CN217673849U - High-filling environment-friendly MPP electric power pipe - Google Patents

High-filling environment-friendly MPP electric power pipe Download PDF

Info

Publication number
CN217673849U
CN217673849U CN202221389707.2U CN202221389707U CN217673849U CN 217673849 U CN217673849 U CN 217673849U CN 202221389707 U CN202221389707 U CN 202221389707U CN 217673849 U CN217673849 U CN 217673849U
Authority
CN
China
Prior art keywords
power pipe
erection
erecting
friendly
electric power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221389707.2U
Other languages
Chinese (zh)
Inventor
陈玲华
江万明
高丹
陈洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiashan Guantong Plastic Industry Co ltd
Original Assignee
Jiashan Guantong Plastic Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiashan Guantong Plastic Industry Co ltd filed Critical Jiashan Guantong Plastic Industry Co ltd
Priority to CN202221389707.2U priority Critical patent/CN217673849U/en
Application granted granted Critical
Publication of CN217673849U publication Critical patent/CN217673849U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

The utility model discloses a high-filling environment-friendly MPP electric power pipe, which comprises an electric power pipe fitting, wherein two sides of the electric power pipe fitting are provided with erecting mechanisms; the erecting mechanism comprises erecting bodies and erecting holes, the erecting bodies are respectively arranged at two ends of the electric power pipe fittings, the erecting holes are uniformly distributed on the inner wall of the erecting bodies, the electric power pipe fittings are horizontally placed in two groups of matched erecting holes, a supporting frame is arranged below the erecting bodies, and a bottom plate is arranged on the side edge of the supporting frame; the utility model discloses a be provided with the mechanism of erectting, at construction site, when needing to erect the electric power pipe fitting, only need mutually support two sets of bodies of erectting, place the electric power pipe fitting and set up the assorted that sets up on the body of erectting and erect downthehole portion, support frame and bottom plate support parts such as the body of erectting simultaneously, accomplish the purpose of erectting, when avoiding producing friction with ground, in overcast and rainy weather, guarantee the circulation of air to avoid the material bottom to milden and rot impaired problem production.

Description

一种高填充环保MPP电力管A high-filling environment-friendly MPP power pipe

技术领域technical field

本实用新型涉及电力技术领域,具体为一种高填充环保MPP电力管。The utility model relates to the technical field of electric power, in particular to a high-filling environment-friendly MPP electric power pipe.

背景技术Background technique

一种高填充环保MPP电力管为高填充式的环保型MPP电力管,MPP电力管是以改性聚丙烯为主要原材料,具有穿放电缆容易、施工简便等一系列优点,同时也符合现代城市的发展要求,目前传统的高填充环保MPP电力管,往往在施工场所,一般是将其直接堆放至地面,不能对其进行架设,容易与地面产生摩擦的同时,在阴雨天气,堆叠较为紧密会影响到空气的流通,从而存在材料底部霉变受损的问题产生。A high-filling environment-friendly MPP power pipe is a high-filling environment-friendly MPP power pipe. The MPP power pipe is made of modified polypropylene as the main raw material. The development requirements of the current traditional high-filling and environmentally friendly MPP power pipes are often stacked directly on the ground in the construction site, and they cannot be erected. They are prone to friction with the ground, and in rainy weather, the stacking is relatively tight. It affects the circulation of air, so there is a problem of mildew and damage at the bottom of the material.

实用新型内容Utility model content

本实用新型的目的在于提供易于架设的一种高填充环保MPP电力管,以解决上述背景技术中提出的问题。The purpose of this utility model is to provide a kind of highly filled and environment-friendly MPP electric power pipe which is easy to erect, so as to solve the problems raised in the above-mentioned background technology.

为实现上述目的,本实用新型提供如下技术方案:一种高填充环保MPP电力管,包括电力管件,所述电力管件两侧设置有架设机构;所述架设机构包括架设体和架设孔,所述架设体分别设置于电力管件两端,所述架设孔均匀分布开设于架设体内壁,且电力管件水平置放在两组相匹配的架设孔内部,所述架设体下方设置有支撑架,且支撑架侧边安装有底板,所述支撑架外部套设有调节套筒,且调节套筒固接于相匹配的架设体底端,所述支撑架内部开设有内槽,且内槽内壁通过轴承活动安装有螺纹转杆,所述螺纹转杆底端贯穿于支撑架安装有手柄,所述螺纹转杆上通过螺纹连接有套块,所述套块两侧皆贯穿于支撑架安装有连接板,且连接板背离套块的一端固接在调节套筒内壁,所述架设体与电力管件之间设置有定位机构,完成架设的目的,避免与地面产生摩擦的同时,在阴雨天气,保证空气的流通,从而避免材料底部霉变受损的问题产生。In order to achieve the above purpose, the utility model provides the following technical solutions: a highly filled and environmentally friendly MPP power pipe, including power pipe fittings, and erection mechanisms are arranged on both sides of the power pipe fittings; the erection mechanism includes erection bodies and erection holes, and the The erection bodies are respectively arranged at both ends of the electric pipe fittings, the erection holes are evenly distributed on the inner wall of the erection body, and the electric power pipe fittings are horizontally placed inside two sets of matching erection holes, a support frame is arranged under the erection bodies, and supports A bottom plate is installed on the side of the frame, and an adjustment sleeve is set on the outside of the support frame, and the adjustment sleeve is fixedly connected to the bottom end of the matching erection body. An inner groove is opened inside the support frame, and the inner wall of the inner groove passes through the bearing A threaded rotating rod is installed movable, the bottom end of the threaded rotating rod penetrates through the support frame and a handle is installed, and the threaded rotating rod is connected with a set block through threads, and both sides of the set block run through the support frame to install a connecting plate , and the end of the connecting plate facing away from the sleeve block is fixed on the inner wall of the adjusting sleeve, and a positioning mechanism is arranged between the erecting body and the power pipe fitting to complete the purpose of erecting, avoid friction with the ground, and ensure air in rainy weather. circulation, so as to avoid the problem of mildew and damage at the bottom of the material.

优选的,所述连接板底端固接有定位块,且定位块的另一端插设在支撑架上设置相匹配的槽内,可提高连接处的稳固性。Preferably, a positioning block is fixedly connected to the bottom end of the connecting plate, and the other end of the positioning block is inserted into a matching groove provided on the support frame, which can improve the stability of the connection.

优选的,所述手柄外表面胶粘有防滑层,且防滑层的材质为橡胶材质设计,避免手部易产生打滑的现象。Preferably, the outer surface of the handle is glued with an anti-slip layer, and the material of the anti-slip layer is designed with rubber material, so as to prevent the hand from slipping easily.

优选的,所述架设孔内壁胶粘有防护垫,且防护垫与电力管件两端处于相贴合的状态,可对置放中的电力管件进行防护。Preferably, a protective pad is glued to the inner wall of the erection hole, and the protective pad is in a state of adhering to both ends of the electric pipe fitting, so as to protect the electric pipe fitting being placed.

优选的,所述底板顶端固接有滑杆,且滑杆的另一端固接在相匹配的架设体底端,所述滑杆上滑动连接有稳定块,且稳定块的另一端安装于调节套筒侧壁,确保调节套筒移动过程中的稳定性。Preferably, a slide bar is fixedly connected to the top of the bottom plate, and the other end of the slide bar is fixedly connected to the bottom end of the matching erection body, a stabilizing block is slidably connected to the sliding bar, and the other end of the stabilizing block is installed on the adjusting Socket side walls to ensure stability during movement of the adjusting socket.

优选的,所述定位机构包括定位杆,所述定位杆安装于电力管件表面两侧,所述架设体内部开设有活动口,且活动口内部活动安装有活动块,所述活动口与活动块之间设置有压缩弹簧,所述活动块上表面贯穿于架设体安装有顶板,且顶板上表面安装有推把,所述顶板的一端安装有侧板,且侧板内侧安装有限位杆,所述定位杆内部水平开设有定位孔,且限位杆插设于相匹配的定位孔内部,所述架设体顶端安装有堆放板,对两头所设置的定位杆处进行限位处理,此时可确保电力管件在置放过程中的稳定性。Preferably, the positioning mechanism includes a positioning rod, and the positioning rod is installed on both sides of the surface of the electric power pipe. A movable port is opened inside the erecting body, and a movable block is installed in the movable port, and the movable port and the movable block Compression springs are arranged between them, the upper surface of the movable block penetrates through the erection body and a top plate is installed, and a push handle is installed on the top surface of the top plate, a side plate is installed on one end of the top plate, and a limit rod is installed on the inside of the side plate. A positioning hole is horizontally opened inside the positioning rod, and the positioning rod is inserted into the matching positioning hole. Ensure the stability of power pipe fittings during placement.

优选的,所述顶板底端通过轴承活动安装有滚珠,且滚珠的另一端与架设体上表面处于相互贴合的状态,提高顶板在移动过程中的顺畅性。Preferably, the bottom end of the top plate is movably installed with balls through bearings, and the other end of the balls is in a state of mutual adhering to the upper surface of the erecting body, which improves the smoothness of the top plate during movement.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the present utility model are:

1.本实用新型通过设置有架设机构,在施工场所,需将电力管件架设时,只需相互配合两组架设体,将电力管件置放于架设体上所设置相匹配的架设孔内部,同时支撑架以及底板对架设体等部件进行支撑,完成架设的目的,避免与地面产生摩擦的同时,在阴雨天气,保证空气的流通,从而避免材料底部霉变受损的问题产生。1. The utility model is equipped with an erection mechanism. When the power pipe fittings need to be erected in the construction site, only two sets of erection bodies need to be matched with each other, and the power pipe fittings are placed inside the matching erection holes set on the erection bodies. At the same time The support frame and the bottom plate support the erection body and other components to complete the purpose of erection, avoid friction with the ground, and ensure air circulation in rainy weather, thereby avoiding the problem of mildew and damage at the bottom of the material.

2.本实用新型通过设置有定位机构,在需对电力管件架设过程进行定位时,只需将限位杆插设至相匹配的定位孔内部,对该两头所设置的定位杆处进行限位处理,此时可确保电力管件在置放过程中的稳定性,通过架设体上所设置的堆放板,堆放板上表面较为平整,此时可进一步进行堆叠操作,提高使用效果。2. The utility model is equipped with a positioning mechanism. When the power pipe fittings need to be positioned during the erection process, the positioning rod only needs to be inserted into the matching positioning hole, and the positioning rods set at the two ends are limited. At this time, the stability of the power pipe fittings in the placement process can be ensured. The stacking plate is relatively flat through the stacking plate provided on the erecting body. At this time, further stacking operations can be performed to improve the use effect.

附图说明Description of drawings

图1为本实用新型的立体结构示意图;Fig. 1 is the three-dimensional structure schematic diagram of the present utility model;

图2为本实用新型的正视剖面结构示意图;Fig. 2 is the front view sectional structure schematic diagram of the utility model;

图3为本实用新型架设体处的侧视剖面局部结构示意图;Fig. 3 is a side view section partial structural schematic diagram of the erection body of the utility model;

图4为本实用新型图2中A处的放大结构示意图;Fig. 4 is the enlarged schematic diagram of the structure at A in Fig. 2 of the present utility model;

图5为本实用新型图2中B处的放大结构示意图;Fig. 5 is the enlarged schematic diagram of the structure at B in Fig. 2 of the present invention;

图6为本实用新型图2中C处的放大结构示意图。FIG. 6 is a schematic diagram of an enlarged structure at point C in FIG. 2 of the present invention.

图中:1、电力管件;2、架设体;201、架设孔;202、防护垫;3、支撑架;301、底板;302、内槽;303、螺纹转杆;304、手柄;305、防滑层;306、套块;307、连接板;308、定位块;309、调节套筒;310、滑杆;311、稳定块;4、定位杆;401、活动口;402、活动块;403、压缩弹簧;404、顶板;405、滚珠;406、推把;407、侧板;408、限位杆;409、定位孔;410、堆放板。In the figure: 1, power pipe fittings; 2, erecting body; 201, erecting hole; 202, protective pad; 3, support frame; 301, bottom plate; 302, inner groove; 303, threaded rotating rod; 304, handle; Layer; 306, cover block; 307, connecting plate; 308, positioning block; 309, adjusting sleeve; 310, slide bar; 311, stabilizing block; 4, positioning bar; 401, movable mouth; 402, movable block; 403, Compression spring; 404, top plate; 405, ball; 406, push handle; 407, side plate; 408, limit rod; 409, positioning hole; 410, stacking plate.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

实施例1Example 1

请参阅图1、图2、图3、图4和图5,图示中的一种高填充环保MPP电力管,包括电力管件1,电力管件1两侧设置有架设机构;架设机构包括架设体2和架设孔201,架设体2分别设置于电力管件1两端,架设孔201均匀分布开设于架设体2内壁,且电力管件1水平置放在两组相匹配的架设孔201内部,架设体2下方设置有支撑架3,且支撑架3侧边安装有底板301,支撑架3外部套设有调节套筒309,且调节套筒309固接于相匹配的架设体2底端,支撑架3内部开设有内槽302,且内槽302内壁通过轴承活动安装有螺纹转杆303,螺纹转杆303底端贯穿于支撑架3安装有手柄304,螺纹转杆303上通过螺纹连接有套块306,套块306两侧皆贯穿于支撑架3安装有连接板307,且连接板307背离套块306的一端固接在调节套筒309内壁,架设体2与电力管件1之间设置有定位机构,完成架设的目的,避免与地面产生摩擦的同时,在阴雨天气,保证空气的流通,从而避免材料底部霉变受损的问题产生。Please refer to Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5, a kind of highly filled and environmentally friendly MPP power pipe in the illustration, including a power pipe fitting 1, and erection mechanisms are arranged on both sides of the power pipe fitting 1; the erection mechanism includes the erection body 2 and erection holes 201, the erection body 2 is respectively arranged at both ends of the power pipe fitting 1, the erection holes 201 are evenly distributed on the inner wall of the erection body 2, and the power pipe fitting 1 is horizontally placed inside two sets of matching erection holes 201, the erection body 2 is provided with a support frame 3, and a bottom plate 301 is installed on the side of the support frame 3, and an adjustment sleeve 309 is set on the outside of the support frame 3, and the adjustment sleeve 309 is fixedly connected to the bottom end of the matching erection body 2, and the support frame 3 There is an inner groove 302 inside, and the inner wall of the inner groove 302 is equipped with a threaded rotating rod 303 through the bearing movement, and the bottom end of the threaded rotating rod 303 runs through the support frame 3, and a handle 304 is installed, and the threaded rotating rod 303 is connected with a sleeve through threads 306, both sides of the cover block 306 run through the support frame 3 and a connecting plate 307 is installed, and the end of the connecting plate 307 away from the cover block 306 is fixed on the inner wall of the adjusting sleeve 309, and a positioning The mechanism completes the purpose of erection, avoids friction with the ground, and at the same time ensures the circulation of air in rainy weather, thereby avoiding the problem of mildew and damage at the bottom of the material.

其中,连接板307底端固接有定位块308,且定位块308的另一端插设在支撑架3上设置相匹配的槽内,当连接板307处于静止状态时,定位块308插设在支撑架3槽内,可提高连接处的稳固性。Wherein, the bottom end of the connecting plate 307 is affixed with a positioning block 308, and the other end of the positioning block 308 is inserted in a matching groove provided on the support frame 3. When the connecting plate 307 is in a static state, the positioning block 308 is inserted in the The support frame 3 slots can improve the stability of the connection.

其中,手柄304外表面胶粘有防滑层305,且防滑层305的材质为橡胶材质设计,转动手柄304时,手部与防滑层305相接触,其中防滑层305为橡胶设计,可增加摩擦力的同时,避免手部易产生打滑的现象。Wherein, the outer surface of the handle 304 is glued with an anti-slip layer 305, and the material of the anti-slip layer 305 is a rubber material design. When the handle 304 is turned, the hand is in contact with the anti-slip layer 305, wherein the anti-slip layer 305 is designed for rubber, which can increase friction At the same time, avoid the phenomenon that the hands are prone to slipping.

其中,架设孔201内壁胶粘有防护垫202,且防护垫202与电力管件1两端处于相贴合的状态,在电力管件1置放于架设孔201内部时,其中防护垫202为海绵材质,可对置放中的电力管件1进行防护。Among them, the inner wall of the erection hole 201 is glued with a protective pad 202, and the two ends of the protective pad 202 and the power pipe 1 are in a state of being attached to each other. When the power pipe 1 is placed inside the erection hole 201, the protective pad 202 is made of sponge material. , it can protect the power pipe fitting 1 being placed.

另外,底板301顶端固接有滑杆310,且滑杆310的另一端固接在相匹配的架设体2底端,滑杆310上滑动连接有稳定块311,且稳定块311的另一端安装于调节套筒309侧壁,由于稳定块311滑动连接在滑杆310上,其中稳定块311与调节套筒309为一体式结构设计,在调节套筒309移动的过程中,带动稳定块311在滑杆310上同向滑动,以确保该调节套筒309移动过程中的稳定性。In addition, a slide bar 310 is fixedly connected to the top of the bottom plate 301, and the other end of the slide bar 310 is fixedly connected to the bottom end of the matching erection body 2. On the side wall of the adjusting sleeve 309, since the stabilizing block 311 is slidably connected to the sliding rod 310, wherein the stabilizing block 311 and the adjusting sleeve 309 are designed as an integrated structure, during the movement of the adjusting sleeve 309, the stabilizing block 311 is driven The sliding rod 310 slides in the same direction to ensure the stability of the adjustment sleeve 309 during movement.

本实施方案中,在施工场所,需将电力管件1架设时,只需相互配合两组架设体2,将电力管件1置放于架设体2上所设置相匹配的架设孔201内部,同时支撑架3以及底板301对架设体2等部件进行支撑,完成架设的目的,避免与地面产生摩擦的同时,在阴雨天气,保证空气的流通,从而避免材料底部霉变受损的问题产生,在需对架设体2整体高度进行调节时,在未架设前,转动手柄304,由于螺纹转杆303通过轴承活动安装于内槽302内壁,在力的带动下,使得手柄304转动的过程中,带动螺纹转杆303同时进行转动,由于套块306螺纹连接在螺纹转杆303上,在螺纹转杆303转动的过程中,使得套块306上下移动,在其向上移动时,带动连接板307一同进行移动,此时调节套筒309随之进行移动,由于调节套筒309与架设体2为一体式结构设计,可在调节套筒309移动的过程中,对其架设高度进行调整,确保装置整体的使用效果。In this embodiment, when the power pipe fitting 1 needs to be erected at the construction site, it is only necessary to cooperate with two sets of erection bodies 2, and place the power pipe fitting 1 inside the matching erection hole 201 set on the erection body 2, and simultaneously support the The frame 3 and the bottom plate 301 support the erection body 2 and other components to complete the purpose of erection, avoid friction with the ground, and ensure the circulation of air in rainy weather, thereby avoiding the problem of mildew and damage at the bottom of the material. When adjusting the overall height of the erecting body 2, before erecting, turn the handle 304. Since the threaded rotating rod 303 is installed on the inner wall of the inner groove 302 through the bearing, under the drive of the force, the handle 304 will be rotated to drive the screw thread. The rotating rod 303 rotates at the same time. Since the sleeve block 306 is threadedly connected to the threaded rotating rod 303, the sleeve block 306 moves up and down during the rotation of the threaded rotating rod 303. When it moves upward, it drives the connecting plate 307 to move together. At this time, the adjustment sleeve 309 moves accordingly. Since the adjustment sleeve 309 is integrated with the erection body 2, the erection height of the adjustment sleeve 309 can be adjusted during the movement of the adjustment sleeve 309 to ensure the overall use of the device. Effect.

实施例2Example 2

请参阅图1、图2和图6,本实施方式对于实施例1进一步说明,图示中定位机构包括定位杆4,定位杆4安装于电力管件1表面两侧,架设体2内部开设有活动口401,且活动口401内部活动安装有活动块402,活动口401与活动块402之间设置有压缩弹簧403,活动块402上表面贯穿于架设体2安装有顶板404,且顶板404上表面安装有推把406,顶板404的一端安装有侧板407,且侧板407内侧安装有限位杆408,定位杆4内部水平开设有定位孔409,且限位杆408插设于相匹配的定位孔409内部,架设体2顶端安装有堆放板410,对两头所设置的定位杆4处进行限位处理,此时可确保电力管件1在置放过程中的稳定性。Please refer to Fig. 1, Fig. 2 and Fig. 6. This embodiment further explains Embodiment 1. The positioning mechanism in the figure includes a positioning rod 4, which is installed on both sides of the surface of the power pipe 1, and there are movable parts inside the erecting body 2. mouth 401, and a movable block 402 is installed inside the movable mouth 401, and a compression spring 403 is arranged between the movable mouth 401 and the movable block 402. A push handle 406 is installed, a side plate 407 is installed on one end of the top plate 404, and a limit rod 408 is installed on the inside of the side plate 407, and a positioning hole 409 is horizontally opened in the inside of the positioning rod 4, and the limit rod 408 is inserted in a matching positioning position. Inside the hole 409, a stacking plate 410 is installed on the top of the erecting body 2, and the positioning rods 4 provided at both ends are limited, so as to ensure the stability of the electric pipe fitting 1 during placement.

另外,顶板404底端通过轴承活动安装有滚珠405,且滚珠405的另一端与架设体2上表面处于相互贴合的状态,由于滚珠405通过轴承活动安装,在顶板404移动的过程中,使其随着该移动的方向进行滚动,以确保顶板404在移动过程中的顺畅性。In addition, the bottom end of the top plate 404 is movably installed with a ball 405 through the bearing, and the other end of the ball 405 is in a state of mutual fit with the upper surface of the erection body 2. Since the ball 405 is movably mounted through the bearing, during the movement of the top plate 404, the It rolls along with the moving direction to ensure the smoothness of the top plate 404 during the moving process.

本实施方案中,在需对电力管件1解除其定位时,只需向靠近电力管件1端移动推把406,带动推把406进行移动的同时,使得顶板404同时进行移动,此时活动块402在活动口401内部进行移动,对压缩弹簧403挤压,从而将限位杆408抽离处定位孔409内部的插设,将一侧所设置的限位杆408移除后,电力管件1即可处于可活动的状态,在需对电力管件1架设过程进行定位时,只需将限位杆408插设至相匹配的定位孔409内部,对该两头所设置的定位杆4处进行限位处理,此时可确保电力管件1在置放过程中的稳定性,通过架设体2上所设置的堆放板410,堆放板410上表面较为平整,此时可进一步进行堆叠操作,提高使用效果。In this embodiment, when it is necessary to release the positioning of the power pipe 1, it is only necessary to move the push handle 406 close to the end of the power pipe 1, and drive the push handle 406 to move at the same time, so that the top plate 404 moves simultaneously. At this time, the movable block 402 Move inside the movable port 401, squeeze the compression spring 403, and insert the limit rod 408 away from the inside of the positioning hole 409. After removing the limit rod 408 set on one side, the power pipe 1 is ready. It can be in a movable state. When it is necessary to position the power pipe fitting 1 during the erection process, it is only necessary to insert the limit rod 408 into the matching positioning hole 409 to limit the position of the 4 positioning rods set at both ends. At this time, the stability of the power pipe fitting 1 during placement can be ensured. The upper surface of the stacking plate 410 is relatively flat through the stacking plate 410 provided on the erecting body 2. At this time, further stacking operations can be performed to improve the use effect.

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that, in this document, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any relationship between these entities or operations. any such actual relationship or sequence exists. Moreover, the terms "comprising", "comprising" or any other variation thereof are intended to encompass a non-exclusive inclusion such that a process, method, article or device that includes a list of elements includes not only those elements, but also includes not explicitly listed or other elements inherent to such a process, method, article or apparatus.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention , alternatives and modifications, the scope of the present invention is defined by the appended claims and their equivalents.

Claims (7)

1.一种高填充环保MPP电力管,包括电力管件(1),其特征在于:所述电力管件(1)两侧设置有架设机构;1. A high-fill environment-friendly MPP power pipe, comprising a power pipe fitting (1), is characterized in that: both sides of the power pipe fitting (1) are provided with an erection mechanism; 所述架设机构包括架设体(2)和架设孔(201),所述架设体(2)分别设置于电力管件(1)两端,所述架设孔(201)均匀分布开设于架设体(2)内壁,且电力管件(1)水平置放在两组相匹配的架设孔(201)内部,所述架设体(2)下方设置有支撑架(3),且支撑架(3)侧边安装有底板(301),所述支撑架(3)外部套设有调节套筒(309),且调节套筒(309)固接于相匹配的架设体(2)底端,所述支撑架(3)内部开设有内槽(302),且内槽(302)内壁通过轴承活动安装有螺纹转杆(303),所述螺纹转杆(303)底端贯穿于支撑架(3)安装有手柄(304),所述螺纹转杆(303)上通过螺纹连接有套块(306),所述套块(306)两侧皆贯穿于支撑架(3)安装有连接板(307),且连接板(307)背离套块(306)的一端固接在调节套筒(309)内壁,所述架设体(2)与电力管件(1)之间设置有定位机构。The erection mechanism includes an erection body (2) and an erection hole (201), the erection body (2) is respectively arranged at both ends of the power pipe (1), and the erection holes (201) are evenly distributed on the erection body (2 ) inner wall, and the power pipe fittings (1) are placed horizontally inside two sets of matching erection holes (201), and a support frame (3) is arranged under the erection body (2), and the side of the support frame (3) is installed There is a bottom plate (301), the outside of the support frame (3) is provided with an adjustment sleeve (309), and the adjustment sleeve (309) is fixedly connected to the bottom end of the matching erection body (2), and the support frame ( 3) There is an inner groove (302) inside, and the inner wall of the inner groove (302) is equipped with a threaded rotating rod (303) through bearings, and the bottom end of the threaded rotating rod (303) runs through the support frame (3) and is equipped with a handle (304), the threaded rotating rod (303) is threadedly connected with a cover block (306), both sides of the cover block (306) are installed with a connecting plate (307) through the support frame (3), and connected The end of the plate (307) facing away from the sleeve block (306) is fixedly connected to the inner wall of the adjustment sleeve (309), and a positioning mechanism is provided between the erecting body (2) and the power pipe (1). 2.根据权利要求1所述的一种高填充环保MPP电力管,其特征在于:所述连接板(307)底端固接有定位块(308),且定位块(308)的另一端插设在支撑架(3)上设置相匹配的槽内。2. A high-filling environment-friendly MPP power pipe according to claim 1, characterized in that: a positioning block (308) is fixedly connected to the bottom end of the connecting plate (307), and the other end of the positioning block (308) is plugged into Set in the matching groove on the support frame (3). 3.根据权利要求2所述的一种高填充环保MPP电力管,其特征在于:所述手柄(304)外表面胶粘有防滑层(305),且防滑层(305)的材质为橡胶材质设计。3. A high-filling environment-friendly MPP power pipe according to claim 2, characterized in that: the outer surface of the handle (304) is glued with a non-slip layer (305), and the material of the anti-slip layer (305) is rubber design. 4.根据权利要求3所述的一种高填充环保MPP电力管,其特征在于:所述架设孔(201)内壁胶粘有防护垫(202),且防护垫(202)与电力管件(1)两端处于相贴合的状态。4. A high-filling environment-friendly MPP power pipe according to claim 3, characterized in that: the inner wall of the erection hole (201) is glued with a protective pad (202), and the protective pad (202) is connected to the power pipe fitting (1 ) both ends are in a state of fit. 5.根据权利要求4所述的一种高填充环保MPP电力管,其特征在于:所述底板(301)顶端固接有滑杆(310),且滑杆(310)的另一端固接在相匹配的架设体(2)底端,所述滑杆(310)上滑动连接有稳定块(311),且稳定块(311)的另一端安装于调节套筒(309)侧壁。5. A high-filling environment-friendly MPP power pipe according to claim 4, characterized in that: a sliding rod (310) is fixedly connected to the top of the bottom plate (301), and the other end of the sliding rod (310) is fixedly connected to The bottom end of the matching erection body (2) is slidably connected with a stabilizing block (311) on the slide bar (310), and the other end of the stabilizing block (311) is installed on the side wall of the adjusting sleeve (309). 6.根据权利要求5所述的一种高填充环保MPP电力管,其特征在于:所述定位机构包括定位杆(4),所述定位杆(4)安装于电力管件(1)表面两侧,所述架设体(2)内部开设有活动口(401),且活动口(401)内部活动安装有活动块(402),所述活动口(401)与活动块(402)之间设置有压缩弹簧(403),所述活动块(402)上表面贯穿于架设体(2)安装有顶板(404),且顶板(404)上表面安装有推把(406),所述顶板(404)的一端安装有侧板(407),且侧板(407)内侧安装有限位杆(408),所述定位杆(4)内部水平开设有定位孔(409),且限位杆(408)插设于相匹配的定位孔(409)内部,所述架设体(2)顶端安装有堆放板(410)。6. A high-fill environment-friendly MPP power pipe according to claim 5, characterized in that: the positioning mechanism includes a positioning rod (4), and the positioning rod (4) is installed on both sides of the surface of the power pipe (1) , the erection body (2) is provided with a movable opening (401), and a movable block (402) is movably installed inside the movable opening (401), and a movable opening (401) and the movable block (402) are provided with A compression spring (403), the upper surface of the movable block (402) penetrates through the erecting body (2) and a top plate (404) is installed, and a push handle (406) is installed on the upper surface of the top plate (404), and the top plate (404) A side plate (407) is installed at one end of the side plate (407), and a limit rod (408) is installed on the inside of the side plate (407). Located inside the matching positioning hole (409), a stacking plate (410) is installed on the top of the erecting body (2). 7.根据权利要求6所述的一种高填充环保MPP电力管,其特征在于:所述顶板(404)底端通过轴承活动安装有滚珠(405),且滚珠(405)的另一端与架设体(2)上表面处于相互贴合的状态。7. A high-filling environment-friendly MPP power pipe according to claim 6, characterized in that: the bottom end of the top plate (404) is movably mounted with balls (405) through bearings, and the other end of the balls (405) is connected to the erection The upper surfaces of the body (2) are in a state of being attached to each other.
CN202221389707.2U 2022-06-06 2022-06-06 High-filling environment-friendly MPP electric power pipe Expired - Fee Related CN217673849U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221389707.2U CN217673849U (en) 2022-06-06 2022-06-06 High-filling environment-friendly MPP electric power pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221389707.2U CN217673849U (en) 2022-06-06 2022-06-06 High-filling environment-friendly MPP electric power pipe

Publications (1)

Publication Number Publication Date
CN217673849U true CN217673849U (en) 2022-10-28

Family

ID=83704747

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221389707.2U Expired - Fee Related CN217673849U (en) 2022-06-06 2022-06-06 High-filling environment-friendly MPP electric power pipe

Country Status (1)

Country Link
CN (1) CN217673849U (en)

Similar Documents

Publication Publication Date Title
CN211117990U (en) Concrete pipe placement device for water conservancy project construction
CN217673849U (en) High-filling environment-friendly MPP electric power pipe
CN211764056U (en) Base plate laminating device of wallboard production line
CN216345593U (en) Ambient light analogue means for indoor decoration
CN116281180A (en) An adjustable self-adaptive positioning adsorption tooling
CN216380113U (en) Partition wall with various deformation structures
CN206717465U (en) A kind of tubular object extruding positioner
CN220848134U (en) A new earthquake-resistant structure for construction projects
CN208763451U (en) A mechanical device for building support
CN207656380U (en) A kind of novel aluminium plate surface scratches grinding device
CN211052605U (en) A drilling device for processing three-dimensional garage accessories
CN217079760U (en) Assembled building supporting seat
CN211237291U (en) A kind of art painting display board
CN203922717U (en) A kind of single actuating sleeve is by machine
CN219261856U (en) Support base for assembled building construction
CN210736130U (en) A device for electrical maintenance
CN119491585B (en) Wood floor splicing connection joint calibration tool
CN211000038U (en) Automatic positioning device for accessories of cosmetic box
CN221704766U (en) Pipeline bracket with damping function
CN219838879U (en) Glass attachment device convenient to assemble
CN114313456A (en) A kind of automatic packaging equipment for oral equipment paper-plastic bag
CN217370215U (en) Pin bending device for diode manufacturing
CN206552680U (en) A kind of tobacco conveying device be easy to adjust and repaired
CN218178299U (en) A platform for installation, commissioning, maintenance and repair of electromechanical equipment
CN217268932U (en) Push plate for construction engineering convenient for leveling concrete

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221028

CF01 Termination of patent right due to non-payment of annual fee