CN217580552U - Partially-assembled concrete filled steel tubular column-concrete beam connecting node - Google Patents

Partially-assembled concrete filled steel tubular column-concrete beam connecting node Download PDF

Info

Publication number
CN217580552U
CN217580552U CN202221619114.0U CN202221619114U CN217580552U CN 217580552 U CN217580552 U CN 217580552U CN 202221619114 U CN202221619114 U CN 202221619114U CN 217580552 U CN217580552 U CN 217580552U
Authority
CN
China
Prior art keywords
concrete
concrete beam
strength
holes
square
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221619114.0U
Other languages
Chinese (zh)
Inventor
张再昱
王建涛
孙清
赵炳震
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Construction Engineering Holding Group Future City Innovation Technology Co ltd
Xi'an Jiaotong University
Original Assignee
Shaanxi Construction Engineering Holding Group Future City Innovation Technology Co ltd
Xi'an Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Construction Engineering Holding Group Future City Innovation Technology Co ltd, Xi'an Jiaotong University filed Critical Shaanxi Construction Engineering Holding Group Future City Innovation Technology Co ltd
Priority to CN202221619114.0U priority Critical patent/CN217580552U/en
Application granted granted Critical
Publication of CN217580552U publication Critical patent/CN217580552U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

本实用新型公开了一种部分装配式钢管混凝土柱‑混凝土梁连接节点,包括预应力混凝土梁、牛腿、销轴、薄壁方钢管、销轴螺母和穿芯纵筋;本实用新型的新型连接节点采用高强薄壁方形钢管混凝土柱,高强钢的存在能够显著增强钢管对混凝土的约束效应,并在钢管内部灌入高强混凝土,使得截面的承载力得到显著提升。在预制混凝土梁的底部预埋型钢构件,与梁底部的纵筋焊接牢靠,另外安装摩擦耗能连接件,提升节点部位在地震作用下的耗能能力。在节点的上部位置采用湿式连接方案,经过短期养护后可继续施工;在节点的下部位置采用干式连接方案,采用高强螺栓将混凝土梁预制的钢构件、牛腿侧板和内部加劲肋连接。

Figure 202221619114

The utility model discloses a partially assembled concrete-filled steel tubular column-concrete beam connection node, which comprises a prestressed concrete beam, a corbel, a pin, a thin-walled square steel pipe, a pin nut and a core longitudinal reinforcement; The high-strength thin-walled square concrete-filled steel tubular column is adopted, and the existence of high-strength steel can significantly enhance the restraint effect of the steel tube on the concrete, and the high-strength concrete is poured into the steel tube, so that the bearing capacity of the section is significantly improved. The pre-embedded steel members at the bottom of the precast concrete beams are firmly welded with the longitudinal bars at the bottom of the beams. In addition, friction energy dissipation connectors are installed to improve the energy dissipation capacity of the joints under the action of earthquakes. The wet connection scheme is adopted at the upper part of the node, and the construction can be continued after short-term maintenance; the dry connection scheme is adopted at the lower part of the node, and high-strength bolts are used to connect the prefabricated steel members of the concrete beam, the corbel side plates and the internal stiffeners.

Figure 202221619114

Description

Partially-assembled concrete filled steel tubular column-concrete beam connecting node
Technical Field
The utility model belongs to the technical field of structural engineering, specifically belong to a partial assembled steel core concrete column-concrete beam connected node.
Background
The assembly type building is formed by manufacturing components or fittings used for the building in advance in a processing plant, and then transporting the components or the fittings to a site to be assembled and installed in a reliable connection mode. The fabricated building has the advantages of rapid construction, energy conservation, environmental protection and the like, but the problem of poor integrity and seismic performance caused by unreasonable connection of node parts is increasingly prominent. The traditional fabricated concrete structure is usually connected by adopting sleeve slurry or mechanical connection, so that the requirement on construction precision is high, and the construction quality is difficult to ensure; in a common assembly type structure, the problems of large steel consumption, high manufacturing cost, fire prevention, rust prevention and the like are difficult to solve. The high-strength steel pipe concrete column-precast (prestressed) concrete beam novel connecting frame is popularized and applied in the fabricated building, so that the construction efficiency and the industrialization level of the building can be obviously improved, and the industrialized development requirement of the building in China is completely met.
At present, in common civilian and industrial building, steel core concrete column and concrete beam adopt cast-in-place mode to be connected usually, and this kind of wet-type is connected and is had higher requirements for construction quality, is difficult to be under construction superstructure during the concrete maintenance, has slowed down the construction progress, is unfavorable for realizing the quick construction of modularization of assembly type structure.
SUMMERY OF THE UTILITY MODEL
In order to solve the problems existing in the prior art, the utility model provides a part assembled concrete filled steel tubular column-concrete beam connected node, this novel node can show the wholeness ability and the anti-seismic performance that promote assembly type structure's efficiency of construction, cross-section bearing capacity and structure. The utility model discloses can effectively improve traditional cast-in-place formula or the not enough "fat post" of thick beam ", maintenance cycle length, the poor scheduling problem of wholeness ability and anti-seismic performance that cause of material intensity of assembled steel pipe concrete-concrete beam node completely.
In order to achieve the above purpose, the utility model provides a following technical scheme:
a partially assembled concrete filled steel tubular column-concrete beam connecting node comprises a prestressed concrete beam, brackets, pin shafts, thin-wall square steel tubes, pin shaft nuts and core penetrating longitudinal bars;
the outer side wall of the thin-wall square steel pipe is provided with a bracket, and a square stiffening rib with a hole is arranged in the bracket;
the bottom of the prestressed concrete beam is provided with a prestressed tendon, and the end part of the prestressed tendon is provided with a built-in square steel plate; the front end of the built-in square steel plate is respectively provided with a top steel plate, a side steel plate, a square steel plate and a square steel plate with holes;
after the square steel plate with the holes and the square stiffening ribs with the holes are superposed, the pin shaft penetrates through the holes of the square steel plate with the holes and the square stiffening ribs with the holes and is fixed through a pin shaft nut;
the thin-wall square steel pipe is provided with a hole, one end of the core-through longitudinal bar penetrates through the hole to be fixed, and the other end of the core-through longitudinal bar is laid on the top of the prestressed concrete beam;
and pouring high-strength concrete inside the high-strength thin-wall square steel tube to form high-strength thin-wall square steel tube concrete, pouring post-cast strip concrete on the bracket, and pouring concrete on the core penetrating longitudinal bars at the top of the prestressed concrete beam to form a floor slab overlapped part.
Preferably, the strength grade of the thin-wall square steel tube is not lower than Q420, and the strength grade of the core high-strength concrete is not lower than C60.
Preferably, a stiffening grid is arranged at the core penetrating position of the core penetrating longitudinal rib.
Preferably, brass plates are arranged on two sides of the side steel plate and connected through high-strength bolts.
Preferably, the method for setting the prestressed tendons is a pretensioning method.
Preferably, two side faces of the square stiffening rib with the hole are respectively welded with the bottom plate of the steel bracket wrapped outside and the side wall of the thin-wall steel pipe.
Preferably, the bottom plate of bracket and the welding have the crown plate on the thin wall steel pipe lateral wall.
Preferably, the two square stiffening ribs with holes are in a group, and the square steel plate with holes is inserted into the middle of the two square stiffening ribs with holes and is fixed through a pin roll nut.
Preferably, the bracket is a U-shaped bracket with a hole.
Compared with the prior art, the utility model discloses following profitable technological effect has:
the utility model provides a part assembled steel core concrete column-concrete beam connected node can satisfy wholeness ability and anti-seismic performance between the beam column on the basis of guaranteeing quick modularization construction, the utility model discloses a novel connected node adopts the thin wall square steel core concrete column that excels in, and the existence of high-strength steel can show the restraint effect of reinforcing steel pipe to the concrete to pour into high-strength concrete inside the steel pipe, make the bearing capacity in cross-section show and promote. The steel members are embedded at the bottom of the precast concrete beam and firmly welded with the longitudinal ribs at the bottom of the beam, and in addition, friction energy dissipation connecting pieces are installed to improve the energy dissipation capacity of the joint parts under the action of an earthquake. Adopting a wet connection scheme at the upper part of the node, and continuing construction after short-term maintenance; and a dry type connecting scheme is adopted at the lower part of the node, and a high-strength bolt is adopted to connect the steel member prefabricated by the concrete beam, the bracket side plate and the internal stiffening rib.
The utility model provides a novel connected node of partly assembled high strength thin wall steel core concrete column-prefabricated (prestressing force) concrete beam can effectively overcome traditional cast-in-place formula or complete assembly formula steel core concrete column-concrete beam size, from great, the bearing capacity is low, the efficiency of construction is low, maintenance cycle is long and whole anti-seismic performance subalternation problem, adopt high strength material and high performance structural style, effectively promote the efficiency of construction and the structural performance of the novel mixed structure of steel core concrete column-concrete beam, use in modern civil construction, industrial building, special type building and other multi-layer important buildings and have better economic benefits and technological advantage
Furthermore, the square stiffening rib with the holes is welded with the bottom plate of the bracket and the concrete-filled steel tubular column, so that the bearing capacity of the bottom plate of the bracket is enhanced, and meanwhile, the square stiffening rib with the holes is connected with the precast concrete beam.
Furthermore, the core penetrating position of the core penetrating longitudinal rib is provided with a stiffening grid, and the stiffening grid can effectively reduce the adverse effect of the holes on the pipe wall in the local core area of the node.
Furthermore, brass plates are arranged on two sides of the side steel plate and connected through high-strength bolts, and the energy consumption capacity of the node is enhanced through friction between the brass plates and the steel plate.
Furthermore, the bottom of the prestressed concrete beam can be provided with prestressed tendons according to requirements, the prestressed tendons are arranged in a pre-tensioning method, and the prestressed tendons adopting the pre-tensioning method can improve the cracking performance and deformation control of the beam.
Furthermore, the U-shaped bracket with the hole is arranged at the connecting part of the concrete filled steel tubular column and the concrete beam, so that the beam can be put on the bracket in the hoisting process, the problem of installing components while hoisting is avoided, the building speed is increased, and the construction precision requirement is reduced.
Furthermore, the ring plates are welded for half a circle around the concrete-filled steel tubular column at the upper, middle and lower positions of the bracket, so that the ring plates and the bracket can bear force together, and the overall performance of the bracket and the column is enhanced.
Drawings
FIG. 1 is a schematic view of a partially fabricated concrete filled steel tubular column-concrete beam joint;
FIG. 2 is a schematic view of a high strength thin wall square concrete filled steel tube and an outsourcing bracket configuration;
FIG. 3 is a schematic view of a precast (prestressed) concrete beam construction;
FIG. 4 is a schematic cross-sectional view of a precast (prestressed) concrete beam;
FIG. 5 is a schematic view of a side steel plate;
fig. 6 is a schematic view of a brass plate.
In the drawings: a floor slab overlapping section 1; a prestressed concrete beam 2; a bracket 3; a ring plate 4; a pin shaft 5; 6, high-strength concrete; cold-bending the high-strength thin-wall steel pipe 7; a stiffening grid 8; post-cast strip concrete 9; a square stiffener with holes 10; a pin nut 11; a core penetrating longitudinal rib 12; a square steel plate 13 with holes; a square steel plate 14; a prestressed tendon 15; a hole 16; a brass plate 17; a high-strength bolt 18; a square steel plate 19 is arranged inside; a top steel plate 20; side steel plates 21.
Detailed Description
The present invention will now be described in further detail with reference to specific examples, which are intended to be illustrative, but not limiting, of the invention.
As shown in fig. 1 to 6, a partially fabricated concrete filled steel tubular column-concrete beam joint is composed of high-strength thin-walled square concrete filled steel tubular, a precast (prestressed) concrete beam, and a corbel 3. The high-strength thin-wall square steel tube concrete consists of a cold-formed high-strength thin-wall square steel tube 7 and core high-strength concrete 6, and a hole 16 is formed in the local part of the node core area; the prestressed concrete beam 2 is prefabricated by a factory and shares a longitudinal bar 12 which passes through a node core area with the cast-in-place floor slab laminated part 1; the bracket 3 can be used as a template for pouring the post-pouring belt concrete 9, is welded with the high-strength thin-wall square steel tube concrete column and the annular plate 4, and can bear the load in the use stage.
The strength grade of the cold-formed high-strength thin-wall square steel tube 7 of the high-strength square steel tube concrete column is not lower than Q420, and the strength grade of the core high-strength concrete 6 is not lower than C60.
The longitudinal ribs 12 in the cold-formed high-strength thin-wall steel pipe 7 penetrate through the core area of the node and are locally provided with holes 16, and the core high-strength concrete 6 and the post-cast strip concrete 9 at the beam end work together to bear the upper load of the beam together.
The stiffening grids 8 are arranged at the core penetrating positions of the core penetrating longitudinal ribs 12, so that the adverse effect of the holes 16 formed in the local core area of the node on the pipe wall can be effectively reduced.
The square stiffening ribs 10 with holes are arranged in the bracket 3 and are welded with the bottom plate of the bracket 3 and the cold-formed high-strength thin-wall steel pipe 7, so that the problems of local buckling and insufficient bearing capacity of the cold-formed high-strength thin-wall steel pipe 7 and the bracket 3 are solved. In addition, in order to improve the bearing capacity of the bracket 3, a ring plate 4 is welded on the bottom plate of the bracket 3 and the side plate of the cold-formed high-strength thin-wall steel pipe 7.
The prestressed concrete beam 2 adopts welding to effectively transmit the load of the prestressed tendon 15 to the built-in square steel plate 19, and the front end of the built-in square steel plate 19 is respectively welded with a top steel plate 20, a side steel plate 21, a square steel plate 14 and a square steel plate 13 with holes. In addition, two brass plates 17 and high-strength bolts 18 are arranged on the side steel plate 21, and the energy consumption capability of the node is enhanced through the friction between the brass plates 17 and the steel plate.
The upper part of the beam in the floor slab overlapping part 1 and the floor slab overlapping part 1 penetrate through the longitudinal rib 12, and the hole 16 is formed in the part of the longitudinal rib 12 penetrating through the node core area.
The utility model discloses a novel node scheme's characterized in that, the construction order is on-the-spot erects for steel pipe and steel corbel part, secondly hoist and mount prestressed concrete roof beam 2, then will sell axle 5 and pass foraminiferous square stiffening rib 10 and foraminiferous square steel sheet 13, and adopt round pin axle nut 11 fixed, will indulge muscle 12 afterwards and pass node core region part and open and have hole 16, and pour core high-strength concrete 6 and post-cast strip concrete 9, pour cast-in-place floor coincide part 1 at last, the utility model is suitable for a to building fast, the higher structure of wholeness ability and anti-seismic performance requirement.
The utility model discloses a partly assembled steel core concrete column-concrete beam connected node adopts the installation of partly assembled to effectively improve the efficiency of construction, and novel connected form can guarantee node or frame construction's whole anti-seismic performance.
The high-strength thin-wall square steel tube concrete column adopts high-strength steel and high-strength concrete, so that the problem of overlarge cross section caused by insufficient strength of the traditional material can be solved, the constraint effect of the high-strength steel on the core concrete is large, the bearing capacity of the high-strength material can be fully exerted, and the problems of overhigh use and construction cost of building materials and the like can be reduced. This kind of novel node has the bracket, can realize convenient construction after the quick hoist and mount, improves the efficiency of construction of on-the-spot machinery. The hole is opened to node core district steel pipe, can realize concrete in the post and the one-time whole shaping of pouring of beam-ends post-cast section concrete, is favorable to the biography power between the beam column. The friction energy dissipation connecting piece is arranged at the bottom of the precast concrete beam, and the overall performance and the anti-seismic performance of the structure are increased.
The utility model provides a novel connected node of partly assembled high strength thin wall steel core concrete column-prefabricated (prestressing force) concrete beam can effectively overcome traditional cast-in-place formula or complete assembly formula steel core concrete column-concrete beam size, from great, the bearing capacity is low, the efficiency of construction is low, maintenance cycle length and whole anti-seismic performance subalternation problem, adopt high-strength material and high performance structural style, effectively promote the efficiency of construction and the structural performance of the novel mixed structure of steel core concrete column-concrete beam, it has better economic benefits and technical advantage to use in modern civil construction, industrial building, special type building and other multilayer important buildings.
Examples
The utility model provides a partly assembled steel core concrete column-concrete beam connected node can overcome the not enough too big problem in cross-section that causes of traditional material intensity to the high-strength steel is great to the constraint effect of core concrete, and the bearing capacity that can full play high-strength material is favorable to reducing building material's use and the too high scheduling problem of construction cost. Utilize the utility model discloses a when novel node construction steel core concrete column-concrete beam frame construction, mainly divide into: the method comprises the steps of prefabricating parts in a factory, erecting steel pipes on site, hoisting prefabricated (prestressed) concrete beams, integrally installing on site and pouring concrete.
Factory prefabricated test piece
When a factory manufactures a precast (prestressed) concrete beam, the load of a prestressed tendon 15 can be effectively transmitted to the built-in square steel plate 14 by welding, and the front end of the built-in square steel plate 14 is welded with the square steel plate 13 with holes.
On-site erecting steel pipe
And (4) transporting steel pipes, brackets and other steel parts which are welded completely in a factory to a site, and erecting the steel pipes to serve as construction templates and supports.
Hoisting prefabricated (prestressed) concrete beam
The prestressed concrete beam 2 is transported to a construction site from a factory to be hoisted, placed on a bottom plate of the steel corbel 3, and the square steel plate 13 with the holes is inserted.
In situ monolithic installation
The pin 5 penetrates through the square stiffening rib 10 with holes and the square steel plate 13 with holes and is fixed by the pin nut 11, and then the core penetrating longitudinal rib 12 penetrates through the core area of the node and is partially provided with a hole 16.
Pouring of concrete
And pouring core high-strength concrete 6 and post-cast strip concrete 9, and finally pouring the cast-in-place floor slab laminated part 1, wherein after the steps are finished, the subsequent construction process can be continued after the concrete is cured to the specified strength.

Claims (9)

1.一种部分装配式钢管混凝土柱-混凝土梁连接节点,其特征在于,包括预应力混凝土梁(2)、牛腿(3)、销轴(5)、薄壁方钢管(7)、销轴螺母(11)和穿芯纵筋(12);1. a partially assembled concrete-filled steel tubular column-concrete beam connection node, is characterized in that, comprises prestressed concrete beam (2), corbel (3), pin (5), thin-walled square steel pipe (7), pin nut (11) and longitudinal ribs (12) through the core; 所述薄壁方钢管(7)的外侧壁上设置有牛腿(3),牛腿(3)上内置有带孔方形加劲肋(10);A corbel (3) is provided on the outer side wall of the thin-walled square steel pipe (7), and a square stiffening rib (10) with holes is built in the corbel (3); 预应力混凝土梁(2)的底部设置有预应力筋(15),预应力筋(15)的端部设置有内置方形钢板(19);内置方形钢板(19)的前端分别设置有顶部钢板(20)、侧面钢板(21)、方形钢板(14)和带孔方形钢板(13);The bottom of the prestressed concrete beam (2) is provided with prestressed ribs (15), the ends of the prestressed ribs (15) are provided with built-in square steel plates (19); the front ends of the built-in square steel plates (19) are respectively provided with top steel plates (19). 20), side steel plate (21), square steel plate (14) and square steel plate with holes (13); 所述带孔方形钢板(13)与带孔方形加劲肋(10)相重合后,销轴(5)穿过带孔方形钢板(13)与带孔方形加劲肋(10)的孔,通过销轴螺母(11)进行固定;After the square steel plate with holes (13) and the square stiffeners (10) with holes are overlapped, the pin shaft (5) passes through the holes of the square steel plate with holes (13) and the square stiffeners (10) with holes, The shaft nut (11) is fixed; 所述薄壁方钢管(7)上设置有孔洞(16),穿芯纵筋(12)的一端穿过孔洞(16)进行固定,穿芯纵筋(12)的另一端铺设在预应力混凝土梁(2)的顶部;The thin-walled square steel pipe (7) is provided with a hole (16), one end of the core-penetrating longitudinal rib (12) is fixed through the hole (16), and the other end of the core-penetrating longitudinal rib (12) is laid on the prestressed concrete beam ( 2) at the top; 在高强薄壁方钢管(7)的内部浇筑高强混凝土(6)形成高强薄壁方钢管混凝土,在牛腿(3)上浇筑后浇带混凝土(9),在预应力混凝土梁(2)的顶部的穿芯纵筋(12)上浇筑混凝土形成楼板叠合部分(1)。High-strength concrete (6) is poured inside the high-strength thin-walled square steel pipe (7) to form a high-strength thin-walled square steel tube, poured on the corbel (3) and then poured with concrete (9), on top of the prestressed concrete beam (2) through the core Concrete is poured on the longitudinal bars (12) to form a floor slab overlapping portion (1). 2.根据权利要求1所述的一种部分装配式钢管混凝土柱-混凝土梁连接节点,其特征在于,所述薄壁方钢管(7)的强度等级不低于Q420,核心高强混凝土(6)的强度等级不低于C60。2. A partially assembled CFST column-concrete beam connection node according to claim 1, wherein the strength grade of the thin-walled square steel pipe (7) is not lower than Q420, and the strength of the core high-strength concrete (6) is not lower than Q420. Grade not lower than C60. 3.根据权利要求1所述的一种部分装配式钢管混凝土柱-混凝土梁连接节点,其特征在于,所述穿芯纵筋(12)的穿芯处设有加劲格栅(8)。3. A partially assembled CFST column-concrete beam connection node according to claim 1, characterized in that a stiffening grille (8) is provided at the core through the core longitudinal reinforcement (12). 4.根据权利要求1所述的一种部分装配式钢管混凝土柱-混凝土梁连接节点,其特征在于,所述侧面钢板(21)的两侧设置有黄铜板(17),黄铜板(17)之间通过高强螺栓(18)进行连接。4. A partially assembled CFST column-concrete beam connection node according to claim 1, characterized in that, both sides of the side steel plate (21) are provided with brass plates (17), and the brass plates ( 17) are connected by high-strength bolts (18). 5.根据权利要求1所述的一种部分装配式钢管混凝土柱-混凝土梁连接节点,其特征在于,所述预应力筋(15)的设置方法为先张法。5. A partially assembled CFST column-concrete beam connection node according to claim 1, characterized in that, the prestressing tendon (15) is arranged by a pre-tensioning method. 6.根据权利要求1所述的一种部分装配式钢管混凝土柱-混凝土梁连接节点,其特征在于,带孔方形加劲肋(10)的两侧面分别与外包钢牛腿(3)的底板和薄壁钢管(7)的侧壁进行焊接。6. A partially assembled concrete-filled steel tubular column-concrete beam connection node according to claim 1, wherein the two sides of the square stiffening rib (10) with holes are respectively connected with the bottom plate of the outer steel corbel (3) It is welded with the side wall of the thin-walled steel pipe (7). 7.根据权利要求1所述的一种部分装配式钢管混凝土柱-混凝土梁连接节点,其特征在于,所述牛腿(3)的底板和薄壁钢管(7)侧壁上焊接有环板(4)。7. A partially assembled CFST column-concrete beam connection node according to claim 1, wherein a ring plate is welded on the bottom plate of the corbel (3) and the side wall of the thin-walled steel pipe (7) (4). 8.根据权利要求1所述的一种部分装配式钢管混凝土柱-混凝土梁连接节点,其特征在于,两个所述带孔方形加劲肋(10)为一组,带孔方形钢板(13)插入两个所述带孔方形加劲肋(10)的中部,通过销轴螺母(11)进行固定。8. A partially assembled CFST column-concrete beam connection node according to claim 1, characterized in that, the two square stiffeners (10) with holes are a group, and the square steel plates (13) with holes are a group. Insert into the middle of the two square stiffening ribs (10) with holes and fix them with pin nuts (11). 9.根据权利要求1所述的一种部分装配式钢管混凝土柱-混凝土梁连接节点,其特征在于,所述牛腿(3)为U形带孔牛腿。9 . The partially assembled concrete-filled steel tubular column-concrete beam connection node according to claim 1 , wherein the corbel ( 3 ) is a U-shaped corbel with holes. 10 .
CN202221619114.0U 2022-06-22 2022-06-22 Partially-assembled concrete filled steel tubular column-concrete beam connecting node Expired - Fee Related CN217580552U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221619114.0U CN217580552U (en) 2022-06-22 2022-06-22 Partially-assembled concrete filled steel tubular column-concrete beam connecting node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221619114.0U CN217580552U (en) 2022-06-22 2022-06-22 Partially-assembled concrete filled steel tubular column-concrete beam connecting node

Publications (1)

Publication Number Publication Date
CN217580552U true CN217580552U (en) 2022-10-14

Family

ID=83532370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221619114.0U Expired - Fee Related CN217580552U (en) 2022-06-22 2022-06-22 Partially-assembled concrete filled steel tubular column-concrete beam connecting node

Country Status (1)

Country Link
CN (1) CN217580552U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116950223A (en) * 2023-05-06 2023-10-27 安徽工业大学 Reinforced concrete superposed column, beam connecting structure and construction method
CN117552519A (en) * 2023-11-15 2024-02-13 福建铭泰集团有限公司 Preparation method of a new type of prefabricated concrete-filled steel tube building structure
CN119145659A (en) * 2024-11-18 2024-12-17 福建建工装配式建筑研究院有限公司 Column top supporting tool for mounting prefabricated building cover and mounting method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116950223A (en) * 2023-05-06 2023-10-27 安徽工业大学 Reinforced concrete superposed column, beam connecting structure and construction method
CN117552519A (en) * 2023-11-15 2024-02-13 福建铭泰集团有限公司 Preparation method of a new type of prefabricated concrete-filled steel tube building structure
CN119145659A (en) * 2024-11-18 2024-12-17 福建建工装配式建筑研究院有限公司 Column top supporting tool for mounting prefabricated building cover and mounting method thereof
CN119145659B (en) * 2024-11-18 2025-01-28 福建建工装配式建筑研究院有限公司 Column top supporting tool for mounting prefabricated building cover and mounting method thereof

Similar Documents

Publication Publication Date Title
CN101906754B (en) Rigid connection method for steel beam and concrete pier
CN105804241A (en) Single-layer prefabricated assembly type reinforced concrete beam-column joint
CN107143034A (en) A kind of assembly concrete frame structure beam column rigid connection node
CN209260922U (en) Band girder rib laminated floor slab pre-tensioning system connecting joint structure
CN101457548A (en) Node for connecting round steel tube concrete column with reinforced concrete floor and method for making same
CN114922286A (en) Assembly type replaceable energy consumption hybrid connection node and installation method
CN217840298U (en) Novel friction energy consumption node of steel core concrete column-precast concrete beam
CN109267585B (en) Assembled prismatic table type foundation and column structure and assembling method
CN218643645U (en) Full-assembly type reinforced concrete floor connected by steel-concrete combined structure
CN216892975U (en) Prefabricated assembled coincide steel pipe concrete shear force wall
CN207794299U (en) A kind of complete assembled steel reinforced concrete frame structure system
CN114108808A (en) PVC-FRP (polyvinyl chloride-fiber reinforced plastic) pipe concrete column and concrete composite beam combined structure with adjustable connecting nodes and installation method thereof
CN112267575A (en) Prefabricated steel-encased concrete column and steel beam connecting joint and construction process
CN206736696U (en) A kind of prefabricated assembled anchor bolts steel reinforced concrete combination beam
CN211548015U (en) Prefabricated assembled steel-concrete composite beam
CN218714108U (en) Prefabricated lattice type steel reinforced concrete combined shear wall
CN110106977B (en) A kind of assembled steel structure beam-column grouting anchor node
CN115419166A (en) Support-free connecting joint for prefabricated beam column of assembled concrete frame structure and construction method
CN112267569B (en) Connection node between top of steel column and corrugated steel plate concrete composite slab and construction method
CN112323987B (en) Prefabricated stiffened steel pipe concrete column and profiled steel sheet combined plate joint and construction process
CN208502067U (en) A partially prefabricated prestressed steel-concrete hybrid beam
CN213926773U (en) Prefabricated steel-concrete column and steel beam connection node
CN216713926U (en) Precast concrete elevator structure of dry type connecting node of post-cast-free embedded steel box
CN215977872U (en) Overlapped integral prefabricated shear wall edge component
CN214220274U (en) Partially prefabricated truss type steel reinforced concrete Z-shaped column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221014

CF01 Termination of patent right due to non-payment of annual fee