CN217323145U - An attachment rod for tower cranes - Google Patents

An attachment rod for tower cranes Download PDF

Info

Publication number
CN217323145U
CN217323145U CN202220472823.4U CN202220472823U CN217323145U CN 217323145 U CN217323145 U CN 217323145U CN 202220472823 U CN202220472823 U CN 202220472823U CN 217323145 U CN217323145 U CN 217323145U
Authority
CN
China
Prior art keywords
wall
rod
fixedly connected
installation
tower crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220472823.4U
Other languages
Chinese (zh)
Inventor
杨大春
滕发程
丁国民
李秋松
赵罡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Zhuomate Heavy Industry Co ltd
Original Assignee
Sichuan Zhuomate Heavy Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Zhuomate Heavy Industry Co ltd filed Critical Sichuan Zhuomate Heavy Industry Co ltd
Priority to CN202220472823.4U priority Critical patent/CN217323145U/en
Application granted granted Critical
Publication of CN217323145U publication Critical patent/CN217323145U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to a tower crane technical field discloses an adhere to pole for tower crane, including the main part of the body, the opening has all been seted up at the main part of the body both ends, and two opening inner walls sliding connection respectively have first installation pole and second installation pole, first installation pole and second installation pole one end are the first connector of fixedly connected with and the second connector respectively, the movable hole that the symmetry set up, two are seted up to main part of the body top outer wall the equal fixedly connected with fixed plate in the movable hole outside. The utility model discloses a first installation pole, first connector, second installation pole and the second connector that set up are convenient for install the mobile jib body between adhering to frame and building, cooperate the effect of piston board for can adjust the length of mobile jib body according to the interval of adhering to frame and building, application scope is more extensive, and is comparatively practical, is fit for extensively promoting and using.

Description

一种用于塔式起重机的附着杆An attachment rod for tower cranes

技术领域technical field

本实用新型涉及塔式起重机技术领域,具体为一种用于塔式起重机的附着杆。The utility model relates to the technical field of tower cranes, in particular to an attachment rod for tower cranes.

背景技术Background technique

塔式起重机简称塔机,亦称塔吊,作业空间大,主要用于房屋建筑施工中物料的垂直和水平输送以及建筑构件的安装。附着装置是塔式起重机的重要结构件,起到抵抗外力、提高塔身强度、保持塔式起重机稳定的重要作用,由附着框、附墙座及附着杆三个部分组成。Tower cranes are referred to as tower cranes, also known as tower cranes. They have a large working space and are mainly used for vertical and horizontal transportation of materials and installation of building components in housing construction. The attachment device is an important structural part of the tower crane, which plays an important role in resisting external force, improving the strength of the tower body, and maintaining the stability of the tower crane.

本申请人发现:当前塔式起重机的附着杆在使用时,缺少对自身长度进行调节的功能,从而不便于将附着杆安装在不同间距的附着框和建筑物之间,并且在附着杆安装完成之后,缺少对附着杆加强稳固的作用,导致存在脱落的风险。The applicant found that: when the attachment rod of the current tower crane is in use, it lacks the function of adjusting its own length, so that it is inconvenient to install the attachment rod between attachment frames and buildings with different spacings, and the attachment rod is installed after the completion of the installation of the attachment rod. Afterwards, there is a lack of reinforcement for the attachment rod, resulting in a risk of falling off.

实用新型内容Utility model content

本实用新型的目的在于提供一种用于塔式起重机的附着杆,解决了背景技术中所提出的缺少对自身长度进行调节的功能以及安装完成之后存在脱落风险的问题。The purpose of the present utility model is to provide an attachment rod for a tower crane, which solves the problems of lack of the function of adjusting its own length and the risk of falling off after installation, which is proposed in the background art.

为实现上述目的,本实用新型提供如下技术方案:一种用于塔式起重机的附着杆,包括主杆体,所述主杆体两端均开设有开口,且两个开口内壁分别滑动连接有第一安装杆和第二安装杆,所述第一安装杆和第二安装杆一端分别固定连接有第一连接头和第二连接头,所述主杆体顶部外壁开设有对称设置的活动孔,两个所述活动孔外侧均固定连接有固定板,两个所述固定板顶部外壁均开设有通孔,且两个通孔内壁均转动连接有L型结构的转动杆,两个所述转动杆底端均设置有螺纹段;In order to achieve the above purpose, the present utility model provides the following technical solutions: an attachment rod for a tower crane, comprising a main rod body, both ends of the main rod body are provided with openings, and the inner walls of the two openings are respectively slidably connected with a first rod. The installation rod and the second installation rod, one end of the first installation rod and the second installation rod are respectively fixed with a first connection head and a second connection head, the outer wall of the top of the main rod body is provided with symmetrically arranged movable holes, two The outer sides of the movable holes are fixedly connected with fixed plates, the top outer walls of the two fixed plates are both provided with through holes, and the inner walls of the two through holes are rotatably connected with L-shaped rotating rods, and the bottoms of the two rotating rods Both ends are provided with threaded segments;

所述第一安装杆和第二安装杆顶部外壁均开设有等距分布的定位孔,两个所述螺纹段分别螺接在其中两个定位孔内壁上,两个所述转动杆顶端均固定连接有手轮。The top outer walls of the first installation rod and the second installation rod are provided with equidistant positioning holes, the two threaded segments are respectively screwed on the inner walls of the two positioning holes, and the top ends of the two rotating rods are fixed. A handwheel is attached.

作为本实用新型的一种优选实施方式,所述第一安装杆两侧外壁固定连接有对称设置的第一加强杆,所述主杆体两侧外壁固定连接有对称设置的第一导轨,两个所述第一加强杆一端分别滑动连接在两个第一导轨内壁上。As a preferred embodiment of the present invention, symmetrically arranged first reinforcing rods are fixedly connected to the outer walls on both sides of the first installation rod, and symmetrically arranged first guide rails are fixedly connected to the outer walls of the main rod body. One end of the first reinforcing rod is slidably connected to the inner walls of the two first guide rails, respectively.

作为本实用新型的一种优选实施方式,所述第二安装杆两侧外壁固定连接有对称设置的第二加强杆,所述主杆体两侧外壁固定连接有对称设置的第二导轨,两个所述第二加强杆一端分别滑动连接在两个第二导轨内壁上。As a preferred embodiment of the present invention, symmetrically arranged second reinforcing rods are fixedly connected to the outer walls on both sides of the second installation rod, and symmetrically arranged second guide rails are fixedly connected to the outer walls of both sides of the main rod body. One end of the second reinforcing rod is slidably connected to the inner walls of the two second guide rails respectively.

作为本实用新型的一种优选实施方式,所述主杆体两侧内壁滑动连接有对称设置的活塞板,所述第一安装杆和第二安装杆相对一端分别固定连接在两个活塞板一侧外壁上。As a preferred embodiment of the present invention, symmetrically arranged piston plates are slidably connected to the inner walls on both sides of the main rod body, and opposite ends of the first installation rod and the second installation rod are fixedly connected to one side of the two piston plates respectively. on the outer wall.

作为本实用新型的一种优选实施方式,两个所述活塞板相对一侧外壁固定连接有同一个弧形结构的弹性金属板。As a preferred embodiment of the present invention, an elastic metal plate with the same arc structure is fixedly connected to the outer walls of the two piston plates on the opposite sides.

作为本实用新型的一种优选实施方式,所述主杆体底部内壁开设有滑槽,所述滑槽内壁滑动连接有对称设置的伸缩套管,两个所述伸缩套管的伸缩端均固定连接在弹性金属板底部外壁上,两个所述伸缩套管相对一侧固定连接有同一个连接弹簧。As a preferred embodiment of the present invention, the inner wall of the bottom of the main rod body is provided with a chute, the inner wall of the chute is slidably connected with telescopic sleeves arranged symmetrically, and the telescopic ends of the two telescopic sleeves are fixedly connected On the bottom outer wall of the elastic metal plate, opposite sides of the two telescopic sleeves are fixedly connected with the same connecting spring.

作为本实用新型的一种优选实施方式,所述主杆体一侧外壁开设有检修口,且检修口位于弹性金属板一侧,所述主杆体一侧外壁滑动连接有盖板,且盖板位于检修口一侧,所述盖板一侧外壁开设有对称设置的螺纹孔,且两个螺纹孔内壁均螺接有锁紧螺杆,两个所述锁紧螺杆的螺纹端均螺接在主杆体上。As a preferred embodiment of the present invention, an inspection port is provided on the outer wall of one side of the main rod body, and the inspection port is located on the side of the elastic metal plate, and a cover plate is slidably connected to the outer wall of one side of the main rod body, and the cover plate is located on the side of the elastic metal plate. On one side of the inspection port, symmetrically arranged threaded holes are opened on the outer wall of one side of the cover plate, and the inner walls of the two threaded holes are screwed with locking screws, and the threaded ends of the two locking screws are screwed on the main rod body. superior.

与现有技术相比,本实用新型的有益效果如下:Compared with the prior art, the beneficial effects of the present utility model are as follows:

1.本实用新型一种用于塔式起重机的附着杆,通过设置的第一安装杆、第一连接头、第二安装杆和第二连接头,便于将主杆体安装在附着框和建筑物之间,配合活塞板的作用,使得能够根据附着框和建筑物的间距对主杆体的长度进行调节,适用范围更加广泛,当长度调节完成之后,通过设置的活动孔、固定板、转动杆、手轮、螺纹段和定位孔,能够达到对第一安装杆和第二安装杆的定位效果。1. An attachment rod for tower cranes of the present utility model, through the first installation rod, the first connection head, the second installation rod and the second connection head, it is convenient to install the main rod body on the attachment frame and the building. In between, with the function of the piston plate, the length of the main rod body can be adjusted according to the distance between the attachment frame and the building, and the scope of application is wider. The handwheel, the threaded section and the positioning hole can achieve the positioning effect of the first installation rod and the second installation rod.

2.本实用新型一种用于塔式起重机的附着杆,在对主杆体的长度进行调节时,第一安装杆和第二安装杆分别带动活塞板做相对或者相反方向的运动,此时经过弹性金属板、滑槽、伸缩套管和连接弹簧的作用,能够对两个活塞板在运动时产生的压力或者拉力起到缓冲的作用,使得两个活塞板在主杆体内的运动过程更加稳定。2. An attachment rod of the present invention is used for a tower crane. When the length of the main rod body is adjusted, the first installation rod and the second installation rod respectively drive the piston plate to move in a relative or opposite direction. The function of elastic metal plate, chute, telescopic sleeve and connecting spring can buffer the pressure or tension generated by the two piston plates during movement, so that the movement process of the two piston plates in the main rod body is more stable .

3.本实用新型一种用于塔式起重机的附着杆,通过设置的第一导轨、第一加强杆、第二加强杆和第二导轨,能够在安装完成之后,对第一安装杆和第二安装杆起到稳定支撑的作用,使得第一安装杆和第二安装杆与主杆体之间的连接更加稳固,避免了在工作时出现脱落的现象。3. An attachment rod for a tower crane of the present invention, through the first guide rail, the first reinforcement rod, the second reinforcement rod and the second guide rail, after the installation is completed, the first installation rod and the first installation rod can be installed. The two mounting rods play the role of stable support, so that the connection between the first mounting rod and the second mounting rod and the main rod body is more stable, and the phenomenon of falling off during operation is avoided.

附图说明Description of drawings

通过阅读参照以下附图对非限制性实施例所作的详细描述,本实用新型的其它特征、目的和优点将会变得更明显:Other features, objects and advantages of the present invention will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings:

图1为本实用新型一种用于塔式起重机的附着杆的立体结构示意图;Fig. 1 is a three-dimensional schematic diagram of an attachment rod used for a tower crane according to the present invention;

图2为本实用新型一种用于塔式起重机的附着杆的主杆体剖视结构示意图;FIG. 2 is a cross-sectional structural schematic diagram of a main rod body of an attachment rod used for a tower crane according to the present invention;

图3为本实用新型一种用于塔式起重机的附着杆的图2中A处放大结构示意图。Fig. 3 is an enlarged structural schematic diagram of the attachment rod used for a tower crane in Fig. 2 of the present invention.

图中:1、主杆体;2、第一安装杆;3、第二安装杆;4、第一连接头;5、第二连接头;6、第一加强杆;7、第一导轨;8、第二加强杆;9、第二导轨;10、活动孔;11、固定板;12、转动杆;13、手轮;14、盖板;15、锁紧螺杆;16、定位孔;17、螺纹段;18、活塞板;19、弹性金属板;20、滑槽;21、伸缩套管;22、连接弹簧。In the figure: 1, the main rod body; 2, the first installation rod; 3, the second installation rod; 4, the first connector; 5, the second connector; 6, the first reinforcement rod; 7, the first guide rail; 8 , the second reinforcing rod; 9, the second guide rail; 10, the movable hole; 11, the fixed plate; 12, the rotating rod; 13, the hand wheel; 14, the cover plate; 15, the locking screw; 16, the positioning hole; 17, Thread section; 18, piston plate; 19, elastic metal plate; 20, chute; 21, telescopic sleeve; 22, connecting spring.

具体实施方式Detailed ways

为使本实用新型实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体实施方式,进一步阐述本实用新型。In order to make the technical means, creation features, achievement goals and effects of the present invention easy to understand and understand, the present invention will be further described below with reference to the specific embodiments.

在本实用新型的描述中,需要理解的是,术语“上”、“下”、“前”、“后”、“左”、“右”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inside", The orientation or positional relationship indicated by "outside" is based on the orientation or positional relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the indicated device or element must have a specific orientation , are constructed and operated in a specific orientation, and therefore should not be construed as a limitation of the present invention.

请参阅图1-2,本实用新型提供一种技术方案:一种用于塔式起重机的附着杆,包括主杆体1,主杆体1两端均开设有开口,且两个开口内壁分别滑动连接有第一安装杆2和第二安装杆3,第一安装杆2和第二安装杆3一端分别固定连接有第一连接头4和第二连接头5,便于将主杆体1安装在附着框和建筑物之间,配合活塞板18的作用,使得能够根据附着框和建筑物的间距对主杆体1的长度进行调节,适用范围更加广泛,主杆体1顶部外壁开设有对称设置的活动孔10,两个活动孔10外侧均固定连接有固定板11,两个固定板11顶部外壁均开设有通孔,且两个通孔内壁均转动连接有L型结构的转动杆12,两个转动杆12底端均设置有螺纹段17;1-2, the present utility model provides a technical solution: an attachment pole for a tower crane, comprising a main pole body 1, both ends of the main pole body 1 are provided with openings, and the inner walls of the two openings are respectively slidably connected There are a first installation rod 2 and a second installation rod 3, and one end of the first installation rod 2 and the second installation rod 3 are fixedly connected with a first connection head 4 and a second connection head 5 respectively, so as to facilitate the installation of the main rod body 1 on the attachment frame Between the structure and the building, with the function of the piston plate 18, the length of the main rod body 1 can be adjusted according to the distance between the attachment frame and the building, and the scope of application is wider. The top outer wall of the main rod body 1 is provided with symmetrically arranged movable holes 10. , the outer sides of the two movable holes 10 are fixedly connected with a fixed plate 11, the top outer walls of the two fixed plates 11 are both provided with through holes, and the inner walls of the two through holes are rotatably connected to the L-shaped structure. The rotating rod 12, the two rotating rods The bottom ends of 12 are provided with threaded sections 17;

第一安装杆2和第二安装杆3顶部外壁均开设有等距分布的定位孔16,两个螺纹段17分别螺接在其中两个定位孔16内壁上,两个转动杆12顶端均固定连接有手轮13,当主杆体1的长度调节完成之后,通过设置的活动孔10、固定板11、转动杆12、手轮13、螺纹段17和定位孔16,能够达到对第一安装杆2和第二安装杆3的定位效果。The top outer walls of the first installation rod 2 and the second installation rod 3 are provided with positioning holes 16 equally spaced, two thread segments 17 are screwed on the inner walls of the two positioning holes 16 respectively, and the tops of the two rotating rods 12 are fixed. The hand wheel 13 is connected. After the length adjustment of the main rod body 1 is completed, the movable hole 10, the fixed plate 11, the rotating rod 12, the hand wheel 13, the threaded section 17 and the positioning hole 16 can be set to achieve the first installation rod 2. and the positioning effect of the second installation rod 3 .

请参阅图1,在具体实施方式中,第一安装杆2两侧外壁固定连接有对称设置的第一加强杆6,主杆体1两侧外壁固定连接有对称设置的第一导轨7,两个第一加强杆6一端分别滑动连接在两个第一导轨7内壁上,第二安装杆3两侧外壁固定连接有对称设置的第二加强杆8,主杆体1两侧外壁固定连接有对称设置的第二导轨9,两个第二加强杆8一端分别滑动连接在两个第二导轨9内壁上,能够在安装完成之后,对第一安装杆2和第二安装杆3起到稳定支撑的作用,使得第一安装杆2和第二安装杆3与主杆体1之间的连接更加稳固,避免了在工作时出现脱落的现象。Please refer to FIG. 1 , in a specific embodiment, the outer walls on both sides of the first installation rod 2 are fixedly connected with the first reinforcing rods 6 symmetrically arranged, the outer walls on both sides of the main rod body 1 are fixedly connected with the first guide rails 7 arranged symmetrically, and the two One end of the first reinforcing rod 6 is slidably connected to the inner walls of the two first guide rails 7 respectively, the outer walls on both sides of the second installation rod 3 are fixedly connected with symmetrically arranged second reinforcing rods 8, and the outer walls on both sides of the main rod body 1 are fixedly connected with symmetrically arranged The second guide rail 9, one end of the two second reinforcing rods 8 is slidably connected to the inner walls of the two second guide rails 9, which can stably support the first installation rod 2 and the second installation rod 3 after the installation is completed. As a result, the connection between the first installation rod 2 and the second installation rod 3 and the main rod body 1 is more stable, and the phenomenon of falling off during operation is avoided.

请参阅图1-3,进一步的,主杆体1两侧内壁滑动连接有对称设置的活塞板18,第一安装杆2和第二安装杆3相对一端分别固定连接在两个活塞板18一侧外壁上,两个活塞板18相对一侧外壁固定连接有同一个弧形结构的弹性金属板19,主杆体1底部内壁开设有滑槽20,滑槽20内壁滑动连接有对称设置的伸缩套管21,两个伸缩套管21的伸缩端均固定连接在弹性金属板19底部外壁上,两个伸缩套管21相对一侧固定连接有同一个连接弹簧22,主杆体1一侧外壁开设有检修口,且检修口位于弹性金属板19一侧,能够对两个活塞板18在运动时产生的压力或者拉力起到缓冲的作用,使得两个活塞板18在主杆体1内的运动过程更加稳定,主杆体1一侧外壁滑动连接有盖板14,且盖板14位于检修口一侧,盖板14一侧外壁开设有对称设置的螺纹孔,且两个螺纹孔内壁均螺接有锁紧螺杆15,两个锁紧螺杆15的螺纹端均螺接在主杆体1上,当需要对主杆体1内侧结构的工作状态进行检查时,将锁紧螺杆15从盖板14和主杆体1上拆除,然后将盖板14向上移动即可。Please refer to FIGS. 1-3 , further, piston plates 18 symmetrically arranged are slidably connected to the inner walls on both sides of the main rod body 1 , and opposite ends of the first installation rod 2 and the second installation rod 3 are fixedly connected to one side of the two piston plates 18 respectively. On the outer wall, the two piston plates 18 are fixedly connected to the outer wall of the opposite side with an elastic metal plate 19 of the same arc structure. The inner wall of the bottom of the main rod body 1 is provided with a chute 20, and the inner wall of the chute 20 is slidably connected with a symmetrically arranged telescopic sleeve. 21. The telescopic ends of the two telescopic sleeves 21 are fixedly connected to the bottom outer wall of the elastic metal plate 19, the opposite sides of the two telescopic sleeves 21 are fixedly connected with the same connecting spring 22, and the outer wall of one side of the main rod body 1 is provided with maintenance. The inspection port is located on the side of the elastic metal plate 19, which can buffer the pressure or tension generated by the two piston plates 18 during movement, so that the movement process of the two piston plates 18 in the main rod body 1 is more stable. A cover plate 14 is slidably connected to the outer wall of one side of the main rod body 1, and the cover plate 14 is located on the side of the inspection opening. The outer wall of one side of the cover plate 14 is provided with symmetrically arranged threaded holes, and the inner walls of the two threaded holes are screwed with locking The screw 15 and the threaded ends of the two locking screws 15 are screwed on the main rod body 1. When the working state of the inner structure of the main rod body 1 needs to be checked, the locking screw 15 is removed from the cover plate 14 and the main rod body 1. Remove and then move the cover 14 upwards.

需要说明的是,本实用新型为一种用于塔式起重机的附着杆,各个件均为通用标准件或本领域技术人员知晓的部件,其结构和原理都为本技术人员均可通过技术手册得知或通过常规实验方法获知。It should be noted that the present utility model is an attachment rod for a tower crane, each part is a general standard part or a part known to those skilled in the art, and its structure and principle are all accessible through the technical manual known or known by routine experimental methods.

工作原理:具体使用时,通过设置的第一安装杆2、第一连接头4、第二安装杆3和第二连接头5,便于将主杆体1安装在附着框和建筑物之间,配合活塞板18的作用,使得能够根据附着框和建筑物的间距对主杆体1的长度进行调节,适用范围更加广泛,当长度调节完成之后,通过设置的活动孔10、固定板11、转动杆12、手轮13、螺纹段17和定位孔16,能够达到对第一安装杆2和第二安装杆3的定位效果,然后通过设置的第一导轨7、第一加强杆6、第二加强杆8和第二导轨9,能够在安装完成之后,对第一安装杆2和第二安装杆3起到稳定支撑的作用,使得第一安装杆2和第二安装杆3与主杆体1之间的连接更加稳固,避免了在工作时出现脱落的现象,在对主杆体1的长度进行调节时,第一安装杆2和第二安装杆3分别带动活塞板18做相对或者相反方向的运动,此时经过弹性金属板19、滑槽20、伸缩套管21和连接弹簧22的作用,能够对两个活塞板18在运动时产生的压力或者拉力起到缓冲的作用,使得两个活塞板18在主杆体1内的运动过程更加稳定,当需要对主杆体1内侧结构的工作状态进行检查时,将锁紧螺杆15从盖板14和主杆体1上拆除,然后将盖板14向上移动即可。Working principle: In specific use, the first installation rod 2, the first connection head 4, the second installation rod 3 and the second connection head 5 are arranged to facilitate the installation of the main rod body 1 between the attachment frame and the building. The function of the piston plate 18 makes it possible to adjust the length of the main rod body 1 according to the distance between the attachment frame and the building, and the scope of application is wider. , hand wheel 13, threaded section 17 and positioning hole 16, can achieve the positioning effect of the first installation rod 2 and the second installation rod 3, and then through the set first guide rail 7, first reinforcement rod 6, second reinforcement rod 8 and the second guide rail 9 can play a stable supporting role for the first installation rod 2 and the second installation rod 3 after the installation is completed, so that the first installation rod 2 and the second installation rod 3 and the main rod body 1 The connection is more stable, avoiding the phenomenon of falling off during operation. When adjusting the length of the main rod body 1, the first installation rod 2 and the second installation rod 3 respectively drive the piston plate 18 to move in the opposite or opposite directions. At this time, through the action of the elastic metal plate 19, the chute 20, the telescopic sleeve 21 and the connecting spring 22, the pressure or tension generated by the two piston plates 18 during the movement can be buffered, so that the two piston plates 18 The movement process in the main rod body 1 is more stable. When it is necessary to check the working state of the inner structure of the main rod body 1, the locking screw 15 is removed from the cover plate 14 and the main rod body 1, and then the cover plate 14 is moved upward. Can.

Claims (7)

1. An attachment bar for a tower crane, comprising: the device comprises a main rod body (1), wherein openings are formed in two ends of the main rod body (1), the inner walls of the two openings are respectively connected with a first installation rod (2) and a second installation rod (3) in a sliding mode, one ends of the first installation rod (2) and the second installation rod (3) are respectively and fixedly connected with a first connector (4) and a second connector (5), symmetrically arranged movable holes (10) are formed in the outer wall of the top of the main rod body (1), fixed plates (11) are respectively and fixedly connected to the outer sides of the two movable holes (10), through holes are formed in the outer wall of the top of the two fixed plates (11), the inner walls of the two through holes are respectively and rotatably connected with a rotating rod (12) with an L-shaped structure, and thread sections (17) are arranged at the bottoms of the two rotating rods (12);
locating hole (16) that the equidistance distributes, two are all seted up to first installation pole (2) and second installation pole (3) top outer wall screw thread section (17) spiro union respectively on two locating hole (16) inner walls wherein, two dwang (12) top equal fixedly connected with hand wheel (13).
2. An attachment bar for a tower crane according to claim 1, wherein: first installation pole (2) both sides outer wall fixedly connected with symmetry sets up first stiffener (6), the first guide rail (7) that the owner body of rod (1) both sides outer wall fixedly connected with symmetry set up, two first stiffener (6) one end difference sliding connection is on two first guide rail (7) inner walls.
3. An attachment bar for a tower crane according to claim 1, wherein: second stiffener (8) that second installation pole (3) both sides outer wall fixedly connected with symmetry set up, second guide rail (9) that the outer wall fixedly connected with symmetry of the owner body of rod (1) both sides set up, two second stiffener (8) one end difference sliding connection is on two second guide rail (9) inner walls.
4. An attachment bar for a tower crane according to claim 1, wherein: the inner walls of two sides of the main rod body (1) are connected with piston plates (18) which are symmetrically arranged in a sliding mode, and one ends, opposite to the first installation rod (2) and the second installation rod (3), of the first installation rod and the second installation rod are fixedly connected to the outer wall of one side of each of the two piston plates (18).
5. An attachment bar for a tower crane according to claim 4, wherein: the outer wall of one side of the two piston plates (18) opposite to each other is fixedly connected with an elastic metal plate (19) with the same arc-shaped structure.
6. An attachment bar for a tower crane according to claim 5, wherein: spout (20) have been seted up to the main mast body (1) bottom inner wall, spout (20) inner wall sliding connection has telescopic tube (21) that the symmetry set up, two the equal fixed connection of telescopic tube (21) on elastic metal plate (19) bottom outer wall of flexible end, two the same coupling spring (22) of one side fixedly connected with relatively of telescopic tube (21).
7. An attachment bar for a tower crane according to claim 6, wherein: the maintenance mouth has been seted up to the body of the staff (1) one side outer wall, and the maintenance mouth is located elastic metal board (19) one side, body of the staff (1) one side outer wall sliding connection has apron (14), and apron (14) are located maintenance mouth one side, the screw hole that the symmetry set up is seted up to apron (14) one side outer wall, and two equal spiro union of screw hole inner wall have locking screw (15), two the equal spiro union of thread end of locking screw (15) is on the body of the staff (1).
CN202220472823.4U 2022-03-07 2022-03-07 An attachment rod for tower cranes Expired - Fee Related CN217323145U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220472823.4U CN217323145U (en) 2022-03-07 2022-03-07 An attachment rod for tower cranes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220472823.4U CN217323145U (en) 2022-03-07 2022-03-07 An attachment rod for tower cranes

Publications (1)

Publication Number Publication Date
CN217323145U true CN217323145U (en) 2022-08-30

Family

ID=83000001

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220472823.4U Expired - Fee Related CN217323145U (en) 2022-03-07 2022-03-07 An attachment rod for tower cranes

Country Status (1)

Country Link
CN (1) CN217323145U (en)

Similar Documents

Publication Publication Date Title
CN218623500U (en) Building construction bearing structure
CN217323145U (en) An attachment rod for tower cranes
CN216706498U (en) Auxiliary clamping device for steel structure embedded parts for railway vehicles
CN110607906A (en) An aluminum alloy template splicing structure
CN221703094U (en) A scaffold
CN220847117U (en) Steel structure support for bridge
CN208618249U (en) Deck type steel arch bridge steel reinforced concrete continuous composite beam
CN217384234U (en) Multifunctional building engineering quality detection verticality detection device
CN212695514U (en) A lifting device for installation of power distribution cabinet
CN112062021B (en) Combined distribution transformer hoisting device
CN211899593U (en) Detachable scaffold frame support of encorbelmenting
CN213390733U (en) Positioning device used in curtain wall construction
CN116378215A (en) A steel structure connecting component with a reinforced steel structure
CN204899939U (en) Bent wall wherein partition wall formworking jumbo
CN213654226U (en) Large-span support
CN211779962U (en) Electronic display ware altitude mixture control support
CN219780839U (en) A magnetically shielded frame structure
CN207568015U (en) A kind of high intensity curtain wall support structure for building
CN220816768U (en) Integrated comprehensive supporting and hanging frame with independent bearing function
CN217589822U (en) Protective structure for MSS cabinet
CN219754096U (en) A combined tool protective piece
CN219971663U (en) An adjustable wall-framed fixing device
CN223724135U (en) Building safety scaffold reinforcing apparatus
CN217054243U (en) A mounting frame for water conservancy and hydropower construction
CN222207348U (en) Reinforcing member beam column structure for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220830