CN217627089U - Simple and convenient profile steel structure beam hoisting matching device used on floor - Google Patents

Simple and convenient profile steel structure beam hoisting matching device used on floor Download PDF

Info

Publication number
CN217627089U
CN217627089U CN202220093381.2U CN202220093381U CN217627089U CN 217627089 U CN217627089 U CN 217627089U CN 202220093381 U CN202220093381 U CN 202220093381U CN 217627089 U CN217627089 U CN 217627089U
Authority
CN
China
Prior art keywords
steel structure
structure beam
fork plate
plate
matching device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220093381.2U
Other languages
Chinese (zh)
Inventor
张建忠
袁胜强
上建磊
潘源
肖良
李桐
范英春
葛二朋
汪峰
田经柱
肖思其
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction Municipal Engineering Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction Municipal Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction Municipal Engineering Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202220093381.2U priority Critical patent/CN217627089U/en
Application granted granted Critical
Publication of CN217627089U publication Critical patent/CN217627089U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种用于楼面上简易便捷型钢结构梁吊装配套装置,属于钢结构梁吊装领域,一种用于楼面上简易便捷型钢结构梁吊装配套装置,包括底座,底座的上侧固定连接有立柱,立柱的上侧通过吊耳安装有电动葫芦本体,电动葫芦本体下侧的升降吊钩上装配有钢结构梁吊具,钢结构梁吊具包括有拉力带、第一叉板和第二叉板,第一叉板和第二叉板均至少由一个固定主板和两个插板组成,两个插板均固定在固定主板的一侧,它可以实现,增加了钢梁吊装的安全性、安装的准确性,且能够利用钢结构梁自身的重力提升对钢结构梁的夹持力和稳定性。

Figure 202220093381

The utility model discloses a simple and convenient type steel structure beam hoisting matching device on the floor, belonging to the field of steel structure beam hoisting, a simple and convenient type steel structure beam hoisting matching device on the floor, comprising a base, an upper part of the base The side is fixedly connected with a column, the upper side of the column is installed with an electric hoist body through the lifting lug, the lifting hook on the lower side of the electric hoist body is equipped with a steel structure beam hanger, and the steel structure beam hanger includes a tension belt, a first fork The plate and the second fork plate, the first fork plate and the second fork plate are composed of at least one fixed main board and two plug-in boards, and the two plug-in boards are fixed on one side of the fixed main board, which can be realized by adding steel beams. The safety of hoisting, the accuracy of installation, and the ability to use the gravity of the steel structure beam itself to improve the clamping force and stability of the steel structure beam.

Figure 202220093381

Description

一种用于楼面上简易便捷型钢结构梁吊装配套装置A simple and convenient type steel structure beam hoisting matching device on the floor

技术领域technical field

本实用新型涉及钢结构梁吊装领域,更具体地说,涉及一种用于楼面上简易便捷型钢结构梁吊装配套装置。The utility model relates to the field of steel structure beam hoisting, in particular to a simple and convenient type steel structure beam hoisting matching device on the floor.

背景技术Background technique

如授权公告号为CN212668947U所公开的钢结构横梁吊装装置,其虽然取消通过绳索在钢结构横梁两端捆绑的操作流程,通过使用两组整体装置,将钢结构横梁的两端分别放置在两组支撑件上,之后通过两根等长绳索分别与两组吊耳板连接后进行吊装,保持吊点重心与型钢重心垂直,方便钢结构横梁的水平吊装,并且方便施工,提高便利性,并且实用性强;For example, the steel structure beam hoisting device disclosed by the authorized announcement number CN212668947U, although the operation process of bundling the two ends of the steel structure beam by ropes is cancelled, by using two sets of integral devices, the two ends of the steel structure beam are respectively placed in the two groups. On the support, it is then connected to the two sets of lifting lug plates by two equal-length ropes, and then hoisted, keeping the center of gravity of the lifting point perpendicular to the center of gravity of the profiled steel, which is convenient for the horizontal hoisting of the steel structure beam, and facilitates construction, improves convenience, and is practical strong;

但是并未解决现有装置进行钢梁吊装的安全性较差、安装的准确性较差,导致楼面、屋面钢结构施工中钢梁吊装的效率较差,工程综合成本较高,且装置对钢梁固定的稳定性较差的问题,为此我们提出一种用于楼面上简易便捷型钢结构梁吊装配套装置。However, it does not solve the problem that the existing device has poor safety and poor installation accuracy for steel beam hoisting, resulting in poor efficiency of steel beam hoisting in the construction of floor and roof steel structures, high overall project cost, and the installation of Due to the problem of poor stability of steel beam fixing, we propose a simple and convenient steel structure beam hoisting supporting device on the floor.

实用新型内容Utility model content

1.要解决的技术问题1. technical problem to be solved

针对现有技术中存在的问题,本实用新型的目的在于提供一种用于楼面上简易便捷型钢结构梁吊装配套装置,它可以实现,增加了钢梁吊装的安全性、安装的准确性,且能够利用钢结构梁自身的重力提升对钢结构梁的夹持力和稳定性。Aiming at the problems existing in the prior art, the purpose of this utility model is to provide a simple and convenient type steel structure beam hoisting supporting device on the floor, which can be realized, and increases the safety of the steel beam hoisting and the installation accuracy, Moreover, the gravity of the steel structure beam itself can be used to improve the clamping force and stability of the steel structure beam.

2.技术方案2. Technical solutions

为解决上述问题,本实用新型采用如下的技术方案。In order to solve the above problems, the present invention adopts the following technical solutions.

一种用于楼面上简易便捷型钢结构梁吊装配套装置,包括底座,所述底座的上侧固定连接有立柱,所述立柱的上侧通过吊耳安装有电动葫芦本体,所述电动葫芦本体下侧的升降吊钩上装配有钢结构梁吊具;A simple and convenient type steel structure beam hoisting matching device on the floor, including a base, the upper side of the base is fixedly connected with a column, the upper side of the column is installed with an electric hoist body through a lifting lug, and the electric hoist body is The lifting hook on the lower side is equipped with a steel structure beam spreader;

所述钢结构梁吊具包括有拉力带、第一叉板和第二叉板,所述第一叉板和第二叉板均至少由一个固定主板和两个插板组成,两个所述插板均固定在固定主板的一侧,所述第一叉板的固定主板上开设有两个间隙槽,所述拉力带的下部两端均贯穿间隙槽和第二叉板的固定主板相连接,所述拉力带的上端与电动葫芦本体的升降吊钩连接。The steel structure beam hanger includes a tension belt, a first fork plate and a second fork plate. Both the first fork plate and the second fork plate are composed of at least one fixed main board and two The plug-in boards are all fixed on one side of the fixed main board, the fixed main board of the first fork board is provided with two gap slots, and the lower ends of the tension band pass through the gap slots and are connected to the fixed main board of the second fork board. , the upper end of the tension belt is connected with the lifting hook of the electric hoist body.

进一步的,所述底座两侧的两个端角处均设置有可升降滑动轮。Further, two end corners on both sides of the base are provided with liftable sliding wheels.

进一步的,所述底座和立柱之间固定连接有两个斜撑。Further, two diagonal braces are fixedly connected between the base and the upright column.

进一步的,所述间隙槽内部远离插板的位置转动连接有减损轴。Further, a loss reduction shaft is rotatably connected inside the gap groove at a position away from the plug board.

进一步的,所述第一叉板的固定主板上固定连接有两个定位杆,所述第二叉板的固定主板和定位杆滑动连接。Further, two positioning rods are fixedly connected to the fixed main board of the first fork plate, and the fixed main board of the second fork plate and the positioning rod are slidably connected.

进一步的,所述定位杆的外侧且位于第二叉板远离第一叉板的一侧套接有回力弹簧。Further, a return spring is sleeved on the outer side of the positioning rod and on the side of the second fork plate away from the first fork plate.

3.有益效果3. beneficial effect

相比于现有技术,本实用新型的优点在于:Compared with the prior art, the advantages of the present utility model are:

(1)本方案通过各个配件的配合实现了楼面或者屋面上不依靠塔吊、汽车吊、叉车等大型设备进行吊装的突破,增加了钢梁吊装的安全性、安装的准确性,大大提高了楼面、屋面钢结构施工中钢梁吊装的效率,降低了工程综合成本。(1) This scheme achieves a breakthrough in hoisting on the floor or roof without relying on large equipment such as tower cranes, truck cranes, forklifts, etc. through the cooperation of various accessories, increasing the safety of steel beam hoisting and the accuracy of installation, and greatly improving the The efficiency of steel beam hoisting in the construction of floor and roof steel structures reduces the overall cost of the project.

(2)本方案通过设置钢结构梁吊具能够利用钢结构梁自身的重力提升对钢结构梁的夹持力,从而有效的提升装置的稳定性。(2) In this scheme, by setting the steel structure beam hanger, the clamping force of the steel structure beam can be increased by the gravity of the steel structure beam itself, so as to effectively improve the stability of the device.

附图说明Description of drawings

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型钢结构梁吊具的结构示意图;Fig. 2 is the structural representation of the utility model steel structure beam hanger;

图3为本实用新型钢结构梁吊具的剖切结构示意图;Fig. 3 is the cutaway structure schematic diagram of the steel structure beam hanger of the present utility model;

图4为本实用新型钢结构梁吊具的剖切侧视图。4 is a cutaway side view of the steel structure beam hanger of the present invention.

图中标号说明:Description of the labels in the figure:

1、底座;2、拉力带;3、第一叉板;4、斜撑;5、立柱;6、电动葫芦本体;7、吊耳;8、可升降滑动轮;9、第二叉板;10、定位杆;11、回力弹簧;12、减损轴。1. Base; 2. Tension belt; 3. First fork plate; 4. Diagonal brace; 5. Upright column; 6. Electric hoist body; 7. Lifting lug; 8. Liftable sliding wheel; 10. Positioning rod; 11. Return spring; 12. Loss reduction shaft.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述;显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例,基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model; obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. For example, based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative work shall fall within the protection scope of the present invention.

实施例1:Example 1:

请参阅图1-4所示,一种用于楼面上简易便捷型钢结构梁吊装配套装置,包括底座1,底座1的上侧固定连接有立柱5,立柱5的上侧通过吊耳7安装有电动葫芦本体6,电动葫芦本体下侧的升降吊钩上装配有钢结构梁吊具;Please refer to Figure 1-4, a simple and convenient steel structure beam hoisting supporting device on the floor, including a base 1, the upper side of the base 1 is fixedly connected with a column 5, and the upper side of the column 5 is installed through the lifting lugs 7 There is an electric hoist body 6, and the lifting hook on the lower side of the electric hoist body is equipped with a steel structure beam spreader;

其中,底座1由长短共计7根相同型号20#工字钢组合焊接而成的矩形底盘,上部中间4根工字钢交叉位置再焊接1块30*60cm的铁板而成,即由4根相同型号的工字钢平行焊接组成一个矩形框架,框架内部3根相同工字钢以十字交叉焊接,并与框架焊接,交叉位置靠近框架的一边,1块30*60cm的铁板焊接于工字钢十字交叉位置,铁板四个角上分别为4个孔用于与立柱螺栓连接;Among them, the base 1 is made of a rectangular chassis formed by welding a total of 7 pieces of the same type of 20# I-beams, and the upper middle 4 pieces of I-beams are welded with a 30*60cm iron plate at the cross position, that is, 4 pieces of I-beams are welded together. I-beams of the same type are welded in parallel to form a rectangular frame. Three identical I-beams inside the frame are cross-welded and welded to the frame. The cross position is close to one side of the frame. A 30*60cm iron plate is welded to the I-beam. At the steel cross position, there are 4 holes on the four corners of the iron plate for connecting with the stud bolts;

其中,为了方便装置的移动,底座1两侧的两个端角处均设置有可升降滑动轮8。Wherein, in order to facilitate the movement of the device, two end corners on both sides of the base 1 are provided with liftable sliding wheels 8 .

其中,为了加强立柱5的稳定性,底座1和立柱5之间固定连接有两个斜撑4,用以对立柱5进行加固,拉力带2为斜向空心钢管管径8cm,壁厚5mm,其下部螺栓连接于底座1里侧距离立柱5较远的一侧的阴角上,上部同样螺栓连接于立柱5上,形成稳定的空间结构,螺栓连接,便于安装与拆卸。Among them, in order to strengthen the stability of the column 5, two diagonal braces 4 are fixedly connected between the base 1 and the column 5 to reinforce the column 5, and the tension band 2 is an oblique hollow steel pipe with a diameter of 8cm and a wall thickness of 5mm. The lower part is bolted to the inner corner of the inner side of the base 1 farther from the column 5, and the upper part is also bolted to the column 5 to form a stable space structure, and the bolt connection is convenient for installation and disassembly.

其中,立柱5由一根粗型空心钢管立杆管径18cm,壁厚8mm及一个铁板组合而成,铁板尺寸为30*60cm,焊接于立杆底部,铁板上与底座1上对应位置有相同数量大小的孔洞,用于与底座1的螺栓连接,螺栓连接便于立柱5与底座1的安装组合与拆卸,立柱5微微向里侧倾斜约5-定位杆10cm,倾斜于有斜撑4的一里侧.Among them, the column 5 is composed of a thick hollow steel pipe vertical rod with a diameter of 18cm, a wall thickness of 8mm and an iron plate. The size of the iron plate is 30*60cm, which is welded to the bottom of the vertical rod. The iron plate corresponds to the base 1 There are holes of the same number and size at the position, which are used for the bolt connection with the base 1. The bolt connection is convenient for the installation, combination and disassembly of the column 5 and the base 1. 4 on the one mile side.

其中,吊耳7由横竖两块30*30*1.8cm铁板焊接于立柱5顶部,其中横向铁板平焊于立柱5顶部,竖向铁板与立柱5及横向顶板满焊连接,竖向铁板设置2个孔洞用于悬挂电动葫芦本体6。Among them, the lifting lug 7 is welded on the top of the column 5 by two horizontal and vertical 30*30*1.8cm iron plates, wherein the horizontal iron plate is flat welded on the top of the column 5, and the vertical iron plate is fully welded with the column 5 and the horizontal top plate. The iron plate is provided with 2 holes for suspending the electric hoist body 6 .

其中,电动葫芦本体6提供其下端升降吊钩整体上升的动力,电动葫芦本体通过铰链悬挂于吊耳7上,根据实际情况选择一般选择承受荷载3t/5t的简易自动升降型电动葫芦,承受重量必须满足荷载要求。Among them, the electric hoist body 6 provides the power to lift the lower end of the lifting hook as a whole, and the electric hoist body is suspended on the lifting lug 7 through a hinge. According to the actual situation, a simple automatic lifting electric hoist with a load of 3t/5t is generally selected to bear the weight. Load requirements must be met.

其中,请参阅图1-2所示,钢结构梁吊具包括有拉力带2、第一叉板3和第二叉板9,第一叉板3和第二叉板9均至少由一个固定主板和两个插板组成,两个插板均固定在固定主板的一侧,第一叉板3的固定主板上开设有两个间隙槽,拉力带2的下部两端均贯穿间隙槽和第二叉板9的固定主板相连接,拉力带2的上端和电动葫芦本体6的升降吊钩连接;Among them, please refer to Fig. 1-2, the steel structure beam hanger includes a tension belt 2, a first fork plate 3 and a second fork plate 9, and the first fork plate 3 and the second fork plate 9 are fixed by at least one The main board is composed of two plug-in boards, and the two plug-in boards are fixed on one side of the fixed main board. The fixed main board of the two-pronged plate 9 is connected, and the upper end of the tension belt 2 is connected with the lifting hook of the electric hoist body 6;

其中,钢结构梁由两个钢结构梁横板和一个钢结构梁竖板组成;Among them, the steel structure beam is composed of two steel structure beam transverse plates and one steel structure beam vertical plate;

在对钢结构梁进行吊运时,将第一叉板3和第二叉板9分别放置在一个钢结构梁横板的上侧和下侧,且第二叉板9位于第一叉板3的上侧,两个插板位于钢结构梁竖板的两侧,然后电动葫芦本体6的升降吊钩拉动拉力带2,拉力带2被拉动时,会带动第二叉板9向下进行移动,第一叉板3向上进行移动,让第一叉板3和第二叉板9对钢结构梁进行夹持,从而利用钢结构梁自身的重力提升钢结构梁吊具对钢结构梁的夹持力,从而有效的提升装置的稳定性。When hoisting the steel structure beam, the first fork plate 3 and the second fork plate 9 are placed on the upper and lower sides of a steel structure beam transverse plate respectively, and the second fork plate 9 is located on the first fork plate 3 On the upper side of the hoist, the two insert plates are located on both sides of the steel structure beam vertical plate, and then the lifting hook of the electric hoist body 6 pulls the tension belt 2. When the tension belt 2 is pulled, it will drive the second fork plate 9 to move downward. , the first fork plate 3 moves upward, so that the first fork plate 3 and the second fork plate 9 clamp the steel structure beam, so as to use the gravity of the steel structure beam itself to lift the clamp of the steel structure beam hanger to the steel structure beam Holding force, thereby effectively improving the stability of the device.

且,为了减小吊装钢结构梁时拉力带2受到的磨损,间隙槽内部远离插板的位置转动连接有减损轴12,当拉力带2移动时通过减损轴12的转动能够有效的减小第一叉板3和拉力带2之间的摩擦力。拉力带2为软质带,用承载为强的合成尼龙制成。In addition, in order to reduce the wear and tear of the tension belt 2 when the steel structure beam is hoisted, the position of the inside of the gap groove away from the insert plate is rotatably connected with the loss reduction shaft 12. When the tension belt 2 moves, the rotation of the loss reduction shaft 12 can effectively reduce the number of damages. The friction force between a fork plate 3 and the tension band 2. The tension belt 2 is a soft belt, made of synthetic nylon with strong load-bearing capacity.

为了更好的对第一叉板3和第二叉板9进行定位,第一叉板3的固定主板上固定连接有两个定位杆10,第二叉板9的固定主板和定位杆10滑动连接,通过设置定位杆10能够有效的避免第一叉板3和第二叉板9之间发生错位现象。In order to better position the first fork plate 3 and the second fork plate 9, two positioning rods 10 are fixedly connected to the fixed main plate of the first fork plate 3, and the fixed main plate of the second fork plate 9 and the positioning rod 10 slide. For connection, the dislocation phenomenon between the first fork plate 3 and the second fork plate 9 can be effectively avoided by arranging the positioning rod 10 .

同时,为了使第一叉板3和第二叉板9能够对钢结构梁进行夹持,定位杆10的外侧且位于第二叉板9远离第一叉板3的一侧套接有回力弹簧11,通过设置回力弹簧11能够带动第二叉板9朝靠近第一叉板3的方向进行移动,让第一叉板3和第二叉板9对钢结构梁进行夹持。第一叉板和第二叉板对钢结构梁进行夹持面上可履设橡胶层,用于提高摩擦力。At the same time, in order to enable the first fork plate 3 and the second fork plate 9 to clamp the steel structural beam, a return spring is sleeved on the outer side of the positioning rod 10 and on the side of the second fork plate 9 away from the first fork plate 3 11. By setting the return spring 11, the second fork plate 9 can be driven to move in the direction close to the first fork plate 3, so that the first fork plate 3 and the second fork plate 9 can clamp the steel structural beam. A rubber layer can be set on the clamping surfaces of the first fork plate and the second fork plate to the steel structural beam, so as to improve the frictional force.

在使用时:将第一叉板3和第二叉板9分别放置在一个钢结构梁横板的上侧和下侧,且第二叉板9位于第一叉板3的上侧,两个插板位于钢结构梁竖板的两侧,然后启动电动葫芦本体6,电动葫芦本体的升降吊钩对拉力带2进行拉动,拉力带2被拉动时,会带动第二叉板9向下进行移动,第一叉板3向上进行移动,让第一叉板3和第二叉板9对钢结构梁进行夹持,从而利用钢结构梁自身的重力提升钢结构梁吊具对钢结构梁的夹持力,从而有效的提升装置的稳定性,通过各个配件的配合实现了楼面或者屋面上不依靠塔吊、汽车吊、叉车等大型设备进行吊装的突破,增加了钢梁吊装的安全性、安装的准确性,大大提高了楼面、屋面钢结构施工中钢梁吊装的效率,降低了工程综合成本。In use: the first fork plate 3 and the second fork plate 9 are placed on the upper and lower sides of a steel structural beam cross plate respectively, and the second fork plate 9 is located on the upper side of the first fork plate 3, and the two The plug plates are located on both sides of the vertical plate of the steel structure beam, and then the electric hoist body 6 is activated. The lifting hook of the electric hoist body pulls the tension belt 2. When the tension belt 2 is pulled, it will drive the second fork plate 9 to move downward. Move, the first fork plate 3 moves upward, so that the first fork plate 3 and the second fork plate 9 clamp the steel structure beam, so as to use the gravity of the steel structure beam itself to lift the steel structure beam hanger to the steel structure beam. Clamping force can effectively improve the stability of the device. Through the cooperation of various accessories, a breakthrough is achieved in hoisting on the floor or roof without relying on large equipment such as tower cranes, truck cranes and forklifts, which increases the safety of steel beam hoisting, The accuracy of installation greatly improves the efficiency of steel beam hoisting in the construction of floor and roof steel structures, and reduces the overall cost of the project.

以上所述,仅为本实用新型较佳的具体实施方式;但本实用新型的保护范围并不局限于此。任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其改进构思加以等同替换或改变,都应涵盖在本实用新型的保护范围内。The above descriptions are only preferred specific embodiments of the present invention; however, the protection scope of the present invention is not limited thereto. Any person skilled in the art who is familiar with the technical scope disclosed by the present utility model, according to the technical solution of the present utility model and its improvement concept, equivalently replaces or changes, should be covered within the protection scope of the present utility model.

Claims (6)

1.一种用于楼面上简易便捷型钢结构梁吊装配套装置,包括底座(1),其特征在于:所述底座(1)的上侧固定连接有立柱(5),所述立柱(5)的上侧通过吊耳(7)安装有电动葫芦本体(6),所述电动葫芦本体下侧的升降吊钩上装配有钢结构梁吊具;1. A simple and convenient type steel structure beam hoisting supporting device on the floor, comprising a base (1), characterized in that: the upper side of the base (1) is fixedly connected with a column (5), the column (5) The upper side of the electric hoist is installed with an electric hoist body (6) through the lifting lug (7), and the lifting hook on the lower side of the electric hoist body is equipped with a steel structure beam hanger; 所述钢结构梁吊具包括有拉力带(2)、第一叉板(3)和第二叉板(9),所述第一叉板(3)和第二叉板(9)均至少由一个固定主板和两个插板组成,两个所述插板均固定在固定主板的一侧,所述第一叉板(3)的固定主板上开设有两个间隙槽,所述拉力带(2)的下部两端均贯穿间隙槽和第二叉板(9)的固定主板相连接,所述拉力带(2)的上端与电动葫芦本体(6)的升降吊钩连接。The steel structure beam hanger includes a tension band (2), a first fork plate (3) and a second fork plate (9), and the first fork plate (3) and the second fork plate (9) are at least It consists of a fixed main board and two plug-in boards. The two plug-in boards are both fixed on one side of the fixed main board. The fixed main board of the first fork board (3) is provided with two gap slots. Both ends of the lower part of (2) pass through the gap slot and are connected to the fixed main board of the second fork plate (9), and the upper end of the tension belt (2) is connected to the lifting hook of the electric hoist body (6). 2.根据权利要求1所述的一种用于楼面上简易便捷型钢结构梁吊装配套装置,其特征在于:所述底座(1)两侧的两个端角处均设置有可升降滑动轮(8)。2. A simple and convenient type steel structure beam hoisting matching device on the floor according to claim 1, characterized in that: two end corners on both sides of the base (1) are provided with liftable sliding wheels (8). 3.根据权利要求1所述的一种用于楼面上简易便捷型钢结构梁吊装配套装置,其特征在于:所述底座(1)和立柱(5)之间固定连接有两个斜撑(4)。3. A simple and convenient type steel structure beam hoisting matching device on the floor according to claim 1, characterized in that: two diagonal braces ( 4). 4.根据权利要求1所述的一种用于楼面上简易便捷型钢结构梁吊装配套装置,其特征在于:所述间隙槽内部远离插板的位置转动连接有减损轴(12)。4. A simple and convenient type steel structure beam hoisting matching device on a floor according to claim 1, characterized in that: a loss-reducing shaft (12) is rotatably connected inside the gap groove at a position away from the insert plate. 5.根据权利要求1所述的一种用于楼面上简易便捷型钢结构梁吊装配套装置,其特征在于:所述第一叉板(3)的固定主板上固定连接有两个定位杆(10),所述第二叉板(9)的固定主板和定位杆(10)滑动连接。5. A simple and convenient type steel structure beam hoisting matching device on the floor according to claim 1, characterized in that: two positioning rods ( 10), the fixed main plate of the second fork plate (9) and the positioning rod (10) are slidably connected. 6.根据权利要求5所述的一种用于楼面上简易便捷型钢结构梁吊装配套装置,其特征在于:所述定位杆(10)的外侧且位于第二叉板(9)远离第一叉板(3)的一侧套接有回力弹簧(11)。6. A simple and convenient type steel structure beam hoisting matching device on a floor according to claim 5, characterized in that: the positioning rod (10) is located outside the second fork plate (9) away from the first A return spring (11) is sleeved on one side of the fork plate (3).
CN202220093381.2U 2022-01-14 2022-01-14 Simple and convenient profile steel structure beam hoisting matching device used on floor Expired - Fee Related CN217627089U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220093381.2U CN217627089U (en) 2022-01-14 2022-01-14 Simple and convenient profile steel structure beam hoisting matching device used on floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220093381.2U CN217627089U (en) 2022-01-14 2022-01-14 Simple and convenient profile steel structure beam hoisting matching device used on floor

Publications (1)

Publication Number Publication Date
CN217627089U true CN217627089U (en) 2022-10-21

Family

ID=83643128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220093381.2U Expired - Fee Related CN217627089U (en) 2022-01-14 2022-01-14 Simple and convenient profile steel structure beam hoisting matching device used on floor

Country Status (1)

Country Link
CN (1) CN217627089U (en)

Similar Documents

Publication Publication Date Title
CN207748760U (en) A kind of bridge crane of hoisting large-size drainpipe
CN209988942U (en) Assembled building superimposed sheet lifting device
CN211366784U (en) Integral hoisting system in narrow space
CN211569862U (en) Prefabricated hoist and mount piece of building convenient to dismouting
CN212198218U (en) A gantry crane with stay cable
CN219860047U (en) Large plate glass lifting device in narrow space
CN201660377U (en) Special gantry crane for overlength and large-tonnage parts
CN217537949U (en) An assembled shear wall transportation hoisting device
CN220485176U (en) Hoisting device without counterweight
CN210683047U (en) Loading and unloading truck device for large components
CN207046738U (en) A kind of boom hoisting for loading and unloading and shifting suitable for equipment
CN201343871Y (en) Curtain wall moving plate support
CN209957241U (en) a steel hanger
CN209567730U (en) A kind of small-sized lattice dead man steel construction
CN112607631A (en) Small gun carrier
CN223163045U (en) Be applicable to building industry prefab hoist and mount slide hanger
CN215479226U (en) Curtain wall unit plate transportation device
CN117432172B (en) House building construction operation platform and working method thereof
CN218520955U (en) Combined hanging plate track channel steel
CN222714892U (en) A kind of wooden box hanger bracket for car frame
CN222361855U (en) A tower crane chassis
CN214989915U (en) Frame for chemical injection winch
CN221440170U (en) Hoisting mechanism of pier column climbing frame
CN213171146U (en) An equipment lifting device
CN223813261U (en) Hoisting tool for top plate flat top upright post

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221021