CN217692427U - A large-span ladder cable tray - Google Patents

A large-span ladder cable tray Download PDF

Info

Publication number
CN217692427U
CN217692427U CN202220629411.7U CN202220629411U CN217692427U CN 217692427 U CN217692427 U CN 217692427U CN 202220629411 U CN202220629411 U CN 202220629411U CN 217692427 U CN217692427 U CN 217692427U
Authority
CN
China
Prior art keywords
ladder
tank body
cell body
tank
span
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220629411.7U
Other languages
Chinese (zh)
Inventor
唐健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bazhou Odesheng Metal Products Co ltd
Original Assignee
Haiyun Electric Jiangsu Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haiyun Electric Jiangsu Co ltd filed Critical Haiyun Electric Jiangsu Co ltd
Priority to CN202220629411.7U priority Critical patent/CN217692427U/en
Application granted granted Critical
Publication of CN217692427U publication Critical patent/CN217692427U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control And Safety Of Cranes (AREA)

Abstract

The utility model belongs to the technical field of the cable testing bridge, especially, be a big span ladder type cable testing bridge, including first cell body, second cell body, third cell body, side's pipe ladder fender and shock attenuation mounting bracket, the both sides of first cell body are connected with second cell body and third cell body through first rotation axis rotation respectively, first cell body, second cell body and third cell body symmetry respectively are provided with two. The utility model discloses a set up first cell body, the second cell body, the third cell body, side's pipe ladder keeps off and the shock attenuation mounting bracket, the design that first rotation axis and second rotation axis and side's pipe ladder kept off, it is folding to make the ladder type crane span structure disassemble, in the crane span structure transportation, can pass through folding crane span structure, reduce the whole volume of crane span structure, the transport means with the volume can load more crane span structures, reduce the cost of transportation, the side's pipe ladder of pegging graft keeps off the integral erection of the crane span structure of being convenient for, design through the shock attenuation mounting bracket, improve crane span structure shock attenuation effect.

Description

一种大跨距梯式电缆桥架A large-span ladder cable bridge

技术领域technical field

本实用新型涉及电缆桥架技术领域,具体为一种大跨距梯式电缆桥架。The utility model relates to the technical field of cable bridges, in particular to a large-span ladder type cable bridge.

背景技术Background technique

电缆桥架分为槽式、托盘式和梯架式等结构,由支架、托臂和安装附件等组成,其作用是能够将电缆整齐的排列在里面,从一个设备引至另外一个设备时所用的,不会影响建筑物美观,一般量大的电缆我们就会使用梯架式电缆桥架。The cable tray is divided into trough type, tray type and ladder frame structure. It is composed of brackets, brackets and installation accessories. Its function is to arrange the cables neatly inside and lead them from one device to another. , It will not affect the beauty of the building. Generally, we will use ladder type cable trays for large cables.

但是现有的梯式电缆桥架存在以下不足:常见的梯式桥架通常采用一体式C型设计,且采用的是焊接方式连接,体积比较大,不便于运输,加大运输成本,且由于体积过大不便于安装,现有的梯式桥架抗震效果较差。However, the existing ladder-type cable trays have the following disadvantages: the common ladder-type cable tray usually adopts an integrated C-shaped design, and is connected by welding. It is very inconvenient to install, and the existing ladder bridge has poor seismic effect.

实用新型内容Utility model content

(一)解决的技术问题(1) Solved technical problems

针对现有技术的不足,本实用新型提供了一种大跨距梯式电缆桥架,解决了上述背景技术中所提出的梯式桥架不便于运输、焊接方式连接安装效率底和抗震效果较差的问题。Aiming at the deficiencies of the prior art, the utility model provides a large-span ladder-type cable bridge, which solves the problems that the ladder-type bridge proposed in the above-mentioned background technology is not convenient for transportation, the installation efficiency of the welding method is low, and the anti-seismic effect is poor. question.

(二)技术方案(2) Technical solution

本实用新型为了实现上述目的具体采用以下技术方案:The utility model specifically adopts the following technical solutions in order to achieve the above object:

一种大跨距梯式电缆桥架,包括第一槽体、第二槽体、第三槽体、方管梯挡和减震安装架,所述第一槽体的两侧分别通过第一旋转轴转动连接有第二槽体和第三槽体,所述第一槽体、第二槽体和第三槽体分别对称设置有两个,两个第一槽体之间通过插接槽滑动插接有方管梯挡,所述第一槽体上卡合设置有减震安装架。A large-span ladder-type cable bridge, comprising a first trough, a second trough, a third trough, a square tube ladder stop and a shock-absorbing installation frame, the two sides of the first trough are respectively rotated by a first The shaft is rotatably connected with a second groove body and a third groove body, and two of the first groove body, the second groove body and the third groove body are symmetrically arranged respectively, and the two first groove bodies slide through the insertion groove A square tube ladder block is plugged in, and a shock-absorbing installation frame is engaged with the first groove body.

进一步地,所述第一槽体上等间距分别开设有若干个散热孔和插接槽,所述第一槽体的一端一体成型设置有第一挡板。Further, a plurality of cooling holes and socket slots are provided at equal intervals on the first tank body, and one end of the first tank body is integrally formed with a first baffle plate.

进一步地,所述第一槽体、第二槽体和第三槽体的两端均设置有第二旋转轴,所述第二槽体的一端一体成型设置有第二挡板。Further, both ends of the first tank body, the second tank body and the third tank body are provided with a second rotating shaft, and one end of the second tank body is integrally formed with a second baffle plate.

进一步地,所述第三槽体的一端一体成型设置有第三挡板。Further, one end of the third tank is integrally formed with a third baffle.

进一步地,所述方管梯挡的两端通过插接块滑动插接在插接槽中,所述方管梯挡上开设有连接槽。Further, the two ends of the square tube ladder block are slidably inserted into the insertion groove through the socket block, and the square tube ladder block is provided with a connecting groove.

进一步地,所述减震安装架由U型挂钩、弹簧减震器、安装块和安装孔组成,所述U型挂钩通过散热孔卡合在第一槽体上,所述U型挂钩上固定连接有弹簧减震器,所述弹簧减震器的顶端固定连接在安装块上,所述安装块的顶部开设有安装孔。Further, the shock absorbing installation frame is composed of a U-shaped hook, a spring shock absorber, a mounting block and a mounting hole, the U-shaped hook is engaged with the first groove body through the heat dissipation hole, and the U-shaped hook is fixed on the A spring shock absorber is connected, and the top end of the spring shock absorber is fixedly connected to the installation block, and an installation hole is opened on the top of the installation block.

(三)有益效果(3) Beneficial effects

与现有技术相比,本实用新型提供了一种大跨距梯式电缆桥架,具备以下有益效果:Compared with the prior art, the utility model provides a large-span ladder type cable bridge, which has the following beneficial effects:

本实用新型,通过设置第一槽体、第二槽体、第三槽体、方管梯挡和减震安装架,第一旋转轴和第二旋转轴以及方管梯挡的设计,能够使梯式桥架拆解折叠,在桥架运输过程中,能够通过折叠桥架,将桥架整体体积减小,同体积的运输工具能够装载更多的桥架,减少运输成本,插接的方管梯挡便于桥架的整体安装,通过减震安装架的设计,提高桥架减震效果。The utility model can make The ladder bridge can be disassembled and folded. During the transport of the bridge, the overall volume of the bridge can be reduced by folding the bridge. The same volume of transport can load more bridges, reducing transportation costs. The overall installation of the bridge, through the design of the shock-absorbing mounting frame, improves the shock-absorbing effect of the bridge.

附图说明Description of drawings

图1为本实用新型整体结构示意图;Fig. 1 is a schematic diagram of the overall structure of the utility model;

图2为本实用新型整体半折叠结构示意图;Fig. 2 is a schematic diagram of the whole half-folding structure of the utility model;

图3为本实用新型整体完全折叠结构示意图;Fig. 3 is a schematic diagram of the overall fully folded structure of the utility model;

图4为本实用新型方管梯挡结构示意图;Fig. 4 is a structural schematic diagram of a square tube ladder stop of the present invention;

图5为本实用新型减震安装架结构示意图。Fig. 5 is a structural schematic diagram of the shock-absorbing mounting frame of the present invention.

图中:1、第一槽体;101、散热孔;102、插接槽;103、第一旋转轴; 104、第一挡板;2、第二槽体;201、第二旋转轴;202、第二挡板;3、第三槽体;301、第三挡板;4、方管梯挡;401、插接块;402、连接槽;5、减震安装架;501、U型挂钩;502、弹簧减震器;503、安装块;504、安装孔。In the figure: 1, the first tank body; 101, cooling holes; 102, the socket slot; 103, the first rotating shaft; 104, the first baffle; 2, the second tank body; 201, the second rotating shaft; 202 , the second baffle; 3, the third tank body; 301, the third baffle; 4, the square tube ladder block; 401, the plug block; 402, the connecting groove; 5, the shock absorbing mounting frame; 501, the U-shaped hook ; 502, the spring shock absorber; 503, the mounting block; 504, the mounting hole.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

实施例Example

如图1-5所示,本实用新型一个实施例提出的一种大跨距梯式电缆桥架,包括第一槽体1、第二槽体2、第三槽体3、方管梯挡4和减震安装架5,第一槽体1的两侧分别通过第一旋转轴103转动连接有第二槽体2和第三槽体3,第一槽体1、第二槽体2和第三槽体3分别对称设置有两个,两个第一槽体1 之间通过插接槽102滑动插接有方管梯挡4,第一槽体1上卡合设置有减震安装架5。As shown in Figures 1-5, a large-span ladder-type cable bridge proposed by an embodiment of the present invention includes a first tank body 1, a second tank body 2, a third tank body 3, and a square tube ladder block 4 and the shock absorbing mounting bracket 5, the two sides of the first tank body 1 are respectively connected with the second tank body 2 and the third tank body 3 through the first rotating shaft 103, and the first tank body 1, the second tank body 2 and the second tank body Two of the three tank bodies 3 are respectively arranged symmetrically, and a square pipe ladder block 4 is slidably inserted between the two first tank bodies 1 through the insertion slot 102, and a shock-absorbing mounting bracket 5 is mounted on the first tank body 1 .

综上所知,通过桥架能够拆解折叠设计,在运输时能够将桥架折叠,减小整体体积,提高运输效率,减小运输成本,在安装使用前,将桥架延展组装,第一槽体1、第二槽体2和第三槽体3通过第二旋转轴201呈S型折叠收缩,将第一槽体1、第二槽体2和第三槽体3通过拉伸延展平铺在地面上,而后沿着第一旋转轴103的转动方向,将第二槽体2和第三槽体3竖起,使得第二槽体2和第三槽体3垂直于第一槽体1,此时梯式桥架便延展完毕,此设计里一个完整的梯式桥架由两个第一槽体1、第二槽体2和第三槽体3组成,将两个延展完成的第一槽体1、第二槽体2和第三槽体3开口相对放置,使两个插接槽102的开口相对,将方管梯挡4两端的插接块401分别插接在两端的插接槽102内部,将所需的方管梯挡4逐个插接完成,而后将减震安装架5 上U型挂钩501的一端卡合在第一槽体1上开设的散热孔101内部,通过减震安装架5将组装后的梯式桥架固定安装在屋顶,便可以进行电缆的走线安装,通过减震安装架5的设计,能够使桥架的减震效果提高,避免因震动使桥架掉落,在桥架受到振动时,减震安装架5上的弹簧减震器502能够将震动的力减小,弹簧减震器502为现有公开技术手段,因此不再文中赘述,整体设计结构合理,安装简单,便于运输携带,提高整体便捷性,从而减少运输成本,较以往整体焊接式的桥架,此设计提高了安装时的便捷,减震安装架5提高了桥架的减震效果,延长了桥架的使用寿命,适合推广使用。To sum up, the bridge frame can be disassembled and folded, and the bridge frame can be folded during transportation, reducing the overall volume, improving transportation efficiency, and reducing transportation costs. Before installation and use, the bridge frame is extended and assembled. The first tank body 1 , The second tank body 2 and the third tank body 3 are folded and shrunk in an S shape through the second rotating shaft 201, and the first tank body 1, the second tank body 2 and the third tank body 3 are spread on the ground by stretching , and then erect the second tank body 2 and the third tank body 3 along the rotation direction of the first rotating shaft 103, so that the second tank body 2 and the third tank body 3 are perpendicular to the first tank body 1, thus When the ladder bridge is extended, a complete ladder bridge in this design is composed of two first tanks 1, second tanks 2 and third tanks 3, and the two extended first tanks 1 1. The openings of the second tank body 2 and the third tank body 3 are placed opposite to each other, so that the openings of the two insertion slots 102 are opposite, and the insertion blocks 401 at both ends of the square tube ladder block 4 are respectively inserted into the insertion slots 102 at both ends. , inserting the required square tube ladder blocks 4 one by one, and then snapping one end of the U-shaped hook 501 on the shock absorbing mounting frame 5 into the inside of the cooling hole 101 provided on the first tank body 1, through the shock absorbing mounting frame 5 5 Fix the assembled ladder-type bridge frame on the roof, and then the cables can be routed and installed. Through the design of the shock-absorbing mounting frame 5, the shock-absorbing effect of the bridge frame can be improved, and the bridge frame can be avoided from falling due to vibration. When being vibrated, the spring shock absorber 502 on the shock absorbing mount 5 can reduce the force of the vibration. The spring shock absorber 502 is an existing public technical means, so it will not be repeated in the text. The overall design structure is reasonable and the installation is simple. It is easy to transport and carry, and improves the overall convenience, thereby reducing transportation costs. Compared with the previous integrally welded bridge frame, this design improves the convenience of installation. The shock-absorbing mounting frame 5 improves the shock absorption effect of the bridge frame and prolongs the service life of the bridge frame , suitable for promotional use.

如图2和图3所示,在一些实施例中,第一槽体1上等间距分别开设有若干个散热孔101和插接槽102,第一槽体1的一端一体成型设置有第一挡板 104,第一旋转轴103用于第二槽体2和第三槽体3连接在第一槽体1上,散热孔101提高桥架的透气,同时减轻桥架的整体重量,提高安装时的便捷,第一挡板104用于限制第一槽体1的翻转方向,避免延展后发生错位现象,确保正常折叠使用。As shown in Figure 2 and Figure 3, in some embodiments, a number of cooling holes 101 and socket slots 102 are provided at equal intervals on the first tank body 1, and one end of the first tank body 1 is integrally formed with a first The baffle plate 104 and the first rotating shaft 103 are used to connect the second tank body 2 and the third tank body 3 to the first tank body 1. The heat dissipation holes 101 improve the ventilation of the bridge frame, reduce the overall weight of the bridge frame, and improve the installation efficiency. Convenient, the first baffle 104 is used to limit the turning direction of the first tank body 1 to avoid misalignment after stretching and ensure normal folding and use.

如图3所示,在一些实施例中,第一槽体1、第二槽体2和第三槽体3的两端均设置有第二旋转轴201,第二槽体2的一端一体成型设置有第二挡板 202,第二旋转轴201用于连接在两个第一槽体1、第二槽体2和第三槽体3 之间,确保桥架能够折叠收缩,第二挡板202用于限制第二槽体2的翻转方向,确保延展后的正常使用。As shown in Figure 3, in some embodiments, the two ends of the first tank body 1, the second tank body 2 and the third tank body 3 are provided with a second rotating shaft 201, and one end of the second tank body 2 is integrally formed A second baffle 202 is provided, and the second rotating shaft 201 is used to connect between the two first tanks 1 , the second tank 2 and the third tank 3 to ensure that the bridge can be folded and contracted. The second baffle 202 It is used to limit the turning direction of the second tank body 2 to ensure normal use after stretching.

如图3所示,在一些实施例中,第三槽体3的一端一体成型设置有第三挡板301,第三挡板301用于限制第三槽体3的翻转方向,确保延展后的正常使用。As shown in Figure 3, in some embodiments, one end of the third tank 3 is integrally formed with a third baffle 301, and the third baffle 301 is used to limit the turning direction of the third tank 3 to ensure the extended Normal use.

如图1和图4所示,在一些实施例中,方管梯挡4的两端通过插接块401 滑动插接在插接槽102中,方管梯挡4上开设有连接槽402,方管梯挡4用于固定支撑电缆,满足桥架的使用需求。As shown in Figures 1 and 4, in some embodiments, the two ends of the square tube ladder block 4 are slidably inserted into the socket slot 102 through the insertion block 401, and the square tube ladder block 4 is provided with a connecting groove 402, The square tube ladder block 4 is used to fix the supporting cables to meet the use requirements of the bridge frame.

如图1和图5所示,在一些实施例中,减震安装架5由U型挂钩501、弹簧减震器502、安装块503和安装孔504组成,U型挂钩501通过散热孔101 卡合在第一槽体1上,U型挂钩501上固定连接有弹簧减震器502,弹簧减震器502的顶端固定连接在安装块503上,安装块503的顶部开设有安装孔504, U型挂钩501通过钩挂散热孔101,提高安装时的便捷性,弹簧减震器502提高了桥架的减震效果,避免桥架因振动而导致损坏,减震安装架5提高了桥架的整体减震能力,延长使用寿命。As shown in Figure 1 and Figure 5, in some embodiments, the shock absorbing mounting bracket 5 is composed of a U-shaped hook 501, a spring shock absorber 502, a mounting block 503 and a mounting hole 504, and the U-shaped hook 501 is stuck through the cooling hole 101 Closed on the first groove body 1, a spring shock absorber 502 is fixedly connected to the U-shaped hook 501, and the top of the spring shock absorber 502 is fixedly connected to the mounting block 503, and the top of the mounting block 503 is provided with a mounting hole 504, U The type hook 501 improves the convenience of installation by hooking the cooling hole 101, the spring shock absorber 502 improves the shock absorption effect of the bridge frame, and avoids damage to the bridge frame due to vibration, and the shock absorption mounting frame 5 improves the overall shock absorption of the bridge frame capacity and prolong service life.

最后应说明的是:以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,尽管参照前述实施例对本实用新型进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。Finally, it should be noted that: the above is only a preferred embodiment of the utility model, and is not intended to limit the utility model, although the utility model has been described in detail with reference to the foregoing embodiments, for those skilled in the art , it is still possible to modify the technical solutions described in the foregoing embodiments, or perform equivalent replacements for some of the technical features. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.

Claims (6)

1.一种大跨距梯式电缆桥架,包括第一槽体(1)、第二槽体(2)、第三槽体(3)、方管梯挡(4)和减震安装架(5),其特征在于:所述第一槽体(1)的两侧分别通过第一旋转轴(103)转动连接有第二槽体(2)和第三槽体(3),所述第一槽体(1)、第二槽体(2)和第三槽体(3)分别对称设置有两个,两个第一槽体(1)之间通过插接槽(102)滑动插接有方管梯挡(4),所述第一槽体(1)上卡合设置有减震安装架(5)。1. A large-span ladder type cable bridge, comprising the first tank body (1), the second tank body (2), the third tank body (3), the square tube ladder stop (4) and the shock-absorbing installation frame ( 5), it is characterized in that: the two sides of the first tank (1) are respectively connected with the second tank (2) and the third tank (3) through the first rotating shaft (103), and the second tank (1) Two first tanks (1), second tanks (2) and third tanks (3) are symmetrically arranged respectively, and the two first tanks (1) are slidably inserted through the insertion slots (102) There is a square tube ladder block (4), and a shock-absorbing installation frame (5) is engaged with the first tank body (1). 2.根据权利要求1所述的一种大跨距梯式电缆桥架,其特征在于:所述第一槽体(1)上等间距分别开设有若干个散热孔(101)和插接槽(102),所述第一槽体(1)的一端一体成型设置有第一挡板(104)。2. A long-span ladder-type cable bridge according to claim 1, characterized in that: said first tank body (1) is provided with several cooling holes (101) and socket slots ( 102), one end of the first tank (1) is integrally formed with a first baffle (104). 3.根据权利要求1所述的一种大跨距梯式电缆桥架,其特征在于:所述第一槽体(1)、第二槽体(2)和第三槽体(3)的两端均设置有第二旋转轴(201),所述第二槽体(2)的一端一体成型设置有第二挡板(202)。3. A long-span ladder-type cable bridge according to claim 1, characterized in that: two of the first tank body (1), the second tank body (2) and the third tank body (3) Both ends are provided with a second rotating shaft (201), and one end of the second tank body (2) is integrally formed with a second baffle plate (202). 4.根据权利要求1所述的一种大跨距梯式电缆桥架,其特征在于:所述第三槽体(3)的一端一体成型设置有第三挡板(301)。4. A long-span ladder-type cable bridge according to claim 1, characterized in that: one end of the third tank (3) is integrally formed with a third baffle (301). 5.根据权利要求1所述的一种大跨距梯式电缆桥架,其特征在于:所述方管梯挡(4)的两端通过插接块(401)滑动插接在插接槽(102)中,所述方管梯挡(4)上开设有连接槽(402)。5. A long-span ladder-type cable tray according to claim 1, characterized in that: both ends of the square tube ladder block (4) are slidably plugged into the socket slot ( In 102), a connection groove (402) is opened on the square tube ladder block (4). 6.根据权利要求1所述的一种大跨距梯式电缆桥架,其特征在于:所述减震安装架(5)由U型挂钩(501)、弹簧减震器(502)、安装块(503)和安装孔(504)组成,所述U型挂钩(501)通过散热孔(101)卡合在第一槽体(1)上,所述U型挂钩(501)上固定连接有弹簧减震器(502),所述弹簧减震器(502)的顶端固定连接在安装块(503)上,所述安装块(503)的顶部开设有安装孔(504)。6. A long-span ladder cable bridge according to claim 1, characterized in that: the shock absorbing mounting frame (5) consists of a U-shaped hook (501), a spring shock absorber (502), a mounting block (503) and the installation hole (504), the U-shaped hook (501) is engaged on the first tank body (1) through the cooling hole (101), and the U-shaped hook (501) is fixedly connected with a spring The shock absorber (502), the top end of the spring shock absorber (502) is fixedly connected to the installation block (503), and the top of the installation block (503) is provided with an installation hole (504).
CN202220629411.7U 2022-03-22 2022-03-22 A large-span ladder cable tray Active CN217692427U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220629411.7U CN217692427U (en) 2022-03-22 2022-03-22 A large-span ladder cable tray

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220629411.7U CN217692427U (en) 2022-03-22 2022-03-22 A large-span ladder cable tray

Publications (1)

Publication Number Publication Date
CN217692427U true CN217692427U (en) 2022-10-28

Family

ID=83731589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220629411.7U Active CN217692427U (en) 2022-03-22 2022-03-22 A large-span ladder cable tray

Country Status (1)

Country Link
CN (1) CN217692427U (en)

Similar Documents

Publication Publication Date Title
CN209130471U (en) A kind of antidetonation suspension and support
CN211714731U (en) Wind-resistant reinforcement device for transmission tower and transmission tower
CN220964700U (en) Flexible photovoltaic bracket device with prestressed double-layer cable structure
CN207183363U (en) A kind of heat-dissipating type lithium battery group
CN115664314A (en) Photovoltaic support and photovoltaic array
CN210838886U (en) A kind of cable support for municipal engineering
CN201724958U (en) Package type solar module exposure rack
CN216598821U (en) A vertical cable tray for convenient cable classification
CN209545490U (en) A kind of vehicle
CN221126814U (en) Combined ladder type cable bridge
CN221221704U (en) Aluminum alloy pipeline bracket
CN220896566U (en) Various steel tile photovoltaic support fixed knot constructs device
CN214825320U (en) A photovoltaic panel transportation protection device
CN207131975U (en) Collapsible antidetonation connector
CN221380815U (en) Flexible photovoltaic bracket
CN223462954U (en) A photovoltaic flexible support external stabilizing structure
CN217871924U (en) Building engineering safety protection net connection structure
CN216428790U (en) Roof steel structure of large-span string beams
CN209398945U (en) A kind of multi-layer piping para-seismic support
CN223680683U (en) Ladder type aluminum alloy bridge
CN220465213U (en) Hail suppression device for motor vehicle
CN223374285U (en) Door and window assembly structure
CN222423550U (en) Photovoltaic module support
CN222393991U (en) Device for judging heating defect of composite insulator
CN223309541U (en) A power pipeline corridor communication device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20250712

Address after: 065799 Hebei Province Langfang City Bazhou City Bazhou Town Old Dyke Village East of the Village

Patentee after: Bazhou odesheng metal products Co.,Ltd.

Country or region after: China

Address before: 212000 No. 3, Yuanbo Avenue, Yangzhong Economic Development Zone, Zhenjiang City, Jiangsu Province

Patentee before: Haiyun Electric Jiangsu Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right