CN217461538U - A steel platform of unloading of encorbelmenting for assembly type structure construction - Google Patents
A steel platform of unloading of encorbelmenting for assembly type structure construction Download PDFInfo
- Publication number
- CN217461538U CN217461538U CN202221133407.8U CN202221133407U CN217461538U CN 217461538 U CN217461538 U CN 217461538U CN 202221133407 U CN202221133407 U CN 202221133407U CN 217461538 U CN217461538 U CN 217461538U
- Authority
- CN
- China
- Prior art keywords
- beams
- steel
- fixedly connected
- main
- window opening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及装配式建筑施工技术领域,尤其涉及一种用于装配式建筑施工的悬挑卸料钢平台。The utility model relates to the technical field of prefabricated building construction, in particular to a cantilevered unloading steel platform for prefabricated building construction.
背景技术Background technique
随着我国建筑业的快速发展,节能减排标准等环保措施问题被确定为衡量建筑业绿色发展的重要标准,所以建筑行业对能源消耗、环境污染等问题越来越重视。装配式建筑作为具有环保、减少现场施工的污染、施工效率高等的优势特点,可以在较短工期内完成房屋的建造,能够极大地满足节能减排的要求,是现代化的房屋建造的优选方式之一。在建筑施工过程中层间材料的转移中,卸料平台已成为必不可少的一种转运设备,但是由于装配式混凝土建筑外围护结构构件都是整体吊装施工完成,这显然无法使用传统的悬挑卸料钢平台,因为无法将卸料钢平台直接搁置在楼板上。所以目前,装配式混凝土建筑大部分采用人工进行楼层间传料,因此需要投入大量强壮劳动力、且施工周期长、安全风险大,已经越来越难以满足装配式建筑所需的安全、整洁、低强度和快节奏的现场施工需求。With the rapid development of my country's construction industry, environmental protection measures such as energy conservation and emission reduction standards have been identified as important standards to measure the green development of the construction industry. Therefore, the construction industry has paid more and more attention to issues such as energy consumption and environmental pollution. As the prefabricated building has the advantages of environmental protection, reducing pollution from on-site construction, and high construction efficiency, it can complete the construction of the house in a short construction period, and can greatly meet the requirements of energy saving and emission reduction. It is one of the preferred methods for modern house construction. one. In the transfer of materials between layers in the construction process, the unloading platform has become an indispensable transfer equipment. However, since the outer protective structure components of the prefabricated concrete building are all hoisted as a whole, it is obviously impossible to use the traditional The unloading steel platform can be cantilevered, because the unloading steel platform cannot be placed directly on the floor. Therefore, at present, most of the prefabricated concrete buildings use manual material transfer between floors, so a lot of strong labor is required, and the construction period is long and the safety risk is high. The intensity and fast pace of site construction demands.
实用新型内容Utility model content
为了克服上述技术的不足,本实用新型的目的是提供一种用于装配式建筑施工的悬挑卸料钢平台。In order to overcome the deficiencies of the above technologies, the purpose of this utility model is to provide a cantilevered unloading steel platform for prefabricated building construction.
本实用新型所采用的技术方案是:一种用于装配式建筑施工的悬挑卸料钢平台,包括两个穿设在施工层窗洞口a上的主梁,窗洞口a的外侧设置有钢板、组合式拉杆固定机构和两根钢丝绳,窗洞口a的内侧设置有横梁a、两个圆钢锚环a和两个短肢梁,钢板和横梁a均设置在两个主梁的上方,两个主梁间隔平行设置,两个主梁之间设置有多个次梁,多个次梁沿主梁长度方向依次间隔设置,相邻两个次梁呈平行设置,次梁的两端分别与两个主梁固定连接,所述两个主梁的一端均与钢板固定连接,另一端分别与两个圆钢锚环a固定连接,所述圆钢锚环a锚固在楼板上,所述两个短肢梁分别与两个主梁固定连接,所述横梁a的长度大于窗洞口a的宽度,横梁a的两端分别与两个短肢梁固定连接,横梁a的两端贴设在窗洞口a两侧的墙壁上,所述两根钢丝绳的一端分别与两个主梁固定连接,两根钢丝绳的另一端与组合式固定机构固定连接,所述组合式固定机构设置在施工层上一层的窗洞口b位置处,所述组合式固定机构包括横梁b、两个竖梁a和两个竖梁b,横梁b的长度大于窗洞口b的宽度,两个竖梁a分别与横梁b的两端固定连接,两个竖梁a贴设在窗洞口b两侧的墙壁上,两个竖梁b与横梁b的底部固定连接,两个竖梁b的下部均贴设在窗洞口b下方的墙壁上,所述两根钢丝绳均与横梁b固定连接,所述次梁与钢板固定连接,所述钢板上固定安装有护栏。The technical scheme adopted by the utility model is: a cantilevered unloading steel platform for prefabricated building construction, comprising two main beams pierced through the window opening a of the construction layer, and the outer side of the window opening a is provided with a steel plate , Combined tie rod fixing mechanism and two wire ropes, the inner side of the window opening a is provided with a beam a, two round steel anchor rings a and two short limb beams, the steel plate and the beam a are set above the two main beams, and the two The main beams are arranged in parallel at intervals, and a plurality of secondary beams are arranged between the two main beams. The plurality of secondary beams are arranged at intervals along the length direction of the main beams. The two adjacent secondary beams are arranged in parallel. The two main beams are fixedly connected, one end of the two main beams is fixedly connected to the steel plate, and the other end is fixedly connected to the two round steel anchor rings a, the round steel anchor rings a are anchored on the floor, the two Each short-leg beam is fixedly connected to the two main beams, the length of the beam a is greater than the width of the window opening a, the two ends of the beam a are fixedly connected to the two short-leg beams, and the two ends of the beam a are attached to the window On the walls on both sides of the hole a, one end of the two steel wire ropes is fixedly connected to the two main beams respectively, and the other end of the two steel wire ropes is fixedly connected to the combined fixing mechanism, and the combined fixing mechanism is arranged on the construction layer. At the position of the window opening b on the floor, the combined fixing mechanism includes a beam b, two vertical beams a and two vertical beams b, the length of the beam b is greater than the width of the window opening b, and the two vertical beams a are respectively connected with the beam b. The two ends are fixedly connected, the two vertical beams a are attached to the walls on both sides of the window opening b, the two vertical beams b are fixedly connected to the bottom of the beam b, and the lower parts of the two vertical beams b are attached to the window opening b. On the wall below, the two steel wire ropes are fixedly connected to the beam b, the secondary beam is fixedly connected to the steel plate, and a guardrail is fixedly installed on the steel plate.
进一步的,所述主梁为槽钢。Further, the main beam is channel steel.
进一步的,所述次梁为槽钢。Further, the secondary beam is channel steel.
进一步的,所述横梁a与主梁呈垂直设置。Further, the transverse beam a is vertically arranged with the main beam.
进一步的,所述横梁a下方设置有用于支撑横梁a的支座,支座位于窗洞口a的内侧。Further, a support for supporting the cross beam a is provided below the beam a, and the support is located inside the window opening a.
进一步的,所述钢丝绳通过圆钢锚环b与主梁固定连接。Further, the steel wire rope is fixedly connected to the main beam through the round steel anchor ring b.
与现有技术相比,本实用新型具有以下有益效果:本实用新型所述的一种用于装配式建筑施工的悬挑卸料钢平台,结构稳定,承重能力强,无需再像传统卸料钢平台一样需要搁置在楼面,同时节省了在上层边梁混凝土内预埋卡环的繁琐环节,极大地提高了平台部的位置选择性,也保证了施工的安全性,本实用新型便于在装配式混凝土结构上使用并对预制混凝土构件不产生任何影响,其安装与拆除都非常便捷,并大大节省人工。Compared with the prior art, the utility model has the following beneficial effects: the cantilevered unloading steel platform for prefabricated building construction described in the utility model has stable structure and strong load-bearing capacity, and does not need to be unloaded like traditional unloading. The steel platform also needs to be placed on the floor, and at the same time, it saves the tedious link of pre-embedding the snap ring in the upper side beam concrete, greatly improves the position selectivity of the platform part, and also ensures the safety of construction. It is used on prefabricated concrete structures and does not have any impact on prefabricated concrete components. Its installation and removal are very convenient, and labor is greatly saved.
附图说明Description of drawings
图1是本实用新型的结构示意图;Fig. 1 is the structural representation of the present utility model;
图2是本实用新型中主梁、钢板、次梁相配合的结构示意图;Fig. 2 is the structural schematic diagram that the main beam, the steel plate and the secondary beam are matched in the present utility model;
图3是本实用新型中组合式固定机构的结构示意图。FIG. 3 is a schematic structural diagram of the combined fixing mechanism in the present invention.
具体实施方式Detailed ways
下面结合附图和具体实施例对本实用新型作详细说明。The present utility model will be described in detail below with reference to the accompanying drawings and specific embodiments.
如图1至图3所示,一种用于装配式建筑施工的悬挑卸料钢平台,包括两个穿设在施工层窗洞口a7上的主梁1,窗洞口a7的外侧设置有钢板3、组合式拉杆固定机构和两根钢丝绳9,窗洞口a7的内侧设置有横梁a8、两个圆钢锚环a5和两个短肢梁10,钢板3和横梁a8均设置在两个主梁1的上方,两个主梁1间隔平行设置,两个主梁1之间设置有多个次梁2,多个次梁2沿主梁1长度方向依次间隔设置,相邻两个次梁2呈平行设置,次梁2的两端分别与两个主梁1固定连接,所述两个主梁1的一端均与钢板3固定连接,另一端分别与两个圆钢锚环a5固定连接,所述圆钢锚环a5锚固在楼板上,所述两个短肢梁10分别与两个主梁固定连接,所述横梁a8的长度大于窗洞口a7的宽度,横梁a8的两端分别与两个短肢梁10固定连接,横梁a8的两端贴设在窗洞口a7两侧的墙壁上,所述两根钢丝绳9的一端分别与两个主梁1固定连接,两根钢丝绳9的另一端与组合式固定机构固定连接,所述组合式固定机构设置在施工层上一层的窗洞口b14位置处,所述组合式固定机构包括横梁b11、两个竖梁a12和两个竖梁b13,横梁b11的长度大于窗洞口b14的宽度,两个竖梁a12分别与横梁b11的两端固定连接,两个竖梁a12贴设在窗洞口b14两侧的墙壁上,两个竖梁b13与横梁b11的底部固定连接,两个竖梁b13的下部均贴设在窗洞口b14下方的墙壁上,所述两根钢丝绳9均与横梁b11固定连接,所述次梁2与钢板3固定连接,所述钢板3上固定安装有护栏4。As shown in Figures 1 to 3, a cantilevered unloading steel platform for prefabricated building construction includes two
所述主梁1为槽钢。The
所述次梁2为槽钢。The
所述横梁a8与主梁1呈垂直设置。The cross beam a8 is perpendicular to the
所述横梁a8下方设置有用于支撑横梁a8的支座15,支座15位于窗洞口a7的内侧。A support 15 for supporting the cross beam a8 is provided below the cross beam a8, and the support 15 is located inside the window opening a7.
所述钢丝绳9通过圆钢锚环b6与主梁1固定连接。The
本实用新型使用时,工人通过窗洞口a7进出,将钢板3上的施工材料运输至内部,非常便捷,大大节省人力,提高施工效率。When the utility model is used, the workers enter and exit through the window opening a7, and transport the construction materials on the
上述实施例以本实用新型技术方案为前提,给出了详细的实施方式和具体的操作过程,但本实用新型的保护范围不限于上述的实施例。The above embodiments are based on the technical solutions of the present invention, and provide detailed implementations and specific operation processes, but the protection scope of the present invention is not limited to the above embodiments.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202221133407.8U CN217461538U (en) | 2022-05-12 | 2022-05-12 | A steel platform of unloading of encorbelmenting for assembly type structure construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202221133407.8U CN217461538U (en) | 2022-05-12 | 2022-05-12 | A steel platform of unloading of encorbelmenting for assembly type structure construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN217461538U true CN217461538U (en) | 2022-09-20 |
Family
ID=83275394
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202221133407.8U Expired - Fee Related CN217461538U (en) | 2022-05-12 | 2022-05-12 | A steel platform of unloading of encorbelmenting for assembly type structure construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN217461538U (en) |
-
2022
- 2022-05-12 CN CN202221133407.8U patent/CN217461538U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104261232B (en) | Lifting device attached to special-shaped section and installation method thereof | |
| CN215670929U (en) | Shear force wall elevator shaft assembled operation platform | |
| CN106592962A (en) | Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus | |
| CN213774554U (en) | Assembled self-control sliding lifting construction unloading platform | |
| KR20250036109A (en) | Structural Systems and Methods for Floor Structural Work in Elevator Machine Room of Apartment Housing | |
| CN117145043A (en) | Prefabricated corridor, corridor end connection structure and construction method | |
| CN212336672U (en) | I-steel overhanging bearing frame of basket pull rod for constructional engineering | |
| CN206319610U (en) | Roof system steel truss slipping and assembling construction platform structure | |
| CN210858024U (en) | Discharging platform with liftable hole part | |
| CN205329640U (en) | " T " supports symmetrical sliding formwork construction structures | |
| CN208415293U (en) | Integral prefabricated assembled main transformer foundation for indoor substation | |
| CN106401252A (en) | Flat roof of large-diameter silo and silo | |
| CN214570326U (en) | Curtain wall unit plate rail hoisting and hard protection integrated device | |
| CN115030518A (en) | A method for segmented integral hoisting of a steel structure coal conveying trestle | |
| CN108277994A (en) | On across the high ferro safe guarding shed quick method for dismounting of operation line | |
| CN104060838A (en) | Grouping and air-pairing installation method for corridor | |
| CN111608376B (en) | Comprehensive construction method for shaping component | |
| CN219261788U (en) | Unloading platform for steel structure assembly building | |
| WO2009093974A1 (en) | Frame system for supporting facade elements and use of the frame system | |
| CN217400394U (en) | High-altitude manual hoisting profiled steel sheet construction device | |
| CN111236603A (en) | Comprehensive construction method for steel plate mesh overhanging scaffold | |
| CN115478710A (en) | High-rise building roof cantilever structure dismantling construction method | |
| CN111608377B (en) | Comprehensive construction method for building overhanging scaffold | |
| CN209585313U (en) | Monorail hole to be provided plugging structure | |
| CN114809659A (en) | Unloading platform for construction engineering and construction method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220920 |