CN217557679U - Combined building template for constructional engineering - Google Patents
Combined building template for constructional engineering Download PDFInfo
- Publication number
- CN217557679U CN217557679U CN202121952593.3U CN202121952593U CN217557679U CN 217557679 U CN217557679 U CN 217557679U CN 202121952593 U CN202121952593 U CN 202121952593U CN 217557679 U CN217557679 U CN 217557679U
- Authority
- CN
- China
- Prior art keywords
- baffle
- connecting plate
- angle connecting
- right angle
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009415 formwork Methods 0.000 claims abstract description 39
- 238000010276 construction Methods 0.000 claims abstract description 20
- 230000000694 effects Effects 0.000 claims description 2
- 239000004567 concrete Substances 0.000 description 12
- 238000009434 installation Methods 0.000 description 6
- 238000001746 injection moulding Methods 0.000 description 5
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000009191 jumping Effects 0.000 description 1
- 239000012528 membrane Substances 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本实用新型公开了一种建筑工程用组合式建筑模板,包括底板,所述底板上表面接近两侧处均活动安装有一号挡板,所述底板上表面接近前表面和后表面处均活动安装有二号挡板,所述一号挡板一侧表面接近下表面处固定安装一号直角连接板,所述一号挡板一侧表面接近上表面处活动安装有二号直角连接板,所述底板两侧表面和所述一号挡板另一侧表面均固定嵌入安装有螺纹套,所述一号直角连接板和所述二号直角连接板一侧表面接近上端处均开设有一号孔洞。本实用新型所述的一种建筑工程用组合式建筑模板,能够使挡板与挡板之间的连接误差减小,使其便于拆卸和安装,且能在固定好的模板上添加新的模板。
The utility model discloses a combined building formwork for construction engineering, which comprises a base plate, a No. 1 baffle plate is movably installed on the upper surface of the base plate near both sides, and the upper surface of the base plate is movably installed at the front surface and the rear surface There is a No. 2 baffle, a No. 1 right-angle connecting plate is fixedly installed on one side surface of the No. 1 baffle close to the lower surface, and a No. 2 right-angle connecting plate is movably installed on one side surface of the No. 1 baffle close to the upper surface. The two side surfaces of the bottom plate and the other side surface of the No. 1 baffle plate are fixedly embedded with threaded sleeves, and the one side surfaces of the No. 1 right-angle connecting plate and the No. 2 right-angle connecting plate are provided with a No. 1 hole near the upper end. . The combined building formwork used in the construction project of the utility model can reduce the connection error between the baffle and the baffle, make it easy to disassemble and install, and can add a new formwork to the fixed formwork .
Description
技术领域technical field
本实用新型涉及建筑模板领域,特别涉及一种建筑工程用组合式建筑模板。The utility model relates to the field of building templates, in particular to a combined building template for building engineering.
背景技术Background technique
建筑模板是一种临时性支护结构,按设计要求制作,使混凝土结构、构件按规定的位置、几何尺寸成形,保持其正确位置,并承受建筑模板自重及作用在其上的外部荷载,进行模板工程的目的,是保证混凝土工程质量与施工安全、加快施工进度和降低工程成本,建筑模板是混凝土浇筑成形的模壳和支架,按材料的性质可分为建筑模板、建筑木胶板、覆膜板、多层板、双面复胶、双面覆膜建筑模板等,建筑模板按施工工艺条件可分为现浇混凝土模板、预组装模板、大模板、跃升模板等,组合式模板,是现代模板技术中,用它进行现浇钢筋混凝土结构施工,可事先按设计要求组拼成梁、柱、墙、楼板的大型模板,整体吊装就位;现有的建筑工程用建筑模板在使用时存在一定的弊端,挡板与挡板之间采用铁钉直接连接,模板的误差大,不便于拆卸和安装,且不能在固定好的模板上添加新的模板。The building formwork is a temporary supporting structure, which is made according to the design requirements, so that the concrete structure and components are formed according to the specified position and geometric size, maintain their correct position, and bear the self-weight of the building formwork and the external load acting on it. The purpose of the formwork project is to ensure the quality and construction safety of the concrete project, speed up the construction progress and reduce the project cost. The building formwork is the formwork and bracket formed by concrete pouring. Membrane board, multi-layer board, double-sided glue, double-sided film-coated building formwork, etc. According to the construction process conditions, the building formwork can be divided into cast-in-place concrete formwork, pre-assembled formwork, large formwork, jumping formwork, etc. The combined formwork is a In the modern formwork technology, it is used for the construction of cast-in-place reinforced concrete structures, which can be assembled into large formworks of beams, columns, walls and floors according to the design requirements in advance, and the whole hoisting in place; the existing building formwork for construction engineering is used when using There are certain drawbacks, the baffle and the baffle are directly connected by iron nails, the error of the template is large, it is inconvenient to disassemble and install, and a new template cannot be added to the fixed template.
实用新型内容Utility model content
本实用新型的主要目的在于提供一种建筑工程用组合式建筑模板,可以有效解决背景技术中的问题。The main purpose of the present utility model is to provide a combined building formwork for building engineering, which can effectively solve the problems in the background technology.
为实现上述目的,本实用新型采取的技术方案为:To achieve the above purpose, the technical scheme adopted by the present utility model is:
一种建筑工程用组合式建筑模板,包括底板,所述底板上表面接近两侧处均活动安装有一号挡板,所述底板上表面接近前表面和后表面处均活动安装有二号挡板,所述一号挡板一侧表面接近下表面处固定安装一号直角连接板,所述一号挡板一侧表面接近上表面处活动安装有二号直角连接板。A combined building formwork for construction engineering, comprising a base plate, a No. 1 baffle plate is movably installed on the upper surface of the base plate near both sides, and a No. 2 baffle plate is movably installed on the upper surface of the base plate near the front surface and the rear surface. , a No. 1 right-angle connecting plate is fixedly installed on one side surface of the No. 1 baffle close to the lower surface, and a No. 2 right-angle connecting plate is movably installed on one side surface of the No. 1 baffle close to the upper surface.
优选的,所述底板两侧表面和所述一号挡板另一侧表面均固定嵌入安装有螺纹套。Preferably, both sides of the bottom plate and the other side of the No. 1 baffle plate are fixedly embedded and installed with threaded sleeves.
优选的,所述一号直角连接板和所述二号直角连接板一侧表面接近上端处均开设有一号孔洞,所述一号直角连接板和所述二号直角连接板另一侧表面接近下端处均开设有二号孔洞。Preferably, a No. 1 hole is formed on one side surface of the No. 1 right-angle connecting plate and the No. 2 right-angle connecting plate near the upper end, and the other side surfaces of the No. 1 right-angle connecting plate and the No. 2 right-angle connecting plate are close to each other. There is a second hole at the lower end.
优选的,所述一号直角连接板和所述二号直角连接板一侧表面均活动嵌入安装有一号螺栓,所述一号螺栓贯穿所述二号孔洞与所述螺纹套活动连接,且所述一号螺栓与所述二号孔洞活动连接。Preferably, a No. 1 bolt is movably embedded in one side surface of the No. 1 right-angle connecting plate and the No. 2 right-angle connecting plate, and the No. 1 bolt is movably connected to the threaded sleeve through the No. 2 hole, and the The No. 1 bolt is movably connected with the No. 2 hole.
优选的,所述二号挡板一侧表面接近下端处均固定嵌入安装有连接底座,所述连接底座贯穿所述二号挡板,所述连接底座一端表面开设有螺纹槽。Preferably, a connection base is fixedly embedded and installed on one side surface of the No. 2 baffle near the lower end, the connection base penetrates the No. 2 baffle, and one end surface of the connection base is provided with a threaded groove.
优选的,所述一号直角连接板另一侧表面活动嵌入安装有二号螺栓,所述二号螺栓贯穿所述一号孔洞与所述连接底座一端的螺纹槽活动连接,且所述二号螺栓与所述一号孔洞活动连接,所述二号挡板通过所述一号直角连接板与所述一号挡板活动连接。Preferably, a No. 2 bolt is movably embedded and installed on the other side surface of the No. 1 right-angle connecting plate, and the No. 2 bolt penetrates the No. 1 hole and is movably connected to a threaded groove at one end of the connection base, and the No. 2 bolt is movably connected to one end of the connecting base. The bolt is movably connected with the No. 1 hole, and the No. 2 baffle is movably connected with the No. 1 baffle through the No. 1 right-angle connecting plate.
与现有技术相比,本实用新型具有如下有益效果:Compared with the prior art, the utility model has the following beneficial effects:
本实用新型中,将底板放置在水平面上,再将两个一号挡板放置在底板上表面,使二号孔洞与螺纹套对齐,用电动螺丝刀将一号螺栓穿过二号孔洞拧入螺纹套内部,从而将一号挡板固定,然后将二号挡板插入两个一号挡板之间,使连接底座的螺纹槽对准一号孔洞,用电动螺丝刀将二号螺栓穿过一号孔洞拧入连接底座的螺纹槽内部,从而将二号挡板固定,将二号直角连接板安装到一号挡板上端,通过一号螺栓与螺纹套的活动连接,使二号直角连接板与一号挡板固定,在一号挡板和二号挡板上表面重复上述操作,从而能够在固定好的模板上添加新的模板,使模板能够自由拼接组合,二号直角连接板同时也防止在倒混凝土时二号挡板向外侧偏移,降低混凝土注塑成型后的误差,提高混凝土注塑的精准度,通过螺栓紧固,降低了模板的拆卸和安装难度,加快模板的拆卸和安装速度。In the utility model, the bottom plate is placed on a horizontal plane, and two No. 1 baffle plates are placed on the upper surface of the bottom plate, so that the No. 2 hole is aligned with the threaded sleeve, and an electric screwdriver is used to screw the No. 1 bolt through the No. 2 hole into the thread Insert the No. 1 bezel into place to fix the No. 1 bezel, then insert the No. 2 bezel between the two No. The hole is screwed into the threaded groove of the connection base, so that the No. 2 baffle is fixed, and the No. 2 right-angle connecting plate is installed on the upper end of the No. 1 baffle. The No. 1 baffle is fixed, and the above operations are repeated on the upper surfaces of the No. 1 and No. 2 baffles, so that a new form can be added to the fixed form, so that the form can be freely spliced and combined, and the No. 2 right-angle connecting plate also prevents the When pouring concrete, the No. 2 baffle plate is shifted to the outside, which reduces the error after concrete injection molding and improves the accuracy of concrete injection molding. Fastening with bolts reduces the difficulty of disassembly and installation of the formwork, and speeds up the disassembly and installation of the formwork.
附图说明Description of drawings
图1为本实用新型一种建筑工程用组合式建筑模板的整体结构示意图;Fig. 1 is the overall structure schematic diagram of the utility model a kind of construction engineering combined type building formwork;
图2为本实用新型一种建筑工程用组合式建筑模板的整体结构拆分视图;2 is a split view of the overall structure of a combined building formwork for a construction project of the present invention;
图3为本实用新型一种建筑工程用组合式建筑模板的一号螺栓与底板连接处剖面视图;Fig. 3 is a sectional view of the joint of the No. 1 bolt and the bottom plate of a combined building formwork for a construction project of the present invention;
图4为本实用新型一种建筑工程用组合式建筑模板的二号螺栓与二号挡板连接处剖面视图。FIG. 4 is a cross-sectional view of the connection between the No. 2 bolt and the No. 2 baffle plate of a combined building formwork for a construction project of the present invention.
图中:1、底板;101、螺纹套;102、一号螺栓;2、一号挡板;3、二号挡板;301、连接底座;302、二号螺栓;4、一号直角连接板;401、一号孔洞;402、二号孔洞;403、二号直角连接板。In the figure: 1. Bottom plate; 101, Threaded sleeve; 102, No. 1 bolt; 2. No. 1 baffle; 3, No. 2 baffle; 301, Connection base; 302, No. 2 bolt; ; 401, No. 1 hole; 402, No. 2 hole; 403, No. 2 right-angle connecting plate.
具体实施方式Detailed ways
为使本实用新型实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体实施方式,进一步阐述本实用新型。In order to make the technical means, creation features, achievement goals and effects of the present invention easy to understand and understand, the present invention will be further described below with reference to the specific embodiments.
如图1-4所示,一种建筑工程用组合式建筑模板,包括底板1,底板1上表面接近两侧处均活动安装有一号挡板2,底板1上表面接近前表面和后表面处均活动安装有二号挡板3,一号挡板2一侧表面接近下表面处固定安装一号直角连接板4,一号挡板2一侧表面接近上表面处活动安装有二号直角连接板403;As shown in Figure 1-4, a combined building formwork for construction engineering includes a base plate 1, a No. The No. 2
底板1两侧表面和一号挡板2另一侧表面均固定嵌入安装有螺纹套101;一号直角连接板4和二号直角连接板403一侧表面接近上端处均开设有一号孔洞401,一号直角连接板4和二号直角连接板403另一侧表面接近下端处均开设有二号孔洞402;一号直角连接板4和二号直角连接板403一侧表面均活动嵌入安装有一号螺栓102,一号螺栓102贯穿二号孔洞402与螺纹套101活动连接,且一号螺栓102与二号孔洞402活动连接;二号挡板3一侧表面接近下端处均固定嵌入安装有连接底座301,连接底座301贯穿二号挡板3,连接底座301一端表面开设有螺纹槽;一号直角连接板4另一侧表面活动嵌入安装有二号螺栓302,二号螺栓302贯穿一号孔洞401与连接底座301一端的螺纹槽活动连接,且二号螺栓302与一号孔洞401活动连接,二号挡板3通过一号直角连接板4与一号挡板2活动连接,能够在固定好的模板上添加新的模板,使模板能够自由拼接组合,二号直角连接板403同时也防止在倒混凝土时二号挡板3向外侧偏移,降低混凝土注塑成型后的误差,提高混凝土注塑的精准度,通过螺栓紧固,降低了模板的拆卸和安装难度,加快模板的拆卸和安装速度。The two side surfaces of the bottom plate 1 and the other side surface of the No. 1
需要说明的是,本实用新型为一种建筑工程用组合式建筑模板,在使用时,将底板1放置在水平面上,再将两个一号挡板2放置在底板1上表面,使二号孔洞402与螺纹套101对齐,用电动螺丝刀将一号螺栓102穿过二号孔洞402拧入螺纹套101内部,从而将一号挡板2固定,然后将二号挡板3插入两个一号挡板2之间,使连接底座301的螺纹槽对准一号孔洞401,用电动螺丝刀将二号螺栓302穿过一号孔洞401拧入连接底座301的螺纹槽内部,从而将二号挡板3固定,将二号直角连接板403安装到一号挡板2上端,通过一号螺栓102与螺纹套101的活动连接,使二号直角连接板403与一号挡板2固定,在一号挡板2和二号挡板3上表面重复上述操作,从而能够在固定好的模板上添加新的模板,使模板能够自由拼接组合,二号直角连接板403同时也防止在倒混凝土时二号挡板3向外侧偏移,降低混凝土注塑成型后的误差,提高混凝土注塑的精准度,通过螺栓紧固,降低了模板的拆卸和安装难度,加快模板的拆卸和安装速度。It should be noted that the present utility model is a combined building formwork for construction engineering. When in use, the bottom plate 1 is placed on a horizontal plane, and then two No. 1
以上显示和描述了本实用新型的基本原理和主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定。The basic principles and main features of the present invention and the advantages of the present invention are shown and described above. It should be understood by those skilled in the art that the present invention is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principle of the present invention. Without departing from the spirit and scope of the present invention, the present invention The new model will also have various changes and improvements, which all fall within the scope of the claimed invention. The claimed scope of the present invention is defined by the appended claims and their equivalents.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202121952593.3U CN217557679U (en) | 2021-08-19 | 2021-08-19 | Combined building template for constructional engineering |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202121952593.3U CN217557679U (en) | 2021-08-19 | 2021-08-19 | Combined building template for constructional engineering |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN217557679U true CN217557679U (en) | 2022-10-11 |
Family
ID=83465672
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202121952593.3U Active CN217557679U (en) | 2021-08-19 | 2021-08-19 | Combined building template for constructional engineering |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN217557679U (en) |
-
2021
- 2021-08-19 CN CN202121952593.3U patent/CN217557679U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110468963A (en) | A kind of assembled architecture primary and secondary joist steel connecting joint structure | |
| CN211974459U (en) | Reinforced concrete column jacking underpinning structure | |
| CN206722087U (en) | A kind of assembly concrete frame structure bracing members bearing | |
| CN209179485U (en) | A kind of twin columns shuttering fastening member | |
| CN217557679U (en) | Combined building template for constructional engineering | |
| CN205617791U (en) | Novel rectangular cross section concrete column moulded die plate body system | |
| CN217480405U (en) | Assembled steel construction building | |
| CN115492374A (en) | Beam column joint formwork reinforcing structure and construction method | |
| CN211396109U (en) | Steel pipe column combination wall | |
| CN217399991U (en) | External hanging connection structure of composite wall board | |
| CN220828037U (en) | Truss floor carrier plate supporting structure | |
| CN219773324U (en) | Concrete beam plate structure | |
| CN207660236U (en) | The quick connection hanging piece structure of wall | |
| CN215483800U (en) | Wallboard in prefabricated easy to assemble | |
| CN116657792A (en) | An assembled double-layer steel plate composite shear wall that realizes double-sided compression | |
| CN213330004U (en) | Large steel formwork and combined formwork formed by same | |
| CN115341646A (en) | Integrally-assembled hanging plate connecting structure | |
| CN209114621U (en) | A kind of T-type connection structure of building top and building wall board | |
| CN210342650U (en) | A combined aluminum alloy formwork | |
| CN209703318U (en) | A kind of regularization bridge type cast-in-situ floor support construction | |
| CN207122132U (en) | A kind of building template | |
| CN221856206U (en) | A building formwork reinforcement system | |
| CN211229494U (en) | Adjustable combined template | |
| CN220167470U (en) | Spliced building pouring template structure | |
| CN220414956U (en) | Camber reinforcing structure for brick-concrete wall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20241016 Address after: Room 1703, Unit 2, Building 4, No. 19 Yikang Street, Jianye District, Nanjing City, Jiangsu Province 210000 Patentee after: Gu He Country or region after: China Patentee after: Jiang Zisheng Address before: No. 5, Fuyuan New Village, Jimo District, Qingdao City, Shandong Province, 266000 Patentee before: Zhang Xiaohong Country or region before: China |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250106 Address after: 3rd Floor, Jinhe Building, No. 3 Xiangshan Road, Pukou District, Nanjing City, Jiangsu Province 210000 Patentee after: Jiangsu Zhongsheng Construction Group Co.,Ltd. Country or region after: China Address before: Room 1703, Unit 2, Building 4, No. 19 Yikang Street, Jianye District, Nanjing City, Jiangsu Province 210000 Patentee before: Gu He Country or region before: China Patentee before: Jiang Zisheng |
