CN217299747U - Novel scaffold for urban building engineering construction device - Google Patents

Novel scaffold for urban building engineering construction device Download PDF

Info

Publication number
CN217299747U
CN217299747U CN202220853004.4U CN202220853004U CN217299747U CN 217299747 U CN217299747 U CN 217299747U CN 202220853004 U CN202220853004 U CN 202220853004U CN 217299747 U CN217299747 U CN 217299747U
Authority
CN
China
Prior art keywords
mounting panel
dead lever
engineering construction
connecting rod
building engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220853004.4U
Other languages
Chinese (zh)
Inventor
龙强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220853004.4U priority Critical patent/CN217299747U/en
Application granted granted Critical
Publication of CN217299747U publication Critical patent/CN217299747U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a novel scaffold for urban building engineering construction device, including mounting panel one and mounting panel two, the outside of mounting panel one is provided with the dead lever, the upper end of dead lever is provided with the connecting rod, the upper end of connecting rod is provided with support column one, the upper end of support column one is provided with support column two, the outside of mounting panel one is provided with the strengthening rib, the outside of mounting panel two is provided with the one end of haulage rope, the upper end of dead lever is provided with the guide bar through the support, the inside of dead lever is provided with the installation pole, dead lever perpendicular to mounting panel one, adopt welded connection between dead lever and the mounting panel one, the utility model relates to a scaffold technical field. The utility model provides a novel scaffold for city building engineering construction device has solved that current scaffold is most direct to be fixed on the outer wall through the built-in fitting, does not possess other bearing structure, and stability is relatively poor, has the problem of certain potential safety hazard.

Description

Novel scaffold for urban building engineering construction device
Technical Field
The utility model relates to a ram technical field specifically is a novel ram is used in city building engineering construction device.
Background
The cantilever frame is a simple facility used in a building, is divided into two types of cantilever in each layer, and the multilayer is encorbelmented, and the existing cantilever frame is mostly directly fixed on the outer wall through the built-in fitting, does not have other bearing structures, and stability is relatively poor, has certain potential safety hazard, and in view of this, we provide a novel cantilever frame device for urban building engineering construction.
Disclosure of Invention
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a novel outrigger is used in city building engineering construction device has solved that current outrigger is most direct to be fixed on the outer wall through the built-in fitting, does not possess other bearing structure, and stability is relatively poor, has the problem of certain potential safety hazard.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a novel outrigger is used in city building engineering construction device, includes a novel outrigger is used in city building engineering construction device, including mounting panel one and mounting panel two, the outside of mounting panel one is provided with the dead lever, the upper end of dead lever is provided with the connecting rod, the upper end of connecting rod is provided with support column one, the upper end of support column one is provided with support column two, the outside of mounting panel one is provided with the strengthening rib, the outside of mounting panel two is provided with the one end of haulage rope, the upper end of dead lever is provided with the guide bar through the support, the inside of dead lever is provided with the installation pole.
Preferably, the fixed rod is perpendicular to the first mounting plate, welded connection is adopted between the fixed rod and the first mounting plate, the connecting rod is perpendicular to the fixed rod, the connecting rod is provided with two, and welded connection is adopted between the connecting rod and the fixed rod.
Preferably, the first support column is parallel to the fixing rod, the second support column is parallel to the connecting rod, and five support columns are equidistantly arranged.
Preferably, the lower ends of the reinforcing ribs and the fixed rods are in welded connection, and the second mounting plate is located above the first mounting plate.
Preferably, the guide rod is fixedly installed at the upper end of the fixing rod through a bolt, and the guide rod is located on one side, close to the first mounting plate, of the connecting rod.
Preferably, the pulling rope is provided with two in the outside of mounting panel two, the other end and the installation pole fixed connection of pulling rope, the pulling rope is laminated with the lower extreme of guide bar.
(III) advantageous effects
The utility model provides a novel scaffold for urban building engineering construction device. The method has the following beneficial effects:
(1) the utility model provides a novel outrigger device for city building engineering construction, be provided with mounting panel one and mounting panel two, the two is pre-buried on the wall, the outside of mounting panel one is provided with the dead lever, lower extreme at the dead lever is provided with the strengthening rib, improve device's intensity, the inside of dead lever is provided with the installation pole, the outside of installation pole is provided with the haulage rope, the haulage rope turns to the back through the guide bar and installs on mounting panel two, further improve device's stability, avoid the haulage rope to cause the hindrance to the staff on the footboard, the security of using is improved.
Drawings
FIG. 1 is a schematic view of the three-dimensional structure of the present invention;
FIG. 2 is a schematic side view of the present invention;
FIG. 3 is a schematic front view of the present invention;
fig. 4 is an enlarged schematic view of a portion a in fig. 2 according to the present invention.
In the figure: 1. a first mounting plate; 2. a second mounting plate; 3. fixing the rod; 4. a connecting rod; 5. a first supporting column; 6. a second supporting column; 7. reinforcing ribs; 8. a hauling rope; 9. a guide bar; 10. and (5) installing a rod.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution:
the first embodiment is as follows: a novel scaffold device for urban building engineering construction comprises a mounting plate I1 and a mounting plate II 2, wherein a fixed rod 3 is arranged on the outer side of the mounting plate I1, a connecting rod 4 is arranged at the upper end of the fixed rod 3, a supporting column I5 is arranged at the upper end of the connecting rod 4, a supporting column II 6 is arranged at the upper end of the supporting column I5, a reinforcing rib 7 is arranged on the outer side of the mounting plate I1, one end of a traction rope 8 is arranged on the outer side of the mounting plate II 2, a guide rod 9 is arranged at the upper end of the fixed rod 3 through a support, a mounting rod 10 is arranged inside the fixed rod 3, the fixed rod 3 is perpendicular to the mounting plate I1, the fixed rod 3 is welded with the mounting plate I1, the connecting rod 4 is perpendicular to the fixed rod 3, two connecting rods 4 are arranged, the connecting rod 4 is welded with the fixed rod 3, the supporting column I5 is parallel to the fixed rod 3, and the supporting column II 6 is parallel to the connecting rod 4, the second support column 6 is provided with five equal intervals, the reinforcing ribs 7 are connected with the lower end of the fixed rod 3 in a welding mode, and the second mounting plate 2 is located above the first mounting plate 1. The mounting plate I1 and the mounting plate II 2 are fixed on the outer side of the wall through embedded parts, the reinforcing ribs 7 improve the stability of the fixing rods 3, and the scaffold boards are placed on the upper ends of the support columns I5 and the support columns II 6.
The second embodiment is different from the first embodiment in that the guide rod 9 is fixedly installed at the upper end of the fixing rod 3 through a bolt, the guide rod 9 is located on one side of the connecting rod 4 close to the first mounting plate 1, two pulling ropes 8 are arranged on the outer side of the second mounting plate 2, the other end of each pulling rope 8 is fixedly connected with the corresponding mounting rod 10, and the pulling ropes 8 are attached to the lower ends of the guide rods 9. Haulage rope 8 plays traction to dead lever 3 through installation pole 10, further improves the stability of device, and guide bar 9 plays the guide effect to haulage rope 8, avoids haulage rope 8 to cause the hindrance to the staff on the footboard, improves the security of using.
The during operation, mounting panel 1 and mounting panel two 2 are fixed in the wall outside through the built-in fitting, and strengthening rib 7 improves the stability of dead lever 3, and the scaffold board is placed in the upper end of support column one 5 and support column two 6, and haulage rope 8 plays the traction to dead lever 3 through installation pole 10, further improves the stability of device, and guide bar 9 plays the guide effect to haulage rope 8, avoids haulage rope 8 to cause the hindrance to the staff on the scaffold board, improves the security of using.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions.

Claims (6)

1. The utility model provides a novel scaffold device is used in city building engineering construction, includes mounting panel one (1) and mounting panel two (2), its characterized in that: the outside of mounting panel (1) is provided with dead lever (3), the upper end of dead lever (3) is provided with connecting rod (4), the upper end of connecting rod (4) is provided with support column (5), the upper end of support column (5) is provided with support column two (6), the outside of mounting panel (1) is provided with strengthening rib (7), the outside of mounting panel two (2) is provided with the one end of haulage rope (8), the upper end of dead lever (3) is provided with guide bar (9) through the support, the inside of dead lever (3) is provided with installation pole (10).
2. The novel cantilever frame device for urban building engineering construction according to claim 1, wherein: dead lever (3) perpendicular to mounting panel (1), adopt welded connection between dead lever (3) and mounting panel (1), connecting rod (4) perpendicular to dead lever (3), connecting rod (4) are provided with two, adopt welded connection between connecting rod (4) and dead lever (3).
3. The novel cantilever frame device for urban building engineering construction according to claim 2, wherein: the first support column (5) is parallel to the fixing rod (3), the second support column (6) is parallel to the connecting rod (4), and five support columns (6) are arranged at equal intervals.
4. The novel cantilever frame device for urban building engineering construction according to claim 3, wherein: the lower extreme of strengthening rib (7) and dead lever (3) is welded connection, mounting panel two (2) are located the top of mounting panel one (1).
5. The novel cantilever frame device for urban building engineering construction according to claim 4, wherein: the guide rod (9) is fixedly installed at the upper end of the fixing rod (3) through a bolt, and the guide rod (9) is located on one side, close to the mounting plate I (1), of the connecting rod (4).
6. The novel cantilever frame device for urban building engineering construction according to claim 5, wherein: the outer sides of the two mounting plates (2) are provided with two hauling ropes (8), the other ends of the hauling ropes (8) are fixedly connected with the mounting rods (10), and the hauling ropes (8) are attached to the lower ends of the guide rods (9).
CN202220853004.4U 2022-04-13 2022-04-13 Novel scaffold for urban building engineering construction device Active CN217299747U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220853004.4U CN217299747U (en) 2022-04-13 2022-04-13 Novel scaffold for urban building engineering construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220853004.4U CN217299747U (en) 2022-04-13 2022-04-13 Novel scaffold for urban building engineering construction device

Publications (1)

Publication Number Publication Date
CN217299747U true CN217299747U (en) 2022-08-26

Family

ID=82938983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220853004.4U Active CN217299747U (en) 2022-04-13 2022-04-13 Novel scaffold for urban building engineering construction device

Country Status (1)

Country Link
CN (1) CN217299747U (en)

Similar Documents

Publication Publication Date Title
CN205444446U (en) Assembled industrialization steel construction house
CN210659228U (en) Movable single-side formwork system for subway construction
CN217299747U (en) Novel scaffold for urban building engineering construction device
CN201486120U (en) Detachable steel column connecting construction operation platform
CN208934394U (en) One kind can turnover type hydraulic climbing formwork wall-attaching equipment
CN208310204U (en) A kind of pedestal for elevator coupling beam formwork erection
CN216038325U (en) Tower crane internal climbing frame fixing frame
CN214462401U (en) Double-layer protection frame with novel structure
CN214996345U (en) Assembled overhanging pedestrian escalator for deep foundation pit
CN209970667U (en) Roller type photovoltaic glass assembly platform
CN215052128U (en) Platform in tower column shaft
CN206308993U (en) A kind of fast formula single pole of spelling makes somebody a mere figurehead platform
CN206319622U (en) A kind of roof system steel truss sliding rail
CN220564056U (en) Shaft with elevator steel frame
CN206829587U (en) A kind of hydraulic climbing formwork wall-attached frame
CN220412551U (en) Construction elevator roofing attaches frame structure
CN220184076U (en) Fixing base for construction of large-span cable bridge
CN213774592U (en) Whole protector of platform of unloading of encorbelmenting
CN212689545U (en) Corner pole setting device for lifting aluminum alloy climbing frame
CN218114720U (en) Elevator pre-installation elevator car structure
CN212656521U (en) Firm safe type truss layer structure
CN219500928U (en) Detachable hidden curtain washs steelframe
CN214785832U (en) Super high-rise core section of thick bamboo horizontal construction is from early warning construction platform
CN216766779U (en) Integrated formwork support for double-layer cantilever plate structure
CN213597445U (en) Lower section track of lifting scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant