1, buffer board 404 also can prevent construction stake body 1 at the removal in-process landing simultaneously, play fine guard action, the practicality that sets up so that the device has obtained great promotion.
Furthermore, a detachable structure is formed between the first fixing plate 401 and the bottom plate 2 through screws, and one side of the outer wall of the rotating shaft 402 is movably connected with one side of the first fixing plate 401, so that the first fixing plate can be conveniently mounted and dismounted, and meanwhile, the position of the buffer plate 404 can be conveniently adjusted, so that the first fixing plate is more convenient to use.
In addition, outer wall one side threaded connection of backup pad 6 has bracing piece 7, and the one end fixed mounting of bracing piece 7 has handle 8, and the bottom fixed mounting of backup pad 6 has gyro wheel 9 for be convenient for promote the removal to the device, make it more laborsaving when removing, saved a large amount of time, satisfied user's user demand.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
The working principle is as follows: at first switch on external power source, place construction pile body 1 in the top of bottom plate 2, then slide electric slider 303, make the inner wall along spout 302 slide, thereby adjust the height of flexible loop bar 304, then adjust the length of flexible loop bar 304, make centre gripping frame 305 press from both sides construction pile body 1 and press from both sides tightly fixed, when needs lift construction pile body 1 off, drive loose axle 503 through electric putter 502 and move, make 2 jack-up of bottom plate, bottom plate 2 drives back shaft 505 and moves, thereby make 2 slopes of bottom plate, then adjust buffer board 404 to suitable angle through pivot 402, lift construction pile body 1 off, just so accomplish the use of whole engineering construction pile of convenient removal.
To sum up, this civil engineering construction stake of convenient removal drives loose axle 503 through electric putter 502 and rotates to the feasible bottom plate 2 jack-up that makes bottom plate 2 drive back shaft 505 rotate, thereby makes 2 angles of bottom plate deflect, makes construction stake body 1 slow landing, thereby has made things convenient for and has removed the transfer to construction stake body 1, makes it more laborsaving convenient when removing, brings very big facility for the removal work, great improvement work efficiency.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a civil engineering construction stake of convenient removal, includes construction pile body (1) and bottom plate (2), its characterized in that: a clamping mechanism (3) is fixedly mounted on one side of the bottom plate (2), a buffer mechanism (4) is fixedly mounted on the other side of the bottom plate (2), a deflection mechanism (5) is arranged below the bottom plate (2), a supporting plate (6) is fixedly mounted below the deflection mechanism (5), and the deflection mechanism (5) comprises a connecting shaft (501), an electric push rod (502), a movable shaft (503), a fixed sleeve (504) and a supporting shaft (505);
one side swing joint of connecting axle (501) has electric putter (502), the one end swing joint of electric putter (502) has loose axle (503), the top fixed mounting of backup pad (6) has fixed cover (504), one side swing joint of fixed cover (504) has back shaft (505).
2. A civil engineering construction pile facilitating movement according to claim 1, characterised in that: the outer wall of the movable shaft (503) is movably connected with the bottom of the bottom plate (2), and the construction pile body (1) is placed above the bottom plate (2).
3. A civil engineering construction pile facilitating movement according to claim 1, characterised in that: fixture (3) are including fixed plate (301), spout (302), electronic slider (303), flexible loop bar (304) and centre gripping frame (305), the equal fixed mounting in one side of bottom plate (2) of fixed plate (301), spout (302) have been seted up to one side of fixed plate (301), the inside swing joint of spout (302) has electronic slider (303), one side fixed mounting of electronic slider (303) has flexible loop bar (304), the one end fixed mounting of flexible loop bar (304) has centre gripping frame (305).
4. A civil engineering construction pile facilitating movement according to claim 3, characterised in that: the electric sliding block (303) and the sliding groove (302) form a sliding structure, and the outer diameter of the electric sliding block (303) is matched with the inner diameter of the sliding groove (302).
5. A civil engineering construction pile facilitating movement according to claim 3, characterised in that: the clamping frame (305) and the telescopic loop bar (304) form a telescopic structure, and the clamping frame (305) and the telescopic loop bar (304) are connected through welding.
6. A civil engineering construction pile facilitating movement according to claim 1, characterised in that: buffer gear (4) include first stationary blade (401), pivot (402), second stationary blade (403) and buffer board (404), first stationary blade (401) fixed mounting is in one side of bottom plate (2), one side swing joint of first stationary blade (401) has pivot (402), outer wall one side swing joint of pivot (402) has second stationary blade (403), one side fixed mounting of second stationary blade (403) has buffer board (404).
7. A civil engineering construction pile facilitating movement according to claim 6, characterised in that: the detachable structure is formed between the first fixing plate (401) and the bottom plate (2) through screws, and one side of the outer wall of the rotating shaft (402) is movably connected with one side of the first fixing plate (401).
8. A civil engineering construction pile facilitating movement according to claim 1, characterised in that: the supporting device is characterized in that a supporting rod (7) is connected to one side of the outer wall of the supporting plate (6) in a threaded mode, a handle (8) is fixedly mounted at one end of the supporting rod (7), and a roller (9) is fixedly mounted at the bottom of the supporting plate (6).
CN202221461706.4U 2022-06-13 2022-06-13 Civil engineering construction stake of convenient removal Expired - Fee Related CN217705867U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221461706.4U CN217705867U (en) 2022-06-13 2022-06-13 Civil engineering construction stake of convenient removal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221461706.4U CN217705867U (en) 2022-06-13 2022-06-13 Civil engineering construction stake of convenient removal

Publications (1)

Publication Number Publication Date
CN217705867U true CN217705867U (en) 2022-11-01

Family

ID=83800598

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221461706.4U Expired - Fee Related CN217705867U (en) 2022-06-13 2022-06-13 Civil engineering construction stake of convenient removal

Country Status (1)

Country Link
CN (1) CN217705867U (en)

Similar Documents

Publication Publication Date Title
CN111441611A (en) Energy-concerving and environment-protective building strutting arrangement for civil engineering
CN108608292A (en) A kind of Construction of Civil Engineering metal sheet surface process equipment
CN206813602U (en) A kind of construction sheet material stacking adapter
CN210032534U (en) Civil engineering construction support
CN215254381U (en) Safety protection supporting platform for municipal engineering construction
CN217705867U (en) Civil engineering construction stake of convenient removal
CN213271714U (en) Civil engineering equipment strutting arrangement
CN212556363U (en) Portable material handling device for civil construction
CN209603497U (en) A kind of multi-use architecture template
CN111730463A (en) Civil engineering is with high accuracy equipment of polishing that can hand-carry
CN217923623U (en) Inner supporting structure of foundation pit
CN215564730U (en) Strutting arrangement for civil engineering
CN215594899U (en) Supporting template for constructional engineering
CN214423921U (en) Supporting structure for building engineering construction
CN213539639U (en) Civil engineering construction support
CN213806753U (en) Civil engineering construction support
CN211344693U (en) Civil engineering building strutting arrangement
CN213545827U (en) Progress display board for civil engineering construction management
CN109625042B (en) Operation method of cover plate moving device for cable trench
CN216952366U (en) Support frame for civil engineering of convenient regulation
CN212635706U (en) Adjustable sheet material spare rack for civil construction engineering
CN218406559U (en) Novel concrete is floating for civil engineering construction device
CN213868854U (en) Scaffold for civil engineering
CN211200028U (en) Self-propelled hydraulic landing stage bearing structure
CN217175583U (en) Stable form civil engineering construction support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221101

CF01 Termination of patent right due to non-payment of annual fee