CN217503677U - Heating system for unloading platform of garbage bin - Google Patents

Heating system for unloading platform of garbage bin Download PDF

Info

Publication number
CN217503677U
CN217503677U CN202221131625.8U CN202221131625U CN217503677U CN 217503677 U CN217503677 U CN 217503677U CN 202221131625 U CN202221131625 U CN 202221131625U CN 217503677 U CN217503677 U CN 217503677U
Authority
CN
China
Prior art keywords
pipe
air preheater
outlet
water
communicated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221131625.8U
Other languages
Chinese (zh)
Inventor
单河山
郭永刚
赵东
张鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daming County Kangheng Renewable Energy Co ltd
Original Assignee
Daming County Kangheng Renewable Energy Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daming County Kangheng Renewable Energy Co ltd filed Critical Daming County Kangheng Renewable Energy Co ltd
Priority to CN202221131625.8U priority Critical patent/CN217503677U/en
Application granted granted Critical
Publication of CN217503677U publication Critical patent/CN217503677U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a garbage bin discharging platform heating system, which comprises an air preheater, a steam pocket and a steam turbine, the air preheater is connected with the steam drum and the steam turbine, a warm air blower is arranged in the garbage bin discharging platform, the low-pressure condensed water outlet of the air preheater is connected with the medium inlet of the warm air blower through a water inlet pipeline, the primary air condensed water is used as a heat source to enter the warm air blower, a medium outlet of the warm air blower is connected with a water outlet pipeline, a garbage bin discharging platform heating system is redesigned in the scheme, the primary air low-pressure drain of the air preheater is used as a heat source to supply heat to a warm air blower in the garbage bin discharging platform, the warm air blower extracts air, the air flows into the platform after heat exchange, and then improve the temperature in the platform, the temperature in the platform promotes the fermentation effect that improves rubbish, helps the exhaust moisture, improves the combustion effect at burning furnace, and the rational planning utilizes, improves economic benefits.

Description

垃圾仓卸料平台加热系统Heating system for unloading platform of garbage bin

技术领域technical field

本实用新型涉及垃圾处理技术领域,具体涉及垃圾仓卸料平台加热系统。The utility model relates to the technical field of garbage disposal, in particular to a heating system for a discharge platform of a garbage bin.

背景技术Background technique

垃圾仓在低温季节雨雪结冰,导致平台内温度低,垃圾在低温下发酵效果差,水分多。垃圾在焚烧炉中易产生燃烧不充分、炉温不稳定等现象,需要大量燃油进行助燃,经济效益差,需改进。The garbage bin freezes with rain and snow in the low temperature season, resulting in low temperature in the platform, poor fermentation effect of garbage at low temperature, and more water. In the incinerator, the garbage is prone to insufficient combustion and unstable furnace temperature, which requires a large amount of fuel for combustion, which has poor economic benefits and needs to be improved.

实用新型内容Utility model content

为解决上述至少一个技术缺陷,本实用新型提供了如下技术方案:In order to solve the above-mentioned at least one technical defect, the utility model provides the following technical solutions:

本申请文件公开垃圾仓卸料平台加热系统,包括空预器、汽包、汽轮机,所述空预器与汽包、汽轮机连接,所述垃圾仓卸料平台内设置暖风机,所述空预器的低压冷凝水出口通过进水管道与暖风机的介质入口连接,以一次风冷凝水为热源进入暖风机,所述暖风机的介质出口连接出水管道。This application document discloses a heating system for the unloading platform of the garbage bin, including an air preheater, a steam drum, and a steam turbine. The air preheater is connected to the steam drum and the steam turbine. A heater is arranged in the unloading platform of the garbage bin. The low-pressure condensate water outlet of the heater is connected to the medium inlet of the heater through the water inlet pipe, and the primary air condensate water is used as a heat source to enter the heater, and the medium outlet of the heater is connected to the water outlet pipe.

本方案中重新设计垃圾仓卸料平台加热系统,以空预器的一次风低压疏水为热源向垃圾仓卸料平台内的暖风机供热,通过暖风机抽取空气经换热后流向平台内,进而提高平台内的温度,平台内内的温度提升提高垃圾的发酵效果,有助排出水分,提高在焚烧炉的燃烧效果,合理规划利用,提高经济效益。In this scheme, the heating system of the unloading platform of the waste bin is redesigned, and the primary air low-pressure drain of the air preheater is used as the heat source to supply heat to the heater in the unloading platform of the waste bin, and the air is extracted through the heater and flows into the platform after heat exchange. In addition, the temperature in the platform is increased, and the temperature increase in the platform can improve the fermentation effect of garbage, help to discharge moisture, improve the combustion effect in the incinerator, and rationally plan and utilize it to improve economic benefits.

进一步,所述垃圾仓卸料平台内设置进水母管、回水母管,所述进水母管与所述进水管道连通且所述进水母管上间隔设置若干子管一,所述回水母管与所述出水管道连通且所述回水母管上设置若干子管二,所述子管一、子管二分别与对应暖风机的介质入口、介质出口连接。在垃圾仓卸料平台内安装进水母管、回水母管,优选同走向安装,方便布局,通过进水母管、回水母管上的子管一、子管二与若干暖风机分别连通,方便安装及对接。Further, a water inlet pipe and a water return main pipe are arranged in the unloading platform of the garbage bin, the water inlet pipe is communicated with the water inlet pipe, and several sub-pipes are arranged on the water inlet pipe at intervals, and the water return main pipe is arranged. A plurality of sub-pipes two are arranged on the water return main pipe, which are communicated with the water outlet pipe and are respectively connected with the medium inlet and the medium outlet of the corresponding heater. Install the water inlet pipe and the return water main pipe in the unloading platform of the garbage bin, preferably in the same direction, which is convenient for layout. The sub-pipe 1 and sub-pipe 2 on the water inlet main pipe and the return water main pipe are respectively connected with several heaters, which is convenient for installation. and docking.

进一步,所述出水管道的出口连通外界且出水管道通过连通管与所述进水管道连通,所述连通管上设置阀门。增加连通管使进、出水管形成循环水路,方便再次利用出水管道内的高温水流,此外,也方便后期以其他热源代替一次风冷凝水供热。Further, the outlet of the water outlet pipe is connected to the outside world, and the water outlet pipe is communicated with the water inlet pipe through a communication pipe, and a valve is arranged on the communication pipe. Adding a connecting pipe makes the inlet and outlet pipes form a circulating water path, which is convenient for reusing the high-temperature water flow in the outlet pipe. In addition, it is also convenient for other heat sources to replace the primary air condensed water for heating in the later stage.

进一步,所述空预器外设置疏水扩容器一,所述疏水扩容器一的入口与空预器低压蒸汽出口连通,所述疏水扩容器一的液体出口与空预器中除氧器的低压冷凝水进口以及外界连通,所述疏水扩容器的气体出口与汽轮机和空预器之间的连接管道二连通。以疏水扩容器作为缓冲,避免较高温度的水进入除氧器,进而造成除氧器的效果的降低。此外,蒸汽的进入也会部分转换为冷凝水并进行除氧处理。Further, a hydrophobic expansion vessel 1 is arranged outside the air preheater, the inlet of the hydrophobic expansion vessel 1 is communicated with the low pressure steam outlet of the air preheater, and the liquid outlet of the hydrophobic expansion vessel 1 is connected with the low pressure of the deaerator in the air preheater. The condensed water inlet is communicated with the outside world, and the gas outlet of the hydrophobic expansion vessel is communicated with the second connecting pipeline between the steam turbine and the air preheater. The hydrophobic expansion vessel is used as a buffer to prevent water at a higher temperature from entering the deaerator, thereby reducing the effect of the deaerator. In addition, the incoming steam is also partially converted into condensed water and deoxygenated.

进一步,所述空预器外设置疏水扩容器二,所述疏水空容器二的入口与空预器高压蒸汽出口连通,所述疏水扩容器二的液体出口与空预器中除氧器的高压冷凝水进口以及外界连通,所述疏水扩容器二的气体出口与汽包和空预器之间的连接管道一连通。Further, a second hydrophobic expansion vessel is arranged outside the air preheater, the inlet of the second hydrophobic empty vessel is communicated with the high pressure steam outlet of the air preheater, and the liquid outlet of the second hydrophobic expansion vessel is connected to the high pressure of the deaerator in the air preheater. The condensed water inlet is communicated with the outside world, and the gas outlet of the second hydrophobic expansion vessel is communicated with the connecting pipe between the steam drum and the air preheater.

与现有技术相比,本实用新型的有益效果:Compared with the prior art, the beneficial effects of the present utility model:

1、本实用新型重新设计垃圾仓卸料平台加热系统,以空预器一次风冷凝水为热源向平台内的暖风机供热,合理规划利用,经济效益高。1. The utility model redesigns the heating system of the unloading platform of the garbage bin, and uses the primary air condensed water of the air preheater as the heat source to supply heat to the heater in the platform, which is reasonably planned and utilized, and has high economic benefits.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the technical solutions in the embodiments of the present invention more clearly, the following briefly introduces the accompanying drawings used in the description of the embodiments. Obviously, the drawings in the following description are only some implementations of the present invention. For example, for those of ordinary skill in the art, other drawings can also be obtained based on these drawings without any creative effort.

图1是实施例1中本垃圾仓卸料平台加热系统的示意图;Fig. 1 is the schematic diagram of the heating system of the waste bin discharge platform in Example 1;

其中,附图标记为:Among them, the reference numerals are:

1、垃圾仓卸料平台;2、空预器;3、暖风机;4、进水管道;5、出水管道;6、连通管;7、进水母管;8、回水母管;9、输送管道一;10、输送管道二;11、疏水扩容器一;12、疏水扩容器二;13、连接管道二;14、连接管道一;15、气体出口;16、液体出口;17、子管一;18、子管二;1. Discharge platform of garbage bin; 2. Air preheater; 3. Heater; 4. Water inlet pipe; 5. Water outlet pipe; 6. Connecting pipe; 7. Water inlet pipe; 8. Return water pipe; 9. Transport Pipeline one; 10. Conveying pipeline two; 11. Drain expansion container one; 12. Drain expansion container two; 13. Connecting pipeline two; 14. Connecting pipeline one; 15. Gas outlet; 16. Liquid outlet; ; 18, sub-pipe two;

a、锅炉抽汽入口;b、一次抽汽入口;c、低压冷凝水出口;e、低压冷凝水进口;f、高压冷凝水进口;g、低压蒸汽出口;h、高压蒸汽出口。a, boiler extraction steam inlet; b, primary extraction steam inlet; c, low pressure condensate water outlet; e, low pressure condensate water inlet; f, high pressure condensate water inlet; g, low pressure steam outlet; h, high pressure steam outlet.

具体实施方式Detailed ways

下面结合附图和具体实施例对本实用新型作进一步说明。The present utility model will be further described below in conjunction with the accompanying drawings and specific embodiments.

实施例1Example 1

如图1所示,本垃圾仓卸料平台加热系统包括空预器2、汽包(图中未显示)、汽轮机(图中未显示)。空预器2与汽包之间安装输送管道一9,输送管道一9的进气口与汽包连接且出气口与空预器2的锅炉抽汽入口a连接。空预器2与汽轮机之间安装输送管道二10,输送管道二10的进气口与汽轮机连接且出气口与空预器2的一次抽汽入口b连接。本垃圾仓卸料平台1内安装多个暖风机3以及进水母管7、回水母管8,其中进水母管7、出水母管8同走向安装,如本例中横向安装,进水母管7上间隔安装多根子管一17,回水母管8上间隔安装多根子管二18,子管一17、子管二18分别与对应暖风机3的介质入口、介质出口连接。As shown in Figure 1, the heating system for the unloading platform of the garbage bin includes an air preheater 2, a steam drum (not shown in the figure), and a steam turbine (not shown in the figure). A conveying pipe 9 is installed between the air preheater 2 and the steam drum. The air inlet of the conveying pipe 9 is connected to the steam drum and the air outlet is connected to the boiler extraction steam inlet a of the air preheater 2 . A conveying pipe 2 10 is installed between the air preheater 2 and the steam turbine. The air inlet of the conveying pipe 2 10 is connected to the steam turbine and the air outlet is connected to the primary extraction steam inlet b of the air preheater 2 . A plurality of heaters 3, a water inlet pipe 7 and a water return main pipe 8 are installed in the waste bin discharge platform 1, wherein the water inlet pipe 7 and the water outlet pipe 8 are installed in the same direction. For example, in this example, the water inlet pipe 7 A plurality of sub-pipes 17 are installed at intervals on the upper part, and a plurality of sub-pipes 2 18 are installed at intervals on the return water main pipe 8 .

本例中,空预器2的低压冷凝水出口c与进水管道4入口连通,从而向暖风机3的介质入口供热水源,以一次风冷凝水为热源进入暖风机。暖风机3采用热水型,在壳体出风通道腔壁上安装盘管,热水进入盘管以加热经过的气流,气流输送至平台内提升温度,换热后的水源经介质出口,即盘管出口,流向出水管道5。In this example, the low-pressure condensate water outlet c of the air preheater 2 is communicated with the inlet of the water inlet pipe 4, so as to supply hot water to the medium inlet of the heater 3, and the primary air condensate water is used as the heat source to enter the heater. The heater 3 adopts the hot water type, and a coil is installed on the wall of the air outlet channel of the shell. The hot water enters the coil to heat the passing airflow, and the airflow is transported to the platform to increase the temperature. The heat-exchanged water source passes through the medium outlet, namely The coil outlet flows to the water outlet pipe 5.

本例中,以出水管道5的出口连通外界的蓄水池等,出水管道5的出口处安装止回阀,并在临近出口处的管道上通过连通管6与进水管道4连通,连通管6上安装阀门,以及进水管道4在连通管6连接处后方的管道上同样安装阀门以方便控制。连通管、进出水管道等形成循环水路,可二次利用出水管道内的高温水流或在后期以其他热源代替一次风冷凝水供热。In this example, the outlet of the water outlet pipe 5 is connected to the external reservoir, etc., a check valve is installed at the outlet of the water outlet pipe 5, and the pipe near the outlet is connected with the water inlet pipe 4 through the communication pipe 6. The communication pipe A valve is installed on the 6, and the water inlet pipe 4 is also installed with a valve on the pipe behind the connection of the connecting pipe 6 to facilitate control. Connecting pipes, inlet and outlet pipes, etc. form a circulating water path, which can be used for secondary use of high-temperature water flow in the outlet pipe or other heat sources to replace primary air condensed water for heat supply in the later stage.

本例中,空预器2外安装疏水扩容器一11、疏水扩容器二12。疏水扩容器一11下部的入口与空预器2低压蒸汽出口g通过管道连通,疏水扩容器一11底部的液体出口16与空预器2中除氧器的低压冷凝水进口e通过管道连通。疏水扩容器一11上部的气体出口15通过连接管道二13与汽轮机和空预器之间的输送管道二10连通。疏水空容器二12下部的入口与空预器2高压蒸汽出口h通过管道连通,疏水扩容器二12底部的液体出口16与空预器2中除氧器的高压冷凝水进口f连通。疏水扩容器二12上部的气体出口15通过连接管道一14与汽包和空预器之间的输送管道一9连通。以疏水扩容器缓冲,避免较高温度的水进入除氧器,且可将部分蒸汽转换为冷凝水。In this example, the first hydrophobic expansion container 11 and the second hydrophobic expansion container 12 are installed outside the air preheater 2 . The inlet at the lower part of the hydrophobic expansion vessel 11 is connected with the low pressure steam outlet g of the air preheater 2 through a pipeline, and the liquid outlet 16 at the bottom of the hydrophobic expansion vessel 11 is connected with the low pressure condensate water inlet e of the deaerator in the air preheater 2 through a pipeline. The gas outlet 15 at the upper part of the first hydrophobic expansion vessel 11 is communicated with the second conveying pipeline 10 between the steam turbine and the air preheater through the second connecting pipeline 13 . The inlet at the lower part of the second drain container 12 is connected with the high pressure steam outlet h of the air preheater 2 through a pipeline, and the liquid outlet 16 at the bottom of the second drain expansion container 12 is connected with the high pressure condensate water inlet f of the deaerator in the air preheater 2. The gas outlet 15 on the upper part of the second hydrophobic expansion vessel 12 is communicated with the conveying pipeline 1 9 between the steam drum and the air preheater through the connecting pipeline 1 14 . It is buffered with a hydrophobic expansion vessel to prevent water at a higher temperature from entering the deaerator, and can convert part of the steam into condensed water.

本例中,在各管道上可选择安装阀门,如在连接管道一、连接管道二、子管一、子管二、输送管道一、输送管道二、连通管、进水管道、出水管道、进水母管、出水母管等管道上安装阀门,如安装单个阀门或串联安装多个阀门,以及在部分管道处采用并行双管结构并在相并行的每根管道上均安装阀门,如截阀、电磁阀等,以方便操控。In this example, you can choose to install valves on each pipeline, such as connecting pipe 1, connecting pipe 2, sub-pipe 1, sub-pipe 2, conveying pipe 1, conveying pipe 2, connecting pipe, water inlet pipe, water outlet pipe, inlet pipe Install valves on jellyfish pipes, jellyfish pipes and other pipelines, such as installing a single valve or installing multiple valves in series, and adopting a parallel double-pipe structure at some pipelines and installing valves on each parallel pipeline, such as shut-off valves, Solenoid valve, etc., to facilitate control.

本垃圾仓卸料平台以空预器的一次风低压疏水为热源,通过暖风机的换热对平台加热,平台内的温度提高,垃圾的发酵效果好,在焚烧炉的燃烧效果提升。经检测,初始时,在进水管道内的疏水温度在130℃,卸料平台在零下5°左右,以压力1.8MPa、流量2.4t/h的状态输送,经运行后,暖风出水温度在53℃,卸料平台内温度提升至25℃,效果明显。The waste bin discharge platform uses the primary air low-pressure drainage of the air preheater as the heat source, and the platform is heated by the heat exchange of the heater, the temperature in the platform is increased, the fermentation effect of the waste is good, and the combustion effect in the incinerator is improved. After testing, initially, the hydrophobic temperature in the water inlet pipe was 130 °C, the discharge platform was about minus 5 °C, and the pressure was 1.8MPa and the flow rate was 2.4t/h. 53 ℃, the temperature in the unloading platform is raised to 25 ℃, and the effect is obvious.

以上仅是本实用新型的优选实施方式,本实用新型的保护范围并不仅局限于上述实施例,凡属于本实用新型思路下的技术方案均属于本实用新型的保护范围。应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理前提下的若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。The above are only the preferred embodiments of the present utility model, and the protection scope of the present utility model is not limited to the above-mentioned embodiments, and all technical solutions under the idea of the present utility model belong to the protection scope of the present utility model. It should be pointed out that for those skilled in the art, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.

Claims (5)

1.垃圾仓卸料平台加热系统,包括空预器、汽包、汽轮机,所述空预器与汽包、汽轮机连接,其特征在于,所述垃圾仓卸料平台内设置暖风机,所述空预器的低压冷凝水出口通过进水管道与暖风机的介质入口连接,以一次风冷凝水为热源进入暖风机,所述暖风机的介质出口连接出水管道。1. The heating system for the unloading platform of the garbage bin includes an air preheater, a steam drum and a steam turbine, and the air preheater is connected with the steam drum and the steam turbine. The low-pressure condensate water outlet of the air preheater is connected to the medium inlet of the heater through the water inlet pipe, and the primary air condensate water is used as a heat source to enter the heater, and the medium outlet of the heater is connected to the water outlet pipe. 2.如权利要求1所述的垃圾仓卸料平台加热系统,其特征在于:所述垃圾仓卸料平台内设置进水母管、回水母管,所述进水母管与所述进水管道连通且所述进水母管上间隔设置若干子管一,所述回水母管与所述出水管道连通且所述回水母管上设置若干子管二,所述子管一、子管二分别与对应暖风机的介质入口、介质出口连接。2 . The heating system for the unloading platform of a garbage bin according to claim 1 , wherein a water inlet pipe and a water return mother pipe are arranged in the garbage bin discharge platform, and the water inlet pipe is communicated with the water inlet pipe. 3 . And a number of sub-pipes are arranged on the water inlet main pipe at intervals, the return water main pipe is communicated with the water outlet pipe, and a plurality of sub-pipes are arranged on the water-return main pipe, and the sub-pipe 1 and the sub-pipe The medium inlet and medium outlet of the heater are connected. 3.如权利要求2所述的垃圾仓卸料平台加热系统,其特征在于:所述出水管道的出口连通外界且出水管道通过连通管与所述进水管道连通,所述连通管上设置阀门。3. The waste bin discharge platform heating system according to claim 2, wherein the outlet of the water outlet pipe is connected to the outside world and the water outlet pipe is communicated with the water inlet pipe through a communication pipe, and a valve is arranged on the communication pipe . 4.如权利要求1所述的垃圾仓卸料平台加热系统,其特征在于:所述空预器外设置疏水扩容器一,所述疏水扩容器一的入口与空预器低压蒸汽出口连通,所述疏水扩容器一的液体出口与空预器中除氧器的低压冷凝水进口以及外界连通,所述疏水扩容器的气体出口与汽轮机和空预器之间的连接管道二连通。4. The waste bin discharge platform heating system according to claim 1, wherein a hydrophobic expansion vessel 1 is arranged outside the air preheater, and the inlet of the hydrophobic expansion vessel 1 is communicated with the low pressure steam outlet of the air preheater, The liquid outlet of the hydrophobic expansion vessel 1 is communicated with the low pressure condensed water inlet of the deaerator in the air preheater and the outside, and the gas outlet of the hydrophobic expansion vessel is communicated with the connecting pipeline 2 between the steam turbine and the air preheater. 5.如权利要求1所述的垃圾仓卸料平台加热系统,其特征在于:所述空预器外设置疏水扩容器二,所述疏水扩容器二的入口与空预器高压蒸汽出口连通,所述疏水扩容器二的液体出口与空预器中除氧器的高压冷凝水进口以及外界连通,所述疏水扩容器二的气体出口与汽包和空预器之间的连接管道一连通。5. The waste bin discharge platform heating system according to claim 1, wherein a second hydrophobic expansion vessel is arranged outside the air preheater, and the inlet of the second hydrophobic expansion vessel is communicated with the high pressure steam outlet of the air preheater, The liquid outlet of the second hydrophobic expansion vessel is communicated with the high pressure condensed water inlet of the deaerator in the air preheater and the outside, and the gas outlet of the second hydrophobic expansion vessel is communicated with the connecting pipe between the steam drum and the air preheater.
CN202221131625.8U 2022-05-11 2022-05-11 Heating system for unloading platform of garbage bin Expired - Fee Related CN217503677U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221131625.8U CN217503677U (en) 2022-05-11 2022-05-11 Heating system for unloading platform of garbage bin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221131625.8U CN217503677U (en) 2022-05-11 2022-05-11 Heating system for unloading platform of garbage bin

Publications (1)

Publication Number Publication Date
CN217503677U true CN217503677U (en) 2022-09-27

Family

ID=83354199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221131625.8U Expired - Fee Related CN217503677U (en) 2022-05-11 2022-05-11 Heating system for unloading platform of garbage bin

Country Status (1)

Country Link
CN (1) CN217503677U (en)

Similar Documents

Publication Publication Date Title
CN106090880B (en) A kind of machine stove set heat circulation afterheat recycling system
CN101900347B (en) System for high-grade recycling waste heat of smoke discharged from boiler of power station
CN102173555B (en) Boiler unit steam extraction and drying sludge system with thermal compensation
CN103398369A (en) Method and system for comprehensive utilization of tail heat of boiler
CN101737766A (en) Coal-water boiler exhaust gas residual heat recovery device
CN101634457A (en) Flue-gas waste heat reclaiming system
CN112484073A (en) Steam air preheating system for waste incineration industry and preheating method thereof
CN103471083B (en) Boiler exhaust smoke waste heat utilization system and control method thereof
CN206449667U (en) Residual-heat utilization
CN1005079B (en) Composite system of low pressure energy saver utilizing waste heat inthe exhausted smoke
CN107345656A (en) A kind of steam raising plant using residual heat from boiler fume
CN212456819U (en) Slag cooler and low temperature economizer heat utilization system of circulating fluidized bed heating unit
CN105485915B (en) A kind of flue gas waste heat recovery apparatus for oil-burning gas-fired boiler
CN102494329A (en) Device for utilizing flue gas waste heat of boiler comprehensively
CN102767820B (en) Smoke waste heat utilizing system at tail of power station boiler applicable to operation in variable working condition
CN205137419U (en) Utilize waste heat of boiler flue gas heating feedwater / condensate system
CN215259880U (en) Boiler waste heat recycling system
CN203421669U (en) Comprehensive heat utilization system of boiler tail
CN212901575U (en) A comprehensive management and distribution system for flue gas waste heat energy
CN211011462U (en) System for utilize condensate water to improve air heater and adjust cold and hot overgrate air temperature
CN205535746U (en) Coal -fired power plant waste heat utilization system based on low -grade heat source center
CN211902832U (en) Condensed water heating system utilizing waste heat of waste heat boiler flue
CN211822315U (en) Hydrophobic recycle economizer system of rubbish power plant
CN205783017U (en) A kind of smoke waste heat utilization system condensing the air-supply of water heating boiler
CN210568527U (en) Device for backheating and heating flue gas by using condensed water

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220927