CN217574329U - Glass fiber coating felt - Google Patents

Glass fiber coating felt Download PDF

Info

Publication number
CN217574329U
CN217574329U CN202220994197.5U CN202220994197U CN217574329U CN 217574329 U CN217574329 U CN 217574329U CN 202220994197 U CN202220994197 U CN 202220994197U CN 217574329 U CN217574329 U CN 217574329U
Authority
CN
China
Prior art keywords
waterproof
plate
coating
setting
coating felt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220994197.5U
Other languages
Chinese (zh)
Inventor
杨鹏威
贾革文
张永超
朱艳红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU CHANGHAI COMPOSITE MATERIALS CO Ltd
Original Assignee
JIANGSU CHANGHAI COMPOSITE MATERIALS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU CHANGHAI COMPOSITE MATERIALS CO Ltd filed Critical JIANGSU CHANGHAI COMPOSITE MATERIALS CO Ltd
Priority to CN202220994197.5U priority Critical patent/CN217574329U/en
Application granted granted Critical
Publication of CN217574329U publication Critical patent/CN217574329U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The utility model discloses a glass fiber coating felt, its technical scheme main points are: the heat insulation structure comprises a waterproof top plate, wherein an upper heat insulation coating is arranged at the top end of the waterproof top plate, a first activated carbon layer is fixedly arranged at the bottom end of the waterproof top plate, and a plurality of honeycomb holes are formed in the bottom surface of the waterproof top plate; fixed subassembly, fixed subassembly sets up one side of waterproof roof for the coating felt can be fixed to the coating felt when standing up, through setting up waterproof roof, can prevent inside moisture in the air gets into the coating felt, through setting up honeycomb holes, can realize first layer noise insulation effect, through setting up the mortise hole, can be when the coating felt stands up through the mortise hole, fix the coating felt on the wall that has tenon column structure, through setting up the sticking block, can tentatively fix the coating felt, make its laminating together, through setting up the acoustic celotex board, can carry out last wall with the remaining sound of the both ends noise reduction treatment in the front through the acoustic celotex board.

Description

Glass fiber coating felt
Technical Field
The utility model relates to a coating felt technical field, concretely relates to glass fiber coating felt.
Background
The light partition wall board is a new type of energy-saving wall material, it is a kind of wall material whose appearance is similar to that of hollow floor slab, but its both sides have male and female mortises, when it is installed, it only needs to stand the board, and the male and female mortises are coated with small quantity of caulking mortar, and then they are assembled together. The high-efficiency energy-saving building material is prepared from various industrial waste residues such as harmless phosphogypsum, light steel slag, fly ash and the like through variable-frequency steam pressurization curing. The light partition board has the advantages of light weight, high strength, multiple environmental protection, heat preservation and insulation, sound insulation, breathing and humidity regulation, fire prevention, rapid construction, wall body cost reduction and the like. The inner layer is provided with the inorganic foaming section bar or other heat preservation materials with reasonable layout, which can insulate heat and absorb sound, the wallboard is formed by pouring, leveling and scientific curing through the production line, the production automation degree is high, and the specifications and varieties are many.
For example, chinese patent publication No. CN207643826U, in which a glass fiber coated mat is proposed, is disclosed, which uses a water and sound insulating material to enhance the water and sound insulating effect of the coated mat, but in this scheme, the heat resistance is not significantly enhanced, and the practicability is greatly reduced, so we propose a glass fiber coated mat.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a glass fiber coating felt has solved the heat resistance and has not had the problem of obvious enhancement.
The above technical purpose of the present invention can be achieved by the following technical solutions:
a glass fiber coated mat comprising: the heat insulation coating is arranged at the top end of the waterproof top plate, a first activated carbon layer is fixedly mounted at the bottom end of the waterproof top plate, and a plurality of honeycomb holes are formed in the bottom surface of the waterproof top plate; the fixing component is arranged on one side of the waterproof top plate and used for fixing the coating felt when the coating felt stands up.
Through adopting above-mentioned technical scheme, through setting up waterproof roof, can prevent that moisture in the air from getting into inside the coating felt, through setting up thermal barrier coating, can strengthen thermal-insulated effect, through setting up honeycomb holes, can realize first layer syllable-dividing effect.
Preferably, the fixing assembly includes: the adhesive block is arranged on one side of the waterproof top plate, a fixing block is fixedly mounted on one side of the adhesive block, and tenon holes are formed in two sides of the fixing block.
Through adopting above-mentioned technical scheme, through setting up the mortise, can fix the coating felt on the wall that has tenon column structure when the coating felt sets up through the mortise, paste the piece through the setting, can tentatively fix the coating felt, make it laminate together.
Preferably, the bottom end of the first activated carbon layer is fixedly provided with a first pasting plate, the bottom surface of the first pasting plate is fixedly provided with a sound-absorbing plate, and the bottom surface of the sound-absorbing plate is fixedly provided with a second pasting plate.
Through adopting above-mentioned technical scheme, through setting up the abatvoix, can carry out second section sound insulation to the coating felt and handle, can absorb or bounce-back most sound through the abatvoix. Thereby enhancing the sound insulation effect of the glass fiber coating mat.
Preferably, the bottom end of the second pasting plate is fixedly provided with a second activated carbon layer, the bottom end of the second activated carbon layer is fixedly provided with a sound insulation plate, and the bottom end of the sound insulation plate is fixedly provided with a waterproof bottom plate.
Through adopting above-mentioned technical scheme, through setting up the acoustic celotex board, can carry out final wall with the remaining sound of the both ends noise reduction treatment in the front through the acoustic celotex board to reach very good triple syllable-dividing effect, through setting up the second activated carbon layer, can adsorb the processing to moisture and impurity that contain in the air, through both ends activated carbon adsorption, can effectively prevent inside impurity gets into the coating felt, destroy inner structure.
Preferably, burrs are fixedly mounted at the bottom end of the waterproof bottom plate, and a lower heat insulation coating is arranged at the bottom end of the waterproof bottom plate.
Through adopting above-mentioned technical scheme, through setting up the burr, can be when the below of coating felt is fixed other boards through the burr, can make it inseparabler with coating felt is connected, increase the frictional force between two boards through the burr to make it fix together.
Preferably, the top surface of the waterproof top plate is provided with a first fixing rib, and the top surface of the waterproof top plate is provided with a second fixing rib.
Through adopting above-mentioned technical scheme, through setting up first fixed muscle, through can transversely fixing to the coating felt, through setting up the fixed muscle of second, can be to the vertical fixed of coating felt, first fixed muscle can effectual increase holistic stability with the fixed muscle of second.
To sum up, the utility model discloses mainly have following beneficial effect:
through setting up waterproof roof, can prevent that moisture in the air from getting into inside the coating felt, through setting up thermal barrier coating, can strengthen thermal-insulated effect, through setting up honeycomb holes, can realize first layer noise insulation effect, through setting up the mortise hole, can be when the coating felt stands up through the mortise hole, fix the coating felt on the wall that has tenon column structure, paste the piece through setting up, can tentatively fix the coating felt, make it laminate together, through setting up the acoustic celotex board, can carry out last wall with the remaining sound of preceding both ends noise reduction processing through the acoustic celotex board, thereby reach very good triple syllable-dividing effect, through setting up second activated carbon layer, can carry out adsorption treatment to moisture and impurity that contain in the air, adsorb through both ends activated carbon, can effectively prevent impurity entering coating felt inside, destroy inner structure.
Through setting up the burr, can be when the below of coating felt is fixed other boards through the burr, can make it inseparabler be connected with the coating felt, increase the frictional force between two boards through the burr to make it fixed together, through setting up first fixed muscle, through can fixing to the horizontal of coating felt, through setting up the fixed muscle of second, can be fixed vertically to the coating felt, first fixed muscle can effectually increase holistic stability with the fixed muscle of second.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
fig. 2 is a schematic structural view of the fixing block of the present invention;
fig. 3 is a schematic structural view of the sticking block of the present invention;
fig. 4 is a partially enlarged schematic view at a in fig. 2.
Reference numerals are as follows: 1. a waterproof top plate; 2. coating a heat insulation coating; 3. a first activated carbon layer; 4. honeycomb holes; 5. sticking the block; 6. a fixed block; 7. mortising holes; 8. a first adhesive sheet; 9. a sound-absorbing panel; 10. a second adhesive sheet; 11. a second activated carbon layer; 12. a sound insulating board; 13. a waterproof bottom plate; 14. a lower thermal barrier coating; 15. deburring; 16. a first fixing rib; 17. and a second fixing rib.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, fig. 2 and fig. 3, a glass fiber coating felt, including waterproof roof 1, the top of waterproof roof 1 is provided with thermal barrier coating 2, the bottom fixed mounting of waterproof roof 1 has first activated carbon layer 3, first activated carbon layer 3 does not do the repeated description here for existing structure, a plurality of honeycomb holes 4 have been seted up to the bottom surface of waterproof roof 1, one side of waterproof roof 1 is provided with fixed subassembly, it can fix to the coating felt to be used for the coating felt to stand up, fixed subassembly is including pasting piece 5, it has the gel all to scribble to paste the both sides of piece 5, it sets up in one side of waterproof roof 1 to paste piece 5, one side fixed mounting who pastes piece 5 has fixed block 6, mortise 7 has all been seted up to the both sides of fixed block 6, through setting up mortise 7, can be when the coating felt stands up through mortise 7, fix the coating felt on the wall that has tenon column structure, through setting up paste piece 5, can tentatively fix the coating, make it paste together.
Referring to fig. 1 and 2, a first adhesive plate 8 is fixedly mounted at the bottom of a first activated carbon layer 3, an acoustic board 9 is fixedly mounted at the bottom of the first adhesive plate 8, the acoustic board 9 is of an existing structure and is not described herein any more, a second adhesive plate 10 is fixedly mounted at the bottom of the acoustic board 9, a second activated carbon layer 11 is fixedly mounted at the bottom of the second adhesive plate 10, an acoustic board 12 is fixedly mounted at the bottom of the second activated carbon layer 11, a waterproof bottom board 13 is fixedly mounted at the bottom of the acoustic board 12, through the arrangement of the acoustic board 12, the acoustic board 12 is of an existing structure and is not described herein any more, the remaining sound of the noise reduction treatment at the front two ends can be finally isolated through the acoustic board 12, so that a very good triple sound insulation effect is achieved, through the arrangement of the second activated carbon layer 11, the second activated carbon layer 11 is of an existing structure and is not described herein any more, the moisture and impurities contained in the air can be adsorbed through activated carbon at the two ends, the impurities can be effectively prevented from entering the coating, and the internal structure can be damaged.
Referring to fig. 1, 2 and 4, a burr 15 is fixedly mounted at the bottom end of the waterproof bottom plate 13, the burr 15 is made of rubber, a lower heat insulation coating 14 is arranged at the bottom end of the waterproof bottom plate 13, a first fixing rib 16 is arranged on the top surface of the waterproof top plate 1, a second fixing rib 17 is arranged on the top surface of the waterproof top plate 1, and by arranging the burr 15, when other plates are required to be fixed below the coating felt, the coating felt can be more tightly connected with the burr 15, and the friction force between the two plates is increased through the burr 15, so that the coating felt is fixed together.
The working principle is as follows: please refer to fig. 1-4, through setting up waterproof roof 1, can prevent moisture in the air from getting into inside the coating felt, through setting up thermal barrier coating 2, can strengthen the thermal-insulated effect, through setting up honeycomb holes 4, can realize first layer syllable-dividing effect, through setting up mortise hole 7, can be when the coating felt stands up through mortise hole 7, fix the coating felt on the wall that has tenon column structure, through setting up sticking block 5, can tentatively fix the coating felt, make it laminate together, through setting up abatvoix 9, can carry out second section sound-proof treatment to the coating felt, can absorb or bounce most sound through abatvoix 9. Thereby strengthen the syllable-dividing effect to glass fiber coating felt, through setting up acoustic celotex board 12, can carry out final wall with the remaining sound of preceding both ends noise reduction treatment through acoustic celotex board 12 to reach very good triple syllable-dividing effect, through setting up second activated carbon layer 11, can adsorb the processing to moisture and impurity that contain in the air, through both ends activated carbon adsorption, can effectively prevent inside impurity gets into the coating felt, destroy inner structure.
Through setting up burr 15, can be when the below of coating felt is fixed other boards through burr 15, can make it inseparabler be connected with the coating felt, increase the frictional force between two boards through burr 15, thereby make it fixed together, through setting up first fixed muscle 16, through can fixing to the horizontal of coating felt, through setting up the fixed muscle 17 of second, can be fixed vertically to the coating felt, first fixed muscle 16 can effectual increase holistic stability with the fixed muscle 17 of second.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A glass fiber coated mat, comprising:
the heat insulation structure comprises a waterproof top plate (1), wherein an upper heat insulation coating (2) is arranged at the top end of the waterproof top plate (1), a first activated carbon layer (3) is fixedly arranged at the bottom end of the waterproof top plate (1), and a plurality of honeycomb holes (4) are formed in the bottom surface of the waterproof top plate (1);
the fixing component is arranged on one side of the waterproof top plate (1) and used for fixing the coating felt when the coating felt stands up.
2. A glass fiber coated mat according to claim 1, wherein the securing assembly comprises:
the waterproof roof board is characterized by comprising an adhesive block (5), wherein the adhesive block (5) is arranged on one side of the waterproof roof board (1), a fixing block (6) is fixedly mounted on one side of the adhesive block (5), and tenon holes (7) are formed in two sides of the fixing block (6).
3. The glass fiber coated felt according to claim 1, wherein a first adhesive plate (8) is fixedly mounted at the bottom end of the first activated carbon layer (3), a sound-absorbing plate (9) is fixedly mounted at the bottom surface of the first adhesive plate (8), and a second adhesive plate (10) is fixedly mounted at the bottom surface of the sound-absorbing plate (9).
4. A glass fiber coated felt according to claim 3, wherein a second activated carbon layer (11) is fixedly installed at the bottom end of the second adhesive plate (10), a sound insulation plate (12) is fixedly installed at the bottom end of the second activated carbon layer (11), and a waterproof bottom plate (13) is fixedly installed at the bottom end of the sound insulation plate (12).
5. A glass fibre coated mat according to claim 4, characterized in that a burr (15) is fixedly mounted at the bottom end of the waterproof bottom plate (13), and a lower thermal insulating coating (14) is provided at the bottom end of the waterproof bottom plate (13).
6. A glass fibre coated mat according to claim 1, characterized in that the top surface of the waterproof top sheet (1) is provided with first fixing ribs (16) and the top surface of the waterproof top sheet (1) is provided with second fixing ribs (17).
CN202220994197.5U 2022-04-24 2022-04-24 Glass fiber coating felt Active CN217574329U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220994197.5U CN217574329U (en) 2022-04-24 2022-04-24 Glass fiber coating felt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220994197.5U CN217574329U (en) 2022-04-24 2022-04-24 Glass fiber coating felt

Publications (1)

Publication Number Publication Date
CN217574329U true CN217574329U (en) 2022-10-14

Family

ID=83542463

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220994197.5U Active CN217574329U (en) 2022-04-24 2022-04-24 Glass fiber coating felt

Country Status (1)

Country Link
CN (1) CN217574329U (en)

Similar Documents

Publication Publication Date Title
CN202012208U (en) Light board integrated assembly type residential construction structure with steel frame
CN211714775U (en) Noise reduction partition plate for construction of building engineering
CN210238892U (en) A composite structure orthogonal glued wood floor
CN217574329U (en) Glass fiber coating felt
CN210049533U (en) Sound insulation type wood-plastic floor
CN202745228U (en) Metal sound insulation low-frequency acoustic board
CN215330899U (en) Sound insulation wallboard
CN2869171Y (en) Partition wall, ceiling structure
CN210658794U (en) Structure of sound attenuation wall body
CN210507927U (en) Steel construction building wall of environmental protection and energy saving
CN210658827U (en) Prefabricated assembled sound insulation inner partition plate
CN218622899U (en) Wall body with thermal-insulated function
CN224016549U (en) A sound-insulating and vibration-damping building structure
CN222796782U (en) Combined type sound insulation wall for residential building engineering
KR102066672B1 (en) Building exterior wall panel
CN220889066U (en) Assembled light partition board
CN201212203Y (en) Enhancement type light-weight wall
CN217711403U (en) Double-layer color steel tile structure
CN220414604U (en) Sound insulation composite aluminum plate for curtain wall
CN212248797U (en) Wooden abatvoix wall structure of light gauge steel
CN216100909U (en) Multilayer composite board for wooden furniture
CN218116950U (en) Light wallboard of fire prevention gives sound insulation
CN218149410U (en) Building sound insulation building board
CN222730821U (en) A combined inorganic fiber sound insulation board
CN219471668U (en) Be applied to outdoor ultra-low energy consumption outdoor pavilion

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant