CN217676216U - A connection structure of a lift attached wall frame and a conversion frame - Google Patents

A connection structure of a lift attached wall frame and a conversion frame Download PDF

Info

Publication number
CN217676216U
CN217676216U CN202221510103.9U CN202221510103U CN217676216U CN 217676216 U CN217676216 U CN 217676216U CN 202221510103 U CN202221510103 U CN 202221510103U CN 217676216 U CN217676216 U CN 217676216U
Authority
CN
China
Prior art keywords
frame
wall
installation
conversion
conversion frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221510103.9U
Other languages
Chinese (zh)
Inventor
吴松华
许二猛
邓鸿阳
孙浩
徐蛟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN202221510103.9U priority Critical patent/CN217676216U/en
Application granted granted Critical
Publication of CN217676216U publication Critical patent/CN217676216U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model belongs to the technical field of construction and specifically relates to a lift attaches wall frame and conversion frame's connection structure is related to, and it is connected with connecting device including setting up the connecting device on the conversion frame, attaches the wall frame and keeps away from the one end of guide rail frame, connecting device is including dismantling a plurality of installation section of thick bamboo of fixing on the conversion frame and fixed connection on the installation panel, attaches the one end that the guide rail frame was kept away from to the wall frame and can correspond and peg graft in the installation section of thick bamboo, be provided with joint spare on the installation section of thick bamboo, joint spare can be with the end fixing who attaches the wall frame on the installation section of thick bamboo. This application has the one end that makes to attach the wall frame and keep away from the guide rail frame can be quick fix the effect on the building structure floor.

Description

一种升降机附墙架与转换架的连接结构A connection structure between a wall frame attached to a lift and a conversion frame

技术领域technical field

本申请涉及建筑施工的领域,尤其是涉及一种升降机附墙架与转换架的连接结构。The present application relates to the field of building construction, in particular to a connection structure between a wall frame attached to a lift and a conversion frame.

背景技术Background technique

施工升降机又称施工电梯,是一种采用齿轮、齿条啮合方式或钢丝绳提升方式,使吊笼作垂直或倾斜运动,用以输送施工人员、工具、设备及物料的建筑机械,它较之其它提升机构稳定、安全可靠,不用另设机房或井道,并且具有拆装方便、搬运灵活性强等优点,应用广泛,尤其在减轻施工人员的劳动强度、加快工程进度,提高工作效率中,起到明显的作用。Construction elevator, also known as construction elevator, is a kind of construction machinery that adopts gear, rack meshing or wire rope lifting method to make the cage move vertically or inclined to transport construction personnel, tools, equipment and materials. The lifting mechanism is stable, safe and reliable, no need to set up another machine room or shaft, and has the advantages of convenient disassembly and assembly, strong handling flexibility, etc. It is widely used, especially in reducing the labor intensity of construction personnel, speeding up the project progress, and improving work efficiency. obvious effect.

施工升降机安装时,为保证导轨架的稳定性以及调整导轨架的垂直度,需要在导轨架和建筑物之间设置附墙架连接。由《施工升降机技术手册》可知,第一道附墙结构与第二道附墙结构最大间距为9m,就目前施工建筑物分析,大部分建筑物都能满足施工电梯附墙架安装要求,但部分超高层或者高层建(构)筑物层间高度大于9m,在层间设置附墙架连接无法满足规定的最大附着间距要求;在施工现场,工作人员会在相邻两层间设置转换架来连接附墙架,设置的转换架使两层间的距离减少到9m以内,附墙架的一端与导轨架连接,附墙架的另外一端与转换架连接。When the construction hoist is installed, in order to ensure the stability of the guide rail frame and adjust the verticality of the guide rail frame, it is necessary to set up a wall frame connection between the guide rail frame and the building. According to the "Technical Manual for Construction Lifts", the maximum distance between the first wall-attached structure and the second wall-attached structure is 9m. According to the analysis of the current construction buildings, most buildings can meet the installation requirements of the construction elevator wall-attached frame, but In some super high-rise or high-rise buildings (structures), the height between floors is greater than 9m, and the installation of wall-attached connections between floors cannot meet the specified maximum attachment spacing requirements; at the construction site, the staff will set up conversion frames between two adjacent floors To connect the attached wall frame, the set conversion frame reduces the distance between the two floors to less than 9m. One end of the attached wall frame is connected to the guide rail frame, and the other end of the attached wall frame is connected to the conversion frame.

针对上述中的相关技术,发明人认为存在有下述缺陷:在超高的层间中,附墙架远离导轨架的一端无法与建筑物进行快速且牢固的连接。With regard to the related technologies mentioned above, the inventor believes that there are the following defects: in the super-high storey, the end of the wall-attached frame away from the rail frame cannot be quickly and firmly connected to the building.

实用新型内容Utility model content

为了在超高层间的建筑物上,附墙架与建筑物能够进行快速的固定,本申请提供一种升降机附墙架与转换架的连接结构。In order to quickly fix the wall-attached frame and the building on super-high-rise buildings, the present application provides a connection structure between the wall-attached frame of the elevator and the conversion frame.

本申请提供的一种升降机附墙架与转换架的连接结构,采用如下的技术方案:This application provides a connection structure between the wall frame attached to the lift and the conversion frame, which adopts the following technical scheme:

一种升降机附墙架与转换架的连接结构,包括设置在转换架上的连接装置,附墙架远离导轨架的一端与连接装置连接,所述连接装置包括可拆卸固定在转换架上的安装板以及固定连接在安装板上的若干个安装筒,附墙架远离导轨架的一端能够对应插接在安装筒内,所述安装筒上设置有卡接件,所述卡接件能够将附墙架的端部固定在安装筒上。A connection structure between a wall frame attached to a lift and a conversion frame, comprising a connection device arranged on the conversion frame, the end of the wall frame far away from the guide rail frame is connected to the connection device, and the connection device includes a mounting device detachably fixed on the conversion frame plate and several installation cylinders fixedly connected to the installation plate, the end of the attached wall bracket far away from the guide rail frame can be plugged into the installation cylinder correspondingly, the installation cylinder is provided with clips, and the clips can attach the attached The end of the wall bracket is fixed on the installation cylinder.

通过采用上述技术方案,本申请设置的连接装置能够使附墙架快速的固定在超高层间距的建筑物上,在安装时,工作人员将附墙架的端部对应插接到安装筒上,然后通过设置的卡接件将附墙架固定在安装筒上即可。By adopting the above-mentioned technical scheme, the connecting device provided in the present application can quickly fix the wall-attached frame on buildings with a super-high-rise space. During installation, the staff plugs the ends of the wall-attached frame into the installation tube correspondingly, Then fix the attached wall bracket on the installation tube through the provided clips.

可选的,所述卡接件包括转动连接在安装筒上的若干个卡杆,所述卡杆远离其转动点的一端能够穿过安装筒,并插接在附墙架上。Optionally, the clamping member includes several clamping rods that are rotatably connected to the mounting cylinder, and the ends of the clamping rods away from the rotation point can pass through the mounting cylinder and be plugged into the wall bracket.

通过采用上述技术方案,当附墙架的端部插接到安装筒上后,卡杆的端部能够直接插接到附墙架上,设置的卡杆使安装筒和附墙架的连接固定更加方便快捷,并且两者之间的连接方式不容易出错。By adopting the above technical scheme, when the end of the wall bracket is plugged into the installation tube, the end of the clamping rod can be directly inserted into the wall bracket, and the provided clamping rod secures the connection between the installation tube and the wall bracket. It is more convenient and faster, and the connection method between the two is not easy to make mistakes.

可选的,所述卡杆的转动点处固定有转轴,所述转轴上套设有扭簧,所述扭簧一端与卡杆固定,扭簧另外一端与安装筒固定;所述安装筒外部滑动配合有固定筒,所述固定筒能够使卡杆转动插接在附墙架上。Optionally, a rotating shaft is fixed at the turning point of the clamping rod, and a torsion spring is sleeved on the rotating shaft, one end of the torsion spring is fixed to the clamping rod, and the other end of the torsion spring is fixed to the installation cylinder; the outside of the installation cylinder A fixed cylinder is slidably matched, and the fixed cylinder can make the clamping rod rotatably plugged into the attached wall bracket.

通过采用上述技术方案,当附墙架的端部插接到安装筒上后,通过滑动固定筒,能够将若干根卡杆的一端同时插接到附墙架上,提高了固定附墙架的效率;当附墙架的端部需要从安装筒上拆卸下时,转轴上套设的扭簧,能够在固定筒滑开后,使卡杆的端部自动从附墙架上转动出。By adopting the above technical scheme, after the end of the wall bracket is inserted into the installation tube, by sliding the fixing tube, one end of several clamping rods can be plugged into the wall bracket at the same time, which improves the efficiency of fixing the wall bracket. Efficiency; when the end of the wall bracket needs to be disassembled from the installation tube, the torsion spring sleeved on the rotating shaft can automatically rotate the end of the clamping rod from the wall bracket after the fixed tube slides away.

可选的,所述安装筒内部的安装板上固定连接有弹簧,所述弹簧的另外一端固定连接有压板,所述附墙架的端部能够压紧到压板上。Optionally, a spring is fixedly connected to the installation plate inside the installation cylinder, and the other end of the spring is fixedly connected to a pressure plate, and the end of the wall-attached bracket can be pressed onto the pressure plate.

通过采用上述技术方案,当附墙架的端部插接到安装筒内部后,能够先抵接到压板上,然后压缩弹簧,直至卡杆插接固定在附墙架上,当附墙架要从安装筒上拆卸下时,设置的弹簧和压板能够将弹簧的弹力作用下附墙架上,使附墙架能够更好的从安装筒内部取出。By adopting the above technical scheme, when the end of the wall bracket is inserted into the installation cylinder, it can first abut against the pressure plate, and then compress the spring until the clamping rod is plugged and fixed on the wall bracket. When dismounting from the installation cylinder, the spring and the pressure plate provided can attach the wall bracket under the elastic force of the spring, so that the wall bracket can be better taken out from the inside of the installation cylinder.

可选的,所述安装板远离升降机的背面上固定连接有多根螺杆,多根所述螺杆能够穿过转换架且从转换架的另外一侧穿出,在多根螺杆远离安装板的一端连接有压紧到转换架上的连接板,并且多根螺杆上均螺纹连接有压紧连接板的螺母。Optionally, a plurality of screw rods are fixedly connected to the back of the mounting plate away from the elevator, and a plurality of the screw rods can pass through the conversion frame and pass out from the other side of the conversion frame. A connection plate is connected to be pressed onto the conversion frame, and nuts for pressing the connection plate are threadedly connected to the plurality of screw rods.

通过采用上述技术方案,通过采用螺杆、连接板和螺母对安装板的固定,当螺母未拧紧到螺杆上时,工作人员可以将安装板在转换架上竖直移动,以便适应施工时存在的误差,避免附墙架远离导轨架的一端不能连接到转环架上。By adopting the above-mentioned technical scheme, by adopting screw rods, connecting plates and nuts to fix the mounting plate, when the nuts are not tightened to the screw rods, the staff can vertically move the mounting plate on the conversion frame, so as to adapt to the errors existing during construction , to avoid that the end of the wall-attached frame away from the rail frame cannot be connected to the swivel frame.

可选的,所述安装板上固定连接有与安装板长度方向相同的固定条,所述固定条上滑动设置有与安装筒配合的滑块,安装筒固定连接在滑块上。Optionally, the mounting plate is fixedly connected with a fixing strip having the same length direction as the mounting plate, and a slider that cooperates with the installation cylinder is slidably arranged on the fixing strip, and the installation cylinder is fixedly connected to the slider.

通过采用上述技术方案,滑动设置的两安装筒,能够弥补在施工中存在的误差,避免出现转换架和导轨架安装完成后,在水平方向上出现对不准的问题,最终导致附墙架不能准确的安装到转换架和导轨架之间;固定在滑块上的两安装筒,可以通过滑动两滑块,使两安装筒上能够对应安装不同宽度的附墙架。By adopting the above-mentioned technical scheme, the two installation cylinders installed by sliding can make up for the errors existing in the construction, and avoid the problem of misalignment in the horizontal direction after the installation of the conversion frame and the guide rail frame, which eventually leads to the failure of the attached wall frame. Accurately installed between the conversion frame and the guide rail frame; the two installation cylinders fixed on the sliders can slide the two sliders, so that the two installation cylinders can be installed with different width wall brackets.

可选的,所述滑块上螺纹连接有固定螺栓,所述固定螺栓穿过滑块并抵紧到固定条上。Optionally, a fixing bolt is threadedly connected to the slider, and the fixing bolt passes through the slider and is pressed against the fixing bar.

通过采用上述技术方案,设置的固定螺栓能够对滑动调节后的滑块进行固定,防止在安装附墙架时,滑块的位置发生移动,导致附墙架的端部不能准确插接到安装筒上。By adopting the above technical solution, the set fixing bolts can fix the slider after sliding adjustment, preventing the position of the slider from moving when the wall bracket is installed, resulting in the end of the wall bracket not being accurately inserted into the installation cylinder superior.

综上所述,本申请包括以下至少一种有益技术效果:In summary, the present application includes at least one of the following beneficial technical effects:

1.本申请设置的连接装置能够使附墙架快速的固定在超高层间距的建筑物上,在安装时,工作人员将附墙架的端部对应插接到安装筒上,然后通过设置的卡接件将附墙架固定在安装筒上即可;1. The connection device set up in this application can quickly fix the wall bracket on buildings with super high-rise spacing. During installation, the staff will insert the end of the wall bracket into the installation cylinder, and then pass the set The clamping piece fixes the attached wall bracket on the installation tube;

2.设置的固定筒,能够将若干根卡杆的一端同时插接到附墙架上,提高了固定附墙架的效率;当附墙架的端部需要从安装筒上拆卸下时,转轴上套设的扭簧,能够在固定筒滑开后,使卡杆的端部自动从附墙架上转动出;2. The set fixing tube can insert one end of several clamping rods to the wall bracket at the same time, which improves the efficiency of fixing the wall bracket; when the end of the wall bracket needs to be disassembled from the installation tube, the shaft The torsion spring set on the top can make the end of the clamping rod automatically rotate out of the attached wall bracket after the fixed cylinder slides away;

3.滑动设置的两安装筒,能够弥补在施工中存在的误差,避免出现转换架和导轨架安装完成后,在水平方向上出现对不准的问题,最终导致附墙架不能准确的安装到转换架和导轨架之间,另外滑动设置的两安装筒,能够方便工作人员在安装不同型号的升降机时,通过滑动两安装筒,使安装筒上也能够安装不同大小的附墙加。3. The two installation cylinders set by sliding can make up for the errors existing in the construction, and avoid the problem of misalignment in the horizontal direction after the installation of the conversion frame and the guide rail frame, which eventually leads to the inaccurate installation of the attached wall frame Between the conversion frame and the guide rail frame, there are two installation cylinders slidingly arranged, which can facilitate the staff to install different sizes of wall attachments on the installation cylinder by sliding the two installation cylinders when installing different types of lifts.

附图说明Description of drawings

图1是本申请实施例体现安装板安装位置的示意图;Fig. 1 is a schematic diagram of the embodiment of the present application embodying the installation position of the mounting plate;

图2是本申请实施例体现安装板上螺母的示意图;Fig. 2 is the schematic diagram of the embodiment of the present application embodying the nut on the mounting plate;

图3是本申请实施例体现卡接件的示意图;Fig. 3 is a schematic diagram of an embodiment of the present application embodying a clip;

图4是本申请的整体结构示意图。Fig. 4 is a schematic diagram of the overall structure of the present application.

附图标记说明:1、安装板;11、螺杆;12、连接板;13、螺母;2、固定条;21、滑块;22、固定螺栓;3、安装筒;31、安装孔;4、卡接件;41、卡杆;42、转轴;43、扭簧;44、固定筒;45、弹簧;46、压板。Explanation of reference signs: 1, mounting plate; 11, screw rod; 12, connecting plate; 13, nut; 2, fixing strip; 21, slider; 22, fixing bolt; Clamping piece; 41, clamping rod; 42, rotating shaft; 43, torsion spring; 44, fixed cylinder; 45, spring; 46, pressing plate.

具体实施方式Detailed ways

以下结合附图1-4对本申请作进一步详细说明。The present application will be described in further detail below in conjunction with accompanying drawings 1-4.

参照图1和图4,在上下相邻的两层结构楼板中设置有转换架,转换架为矩形框架结构且转换架垂直安装在下结构楼板上,并且转换架是由若干个升降机标准节组合而成,升降机标准节的数量选择是由上结构楼板和下结构楼板之间的高度来决定的,若干个升降机标准节之间相互连接,上一层的升降机标准节固定连接在下一层升降机标准节的上端,并且相邻两层升降机标准节之间通过长螺栓进行固定;最下层的升降机标准节的下端与下结构楼板之间通过设置的U型抱箍和膨胀螺栓进行固定,U型抱箍和膨胀螺栓均设置有多个,在对升降机标准节进行固定时,工作人员将U型抱箍倒扣安装到升降机标准节上,然后通过膨胀螺栓将U型抱箍固定在下结构楼板上,从而实现对下层升降机标准节与下结构楼板的固定,设置的转换架使上结构楼板和下结构楼板之间的距离减少到小于等于9m的范围内,从而满足相邻两附墙架之间的安装要求;附墙架的一端与导轨架连接,附墙架的另外一端与转换架连接。Referring to Fig. 1 and Fig. 4, a conversion frame is provided in the upper and lower adjacent two-story structural floors, the conversion frame is a rectangular frame structure and the conversion frame is vertically installed on the lower structural floor, and the conversion frame is composed of several elevator standard sections. As a result, the number of elevator standard sections is determined by the height between the upper structural floor and the lower structural floor. Several elevator standard sections are connected to each other, and the elevator standard sections on the upper floor are fixedly connected to the next floor. The upper end of the elevator standard section on two adjacent floors is fixed by long bolts; the lower end of the lowermost elevator standard section and the lower structural floor are fixed by U-shaped hoops and expansion bolts. U-shaped hoops There are multiple expansion bolts and expansion bolts. When fixing the standard section of the elevator, the staff will install the U-shaped hoop upside down on the standard section of the elevator, and then fix the U-shaped hoop on the lower structural floor through the expansion bolts. Realize the fixation of the lower elevator standard section and the lower structural floor, and the set conversion frame reduces the distance between the upper structural floor and the lower structural floor to a range of less than or equal to 9m, so as to meet the installation between two adjacent wall brackets Requirements: One end of the wall bracket is connected to the rail frame, and the other end of the wall bracket is connected to the conversion frame.

本申请实施例公开一种升降机附墙架与转换架的连接结构。参照图1,一种升降机附墙架与转换架的连接结构包括设置在靠近转换架上端且朝向升降机一侧的连接装置,附墙架的端部通过设置的连接装置与转换架连接固定。The embodiment of the present application discloses a connection structure between a wall frame attached to an elevator and a conversion frame. Referring to Fig. 1 , a connection structure between a wall frame attached to an elevator and a conversion frame includes a connection device arranged near the upper end of the conversion frame and facing the side of the elevator, and the end of the wall frame is connected and fixed with the conversion frame through the provided connection device.

参照图1和图2,连接装置包括可拆卸固定连接在转换架上且呈矩形的安装板1,安装板1的长度方向与转换架的宽度方向相同,安装板1远离升降机的背面垂直固定连接有多根螺杆11,多根螺杆11均朝远离安装板1的方向延伸,并且多根螺杆11分别从转换架的中间以及转换架的两侧穿过,相邻的螺杆11能够对称设置在转换架上单侧架的两侧,在相邻两螺杆11远离安装板1的端部设置有连接板12,螺杆11分别穿过连接板12,并且在螺杆11上螺纹连接有螺母13,当连接板12安装到螺杆11上后,将螺母13拧紧到螺杆11上,使螺母13能够压紧到连接板12上,当螺母13未拧紧到螺杆11上时,工作人员可以将安装板1在转换架上竖直移动,以便适应施工时存在的误差,避免附墙架远离导轨架的一端不能连接到转换架上。Referring to Figures 1 and 2, the connection device includes a rectangular mounting plate 1 that is detachably and fixedly connected to the conversion frame. The length direction of the mounting plate 1 is the same as the width direction of the conversion frame. There are a plurality of screw rods 11, and the plurality of screw rods 11 extend away from the mounting plate 1, and the plurality of screw rods 11 pass through the middle of the conversion frame and both sides of the conversion frame respectively, and adjacent screw rods 11 can be symmetrically arranged on the conversion frame. On both sides of the one-sided frame on the frame, connecting plates 12 are provided at the ends of the adjacent two screw rods 11 away from the mounting plate 1, and the screw rods 11 pass through the connecting plate 12 respectively, and nuts 13 are threaded on the screw rods 11. When connecting After the plate 12 is installed on the screw rod 11, the nut 13 is tightened on the screw rod 11, so that the nut 13 can be pressed onto the connecting plate 12. The frame moves vertically so as to adapt to the errors existing during construction and prevent the end of the wall-attached frame away from the guide rail frame from being unable to connect to the conversion frame.

参照图2和图3,在安装板1朝向升降机的表面上固定连接有固定条2,固定条2的长度方向与安装板1的长度方向相同,在固定条2上滑动设置有多个滑块21,本申请实施例中以两个滑块21来举例说明,两滑块21能够沿固定条2的长度方向滑动,在滑块21朝向升降机的表面上垂直固定连接有呈矩形的安装筒3,安装筒3远离安装板1的一端朝升降机的方向延伸,附墙架远离导轨架的一端能够对应插接在两安装筒3中,在两滑块21上均螺纹连接有固定螺栓22,固定螺栓22穿过滑块21并抵紧到固定条2上,滑动设置的两安装筒3,能够弥补在施工中存在的误差,避免出现转换架和导轨架安装完成后,在水平方向上出现对不准的问题,最终导致附墙架不能准确的安装到转换架和导轨架之间。Referring to Fig. 2 and Fig. 3, on the surface of the mounting plate 1 facing the elevator, a fixed bar 2 is fixedly connected, the length direction of the fixed bar 2 is the same as that of the mounting plate 1, and a plurality of sliders are slidably arranged on the fixed bar 2 21. In the embodiment of the present application, two sliders 21 are used as an example. The two sliders 21 can slide along the length direction of the fixing bar 2. On the surface of the slider 21 facing the elevator, a rectangular installation cylinder 3 is vertically fixedly connected. The end of the installation cylinder 3 away from the installation plate 1 extends towards the direction of the elevator, and the end of the wall bracket away from the guide rail frame can be plugged into the two installation cylinders 3 correspondingly, and the fixing bolts 22 are screwed on the two sliders 21 to fix them. The bolt 22 passes through the slide block 21 and is pressed against the fixed bar 2. The two installation cylinders 3 installed by sliding can make up for the error existing in the construction, and avoid the occurrence of the opposite direction in the horizontal direction after the installation of the conversion frame and the guide rail frame is completed. The problem of inaccuracy eventually led to the inability of the wall mount to be accurately installed between the conversion frame and the rail frame.

参照图2和图3,在安装筒3上设置有卡接件4,设置的卡接件4能够将附墙架的端部牢固的固定在安装筒3上,在安装筒3四周的筒壁上均开设有安装孔31,安装孔31的长度方向与安装筒3的长度方向相同,卡接件4包括转动连接在每个安装孔31内的卡杆41,在安装孔31内部且靠近安装板1的一端固定连接有转轴42,转轴42穿过卡杆41的一端且与其转动连接,卡杆41呈L型,并且卡杆41包括横杆和竖杆,转轴42与横杆远离竖杆的一端转动连接,在附墙架位于安装筒3内部的周面上且与竖杆相对应的位置处均开设有插槽,当附墙架的端部插入到安装筒3内部后,竖杆能够插入到插槽中,从而实现将附墙架固定在安装筒3上。Referring to Fig. 2 and Fig. 3, a clip 4 is provided on the installation cylinder 3, and the provided clip 4 can firmly fix the end of the wall bracket on the installation cylinder 3, and the cylinder wall around the installation cylinder 3 Both are provided with mounting holes 31, the length direction of the mounting holes 31 is the same as the length direction of the mounting cylinder 3, the clamping piece 4 includes a clamping rod 41 that is rotatably connected in each mounting hole 31, and is installed inside the mounting hole 31 and close to it. One end of the plate 1 is fixedly connected with a rotating shaft 42, and the rotating shaft 42 passes through one end of the clamping rod 41 and is rotatably connected with it. The clamping rod 41 is L-shaped, and the clamping rod 41 includes a horizontal bar and a vertical rod, and the rotating shaft 42 and the horizontal rod are far away from the vertical rod. One end of the wall bracket is connected by rotation, and there are slots at the positions where the wall bracket is located on the inner circumference of the installation tube 3 and corresponding to the vertical bar. When the end of the wall bracket is inserted into the inside of the installation tube 3, the vertical bar It can be inserted into the slot, so as to realize fixing the wall bracket on the installation tube 3 .

进一步的,在转轴42上套设有扭簧43,扭簧43的一端与卡杆41固定连接,扭簧43另外一端与安装筒3固定连接;在安装筒3的外部滑动套设有固定筒44,在初始状态下,固定筒44位于安装筒3靠近安装板1的一端,当附墙架的端部插接到安装筒3上后,工作人员朝卡杆41的方向滑动固定筒44,当固定筒44滑动并抵接到卡杆41上后,继续滑动固定筒44,在固定筒44的作用下,驱动多个卡杆41转动,使多根卡杆41上的竖杆能够同时插接到插槽中,提高了将附墙架固定在安装筒3上的效率;当附墙架的端部需要从安装筒3上拆下时,使固定筒44朝远离卡杆41的方向滑动,在扭簧43的作用下,卡杆41插接端能够自动从插槽中弹出。Further, a torsion spring 43 is sheathed on the rotating shaft 42, one end of the torsion spring 43 is fixedly connected to the clamp rod 41, and the other end of the torsion spring 43 is fixedly connected to the installation cylinder 3; a fixed cylinder is provided on the outer sliding sleeve of the installation cylinder 3 44. In the initial state, the fixing cylinder 44 is located at the end of the installation cylinder 3 close to the installation plate 1. When the end of the wall bracket is inserted into the installation cylinder 3, the staff slides the fixing cylinder 44 in the direction of the lever 41, After the fixed cylinder 44 slides and abuts on the clamp rod 41, continue to slide the fixed cylinder 44, and under the action of the fixed cylinder 44, a plurality of clamp rods 41 are driven to rotate, so that the vertical rods on the multiple clamp rods 41 can be inserted simultaneously. Connected to the slot, it improves the efficiency of fixing the wall bracket on the installation tube 3; when the end of the wall bracket needs to be removed from the installation tube 3, the fixing tube 44 slides away from the clamping rod 41 , under the action of the torsion spring 43, the insertion end of the clamping rod 41 can be automatically ejected from the slot.

参照图2和图3,在安装筒3内部的安装板1上固定连接有弹簧45,弹簧45的长度方向与安装筒3的长度方向相同,弹簧45远离安装板1的一端固定连接有压板46,压板46能够在安装筒3内部滑动,当附墙架的端部插接到安装筒3内部后,能够先抵接到压板46上,然后压缩弹簧45,直至卡杆41插接固定在附墙架上,当附墙架要从安装筒3上拆卸下时,设置的弹簧45和压板46能够将弹簧45的弹力作用下附墙架上,使附墙架能够更好的从安装筒3内部取出。Referring to Figure 2 and Figure 3, a spring 45 is fixedly connected to the mounting plate 1 inside the mounting cylinder 3, the length direction of the spring 45 is the same as that of the mounting cylinder 3, and the end of the spring 45 away from the mounting plate 1 is fixedly connected to a pressure plate 46 , the pressure plate 46 can slide inside the installation tube 3, when the end of the attached wall bracket is inserted into the inside of the installation tube 3, it can first abut against the pressure plate 46, and then compress the spring 45 until the clamping rod 41 is plugged and fixed in the attachment On the wall frame, when the wall frame is to be disassembled from the installation tube 3, the spring 45 and the pressure plate 46 provided can attach the wall frame under the elastic force of the spring 45, so that the wall frame can be better removed from the installation tube 3. Take it out inside.

本申请实施例一种升降机附墙架与转换架的连接结构的安装方法为:在对升降机的导轨架进行固定时,先将安装板1固定在转换架上,并且将安装板1在竖直方向上的位置进行调整,调整完成后进行固定,然后将安装板1上的两滑块21调整到与附墙架端部对应的位置处并进行固定,接着将附墙架的端部插接在安装筒3上,最后通过卡接件4对附墙架进行固定。In the embodiment of the present application, the installation method of the connection structure between the wall frame attached to the elevator and the conversion frame is as follows: when fixing the guide rail frame of the elevator, the installation plate 1 is first fixed on the conversion frame, and the installation plate 1 is vertically Adjust the position in the direction, fix it after the adjustment is completed, then adjust the two sliders 21 on the installation plate 1 to the position corresponding to the end of the wall bracket and fix it, and then insert the end of the wall bracket On the installation cylinder 3 , the wall bracket is finally fixed by the clamping piece 4 .

以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。The above are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore: all equivalent changes made according to the structure, shape and principle of the present application should be covered within the scope of the present application. Inside.

Claims (7)

1.一种升降机附墙架与转换架的连接结构,其特征在于:包括设置在转换架上的连接装置,附墙架远离导轨架的一端与连接装置连接,所述连接装置包括可拆卸固定在转换架上的安装板(1)以及固定连接在安装板(1)上的若干个安装筒(3),附墙架远离导轨架的一端能够对应插接在安装筒(3)内,所述安装筒(3)上设置有卡接件(4),所述卡接件(4)能够将附墙架的端部固定在安装筒(3)上。1. A connection structure for a lift with a wall frame and a conversion frame, characterized in that: it includes a connection device arranged on the conversion frame, the wall frame is connected to the connection device at an end far away from the guide rail frame, and the connection device includes a detachable fixed The installation plate (1) on the conversion frame and several installation cylinders (3) fixedly connected on the installation plate (1), the end of the wall-attached frame away from the guide rail frame can be inserted into the installation cylinder (3) correspondingly, so A clamping piece (4) is arranged on the installation cylinder (3), and the clamping piece (4) can fix the end of the wall bracket on the installation cylinder (3). 2.根据权利要求1所述的一种升降机附墙架与转换架的连接结构,其特征在于:所述卡接件(4)包括转动连接在安装筒(3)上的若干个卡杆(41),所述卡杆(41)远离其转动点的一端能够穿过安装筒(3),并插接在附墙架上。2. The connection structure between the wall frame attached to the lift and the conversion frame according to claim 1, characterized in that: the clamping piece (4) includes several clamping rods ( 41), the end of the clamping rod (41) away from its rotation point can pass through the installation cylinder (3) and be plugged into the wall bracket. 3.根据权利要求2所述的一种升降机附墙架与转换架的连接结构,其特征在于:所述卡杆(41)的转动点处固定有转轴(42),所述转轴(42)上套设有扭簧(43),所述扭簧(43)一端与卡杆(41)固定,扭簧(43)另外一端与安装筒(3)固定;所述安装筒(3)外部滑动配合有固定筒(44),所述固定筒(44)能够使卡杆(41)转动插接在附墙架上。3. A connection structure between a wall frame for an elevator and a conversion frame according to claim 2, characterized in that: a rotating shaft (42) is fixed at the turning point of the clamping rod (41), and the rotating shaft (42) The upper sleeve is provided with a torsion spring (43), one end of the torsion spring (43) is fixed to the clamping rod (41), and the other end of the torsion spring (43) is fixed to the installation cylinder (3); the installation cylinder (3) slides outside A fixed cylinder (44) is matched, and the fixed cylinder (44) can make the clamping rod (41) rotate and insert on the attached wall bracket. 4.根据权利要求1所述的一种升降机附墙架与转换架的连接结构,其特征在于:所述安装筒(3)内部的安装板(1)上固定连接有弹簧(45),所述弹簧(45)的另外一端固定连接有压板(46),附墙架的端部能够压紧到压板(46)上。4. A connection structure between a wall frame for an elevator and a conversion frame according to claim 1, characterized in that: a spring (45) is fixedly connected to the mounting plate (1) inside the mounting tube (3), so that The other end of the spring (45) is fixedly connected with a pressing plate (46), and the end of the attached wall frame can be compressed onto the pressing plate (46). 5.根据权利要求1所述的一种升降机附墙架与转换架的连接结构,其特征在于:所述安装板(1)远离升降机的背面上固定连接有多根螺杆(11),多根所述螺杆(11)能够穿过转换架且从转换架的另外一侧穿出,在多根螺杆(11)远离安装板(1)的一端连接有压紧到转换架上的连接板(12),并且多根螺杆(11)上均螺纹连接有压紧连接板(12)的螺母(13)。5. A connection structure between a wall frame for an elevator and a conversion frame according to claim 1, characterized in that: the mounting plate (1) is fixedly connected with a plurality of screws (11) on the back side away from the elevator, and a plurality of screws The screw rods (11) can pass through the conversion frame and pass out from the other side of the conversion frame, and one end of the plurality of screw rods (11) away from the mounting plate (1) is connected with a connecting plate (12) that is pressed onto the conversion frame ), and a plurality of screw rods (11) are threadedly connected with nuts (13) that compress the connecting plate (12). 6.根据权利要求1所述的一种升降机附墙架与转换架的连接结构,其特征在于:所述安装板(1)上固定连接有与安装板(1)长度方向相同的固定条(2),所述固定条(2)上滑动设置有与安装筒(3)配合的滑块(21),安装筒(3)固定连接在滑块(21)上。6. A connection structure between a lift attachment wall frame and a conversion frame according to claim 1, characterized in that: the mounting plate (1) is fixedly connected with a fixing strip ( 2), the fixing bar (2) is slidably provided with a slider (21) cooperating with the installation cylinder (3), and the installation cylinder (3) is fixedly connected to the slider (21). 7.根据权利要求6所述的一种升降机附墙架与转换架的连接结构,其特征在于:所述滑块(21)上螺纹连接有固定螺栓(22),所述固定螺栓(22)穿过滑块(21)并抵紧到固定条(2)上。7. A connection structure between a wall frame for an elevator and a conversion frame according to claim 6, characterized in that: said slider (21) is screwed with a fixing bolt (22), and said fixing bolt (22) Pass through the slide block (21) and press against the fixing bar (2).
CN202221510103.9U 2022-06-16 2022-06-16 A connection structure of a lift attached wall frame and a conversion frame Active CN217676216U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221510103.9U CN217676216U (en) 2022-06-16 2022-06-16 A connection structure of a lift attached wall frame and a conversion frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221510103.9U CN217676216U (en) 2022-06-16 2022-06-16 A connection structure of a lift attached wall frame and a conversion frame

Publications (1)

Publication Number Publication Date
CN217676216U true CN217676216U (en) 2022-10-28

Family

ID=83708768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221510103.9U Active CN217676216U (en) 2022-06-16 2022-06-16 A connection structure of a lift attached wall frame and a conversion frame

Country Status (1)

Country Link
CN (1) CN217676216U (en)

Similar Documents

Publication Publication Date Title
CN218623500U (en) Building construction bearing structure
CN217676216U (en) A connection structure of a lift attached wall frame and a conversion frame
WO2022206075A1 (en) Reverse shipbuilding jig frame structure
CN115142663B (en) Construction elevator attachment device and method for super-large spacing
CN113839356A (en) Energy-saving corrosion-resistant steel cable bridge
CN111350337A (en) Bearing frame for building construction
CN116220335A (en) An automatic positioning and fastening device for frame jacking
CN209625981U (en) A dry-type transformer that is easy to move and install
CN211697272U (en) Attached scaffold member pulling force detection platform
CN216212708U (en) Combined transformer rack
CN214091074U (en) Quick positioner of steel construction installation
CN219794391U (en) Assembled steel skeleton light board
CN221594618U (en) Intensity detection equipment of building structure
CN220469113U (en) Support frame of color steel house
CN219653945U (en) A kind of auxiliary equipment for steel beam installation
CN222009561U (en) A lifting scaffolding wall support extension piece connection structure
CN221716744U (en) Steel structure connection point bracket
CN110823680A (en) A tensile testing machine and its control method
CN219655775U (en) A kind of support and hanger for building electromechanical
CN219954503U (en) Fire control pipeline support frame convenient to it is fixed
CN221031652U (en) Temporary support column for building
CN219343954U (en) High-rise building elevator shaft construction platform
CN220226282U (en) Prefabricated assembled building construction auxiliary assembly
CN221119165U (en) Building scaffold reinforcing apparatus
CN220978887U (en) Mounting and positioning structure for building curtain wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant