Prior art keywords
wall
building
stone
main body
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221261399.5U
Other languages
Chinese (zh)
Inventor
龙方琴
唐满腹
黄耀辉
苏壮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Fanteng Technology Co ltd
Original Assignee
Shenzhen Fanteng Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Fanteng Technology Co ltd filed Critical Shenzhen Fanteng Technology Co ltd
Priority to CN202221261399.5U priority Critical patent/CN217652079U/en
Application granted granted Critical
Publication of CN217652079U publication Critical patent/CN217652079U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

本实用新型公开了一种稳定性高的建筑石材反吊式干挂结构,包括橡胶减震垫、柔性垫和建筑主体,所述建筑主体的一侧活动安装有外墙石材,所述外墙石材与建筑主体之间活动安装有安装组件。本实用新型通过在外墙石材与建筑主体之间活动安装有安装组件,当需要进行对外墙石材进行安装时,通过将外墙石材放置于建筑主体的正前方,且使得卡块对准卡槽,接着推动外墙石材使得外墙石材向靠近建筑主体的方向移动,直至卡块完全插入卡槽内,接着通过转动螺纹套筒,螺纹套筒旋转带动两组螺纹杆沿相互远离的方向移动,直至完全插入固定槽内,从而完成对外墙石材的安装,接着通过将弹性限位夹套接在螺纹套筒的表面,将固定螺杆旋入螺孔。

Figure 202221261399

The utility model discloses a high-stability reverse-hanging dry-hanging structure for building stone materials, which comprises a rubber shock-absorbing pad, a flexible pad and a building main body. An outer wall stone material is movably installed on one side of the building main body. Installation components are movably installed between the stone and the main body of the building. In the utility model, an installation component is movably installed between the outer wall stone and the building main body. When the outer wall stone is required to be installed, the outer wall stone is placed directly in front of the building main body, and the clamping blocks are aligned with the clamping grooves. Then push the outer wall stone to move the outer wall stone in the direction close to the main body of the building until the block is completely inserted into the slot, and then by rotating the threaded sleeve, the threaded sleeve rotates to drive the two groups of threaded rods to move in a direction away from each other until Fully insert it into the fixing groove to complete the installation of the outer wall stone, and then screw the fixing screw into the screw hole by connecting the elastic limit clip to the surface of the threaded sleeve.

Figure 202221261399

Description

一种稳定性高的建筑石材反吊式干挂结构A kind of high stability building stone reverse hanging dry hanging structure

技术领域technical field

本实用新型涉及石材干挂技术领域,具体为一种稳定性高的建筑石材反吊式干挂结构。The utility model relates to the technical field of dry hanging of stone materials, in particular to a reverse hanging dry hanging structure of building stone with high stability.

背景技术Background technique

石材干挂法又名空挂法,是目前墙面装饰中一种新型的施工方法,该方法以金属挂件将饰面石材直接吊挂于墙面或空挂于钢架之上,不需再灌浆粘贴,其原理是在主体结构上设主要受力点,通过金属挂件将石材固定在建筑物上,形成石材装饰幕墙,而在使用过程中,现有的建筑石材干挂结构存在很多问题或缺陷:The stone dry hanging method, also known as the empty hanging method, is a new construction method in the current wall decoration. The principle of grouting paste is to set the main force point on the main structure, and fix the stone on the building through metal pendants to form a stone decorative curtain wall. During the use process, the existing dry hanging structure of building stone has many problems or defect:

传统的建筑石材干挂结构大多较为复杂, 因其结构比较复杂所以不便于对外墙石材进行安装,影响安装人员的安装效率,且不具有反吊式结构,全部荷载都有建筑主体承受,降低了该干挂结构的稳定性。Most of the traditional building stone dry-hanging structures are relatively complicated. Because of the complex structure, it is not convenient to install the stone on the outer wall, which affects the installation efficiency of the installers, and does not have a reverse-hanging structure. All loads are borne by the main body of the building, which reduces the The stability of the hanging structure.

实用新型内容Utility model content

本实用新型的目的在于提供一种稳定性高的建筑石材反吊式干挂结构,以解决上述背景技术中提出的问题。The purpose of the utility model is to provide a highly stable anti-hanging dry-hanging structure for building stones, so as to solve the problems raised in the above-mentioned background technology.

为实现上述目的,本实用新型提供如下技术方案:一种稳定性高的建筑石材反吊式干挂结构,包括橡胶减震垫、柔性垫和建筑主体,所述建筑主体的一侧活动安装有外墙石材,所述外墙石材与建筑主体之间活动安装有安装组件,所述外墙石材的外壁开设有限位槽。In order to achieve the above purpose, the utility model provides the following technical solutions: a highly stable building stone anti-hanging dry-hanging structure, including rubber shock absorbing pads, flexible pads and building main bodies, one side of the building main body is movably installed with As for the stone material of the external wall, an installation component is movably installed between the stone material of the external wall and the main body of the building, and the outer wall of the stone material of the external wall is provided with a limiting groove.

作为本实用新型进一步的方案:所述安装组件包括固定板,且固定板与建筑主体固定连接,所述固定板的外壁延伸至内部开设有卡槽,所述卡槽的内部卡接有卡块,且卡块与外墙石材固定连接,两组所述卡块相互靠近的一端外壁均开设有固定槽,所述卡块之间活动设置有螺纹套筒,所述螺纹套筒的顶部和底部均螺纹连接有螺纹杆,且螺纹杆与固定槽活动连接。As a further solution of the present utility model: the installation assembly includes a fixing plate, and the fixing plate is fixedly connected with the main body of the building, the outer wall of the fixing plate extends to the inside to open a card slot, and the inside of the card slot is clamped with a card block , and the block is fixedly connected with the stone material of the outer wall, and the outer wall at one end of the two groups of blocks close to each other is provided with a fixing groove, and a threaded sleeve is movable between the blocks, and the top and bottom of the threaded sleeve A threaded rod is threadedly connected, and the threaded rod is movably connected with the fixing groove.

作为本实用新型进一步的方案:所述螺纹套筒的外壁活动套接有弹性限位夹,所述弹性限位夹的内壁固定连接有防滑垫,所述弹性限位夹的外壁贯穿开设有螺孔,所述螺孔的内部螺纹连接有固定螺杆。As a further solution of the present invention: the outer wall of the threaded sleeve is movably sleeved with an elastic limit clip, the inner wall of the elastic limit clip is fixedly connected with a non-slip pad, and the outer wall of the elastic limit clip is provided with a screw thread. A fixing screw is threadedly connected to the inside of the screw hole.

作为本实用新型进一步的方案:所述建筑主体的顶部固定连接有顶面大梁,所述顶面大梁的下表面开设有滑槽,所述滑槽的内壁滑动连接有滑块,所述滑块的底部固定连接有卡板,且卡板与限位槽活动连接。As a further solution of the utility model: the top of the main body of the building is fixedly connected with a top girder, the lower surface of the top girder is provided with a chute, the inner wall of the chute is slidably connected with a slider, and the slider The bottom of the bottom is fixedly connected with a clamping plate, and the clamping plate is movably connected with the limiting groove.

作为本实用新型进一步的方案:所述卡板的表面贯穿开设有固定孔,所述固定孔的内部螺纹连接有限位螺杆,且限位螺杆贯穿所述外墙石材的上表面。As a further solution of the present invention, a fixing hole is formed through the surface of the clamping plate, the inner thread of the fixing hole is connected with a limit screw, and the limit screw penetrates the upper surface of the outer wall stone.

作为本实用新型进一步的方案:所述卡板的形状是L型。As a further solution of the present utility model: the shape of the clamping plate is L-shaped.

与现有技术相比,本实用新型的有益效果是:该稳定性高的建筑石材反吊式干挂结构,具有以下优点:Compared with the prior art, the beneficial effect of the present utility model is that the high-stability building stone reverse hanging dry-hanging structure has the following advantages:

(1)通过在外墙石材与建筑主体之间活动安装有安装组件,当需要进行对外墙石材进行安装时,通过将外墙石材放置于建筑主体的正前方,且使得卡块对准卡槽,接着推动外墙石材使得外墙石材向靠近建筑主体的方向移动,直至卡块完全插入卡槽内,接着通过转动螺纹套筒,螺纹套筒旋转带动两组螺纹杆沿相互远离的方向移动,直至完全插入固定槽内,从而完成对外墙石材的安装,接着通过将弹性限位夹套接在螺纹套筒的表面,将固定螺杆旋入螺孔,这样可以对螺纹套筒产生挤压力,接着设置有连接板,并插入建筑主体内,并通过外接螺栓将连接板与弹性限位夹进行固定,从而达到防止螺纹套筒发生转动的目的,解决了传统的因其结构比较复杂所以不便于对外墙石材进行安装,影响安装人员安装效率的问题;(1) Installation components are installed between the exterior wall stone and the main body of the building. When the exterior wall stone needs to be installed, the exterior wall stone is placed in front of the building body, and the card blocks are aligned with the card grooves. Then push the outer wall stone to move the outer wall stone in the direction close to the main body of the building until the block is completely inserted into the slot, and then by rotating the threaded sleeve, the threaded sleeve rotates to drive the two groups of threaded rods to move in a direction away from each other until Completely insert it into the fixing groove to complete the installation of the outer wall stone, and then screw the fixing screw into the screw hole by connecting the elastic limit clip to the surface of the threaded sleeve, so that the threaded sleeve can be squeezed, and then A connecting plate is provided and inserted into the main body of the building, and the connecting plate and the elastic limit clip are fixed by external bolts, so as to achieve the purpose of preventing the threaded sleeve from rotating, and solve the traditional inconvenience due to its complex structure. Wall stone installation, affecting the installation efficiency of the installer;

(2)通过在滑块的底部固定连接有卡板,当外墙石材安装完成后,能够利用滑槽和滑块的相互配合,通过推动卡板可以带动卡板向靠近限位槽的方向移动,直至卡板的下端插入限位槽内,接着通过限位螺杆贯穿外墙石材上表面开设的孔体并旋入固定孔内,可以将卡板与外墙石材进行有效的限位,这样可以形成反吊式设计,让顶面大梁承担部分荷载,进一步提高外墙石材干挂结构的稳定性,解决了传统的不具有反吊式结构,全部荷载都有建筑主体承受,降低了该干挂结构的稳定性的问题;(2) Through the fixed connection of the clamping plate at the bottom of the slider, when the exterior wall stone is installed, the mutual cooperation between the chute and the slider can be used to drive the clamping plate to move towards the limit groove by pushing the clamping plate , until the lower end of the clamping plate is inserted into the limit groove, and then through the hole body opened on the upper surface of the external wall stone through the limit screw and screwed into the fixing hole, the clamping plate and the external wall stone can be effectively limited, so that A reverse-hanging design is formed, allowing the top girder to bear part of the load, further improving the stability of the stone dry-hanging structure on the outer wall, and solving the problem of the traditional non-reverse-hanging structure. All loads are borne by the main body of the building, reducing the dry-hanging structural stability issues;

(3)通过设置有橡胶减震垫和柔性垫,通过设置有橡胶减震垫,可以减缓安装时卡块插入卡槽之间的冲击力,而且设置有柔性垫,可以减缓螺纹杆插入固定槽时所产生的冲击力。(3) By providing rubber shock pads and flexible pads, the impact force of the block inserted into the slot during installation can be slowed down by the rubber shock pads, and the flexible pads can slow down the insertion of the threaded rod into the fixing slot impact force generated.

附图说明Description of drawings

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型的安装组件俯视局部结构示意图;Fig. 2 is a schematic view of the partial structure of the mounting assembly of the present invention;

图3为本实用新型的A处放大图;Fig. 3 is the enlarged view of A place of the utility model;

图4为本实用新型的B处放大图。Fig. 4 is the enlarged view of B of the utility model.

图中:1、外墙石材;2、顶面大梁;3、建筑主体;4、橡胶减震垫;5、安装组件;501、螺孔;502、固定螺杆;503、防滑垫;504、弹性限位夹;505、卡块;506、固定槽;507、螺纹杆;508、固定板;509、卡槽;510、螺纹套筒;6、滑块;7、限位螺杆;8、卡板;9、滑槽;10、固定孔;11、限位槽;12、柔性垫。In the picture: 1. Exterior wall stone; 2. Top beam; 3. Building main body; 4. Rubber shock-absorbing pad; 5. Installation component; 501. Screw hole; Limit clip; 505, clamping block; 506, fixing slot; 507, threaded rod; 508, fixing plate; 509, clamping slot; 510, threaded sleeve; 6, slider; 7, limit screw; 8, clamping plate ; 9. Chute; 10. Fixing hole; 11. Limit slot; 12. Flexible pad.

具体实施方式Detailed ways

为了使本领域技术人员更好地理解本实用新型的技术方案,下面结合附图对本实用新型进行详细描述,本部分的描述仅是示范性和解释性,不应对本实用新型的保护范围有任何的限制作用。In order to make those skilled in the art better understand the technical solutions of the present invention, the present invention will be described in detail below in conjunction with the accompanying drawings. The description in this part is only exemplary and explanatory, and should not have any protection scope of the present invention. restrictive effect.

应注意到:相似的标号和字母在下面的附图中表示类似项,因此,一旦某一项在一个附图中被定义,则在随后的附图中不需要对其进行进一步定义和解释。It should be noted that like numerals and letters refer to like items in the following figures, so once an item is defined in one figure, it does not require further definition and explanation in subsequent figures.

需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,或者是该实用新型产品使用时惯常摆放的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”、“第三”等仅用于区分描述,而不能理解为指示或暗示相对重要性。It should be noted that the orientations or positional relationships indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner" and "outer" are Based on the orientation or positional relationship shown in the drawings, or the orientation or positional relationship that is usually placed when the utility model product is used, it is only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying the device or Elements must have certain orientations, be constructed and operate in certain orientations, and thus should not be construed as limitations on the invention. In addition, the terms "first", "second", "third", etc. are only used for distinguishing descriptions, and should not be construed as indicating or implying relative importance.

此外,术语“水平”、“竖直”、“悬垂”等术语并不表示要求部件绝对水平或悬垂,而是可以稍微倾斜。如“水平”仅仅是指其方向相对“竖直”而言更加水平,并不是表示该结构一定要完全水平,而是可以稍微倾斜。Furthermore, the terms "horizontal", "vertical", "overhanging" etc. do not imply that a component is required to be absolutely horizontal or overhang, but rather may be slightly inclined. For example, "horizontal" only means that its direction is more horizontal than "vertical", it does not mean that the structure must be completely horizontal, but can be slightly inclined.

在本实用新型的描述中,还需要说明的是,除非另有明确的规定和限定,术语“设置”、“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the present invention, it should also be noted that, unless otherwise expressly specified and limited, the terms "arrangement", "installation", "connection" and "connection" should be understood in a broad sense, for example, it may be a fixed connection It can also be a detachable connection or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or the internal communication between the two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood in specific situations.

请参阅图1-4,本实用新型提供的一种实施例:一种稳定性高的建筑石材反吊式干挂结构,包括橡胶减震垫4、柔性垫12和建筑主体3,建筑主体3的一侧活动安装有外墙石材1;Please refer to Fig. 1-4, an embodiment provided by the utility model: a kind of anti-hanging dry-hanging structure of building stone with high stability, including rubber shock absorbing pad 4, flexible pad 12 and building main body 3, building main body 3 Exterior wall stone 1 is movable installed on one side;

具体的,如图1所示,使用时,通过在设置有橡胶减震垫4和柔性垫12,通过设置有橡胶减震垫4,可以减缓安装时卡块505插入卡槽509之间的冲击力,而且设置有柔性垫12,可以减缓螺纹杆507插入固定槽506时所产生的冲击力;Specifically, as shown in FIG. 1 , when in use, the rubber shock-absorbing pad 4 and the flexible pad 12 are provided, and the rubber shock-absorbing pad 4 is provided to reduce the impact of the card block 505 inserted between the card slots 509 during installation. force, and is provided with a flexible pad 12, which can reduce the impact force generated when the threaded rod 507 is inserted into the fixing groove 506;

外墙石材1与建筑主体3之间活动安装有安装组件5,安装组件5包括固定板508,且固定板508与建筑主体3固定连接,固定板508的外壁延伸至内部开设有卡槽509,卡槽509的内部卡接有卡块505,且卡块505与外墙石材1固定连接,两组卡块505相互靠近的一端外壁均开设有固定槽506,卡块505之间活动设置有螺纹套筒510,螺纹套筒510的顶部和底部均螺纹连接有螺纹杆507,且螺纹杆507与固定槽506活动连接,螺纹套筒510的外壁活动套接有弹性限位夹504,弹性限位夹504的内壁固定连接有防滑垫503,弹性限位夹504的外壁贯穿开设有螺孔501,螺孔501的内部螺纹连接有固定螺杆502,外墙石材1的外壁开设有限位槽11,建筑主体3的顶部固定连接有顶面大梁2,顶面大梁2的下表面开设有滑槽9,滑槽9的内壁滑动连接有滑块6;An installation assembly 5 is movably installed between the outer wall stone material 1 and the building main body 3. The installation assembly 5 includes a fixing plate 508, and the fixing plate 508 is fixedly connected with the building main body 3. The outer wall of the fixing plate 508 extends to the inside and is provided with a card slot 509. A clamping block 505 is clamped inside the clamping slot 509, and the clamping block 505 is fixedly connected with the outer wall stone 1. The outer wall of one end of the two sets of clamping blocks 505 close to each other is provided with a fixing groove 506, and the clamping blocks 505 are movably provided with threads. Sleeve 510, the top and bottom of the threaded sleeve 510 are threadedly connected with a threaded rod 507, and the threaded rod 507 is movably connected with the fixing groove 506, and the outer wall of the threaded sleeve 510 is movably sleeved with an elastic limit clip 504, which is elastically limited The inner wall of the clip 504 is fixedly connected with a non-slip pad 503, the outer wall of the elastic limit clip 504 is provided with a screw hole 501, and the inner wall of the screw hole 501 is threadedly connected with a fixed screw 502, and the outer wall of the stone material 1 is provided with a limit slot 11. The top of the main body 3 is fixedly connected with the top beam 2, the lower surface of the top beam 2 is provided with a chute 9, and the inner wall of the chute 9 is slidably connected with a slider 6;

具体的,如图1、图2和图4所示,使用时,通过在外墙石材1与建筑主体3之间活动安装有安装组件5,当需要进行对外墙石材1进行安装时,通过将外墙石材1放置于建筑主体3的正前方,且使得卡块505对准卡槽509,接着推动外墙石材1使得外墙石材1向靠近建筑主体3的方向移动,直至卡块505完全插入卡槽509内,接着通过转动螺纹套筒510,螺纹套筒510旋转带动两组螺纹杆507沿相互远离的方向移动,直至完全插入固定槽506内,从而完成对外墙石材1的安装,接着通过将弹性限位夹504套接在螺纹套筒510的表面,将固定螺杆502旋入螺孔501,这样可以对螺纹套筒510产生挤压力,接着设置有连接板,并插入建筑主体3内,并通过外接螺栓将连接板与弹性限位夹504进行固定,从而达到防止螺纹套筒510发生转动的目的,解决了传统的因其结构比较复杂所以不便于对外墙石材1进行安装,影响安装人员安装效率的问题;Specifically, as shown in FIGS. 1 , 2 and 4 , during use, a mounting assembly 5 is movably installed between the outer wall stone 1 and the building main body 3 . When the outer wall stone 1 needs to be installed, the outer wall stone 1 is installed by The wall stone 1 is placed directly in front of the building body 3, and the block 505 is aligned with the card slot 509, and then the outer wall stone 1 is pushed to move the outer wall stone 1 toward the building body 3 until the block 505 is completely inserted into the card slot 509. In the groove 509, then by rotating the threaded sleeve 510, the threaded sleeve 510 rotates and drives the two groups of threaded rods 507 to move in a direction away from each other until they are completely inserted into the fixing groove 506, so as to complete the installation of the outer wall stone 1, and then through the The elastic limit clip 504 is sleeved on the surface of the threaded sleeve 510, and the fixing screw 502 is screwed into the threaded hole 501, so that the threaded sleeve 510 can be squeezed, and then a connecting plate is provided and inserted into the building body 3, And the connecting plate and the elastic limit clip 504 are fixed by external bolts, so as to achieve the purpose of preventing the threaded sleeve 510 from rotating, solving the traditional inconvenient installation of the external wall stone 1 due to its complex structure, affecting the installation personnel. Installation efficiency issues;

滑块6的底部固定连接有卡板8,且卡板8与限位槽11活动连接,卡板8的形状是L型,卡板8的表面贯穿开设有固定孔10,固定孔10的内部螺纹连接有限位螺杆7,且限位螺杆7贯穿外墙石材1的上表面;The bottom of the slider 6 is fixedly connected with a clamping plate 8, and the clamping plate 8 is movably connected with the limit slot 11. The shape of the clamping plate 8 is L-shaped, and the surface of the clamping plate 8 is provided with a fixing hole 10. The interior of the fixing hole 10 The limit screw 7 is threadedly connected, and the limit screw 7 penetrates the upper surface of the outer wall stone 1;

具体的,如图1和图3所示,使用时,通过在滑块6的底部固定连接有卡板8,当外墙石材1安装完成后,能够利用滑槽9和滑块6的相互配合,通过推动卡板8可以带动卡板8向靠近限位槽11的方向移动,直至卡板8的下端插入限位槽11内,接着通过限位螺杆7贯穿外墙石材1上表面开设的孔体并旋入固定孔10内,可以将卡板8与外墙石材1进行有效的限位,这样可以形成反吊式设计,让顶面大梁2承担部分荷载,进一步提高外墙石材1干挂结构的稳定性,解决了传统的不具有反吊式结构,全部荷载都有建筑主体3承受,降低了该干挂结构的稳定性的问题。Specifically, as shown in FIG. 1 and FIG. 3 , when in use, a clamping plate 8 is fixedly connected to the bottom of the sliding block 6 . After the installation of the outer wall stone 1 is completed, the mutual cooperation between the sliding groove 9 and the sliding block 6 can be used. , by pushing the card plate 8, the card plate 8 can be driven to move in the direction close to the limit slot 11 until the lower end of the card plate 8 is inserted into the limit slot 11, and then the limit screw 7 penetrates the hole opened on the upper surface of the outer wall stone 1 And screw it into the fixing hole 10, the card board 8 and the outer wall stone 1 can be effectively limited, so that a reverse hanging design can be formed, so that the top beam 2 can bear part of the load, and further improve the dry hanging of the outer wall stone 1. The stability of the structure solves the problem that the traditional structure does not have a reverse hanging type, and all loads are borne by the building main body 3, which reduces the stability of the dry hanging structure.

工作原理:使用时,首先,通过在外墙石材1与建筑主体3之间活动安装有安装组件5,当需要进行对外墙石材1进行安装时,通过将外墙石材1放置于建筑主体3的正前方,且使得卡块505对准卡槽509,接着推动外墙石材1使得外墙石材1向靠近建筑主体3的方向移动,直至卡块505完全插入卡槽509内,接着通过转动螺纹套筒510,螺纹套筒510旋转带动两组螺纹杆507沿相互远离的方向移动,直至完全插入固定槽506内,从而完成对外墙石材1的安装,接着通过将弹性限位夹504套接在螺纹套筒510的表面,将固定螺杆502旋入螺孔501,这样可以对螺纹套筒510产生挤压力,接着设置有连接板,并插入建筑主体3内,并通过外接螺栓将连接板与弹性限位夹504进行固定,从而达到防止螺纹套筒510发生转动的目的;Working principle: When using, first, the installation component 5 is installed between the outer wall stone 1 and the building main body 3. When the outer wall stone 1 needs to be installed, the outer wall stone 1 is placed on the front of the building main body 3. forward, and align the block 505 with the groove 509, then push the outer wall stone 1 to move the outer wall stone 1 toward the building body 3 until the block 505 is completely inserted into the groove 509, and then rotate the threaded sleeve 510, the threaded sleeve 510 rotates to drive the two groups of threaded rods 507 to move in the direction away from each other until they are completely inserted into the fixing groove 506, thereby completing the installation of the outer wall stone 1, and then the elastic limit clip 504 is sleeved on the threaded sleeve. On the surface of the barrel 510, the fixing screw 502 is screwed into the screw hole 501, so that the threaded sleeve 510 can be squeezed, and then a connecting plate is provided, which is inserted into the building body 3, and the connecting plate and the elastic limit are connected by external bolts. The position clamp 504 is fixed, so as to achieve the purpose of preventing the threaded sleeve 510 from rotating;

其次,通过在滑块6的底部固定连接有卡板8,当外墙石材1安装完成后,能够利用滑槽9和滑块6的相互配合,通过推动卡板8可以带动卡板8向靠近限位槽11的方向移动,直至卡板8的下端插入限位槽11内,接着通过限位螺杆7贯穿外墙石材1上表面开设的孔体并旋入固定孔10内,可以将卡板8与外墙石材1进行有效的限位,这样可以形成反吊式设计,让顶面大梁2承担部分荷载,进一步提高外墙石材1干挂结构的稳定性;Secondly, by fixing the clamping plate 8 at the bottom of the sliding block 6, after the installation of the outer wall stone material 1 is completed, the sliding groove 9 and the sliding block 6 can cooperate with each other, and the clamping plate 8 can be driven to approach by pushing the clamping plate 8. The direction of the limit slot 11 is moved until the lower end of the card board 8 is inserted into the limit slot 11, and then the limit screw 7 penetrates the hole formed on the upper surface of the outer wall stone 1 and is screwed into the fixing hole 10, the card board can be 8. Effectively limit the position with the outer wall stone 1, which can form a reverse hanging design, let the top beam 2 bear part of the load, and further improve the stability of the dry hanging structure of the outer wall stone 1;

最后,通过在设置有橡胶减震垫4和柔性垫12,通过设置有橡胶减震垫4,可以减缓安装时卡块505插入卡槽509之间的冲击力,而且设置有柔性垫12,可以减缓螺纹杆507插入固定槽506时所产生的冲击力。Finally, by providing the rubber shock-absorbing pad 4 and the flexible pad 12, by providing the rubber shock-absorbing pad 4, the impact force of the card block 505 inserted between the card slots 509 during installation can be mitigated, and the flexible pad 12 is provided, which can The impact force generated when the threaded rod 507 is inserted into the fixing groove 506 is reduced.

本申请文件中使用到的标准零件均可以从市场上购买,而且根据说明书和附图的记载均可以进行订制,各个零件的具体连接方式均采用现有技术中成熟的螺栓、铆钉、焊接等常规手段,机械、零件和设备均采用现有技术中常规的型号,控制方式是通过控制器来自动控制,控制器的控制电路通过本领域的技术人员简单编程即可实现,属于本领域的公知常识,所以本实用新型不再详细解释控制方式和电路连接,且说明书中提到的外设控制器可为本文提到的电器元件起到控制作用,而且该外设控制器为常规的已知设备。The standard parts used in this application document can be purchased from the market, and can be customized according to the description in the description and the attached drawings. The specific connection method of each part adopts the mature bolts, rivets, welding, etc. in the prior art. Conventional means, machinery, parts and equipment all use conventional models in the prior art, the control method is automatically controlled by the controller, and the control circuit of the controller can be realized by simple programming by those skilled in the art, which belongs to the well-known in the art. Common sense, so the present utility model will not explain the control method and circuit connection in detail, and the peripheral controller mentioned in the specification can play a control role for the electrical components mentioned in this article, and the peripheral controller is a conventional known equipment.

需要说明的是,在本文中,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that, herein, the terms "comprising", "comprising" or any other variation thereof are intended to encompass non-exclusive inclusion, such that a process, method, article or device comprising a series of elements includes not only those elements, It also includes other elements not expressly listed or inherent to such a process, method, article or apparatus.

本文中应用了具体个例对本实用新型的原理及实施方式进行了阐述,以上实例的说明只是用于帮助理解本实用新型的方法及其核心思想。以上仅是本实用新型的优选实施方式,应当指出,由于文字表达的有限性,而客观上存在无限的具体结构,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以做出若干改进、润饰或变化,也可以将上述技术特征以适当的方式进行组合;这些改进润饰、变化或组合,或未经改进将实用新型的构思和技术方案直接应用于其它场合的,均应视为本实用新型的保护范围。The principles and implementations of the present invention are described herein by using specific examples, and the descriptions of the above examples are only used to help understand the method and the core idea of the present invention. The above are only the preferred embodiments of the present utility model. It should be pointed out that due to the limited expression of words, there are objectively unlimited specific structures. For those of ordinary skill in the art, without departing from the principles of the present utility model However, several improvements, modifications or changes can also be made, and the above-mentioned technical features can also be combined in an appropriate manner; these improvements, modifications, or combinations, or without improvement, directly apply the concept and technical solutions of the utility model to other It should be regarded as the protection scope of the present utility model.

Claims (6)

1.一种稳定性高的建筑石材反吊式干挂结构,包括橡胶减震垫(4)、柔性垫(12)和建筑主体(3),其特征在于:所述建筑主体(3)的一侧活动安装有外墙石材(1),所述外墙石材(1)与建筑主体(3)之间活动安装有安装组件(5),所述外墙石材(1)的外壁开设有限位槽(11)。1. An anti-hanging dry-hanging structure of building stone material with high stability, comprising a rubber shock-absorbing pad (4), a flexible pad (12) and a building main body (3), characterized in that: the building main body (3) has a An outer wall stone (1) is movably installed on one side, an installation component (5) is movably installed between the outer wall stone (1) and the building main body (3), and the outer wall of the outer wall stone (1) is provided with a limited space slot (11). 2.根据权利要求1所述的一种稳定性高的建筑石材反吊式干挂结构,其特征在于:所述安装组件(5)包括固定板(508),且固定板(508)与建筑主体(3)固定连接,所述固定板(508)的外壁延伸至内部开设有卡槽(509),所述卡槽(509)的内部卡接有卡块(505),且卡块(505)与外墙石材(1)固定连接,两组所述卡块(505)相互靠近的一端外壁均开设有固定槽(506),所述卡块(505)之间活动设置有螺纹套筒(510),所述螺纹套筒(510)的顶部和底部均螺纹连接有螺纹杆(507),且螺纹杆(507)与固定槽(506)活动连接。2. A highly stable anti-hanging dry-hanging structure for building stones according to claim 1, characterized in that: the installation component (5) includes a fixing plate (508), and the fixing plate (508) is connected to the building The main body (3) is fixedly connected, the outer wall of the fixed plate (508) extends to the inside to open a card slot (509), and the inside of the card slot (509) is clamped with a card block (505), and the card block (505 ) is fixedly connected with the external wall stone (1), and the outer wall at one end of the two sets of blocks (505) close to each other is provided with a fixing groove (506), and a threaded sleeve ( 510), the top and bottom of the threaded sleeve (510) are threadedly connected with a threaded rod (507), and the threaded rod (507) is movably connected with the fixing groove (506). 3.根据权利要求2所述的一种稳定性高的建筑石材反吊式干挂结构,其特征在于:所述螺纹套筒(510)的外壁活动套接有弹性限位夹(504),所述弹性限位夹(504)的内壁固定连接有防滑垫(503),所述弹性限位夹(504)的外壁贯穿开设有螺孔(501),所述螺孔(501)的内部螺纹连接有固定螺杆(502)。3. A high-stability anti-hanging dry-hanging structure for building stones according to claim 2, characterized in that: the outer wall of the threaded sleeve (510) is movably socketed with an elastic limit clip (504), The inner wall of the elastic limiting clip (504) is fixedly connected with a non-slip pad (503), and the outer wall of the elastic limiting clip (504) is provided with a screw hole (501), and the internal thread of the screw hole (501) Connected with fixing screw (502). 4.根据权利要求1所述的一种稳定性高的建筑石材反吊式干挂结构,其特征在于:所述建筑主体(3)的顶部固定连接有顶面大梁(2),所述顶面大梁(2)的下表面开设有滑槽(9),所述滑槽(9)的内壁滑动连接有滑块(6),所述滑块(6)的底部固定连接有卡板(8),且卡板(8)与限位槽(11)活动连接。4. A high-stability building stone reverse-hanging dry-hanging structure according to claim 1, characterized in that: a top beam (2) is fixedly connected to the top of the building main body (3), and the top A chute (9) is provided on the lower surface of the face frame (2), the inner wall of the chute (9) is slidably connected with a slider (6), and the bottom of the slider (6) is fixedly connected with a clamping plate (8). ), and the card board (8) is movably connected with the limit slot (11). 5.根据权利要求4所述的一种稳定性高的建筑石材反吊式干挂结构,其特征在于:所述卡板(8)的表面贯穿开设有固定孔(10),所述固定孔(10)的内部螺纹连接有限位螺杆(7),且限位螺杆(7)贯穿所述外墙石材(1)的上表面。5. A highly stable anti-hanging dry-hanging structure for building stones according to claim 4, characterized in that: the surface of the clamp (8) is provided with a fixing hole (10), and the fixing hole The internal thread of (10) is connected with the limiting screw rod (7), and the limiting screw rod (7) runs through the upper surface of the outer wall stone (1). 6.根据权利要求4所述的一种稳定性高的建筑石材反吊式干挂结构,其特征在于:所述卡板(8)的形状是L型。6. A highly stable anti-hanging dry-hanging structure for building stones according to claim 4, characterized in that: the shape of the clamping plate (8) is L-shaped.
CN202221261399.5U 2022-05-25 2022-05-25 High-stability building stone reverse-hanging type dry hanging structure Active CN217652079U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221261399.5U CN217652079U (en) 2022-05-25 2022-05-25 High-stability building stone reverse-hanging type dry hanging structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221261399.5U CN217652079U (en) 2022-05-25 2022-05-25 High-stability building stone reverse-hanging type dry hanging structure

Publications (1)

Publication Number Publication Date
CN217652079U true CN217652079U (en) 2022-10-25

Family

ID=83665079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221261399.5U Active CN217652079U (en) 2022-05-25 2022-05-25 High-stability building stone reverse-hanging type dry hanging structure

Country Status (1)

Country Link
CN (1) CN217652079U (en)

Similar Documents

Publication Publication Date Title
CN217652079U (en) High-stability building stone reverse-hanging type dry hanging structure
CN110653323B (en) A composite splicing riveting and pressing tool for electrical cabinets
CN219667681U (en) Wood pulp fiber cement board and decorative surface bonding flattening device
CN213927634U (en) Wall bracket for repairing wooden ancient architecture
CN217517920U (en) Ceiling decorative board is with hanging piece
CN213937218U (en) A cable installation and adjustment frame for power engineering construction
CN204677688U (en) A kind of novel cable connector
CN214402331U (en) External wall curtain wall for villa decoration
CN209482672U (en) A building platform for indoor and outdoor decoration
CN208797891U (en) A kind of integrated roof of green building based on solar panels
CN216892374U (en) A construction pile for construction engineering
CN219508946U (en) Glass curtain wall point supporting device
CN208734089U (en) A kind of component that aluminum alloy mould plate is connect with wooden model
CN218615402U (en) Transition type leveling equipment for external wall insulation board
CN216239529U (en) Anion floor
CN222140400U (en) Fixing structure of glass curtain wall
CN208777709U (en) A kind of building assembly Corner clamp
CN207469247U (en) A kind of novel pile pulling device
CN221957021U (en) Glass curtain wall beam upright post mounting structure
CN217268640U (en) A plastering device for interior decoration
CN102363371B (en) Turntable positioning device for medicine pressing hydraulic machine
CN216552833U (en) Wall facing brick mounting structure
CN208309900U (en) A kind of assembly concrete connection structure
CN206233427U (en) Curtain wall cross beam attachment structure
CN211736501U (en) A new type of support device for construction engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant