CN217501086U - Simple distributing device for high-rise building concrete pouring construction - Google Patents

Simple distributing device for high-rise building concrete pouring construction Download PDF

Info

Publication number
CN217501086U
CN217501086U CN202220749709.1U CN202220749709U CN217501086U CN 217501086 U CN217501086 U CN 217501086U CN 202220749709 U CN202220749709 U CN 202220749709U CN 217501086 U CN217501086 U CN 217501086U
Authority
CN
China
Prior art keywords
wall
pouring
hole
rise building
mounting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220749709.1U
Other languages
Chinese (zh)
Inventor
谷婷
陈炳
张松如
徐明杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN202220749709.1U priority Critical patent/CN217501086U/en
Application granted granted Critical
Publication of CN217501086U publication Critical patent/CN217501086U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

一种高层建筑混凝土浇筑施工简易布料装置A simple distribution device for high-rise building concrete pouring construction

技术领域technical field

本实用新型涉及建筑工程技术领域,具体为一种高层建筑混凝土浇筑施工简易布料装置。The utility model relates to the technical field of construction engineering, in particular to a simple distribution device for high-rise building concrete pouring construction.

背景技术Background technique

混凝土浇筑的布料装置是泵送混凝土的末端设备,其作用是将泵压来的混凝土通过管道送到要浇筑构件的模板内,混凝土浇筑的布料装置的分类为液压布料装置与手动布料装置,由两部分回转架组成的合成运动就能覆盖所有布料半径范围的布料点,布料装置的结构均为钢结。The distribution device for concrete pouring is the terminal equipment for pumping concrete. Its function is to send the pumped concrete through the pipeline to the formwork of the component to be poured. The distribution device for concrete pouring is classified into hydraulic distribution device and manual distribution device. The composite motion composed of the two-part rotary frame can cover all the distribution points within the radius of the distribution, and the structure of the distribution device is all steel knots.

现有的高层建筑混凝土浇筑施工简易布料装置存在的缺陷是:由于布料装置较为传统,进而影响混凝土浇筑效果,同时也降低了工作效率,从而出现误工期的情况。The defects of the existing simple distribution device for concrete pouring construction of high-rise buildings are: because the distribution device is relatively traditional, the effect of concrete pouring is affected, and the work efficiency is also reduced, resulting in the situation of missed construction period.

因此需要研发一种高层建筑混凝土浇筑施工简易布料装置很有必要。Therefore, it is necessary to develop a simple distribution device for high-rise building concrete pouring construction.

实用新型内容Utility model content

本实用新型的目的在于提供一种高层建筑混凝土浇筑施工简易布料装置,通过设有浇筑布料机构,将浇筑布料机构安装在支撑板的顶部,并由立柱和伸缩杆搭配支撑弹簧对浇筑布料机构进行弹性支撑,同时利用浇筑布料机构具有调节及配重效果,使浇筑布料机构上的浇筑管道可进行调节浇筑操作,避免固定式布料装置影响浇筑操作的情况发生,从而有效的提高了布料装置的稳定性和适用性,以解决上述背景技术中提出布料装置效果差而影响工作效率及质量的问题。The purpose of the utility model is to provide a simple distribution device for concrete pouring construction of high-rise buildings. By being provided with a pouring distribution mechanism, the pouring distribution mechanism is installed on the top of the support plate, and the pouring distribution mechanism is carried out by a column and a telescopic rod with a supporting spring. Elastic support, at the same time, the pouring and distribution mechanism has the effect of adjustment and counterweight, so that the pouring pipeline on the pouring and distribution mechanism can adjust the pouring operation, avoiding the situation that the fixed distribution device affects the pouring operation, thereby effectively improving the stability of the distribution device. In order to solve the problem that the effect of the cloth device in the above-mentioned background art is poor and affects the work efficiency and quality.

为实现上述目的,本实用新型提供如下技术方案:一种高层建筑混凝土浇筑施工简易布料装置,包括底座,所述底座的顶部安装有支撑架,所述支撑架的顶部安装有支撑板,所述支撑板的表面中心位置开设有通孔A,所述支撑板的顶部两侧均安装有立柱,所述支撑板的顶部中心位置安装有浇筑布料机构;In order to achieve the above purpose, the present utility model provides the following technical solutions: a simple distribution device for high-rise building concrete pouring construction, comprising a base, a support frame is installed on the top of the base, a support plate is installed on the top of the support frame, the A through hole A is opened at the center of the surface of the support plate, uprights are installed on both sides of the top of the support plate, and a pouring and distribution mechanism is installed at the center of the top of the support plate;

所述浇筑布料机构包括布料部件和配重部件,所述布料部件与支撑板连接,所述配重部件与布料部件连接,所述布料部件包括安装板,所述安装板的表面中心位置设置有轴承,所述配重部件包括螺杆,所述螺杆的底端与安装板的顶部一侧固定连接。The pouring distribution mechanism includes a distribution part and a counterweight part, the distribution part is connected with the support plate, the counterweight part is connected with the distribution part, the distribution part includes a mounting plate, and the center of the surface of the mounting plate is provided with a Bearing, the weight component includes a screw rod, and the bottom end of the screw rod is fixedly connected with the top side of the mounting plate.

优选的,所述立柱的顶端安装有伸缩杆,所述伸缩杆的外壁与立柱的内壁滑动连接,所述立柱与伸缩杆的外壁设置有支撑弹簧。Preferably, a telescopic rod is installed at the top end of the upright column, the outer wall of the telescopic rod is slidably connected with the inner wall of the upright column, and a support spring is provided on the outer wall of the upright column and the telescopic rod.

优选的,所述伸缩杆的顶端安装有顶板,所述顶板的上表面设置有橡胶垫。Preferably, a top plate is installed on the top end of the telescopic rod, and a rubber pad is disposed on the upper surface of the top plate.

优选的,所述轴承的内部安装有承重柱,所述承重柱的外壁与轴承的内壁固定连接,所述承重柱的表面中心位置开设有通孔B,所述安装板的顶部另一侧安装有浇筑管道,所述浇筑管道的外壁分别与通孔B和通孔A的孔壁滑动连接。Preferably, a bearing column is installed inside the bearing, the outer wall of the bearing column is fixedly connected with the inner wall of the bearing, a through hole B is opened in the center of the surface of the bearing column, and the other side of the top of the mounting plate is installed There are pouring pipes, and the outer walls of the pouring pipes are slidably connected with the hole walls of the through hole B and the through hole A, respectively.

优选的,所述浇筑管道的一端安装有控制阀,所述浇筑管道的另一端安装有管道连接头,所述管道连接头的一端安装有软管。Preferably, a control valve is installed at one end of the pouring pipe, a pipe connection head is installed at the other end of the pouring pipe, and a hose is installed at one end of the pipe connection head.

优选的,所述安装板的顶部中心位置安装有三角架,所述三角架的两侧外壁上方均设置有钢索,所述钢索的一端与安装板的顶部固定连接。Preferably, a tripod is installed at the center of the top of the mounting plate, steel cables are arranged above the outer walls on both sides of the tripod, and one end of the steel cables is fixedly connected to the top of the mounting plate.

优选的,所述螺杆的外壁下方均安装有配重块,所述配重块的表面中心位置开设有通孔C,所述通孔C的孔壁与螺杆的外壁滑动连接。Preferably, a counterweight block is installed under the outer wall of the screw rod, a through hole C is formed in the center of the surface of the counterweight block, and the hole wall of the through hole C is slidably connected with the outer wall of the screw rod.

优选的,所述配重块的顶部中心位置安装有压紧螺母,所述压紧螺母的内壁与螺杆的外壁螺纹连接。Preferably, a compression nut is installed at the top center of the counterweight, and the inner wall of the compression nut is threadedly connected to the outer wall of the screw rod.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the present utility model are:

通过设有浇筑布料机构,将浇筑布料机构安装在支撑板的顶部,并由立柱和伸缩杆搭配支撑弹簧对浇筑布料机构进行弹性支撑,同时利用浇筑布料机构具有调节及配重效果,使浇筑布料机构上的浇筑管道可进行调节浇筑操作,避免固定式布料装置影响浇筑操作的情况发生,从而有效的提高了布料装置的稳定性和适用性。By having a pouring and distributing mechanism, the pouring and distributing mechanism is installed on the top of the support plate, and the pouring and distributing mechanism is elastically supported by the upright column and the telescopic rod and the supporting spring. The pouring pipeline on the mechanism can adjust the pouring operation to avoid the situation that the fixed distribution device affects the pouring operation, thereby effectively improving the stability and applicability of the distribution device.

附图说明Description of drawings

图1为本实用新型提供的正视剖面图;Fig. 1 is the front sectional view that the utility model provides;

图2为本实用新型提供的正视图;Fig. 2 is the front view that the utility model provides;

图3为本实用新型提供的图1中的A处结构放大图;Fig. 3 is an enlarged view of the structure at A place in Fig. 1 provided by the utility model;

图4为本实用新型提供的浇筑布料机构正视剖面图;Fig. 4 is the front sectional view of the pouring and distributing mechanism provided by the utility model;

图5为本实用新型提供的浇筑布料机构部分结构立体图。FIG. 5 is a perspective view of a part of the structure of the pouring and distributing mechanism provided by the utility model.

图中:1、底座;101、支撑架;2、支撑板;201、通孔A;3、立柱;301、伸缩杆;302、支撑弹簧;303、顶板;304、橡胶垫;4、浇筑布料机构;401、安装板;402、轴承;403、承重柱;404、通孔B;405、浇筑管道;406、控制阀;407、管道连接头;408、软管;409、三角架;410、钢索;411、螺杆;412、配重块;413、通孔C;414、压紧螺母。In the figure: 1. base; 101, support frame; 2, support plate; 201, through hole A; 3, column; 301, telescopic rod; 302, support spring; 303, top plate; 304, rubber pad; 4, pouring cloth Mechanism; 401, mounting plate; 402, bearing; 403, load-bearing column; 404, through hole B; 405, pouring pipe; 406, control valve; 407, pipe connector; 408, hose; 409, tripod; 410, Steel cable; 411, screw; 412, counterweight; 413, through hole C; 414, compression nut.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

本实用新型提供如下技术方案:一种高层建筑混凝土浇筑施工简易布料装置,在使用的过程中可以有效的对布料装置提高稳定性及工作效率,增加了浇筑布料机构4,请参阅图1-5,包括底座1,底座1的顶部安装有支撑架101,支撑架101的顶部安装有支撑板2,支撑板2的表面中心位置开设有通孔A201,支撑板2的顶部两侧均安装有立柱3,立柱3的顶端安装有伸缩杆301,伸缩杆301的外壁与立柱3的内壁滑动连接,从而达到伸缩杆301在立柱3上进行伸缩运动,立柱3与伸缩杆301的外壁设置有支撑弹簧302,利用支撑弹簧302具有弹性效果,从而达到伸缩杆301保持伸出状态,伸缩杆301的顶端安装有顶板303,使后续顶板303搭配支撑弹簧302进行弹性支撑处理,顶板303的上表面设置有橡胶垫304,利用橡胶垫304增大摩擦减少磨损的作用,可对顶板303的表面增加摩擦力,减少磨损程度,支撑板2的顶部中心位置安装有浇筑布料机构4;The utility model provides the following technical solutions: a simple distribution device for high-rise building concrete pouring construction, which can effectively improve the stability and work efficiency of the distribution device in the process of use, and adds a pouring and distribution mechanism 4, please refer to Figures 1-5 , including a base 1, a support frame 101 is installed on the top of the base 1, a support plate 2 is installed on the top of the support frame 101, a through hole A201 is opened in the center of the surface of the support plate 2, and columns are installed on both sides of the top of the support plate 2 3. A telescopic rod 301 is installed on the top of the column 3, and the outer wall of the telescopic rod 301 is slidably connected with the inner wall of the column 3, so that the telescopic rod 301 can perform telescopic movement on the column 3, and the outer wall of the column 3 and the telescopic rod 301 is provided with a support spring 302, using the support spring 302 to have an elastic effect, so that the telescopic rod 301 is kept in an extended state, and a top plate 303 is installed on the top of the telescopic rod 301, so that the subsequent top plate 303 is equipped with the support spring 302 for elastic support treatment, and the upper surface of the top plate 303 is provided with The rubber pad 304 uses the rubber pad 304 to increase friction and reduce wear, which can increase the friction force on the surface of the top plate 303 and reduce the degree of wear. The top center of the support plate 2 is installed with a pouring and distributing mechanism 4;

浇筑布料机构4包括布料部件和配重部件,布料部件与支撑板2连接,配重部件与布料部件连接,布料部件包括安装板401,安装板401的表面中心位置设置有轴承402,轴承402的内部安装有承重柱403,承重柱403的外壁与轴承402的内壁固定连接,使轴承402对承重柱403进行固定,且不影响承重柱403转动,通过将承重柱403的底端固定在支撑板2的顶部,从而达到安装板401具有旋转效果,同时搭配顶板303和橡胶垫304,可对安装板401起到摩擦效果,避免安装板401转动太过灵敏,而影响使用的情况,承重柱403的表面中心位置开设有通孔B404,安装板401的顶部另一侧安装有浇筑管道405,浇筑管道405的外壁分别与通孔B404和通孔A201的孔壁滑动连接,浇筑管道405的一端安装有控制阀406,将混凝土浇筑设备接通浇筑管道405的一端,开启控制阀406,使浇筑管道405对混凝土进行输送处理,浇筑管道405的另一端安装有管道连接头407,管道连接头407的一端安装有软管408,利用软管408材质较软,可随意进行摆动,从而便于浇筑管道405内的混凝土进行多方位角度灌输,安装板401的顶部中心位置安装有三角架409,三角架409的两侧外壁上方均设置有钢索410,钢索410的一端与安装板401的顶部固定连接,将三角架409的两侧外壁由钢索410与安装板401进行固定,从而达到对安装板401进行支撑,避免安装板401出现支撑不足而导致断裂的情况发生,配重部件包括螺杆411,螺杆411的底端与安装板401的顶部一侧固定连接,螺杆411的外壁下方均安装有配重块412,配重块412的表面中心位置开设有通孔C413,通孔C413的孔壁与螺杆411的外壁滑动连接,通过根据安装板401配重要求,进行放置几组配重块412,从而保持安装板401为平衡状态,避免一头倾斜而导致出现倾倒的情况发生,配重块412的顶部中心位置安装有压紧螺母414,压紧螺母414的内壁与螺杆411的外壁螺纹连接,使配重块412放置完毕后,由压紧螺母414进行压紧配重块412,从而达到对配重块412进行安装固定,避免配重块412之间松动,影响安装板401上的装置运行,同时利用整体具有调节及配重效果,使浇筑管道405可进行调节浇筑操作,避免固定式布料装置影响浇筑操作的情况发生。The pouring distribution mechanism 4 includes a distribution part and a counterweight part, the distribution part is connected with the support plate 2, the counterweight part is connected with the distribution part, the distribution part includes a mounting plate 401, and a bearing 402 is provided at the center of the surface of the mounting plate 401. A load-bearing column 403 is installed inside, and the outer wall of the bearing column 403 is fixedly connected with the inner wall of the bearing 402, so that the bearing 402 can fix the bearing column 403 without affecting the rotation of the bearing column 403. By fixing the bottom end of the bearing column 403 on the support plate 2, so that the mounting plate 401 has a rotating effect. At the same time, with the top plate 303 and the rubber pad 304, it can have a friction effect on the mounting plate 401, so as to prevent the mounting plate 401 from rotating too sensitively and affecting the use. The load-bearing column 403 A through hole B404 is opened at the center of the surface of the mounting plate 401, a pouring pipe 405 is installed on the other side of the top of the mounting plate 401, the outer wall of the pouring pipe 405 is slidably connected with the hole walls of the through hole B404 and the through hole A201, and one end of the pouring pipe 405 is installed There is a control valve 406, the concrete pouring equipment is connected to one end of the pouring pipeline 405, the control valve 406 is opened, and the pouring pipeline 405 is used to transport the concrete. A hose 408 is installed at one end. The hose 408 is made of soft material and can be swung at will, so as to facilitate the multi-directional infusion of the concrete in the pouring pipe 405. A tripod 409 is installed at the top center of the mounting plate 401. The tripod 409 There are steel cables 410 above the outer walls on both sides of the tripod, one end of the steel cables 410 is fixedly connected with the top of the mounting plate 401, and the outer walls on both sides of the tripod 409 are fixed by the steel cables 410 and the mounting plate 401, so as to achieve the installation plate 401. 401 is supported to prevent the mounting plate 401 from being broken due to insufficient support. The counterweight component includes a screw 411. The bottom end of the screw 411 is fixedly connected to the top side of the mounting plate 401. The weights 412 and the counterweights 412 are provided with a through hole C413 at the center of the surface, and the hole wall of the throughhole C413 is slidably connected to the outer wall of the screw 411. By placing several groups of counterweights 412 according to the weight requirements of the mounting plate 401, Thereby, the mounting plate 401 is kept in a balanced state to avoid the situation of tipping caused by one end of the tilt. A compression nut 414 is installed on the top center of the counterweight 412, and the inner wall of the compression nut 414 is threadedly connected with the outer wall of the screw 411, so that the After the counterweight block 412 is placed, the counterweight block 412 is pressed by the compression nut 414, so as to achieve the installation and fixation of the counterweight block 412, so as to avoid loosening between the counterweight blocks 412 and affect the operation of the device on the installation plate 401. At the same time, the whole body has the effect of adjustment and counterweight, so that the pouring pipeline 405 can be adjusted for the pouring operation, so as to avoid the situation that the fixed distribution device affects the pouring operation.

工作原理:在使用本实用新型时,将四组立柱3对应安装在支撑板2的顶部,并将伸缩杆301设置在立柱3的内部,使其进行滑动连接,从而达到伸缩杆301在立柱3上进行伸缩运动,通过将伸缩杆301和立柱3的外壁上设置支撑弹簧302,利用支撑弹簧302具有弹性效果,从而达到伸缩杆301保持伸出状态,通过将伸缩杆301的顶部安装有顶板303,使后续顶板303搭配支撑弹簧302进行弹性支撑处理,通过将顶板303的表面设置橡胶垫304,利用橡胶垫304增大摩擦减少磨损的作用,可对顶板303的表面增加摩擦力,减少磨损程度,通过将浇筑布料机构4上的安装板401的表面中心位置设置轴承402,并将承重柱403安装在轴承402内,使轴承402对承重柱403进行固定,且不影响承重柱403转动,通过将承重柱403的底端固定在支撑板2的顶部,从而达到安装板401具有旋转效果,通过将浇筑管道405安装在承重柱403上的通孔B404和支撑板2上的通孔A201内,并将混凝土浇筑设备接通浇筑管道405的一端,开启控制阀406,使浇筑管道405对混凝土进行输送处理,通过将浇筑管道405另一端由管道连接头407安装软管408,利用软管408材质较软,可随意进行摆动,从而便于浇筑管道405内的混凝土进行多方位角度灌输,通过将三角架409的两侧外壁由钢索410与安装板401进行固定,从而达到对安装板401进行支撑,避免安装板401出现支撑不足而导致断裂的情况发生,通过将螺杆411的一端固定在安装板401的顶部一侧,并将配重块412由通孔C413套装在螺杆411的外壁上,通过根据安装板401配重要求,进行放置几组配重块412,从而保持安装板401为平衡状态,避免一头倾斜而导致出现倾倒的情况发生,通过将压紧螺母414的内壁与螺杆411的外壁螺纹连接,使配重块412放置完毕后,由压紧螺母414进行压紧配重块412,从而达到对配重块412进行安装固定,避免配重块412之间松动,影响安装板401上的装置运行,同时利用整体具有调节及配重效果,使浇筑管道405可进行调节浇筑操作,避免固定式布料装置影响浇筑操作的情况发生,从而有效的提高了布料装置的稳定性和适用性,也提高了工作效率。Working principle: When using the present utility model, four groups of uprights 3 are correspondingly installed on the top of the support plate 2, and the telescopic rods 301 are arranged inside the uprights 3 to be slidably connected, so as to achieve the telescopic rods 301 on the uprights 3 The telescopic rod 301 and the outer wall of the column 3 are provided with a support spring 302, and the support spring 302 has an elastic effect, so that the telescopic rod 301 is kept in an extended state. By installing the top plate 303 on the top of the telescopic rod 301 , so that the subsequent top plate 303 is equipped with the support spring 302 to perform elastic support treatment. By setting the rubber pad 304 on the surface of the top plate 303, the rubber pad 304 is used to increase friction and reduce wear, which can increase the friction force on the surface of the top plate 303 and reduce the degree of wear. , by setting the bearing 402 at the center of the surface of the mounting plate 401 on the pouring and distributing mechanism 4, and installing the bearing column 403 in the bearing 402, so that the bearing 402 is fixed to the bearing column 403 without affecting the rotation of the bearing column 403. The bottom end of the load-bearing column 403 is fixed on the top of the support plate 2, so that the installation plate 401 has a rotating effect. Connect the concrete pouring equipment to one end of the pouring pipeline 405, open the control valve 406, and make the pouring pipeline 405 transport the concrete. It is relatively soft and can be swung at will, so that the concrete in the pouring pipe 405 can be instilled in multiple directions. By fixing the outer walls of the tripod 409 by the steel cables 410 and the mounting plate 401, the mounting plate 401 can be supported. , to avoid the failure of the mounting plate 401 due to insufficient support. By fixing one end of the screw 411 on the top side of the mounting plate 401, the counterweight 412 is set on the outer wall of the screw 411 through the through hole C413. According to the weight requirements of the mounting plate 401, several sets of weights 412 are placed, so as to keep the mounting plate 401 in a balanced state and avoid tipping caused by tilting one end. Threaded connection, so that after the counterweight 412 is placed, the counterweight 412 is pressed by the compression nut 414, so as to achieve the installation and fixation of the counterweight 412, so as to avoid loosening between the counterweights 412 and affect the mounting plate 401. At the same time, using the overall adjustment and counterweight effect, the pouring pipeline 405 can be adjusted and poured to avoid the situation that the fixed distribution device affects the pouring operation, thereby effectively improving the stability and applicability of the distribution device. Work efficiency is also improved.

虽然在上文中已经参考实施例对本实用新型进行了描述,然而在不脱离本实用新型的范围的情况下,可以对其进行各种改进并且可以用等效物替换其中的部件。尤其是,只要不存在结构冲突,本实用新型所披露的实施例中的各项特征均可通过任意方式相互结合起来使用,在本说明书中未对这些组合的情况进行穷举性的描述仅仅是出于省略篇幅和节约资源的考虑。因此,本实用新型并不局限于文中公开的特定实施例,而是包括落入权利要求的范围内的所有技术方案。Although the present invention has been described above with reference to the embodiments, various modifications may be made and equivalents may be substituted for parts thereof without departing from the scope of the invention. In particular, as long as there is no structural conflict, the various features in the disclosed embodiments of the present invention can be combined with each other in any way, and the description of these combinations is not exhaustive in this specification. For the sake of omitting space and saving resources. Therefore, the present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.

Claims (8)

1.一种高层建筑混凝土浇筑施工简易布料装置,包括底座(1),所述底座(1)的顶部安装有支撑架(101),所述支撑架(101)的顶部安装有支撑板(2),所述支撑板(2)的表面中心位置开设有通孔A(201),所述支撑板(2)的顶部两侧均安装有立柱(3),其特征在于:所述支撑板(2)的顶部中心位置安装有浇筑布料机构(4);1. A simple distribution device for high-rise building concrete pouring construction, comprising a base (1), a support frame (101) is installed on the top of the base (1), and a support plate (2) is installed on the top of the support frame (101). ), a through hole A (201) is provided at the center of the surface of the support plate (2), and columns (3) are installed on both sides of the top of the support plate (2), characterized in that: the support plate ( 2) A pouring and distributing mechanism (4) is installed at the top center position; 所述浇筑布料机构(4)包括布料部件和配重部件,所述布料部件与支撑板(2)连接,所述配重部件与布料部件连接,所述布料部件包括安装板(401),所述安装板(401)的表面中心位置设置有轴承(402),所述配重部件包括螺杆(411),所述螺杆(411)的底端与安装板(401)的顶部一侧固定连接。The pouring and distributing mechanism (4) includes a distributing part and a counterweight part, the distributing part is connected with the support plate (2), the counterweight part is connected with the distributing part, and the distributing part comprises a mounting plate (401), so the A bearing (402) is provided at the center of the surface of the mounting plate (401), and the counterweight component includes a screw (411), the bottom end of which is fixedly connected to the top side of the mounting plate (401). 2.根据权利要求1所述的一种高层建筑混凝土浇筑施工简易布料装置,其特征在于:所述立柱(3)的顶端安装有伸缩杆(301),所述伸缩杆(301)的外壁与立柱(3)的内壁滑动连接,所述立柱(3)与伸缩杆(301)的外壁设置有支撑弹簧(302)。2. A simple distribution device for high-rise building concrete pouring construction according to claim 1, characterized in that: a telescopic rod (301) is installed on the top of the column (3), and the outer wall of the telescopic rod (301) is connected to the The inner wall of the upright column (3) is slidably connected, and the outer wall of the upright column (3) and the telescopic rod (301) is provided with a support spring (302). 3.根据权利要求2所述的一种高层建筑混凝土浇筑施工简易布料装置,其特征在于:所述伸缩杆(301)的顶端安装有顶板(303),所述顶板(303)的上表面设置有橡胶垫(304)。3. The simple distributing device for high-rise building concrete pouring construction according to claim 2, characterized in that: a top plate (303) is installed on the top of the telescopic rod (301), and a top plate (303) is installed on the upper surface of the top plate (303). There are rubber pads (304). 4.根据权利要求1所述的一种高层建筑混凝土浇筑施工简易布料装置,其特征在于:所述轴承(402)的内部安装有承重柱(403),所述承重柱(403)的外壁与轴承(402)的内壁固定连接,所述承重柱(403)的表面中心位置开设有通孔B(404),所述安装板(401)的顶部另一侧安装有浇筑管道(405),所述浇筑管道(405)的外壁分别与通孔B(404)和通孔A(201)的孔壁滑动连接。4. A simple distribution device for high-rise building concrete pouring construction according to claim 1, characterized in that: a load-bearing column (403) is installed inside the bearing (402), and the outer wall of the load-bearing column (403) is connected to The inner wall of the bearing (402) is fixedly connected, a through hole B (404) is opened in the center of the surface of the bearing column (403), and a pouring pipe (405) is installed on the other side of the top of the mounting plate (401), so The outer walls of the pouring pipes (405) are respectively slidably connected with the hole walls of the through hole B (404) and the through hole A (201). 5.根据权利要求4所述的一种高层建筑混凝土浇筑施工简易布料装置,其特征在于:所述浇筑管道(405)的一端安装有控制阀(406),所述浇筑管道(405)的另一端安装有管道连接头(407),所述管道连接头(407)的一端安装有软管(408)。5. A simple distribution device for high-rise building concrete pouring construction according to claim 4, characterized in that: a control valve (406) is installed at one end of the pouring pipeline (405), and the other end of the pouring pipeline (405) is installed with a control valve (406). A pipe connection head (407) is installed at one end, and a hose (408) is installed at one end of the pipe connection head (407). 6.根据权利要求1所述的一种高层建筑混凝土浇筑施工简易布料装置,其特征在于:所述安装板(401)的顶部中心位置安装有三角架(409),所述三角架(409)的两侧外壁上方均设置有钢索(410),所述钢索(410)的一端与安装板(401)的顶部固定连接。6. A simple distribution device for high-rise building concrete pouring construction according to claim 1, characterized in that: a tripod (409) is installed on the top center of the mounting plate (401), and the tripod (409) Steel cables (410) are arranged above the outer walls on both sides of the cable, and one end of the steel cables (410) is fixedly connected to the top of the mounting plate (401). 7.根据权利要求1所述的一种高层建筑混凝土浇筑施工简易布料装置,其特征在于:所述螺杆(411)的外壁下方均安装有配重块(412),所述配重块(412)的表面中心位置开设有通孔C(413),所述通孔C(413)的孔壁与螺杆(411)的外壁滑动连接。7. A simple distribution device for high-rise building concrete pouring construction according to claim 1, characterized in that: a counterweight (412) is installed below the outer wall of the screw (411), and the counterweight (412) ) is provided with a through hole C (413) at the center of the surface, and the hole wall of the through hole C (413) is slidably connected with the outer wall of the screw (411). 8.根据权利要求7所述的一种高层建筑混凝土浇筑施工简易布料装置,其特征在于:所述配重块(412)的顶部中心位置安装有压紧螺母(414),所述压紧螺母(414)的内壁与螺杆(411)的外壁螺纹连接。8. The simple distributing device for high-rise building concrete pouring construction according to claim 7, characterized in that: a compression nut (414) is installed at the top center position of the counterweight (412), and the compression nut The inner wall of (414) is screwed to the outer wall of the screw (411).
CN202220749709.1U 2022-04-02 2022-04-02 Simple distributing device for high-rise building concrete pouring construction Expired - Fee Related CN217501086U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220749709.1U CN217501086U (en) 2022-04-02 2022-04-02 Simple distributing device for high-rise building concrete pouring construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220749709.1U CN217501086U (en) 2022-04-02 2022-04-02 Simple distributing device for high-rise building concrete pouring construction

Publications (1)

Publication Number Publication Date
CN217501086U true CN217501086U (en) 2022-09-27

Family

ID=83348686

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220749709.1U Expired - Fee Related CN217501086U (en) 2022-04-02 2022-04-02 Simple distributing device for high-rise building concrete pouring construction

Country Status (1)

Country Link
CN (1) CN217501086U (en)

Similar Documents

Publication Publication Date Title
CN209960009U (en) Anti-seismic support hanger
CN109252530A (en) A kind of base pit engineering support safeguard and its application method
CN211341248U (en) A kind of anti-seismic steel structure for building construction
CN100396861C (en) Suspended tuned mass damper vibration reduction control device
CN217501086U (en) Simple distributing device for high-rise building concrete pouring construction
CN217734952U (en) Nearly modern building antidetonation reinforcing apparatus based on structural performance optimizes
CN208578354U (en) Remove wall height-adjustable support device
CN207312990U (en) A kind of tower crane conversion base
CN210858001U (en) A large-section inclined column formwork construction structure for construction engineering
CN219157975U (en) A multi-angle connection component of architectural glass curtain wall
CN209987125U (en) A new type of concrete vibrating table
CN207919743U (en) A kind of steel grid structure bolted spherical node assembling supporting arrangement
CN207829270U (en) A kind of reversed support device of large space ceiling construction
CN216196652U (en) Concrete formwork supporting device convenient to adjust and used for building engineering
CN220620454U (en) Green building fireproof steel structure
CN117266428A (en) Assembled vibration reduction floor slab and assembling method
CN220268647U (en) Novel pipeline support and hanger with adjustable height
CN220353461U (en) An adjustable diagonal brace structure for construction engineering design
CN210770965U (en) Anti-seismic support connecting piece
CN218719269U (en) Installing support is used in fire engineering construction
CN216479593U (en) A seismic connection structure for building structure design
CN221168622U (en) Wall-attached support assembly
CN221219806U (en) Building structure reinforcing apparatus with antidetonation effect
CN218438432U (en) Vertical supporting stress uniform distribution device for building reinforcement engineering
CN212154242U (en) A kind of building structural beam reinforcement structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220927

CF01 Termination of patent right due to non-payment of annual fee