CN217419534U - A kind of water conservancy project with sand blocking and water intake gate - Google Patents
A kind of water conservancy project with sand blocking and water intake gate Download PDFInfo
- Publication number
- CN217419534U CN217419534U CN202220337230.7U CN202220337230U CN217419534U CN 217419534 U CN217419534 U CN 217419534U CN 202220337230 U CN202220337230 U CN 202220337230U CN 217419534 U CN217419534 U CN 217419534U
- Authority
- CN
- China
- Prior art keywords
- water
- wall
- fixedly installed
- gate body
- gate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Barrages (AREA)
- Details Of Reciprocating Pumps (AREA)
Abstract
Description
技术领域technical field
本申请涉及水利工程技术领域,更具体地说,涉及一种水利工程用拦沙取水闸门。The present application relates to the technical field of water conservancy projects, and more particularly, to a sand blocking and water intake gate for water conservancy projects.
背景技术Background technique
水利工程是用于控制和调配自然界的地表水和地下水,达到除害兴利目的而修建的工程,也称为水工程,水利工程经常需要修建坝、堤、溢洪道、水闸、鱼道等不同类型的水工建筑物,拦沙取水闸门通常是利用滤网对水体内的泥沙进行过滤,从而将较为清洁的水源通过闸门进行排放。Water conservancy project is a project built for the purpose of controlling and allocating natural surface water and groundwater to achieve the purpose of eliminating harm and benefiting, also known as water project. For hydraulic structures, the sand and water intake gate usually uses a filter screen to filter the sediment in the water body, so as to discharge the relatively clean water source through the gate.
然而,现有的水利工程用拦沙取水闸门在长时间使用时滤网上容易粘黏较多的灰尘造成滤网堵塞,闸门上缺少对滤网的冲刷清洁结构,并且滤网难以快速拆装,有待进一步的改善。However, when the existing sand and water intake gates for water conservancy projects are used for a long time, the filter screen is likely to stick to a lot of dust, causing the filter screen to be blocked. need to be further improved.
实用新型内容Utility model content
为了解决上述问题,本申请提供一种水利工程用拦沙取水闸门。In order to solve the above problems, the present application provides a sand blocking and water intake gate for water conservancy projects.
本申请提供的一种水利工程用拦沙取水闸门采用如下的技术方案:A kind of water conservancy project provided by the application adopts the following technical scheme:
一种水利工程用拦沙取水闸门,包括闸门本体和高压喷头,所述闸门本体顶端固定安装有水泵,所述闸门本体顶端活动设置有活动盖,所述闸门本体两端贯穿开设有水流槽,所述水流槽内壁活动设置有活动框,所述活动框顶端和底端内壁固定安装有均匀分布的分隔块,所述分隔块两侧均固定安装有第一滤网,所述水泵的抽水端口上固定安装有抽水管,所述水泵的出水端口上固定安装有出水管,所述出水管的一端贯穿闸门本体外壁延伸至闸门本体的内部,所述高压喷头均匀分布安装于出水管的外壁,所述闸门本体内部转动安装有转动柱,所述转动柱外壁固定安装有均匀分布的刷毛,所述刷毛外壁与第一滤网的外壁相贴合。A sand and water intake gate for water conservancy projects, comprising a gate body and a high-pressure nozzle, a water pump is fixedly installed at the top of the gate body, a movable cover is movably provided at the top of the gate body, and water flow grooves are provided through the two ends of the gate body, A movable frame is movably arranged on the inner wall of the water flow tank, and evenly distributed partition blocks are fixedly installed on the inner walls of the top and bottom ends of the movable frame, and a first filter screen is fixedly installed on both sides of the partition block. A water pumping pipe is fixedly installed on the top, and a water outlet pipe is fixedly installed on the water outlet port of the water pump. One end of the water outlet pipe extends through the outer wall of the gate body and extends to the interior of the gate body. A rotating column is rotatably installed inside the gate body, and evenly distributed bristles are fixedly installed on the outer wall of the rotating column, and the outer wall of the bristle is attached to the outer wall of the first filter screen.
通过上述技术方案,当需要对第一滤网进行清洁时,开启电机带动刷毛转动,可是实现对第一滤网的刷动,开启水泵将流经闸门本体内的水体抽至多个高压喷头处,利用水压力即可将粘黏附着在第一滤网上的污物冲落,实现对第一滤网的清洁和刷动。Through the above technical solution, when the first filter screen needs to be cleaned, the motor is turned on to drive the bristles to rotate, but the first filter screen can be brushed, and the water body flowing through the gate body is pumped to a plurality of high-pressure nozzles by turning on the water pump. The dirt adhering to the first filter screen can be washed away by the water pressure, and the cleaning and brushing of the first filter screen can be realized.
进一步的,所述活动盖顶端固定安装有太阳能板,所述活动盖内壁固定安装有太阳能控制器和蓄电池。Further, a solar panel is fixedly installed on the top of the movable cover, and a solar controller and a battery are fixedly installed on the inner wall of the movable cover.
通过上述技术方案,通过设置太阳能板,可将太阳能转化为电能储存在蓄电池内,可为水泵提供电能。Through the above technical solution, by arranging the solar panel, the solar energy can be converted into electric energy and stored in the storage battery, and the electric energy can be provided for the water pump.
进一步的,所述闸门本体底端内壁固定安装有第一限位块,所述第一限位块内壁与转动柱底端外壁相贴合,所述闸门本体内部固定安装有第二限位块,所述转动柱顶端外壁与第二限位块内壁相贴合。Further, a first limit block is fixedly installed on the inner wall of the bottom end of the gate body, the inner wall of the first limit block is fitted with the outer wall of the bottom end of the rotating column, and a second limit block is fixedly installed inside the gate body. , the outer wall of the top end of the rotating column is in contact with the inner wall of the second limiting block.
通过上述技术方案,第一限位块和第二限位块的设置利于转动柱的稳定转动。Through the above technical solutions, the arrangement of the first limit block and the second limit block is beneficial to the stable rotation of the rotating column.
进一步的,所述闸门本体内壁固定安装有电机,所述电机的输出轴底端固定安装有第一齿轮,所述转动柱外壁固定安装有第二齿轮,所述第一齿轮和第二齿轮相互啮合。Further, a motor is fixedly installed on the inner wall of the gate body, a first gear is fixedly installed at the bottom end of the output shaft of the motor, a second gear is fixedly installed on the outer wall of the rotating column, and the first gear and the second gear are mutually connected. mesh.
通过上述技术方案,开启电机带动第一齿轮转动,第一齿轮通过啮合作用带动第二齿轮转动,从而实现对第一滤网的刷动。Through the above technical solution, the motor is turned on to drive the first gear to rotate, and the first gear drives the second gear to rotate through the meshing action, thereby realizing the brushing of the first filter screen.
进一步的,所述抽水管底端内壁活动设置有安装管,所述安装管底端固定安装有固定体,所述固定体内外壁贯穿开设有均匀分布的通孔,所述通孔内壁固定安装有第二滤网。Further, an installation pipe is movably arranged on the inner wall of the bottom end of the water pumping pipe, a fixing body is fixedly installed at the bottom end of the installation pipe, uniformly distributed through holes are formed through the inner and outer walls of the fixing body, and the inner wall of the through hole is fixedly installed with a fixed body. Second filter.
通过上述技术方案,通孔和第二滤网的设置可避免将泥沙抽入水泵中,避免水泵堵塞。Through the above technical solutions, the arrangement of the through holes and the second filter screen can prevent the sediment from being pumped into the water pump and prevent the water pump from being blocked.
进一步的,所述安装管两端贯穿式活动安装有螺纹柱,所述螺纹柱两端贯穿抽水管延伸至抽水管的外部,所述螺纹柱的外壁螺纹连接有螺母。Further, both ends of the installation pipe are movably installed with threaded columns, both ends of the threaded columns extend through the water suction pipe to the outside of the water suction pipe, and nuts are threadedly connected to the outer walls of the threaded columns.
通过上述技术方案,将螺纹柱安装在安装管和抽水管上,利用螺母螺纹安装在螺纹柱上可提高抽水管和安装管组装的稳定性。Through the above technical solution, the threaded column is installed on the installation pipe and the water suction pipe, and the threaded column is installed on the threaded column by using the nut thread, which can improve the assembly stability of the water suction pipe and the installation pipe.
进一步的,所述闸门本体顶端固定开设有限位孔,所述活动盖底端四角边缘处固定安装有限位柱,所述限位孔和限位柱相适配,所述闸门本体顶端和底端贯穿开设有限位槽,所述限位槽和活动框相适配,所述活动框顶端固定安装有对称的固定块。Further, a limit hole is fixed at the top of the gate body, a limit column is fixedly installed at the four corner edges of the bottom end of the movable cover, the limit hole and the limit column are matched, and the top and bottom ends of the gate body are fixed. A limit slot is provided throughout, the limit slot is adapted to the movable frame, and a symmetrical fixing block is fixedly installed at the top of the movable frame.
通过上述技术方案,将限位柱放置在限位孔内即可实现活动盖的稳定放置,限位槽和固定块的设置利用将活动框快速抽出。Through the above technical solution, the movable cover can be stably placed by placing the limiting column in the limiting hole, and the setting of the limiting groove and the fixing block utilizes the quick extraction of the movable frame.
综上所述,本申请包括以下至少一个有益技术效果:To sum up, the present application includes at least one of the following beneficial technical effects:
(1)本装置利用电机带动第一齿轮转动,第一齿轮和第二齿轮啮合转动,从而使转动柱转动,此时转动柱上的刷毛可对第一滤网进行刷动,从而使粘黏在第一滤网上的污物落下,实现对第一滤网的刷洗;(1) The device uses the motor to drive the first gear to rotate, and the first gear and the second gear mesh and rotate, so that the rotating column rotates. At this time, the bristles on the rotating column can brush the first filter screen, thereby making the sticky The dirt on the first filter screen falls to realize the brushing of the first filter screen;
(2)本装置利用水泵抽动流经闸门本体的水体,将水体通过多个高压喷头喷至第一滤网上,可将第一滤网上粘黏的污物通过水压力冲落,从而实现对第一滤网的冲洗;(2) The device uses a water pump to pump the water body flowing through the gate body, and sprays the water body onto the first filter screen through a plurality of high-pressure nozzles, so that the sticky dirt on the first filter screen can be washed off by water pressure, so as to realize the protection of the first filter screen. a washing of the filter;
(3)本装置的固体体上设有多个通孔,通孔内壁设置有第二滤网,可避免水体内的泥沙进入水泵,避免了水泵堵塞,利用太阳能板可将太阳能转化为电能存储在蓄电池内,为水泵和电机提供电能,利于能源的节约使用。(3) The solid body of the device is provided with a plurality of through holes, and the inner wall of the through holes is provided with a second filter screen, which can prevent the sediment in the water from entering the water pump and prevent the water pump from being blocked. The solar panel can be used to convert solar energy into electricity. It is stored in the battery to provide electrical energy for the water pump and motor, which is conducive to the economical use of energy.
附图说明Description of drawings
图1为一种水利工程用拦沙取水闸门的立体结构示意图;Fig. 1 is the three-dimensional structure schematic diagram of a kind of water conservancy project with sand blocking and water intake gate;
图2为本申请的闸门本体的剖视结构示意图;2 is a cross-sectional structural schematic diagram of the gate body of the application;
图3为本申请中闸门本体和活动盖的立体拆分结构示意图;3 is a schematic diagram of the three-dimensional split structure of the gate body and the movable cover in the application;
图4为本申请中活动盖的剖视结构示意图;4 is a schematic cross-sectional structure diagram of a movable cover in the application;
图5为本申请中螺纹柱的局部放大结构示意图。FIG. 5 is a partial enlarged structural schematic diagram of the threaded column in the present application.
图中标号说明:1、闸门本体;2、水泵;3、活动盖;4、水流槽;5、活动框;6、分隔块;7、第一滤网;8、出水管;9、抽水管;10、太阳能板;11、高压喷头;12、第一限位块;13、转动柱;14、刷毛;15、电机;16、第一齿轮;17、第二齿轮;18、第二限位块;19、安装管;20、固定体;21、通孔;22、第二滤网;23、限位孔;24、限位柱;25、限位槽;26、固定块;27、太阳能控制器;28、蓄电池;29、螺母;30、螺纹柱。Description of the symbols in the figure: 1, the gate body; 2, the water pump; 3, the movable cover; 4, the water flow groove; 5, the movable frame; 6, the partition block; 7, the first filter screen; ; 10, solar panel; 11, high pressure nozzle; 12, first limit block; 13, rotating column; 14, bristles; 15, motor; 16, first gear; 17, second gear; 18, second limit block; 19, installation pipe; 20, fixed body; 21, through hole; 22, second filter screen; 23, limit hole; 24, limit post; 25, limit slot; 26, fixed block; 27, solar energy Controller; 28, battery; 29, nut; 30, threaded post.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述;显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例,基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model; obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. For example, based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative work shall fall within the protection scope of the present invention.
在本实用新型的描述中,需要说明的是,术语“上”、“下”、“内”、“外”、“顶/底端”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性。In the description of the present invention, it should be noted that the orientation or positional relationship indicated by the terms "upper", "lower", "inner", "outer", "top/bottom", etc. is based on the drawings shown in the drawings. The orientation or positional relationship is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as a limit. Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed to indicate or imply relative importance.
在本实用新型的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“设置有”、“套设/接”、“连接”等,应做广义理解,例如“连接”,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the present invention, it should be noted that, unless otherwise expressly specified and limited, the terms "installation", "provided with", "sleeve/connection", "connection", etc., should be understood in a broad sense, such as "Connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be two elements Internal connectivity. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood in specific situations.
以下结合附图1-5对本申请作进一步详细说明。The present application will be further described in detail below in conjunction with accompanying drawings 1-5.
本申请实施例公开一种水利工程用拦沙取水闸门,包括闸门本体1和高压喷头11,闸门本体1顶端固定安装有水泵2,闸门本体1顶端活动设置有活动盖3,闸门本体1两端贯穿开设有水流槽4,水流槽4内壁活动设置有活动框5,活动框5顶端和底端内壁固定安装有均匀分布的分隔块6,分隔块6两侧均固定安装有第一滤网7,水泵2的抽水端口上固定安装有抽水管9,水泵2的出水端口上固定安装有出水管8,出水管8的一端贯穿闸门本体1外壁延伸至闸门本体1的内部,高压喷头11均匀分布安装于出水管8的外壁,闸门本体1内部转动安装有转动柱13,转动柱13外壁固定安装有均匀分布的刷毛14,刷毛14外壁与第一滤网7的外壁相贴合。The embodiment of the present application discloses a sand and water intake gate for water conservancy projects, comprising a
请参阅图4,为了实现电能的节约使用,活动盖3顶端固定安装有太阳能板10,活动盖3内壁固定安装有太阳能控制器27和蓄电池28。利用太阳能板10储存电能至蓄电池28中,为电机15和水泵2提供电能,可实现电能的节约使用。Referring to FIG. 4 , in order to save electricity, a
请参阅图2,为了实现转动柱13的稳定转动,闸门本体1底端内壁固定安装有第一限位块12,第一限位块12内壁与转动柱13底端外壁相贴合,闸门本体1内部固定安装有第二限位块18,转动柱13顶端外壁与第二限位块18内壁相贴合,闸门本体1内壁固定安装有电机15,电机15的输出轴底端固定安装有第一齿轮16,转动柱13外壁固定安装有第二齿轮17,第一齿轮16和第二齿轮17相互啮合,转动柱13在随第二齿轮17转动时,沿第一限位块12和第二限位块18的内壁运动,从而实现了转动柱13的稳定转动。Please refer to FIG. 2 , in order to realize the stable rotation of the
请参阅图2,为了实现安装管19和抽水管9的稳定安装,抽水管9底端内壁活动设置有安装管19,安装管19底端固定安装有固定体20,固定体20内外壁贯穿开设有均匀分布的通孔21,通孔21内壁固定安装有第二滤网22,安装管19两端贯穿式活动安装有螺纹柱30,螺纹柱30两端贯穿抽水管9延伸至抽水管9的外部,螺纹柱30的外壁螺纹连接有螺母29,将螺纹柱30安装在抽水管9和安装管19的内壁,利用螺母29将螺纹柱30固定安装抽水管9的外壁上,即可实现安装管19和抽水管9的稳定安装。Please refer to FIG. 2 , in order to realize the stable installation of the
请参阅图3,为了实现活动盖3的稳定放置,闸门本体1顶端固定开设有限位孔23,活动盖3底端四角边缘处固定安装有限位柱24,限位孔23和限位柱24相适配,闸门本体1顶端和底端贯穿开设有限位槽25,限位槽25和活动框5相适配,活动框5顶端固定安装有对称的固定块26。将限位柱24放置在限位孔23中,即可实现活动盖3的稳定放置。Please refer to FIG. 3 , in order to realize the stable placement of the
本申请实施例一种水利工程用拦沙取水闸门的实施原理为:将该装置设于需要拦沙取水的合适位置,将活动框5放置在限位槽25,利用第一滤网7可实现对泥沙的过滤,当需要对第一滤网7进行刷洗时,开启电机15带动第一齿轮16转动,第一齿轮16通过啮合作用带动第二齿轮17转动,第二齿轮17带动转动柱13转动,从而使转动柱13外壁上的刷毛14对第一滤网7进行刷洗,开启水泵2将流经闸门本体1内的水体抽至高压喷头11处,通过高压喷头11喷出可实现对第一滤网7的冲洗,太阳能板10吸收太阳能转化为电能在太阳能控制器27的作用下将电能存储到蓄电池28内,蓄电池28为电机15和水泵2供电,当需要将第一滤网7取出时,取下活动盖3,利用吊机将固定块26向上拉动,将活动框5从限位槽25内壁向上取出,即可实现第一滤网7的快速取出。The implementation principle of a sand blocking and water intake gate for water conservancy projects in the embodiment of the present application is as follows: the device is set at a suitable position where sand blocking and water intake are required, the
以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。The above are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore: all equivalent changes made according to the structure, shape and principle of the present application should be covered within the scope of the present application. Inside.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202220337230.7U CN217419534U (en) | 2022-02-20 | 2022-02-20 | A kind of water conservancy project with sand blocking and water intake gate |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202220337230.7U CN217419534U (en) | 2022-02-20 | 2022-02-20 | A kind of water conservancy project with sand blocking and water intake gate |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN217419534U true CN217419534U (en) | 2022-09-13 |
Family
ID=83177623
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202220337230.7U Active CN217419534U (en) | 2022-02-20 | 2022-02-20 | A kind of water conservancy project with sand blocking and water intake gate |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN217419534U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN121164502A (en) * | 2025-11-21 | 2025-12-19 | 呼和浩特海关技术中心 | Grain detection method and equipment based on liquid chromatography-mass spectrometry |
-
2022
- 2022-02-20 CN CN202220337230.7U patent/CN217419534U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN121164502A (en) * | 2025-11-21 | 2025-12-19 | 呼和浩特海关技术中心 | Grain detection method and equipment based on liquid chromatography-mass spectrometry |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN214799403U (en) | A photovoltaic module support device | |
| CN111852845A (en) | A suction pump pump inlet filter mechanism | |
| CN116104183A (en) | An intelligent integrated integrated pumping station | |
| CN206828237U (en) | A kind of swimming pool cleaning plant | |
| CN210712892U (en) | Well point dewatering device for constructional engineering construction | |
| CN213879741U (en) | Solar energy collection device of green building | |
| CN212477655U (en) | Cleaning device for cleaning garbage in water pool | |
| CN212001333U (en) | Dredging device for hydraulic engineering | |
| CN211531053U (en) | Intelligent photovoltaic power generation device | |
| CN219472345U (en) | Multifunctional centrifugal clean water pump | |
| CN218148460U (en) | Drainage equipment for ground foundation construction | |
| CN214363181U (en) | A dust suppression spraying device for municipal engineering | |
| CN216783462U (en) | End face cleaning and maintaining device for urban rail wheel | |
| CN217487164U (en) | Energy-saving and water-saving irrigation device | |
| CN215256861U (en) | Energy-saving submersible pump for well capable of utilizing water wheel to store energy | |
| CN116667773A (en) | Solar photovoltaic panel cleaning device and cleaning method thereof | |
| CN212026099U (en) | Water storage device for hydraulic engineering | |
| CN116354424A (en) | Container integration sewage treatment device convenient to dismantle maintenance | |
| CN212000837U (en) | A road sprinkler for building environmental protection machinery | |
| CN211037108U (en) | Quick desilting device of hydraulic engineering with stirring function | |
| CN209907557U (en) | Landscape pool with self-purification function | |
| CN221061931U (en) | Rural sewage treatment plant | |
| CN210386740U (en) | Cleaning device convenient to wash prism | |
| CN219812827U (en) | Multifunctional cleaning equipment for colony house | |
| CN216075300U (en) | Emergency type canal dredging device after flood |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CB03 | Change of inventor or designer information |
Inventor after: Liu Dongmei Inventor after: Shao Kai Inventor before: Shao Kai |
|
| CB03 | Change of inventor or designer information | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250515 Address after: 067000 Hebei Province Chengde City Caiyuan Jadia Community Patentee after: Liu Dongmei Country or region after: China Address before: 271400 Room 501, unit 3, building 9, No. 30 West Street, Wenmiao sub district office, Ningyang County, Tai'an City, Shandong Province Patentee before: Shao Kai Country or region before: China |
|
| TR01 | Transfer of patent right |