CN217299538U - A construction control device for sloping roof pouring - Google Patents

A construction control device for sloping roof pouring Download PDF

Info

Publication number
CN217299538U
CN217299538U CN202220021816.2U CN202220021816U CN217299538U CN 217299538 U CN217299538 U CN 217299538U CN 202220021816 U CN202220021816 U CN 202220021816U CN 217299538 U CN217299538 U CN 217299538U
Authority
CN
China
Prior art keywords
strip
control device
clamping
baffle
construction control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220021816.2U
Other languages
Chinese (zh)
Inventor
李鹏
黄亚文
阳素萍
陈镇北
陈树秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN202220021816.2U priority Critical patent/CN217299538U/en
Application granted granted Critical
Publication of CN217299538U publication Critical patent/CN217299538U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

一种坡屋面浇筑施工控制装置A construction control device for sloping roof pouring

技术领域technical field

本实用新型涉及房屋建造技术领域,具体为一种坡屋面浇筑施工控制装置。The utility model relates to the technical field of house construction, in particular to a construction control device for sloping roof pouring.

背景技术Background technique

现如今,绝大多数的房屋都采用钢混结构建造,而此类的房屋在建造时为了美观和防水性,也会将屋顶制作成坡面,然后在坡面上安装上彩钢瓦,一方面是为了雨水能够迅速地流走,避免积水导致房屋出现渗漏的情况,另一方面也起到了很好的装饰作用。Nowadays, the vast majority of houses are built with steel-concrete structures. For the sake of beauty and waterproofness, the roofs of such houses are also made into slopes, and then colored steel tiles are installed on the slopes. On the one hand, the rainwater can flow away quickly to avoid the leakage of the house caused by the accumulated water, and on the other hand, it also plays a very good decorative role.

而现在的坡屋面在建造时,大多数都是通过在底部设置模板进行支撑,然后在屋面上架设钢筋笼,然后进行混凝土浇筑,以此形成混凝土的坡面,但是在实际建造的时候,一方面钢筋笼编扎费时费力,且钢筋笼的编扎对屋面的结构强度以及防水性能有很大的决定性影响,对建造工人的操作要求较高,并且费时费力,同时在进行混凝土浇筑时,由于屋顶为斜面,流体状态的混凝土会在重力的作用下沿着底部的倾斜支撑的模板向下流淌,很难定型,并且在混凝土凝固之后,还要进行钻孔安装挂瓦条,然后才能进行彩钢瓦安装固定,在钻孔时,很容易使得混凝土崩裂,导致整个坡屋面的防水效果降低,因此需要提供一种坡屋面浇筑施工控制装置以解决上述问题。In the construction of current sloping roofs, most of them are supported by setting templates at the bottom, then erecting steel cages on the roof, and then pouring concrete to form a concrete slope, but in actual construction, a On the other hand, the braiding of steel cages is time-consuming and labor-intensive, and the braiding of steel cages has a great and decisive influence on the structural strength and waterproof performance of the roof, which requires high operation requirements for construction workers, and is time-consuming and laborious. The roof is inclined, and the concrete in the fluid state will flow down along the inclined supporting formwork at the bottom under the action of gravity, which is difficult to shape. When the steel tile is installed and fixed, it is easy to cause the concrete to crack when drilling, which will reduce the waterproof effect of the entire sloping roof. Therefore, it is necessary to provide a construction control device for the pouring of the sloping roof to solve the above problems.

实用新型内容Utility model content

(一)解决的技术问题(1) Technical problems solved

针对现有技术的不足,本实用新型公开了一种坡屋面浇筑施工控制装置,以解决上述背景技术中提出的问题。Aiming at the deficiencies of the prior art, the utility model discloses a construction control device for sloping roof pouring, so as to solve the problems raised in the above background technology.

(二)技术方案(2) Technical solutions

为实现以上目的,本实用新型通过以下技术方案予以实现:一种坡屋面浇筑施工控制装置,包括竖挡板,所述竖挡板的底部固定焊接有承重挡杆,所述竖挡板的内部活动卡接有横挡条,所述竖挡板的顶端活动接有连接条,所述竖挡板的中部活动卡接有附着网板,所述竖挡板的顶部固定安装有挂瓦条。In order to achieve the above purpose, the present invention is achieved through the following technical solutions: a sloping roof pouring construction control device, comprising a vertical baffle, the bottom of the vertical baffle is fixedly welded with a load-bearing blocking rod, and the interior of the vertical baffle is welded. The horizontal baffle is movably clamped, the top of the vertical baffle is movably connected with a connecting strip, the middle of the vertical baffle is movably clamped with an attached mesh plate, and the top of the vertical baffle is fixedly installed with a hanging tile.

优选的,所述竖挡板的侧面固定焊接有安装条,所述附着网板活动卡接在相邻两组竖挡板侧面的安装条外表面。Preferably, mounting strips are fixedly welded on the sides of the vertical baffles, and the attached mesh plates are movably clamped to the outer surfaces of the mounting strips on the sides of the adjacent two sets of vertical baffles.

优选的,所述安装条的外表面固定焊接有卡柱,所述附着网板的外表面开设有卡孔,所述卡柱活动插接在卡孔的内部。Preferably, a clamping post is fixedly welded on the outer surface of the mounting strip, a clamping hole is formed on the outer surface of the attachment screen, and the clamping post is movably inserted into the interior of the clamping hole.

优选的,所述竖挡板的上表面开设有上卡槽,所述横挡条的下表面开设有下卡槽,所述上卡槽与下卡槽相互卡接。Preferably, the upper surface of the vertical baffle plate is provided with an upper clamping slot, the lower surface of the horizontal baffle is provided with a lower clamping slot, and the upper clamping slot and the lower clamping slot are mutually clamped.

优选的,所述竖挡板的顶部固定连接有连接片,所述挂瓦条活动插接在连接片的内部。Preferably, the top of the vertical baffle is fixedly connected with a connecting piece, and the tile hanging strip is movably inserted inside the connecting piece.

优选的,所述连接片的顶部螺纹连接有固定螺栓,所述固定螺栓的底端活动插接至挂瓦条的内部。Preferably, the top of the connecting piece is threadedly connected with a fixing bolt, and the bottom end of the fixing bolt is movably inserted into the interior of the tile.

优选的,所述连接条包括V形条和防脱卡条,所述防脱卡条固定焊接在V形条的两侧,所述竖挡板的顶端侧面开设有限位槽,所述V形条活动插接在限位槽的内部,所述限位槽的末端开设有防脱定位槽,所述防脱卡条活动插接在防脱定位槽的内部。Preferably, the connecting bar includes a V-shaped bar and an anti-dropping clip, the anti-dropping clip is fixed and welded on both sides of the V-shaped bar, and the top side of the vertical baffle is provided with a limiting groove, and the V-shaped The strip is movably inserted into the interior of the limit slot, the end of the limit slot is provided with an anti-displacement positioning slot, and the anti-displacement clip is movably inserted into the inside of the anti-displacement positioning slot.

本实用新型公开了一种坡屋面浇筑施工控制装置,其具备的有益效果如下:The utility model discloses a sloping roof pouring construction control device, which has the following beneficial effects:

1、该坡屋面浇筑施工控制装置,通过将附着网板外表面的卡孔正对卡柱进行安装,然后将横挡条安装在竖挡板的外表面,使得上卡槽与下卡槽正对进行卡接,然后将混凝体浇筑到多个竖挡板之间,使得混凝土与附着网板进行附着,并且在浇筑时,横挡条很附着网板对混凝土起到限位阻挡的作用,有效防止混凝土向下流,并且方便在施工时进行快速安装,降低操作人员的施工强度。1. The sloping roof pouring construction control device is installed by placing the card hole attached to the outer surface of the mesh panel to the card column, and then installing the transverse bar on the outer surface of the vertical baffle, so that the upper card slot and the lower card slot are in the same direction. The pair is clamped, and then the concrete is poured between multiple vertical baffles, so that the concrete and the attached mesh plate are attached, and during pouring, the transverse slats are very attached to the mesh plate to limit the concrete. , effectively prevent the concrete from flowing down, and facilitate the rapid installation during construction, reducing the construction strength of the operator.

2、该坡屋面浇筑施工控制装置,一次浇筑时混凝土的厚度与横挡条的顶端齐平,然后等到一次浇筑的混凝土稍有定型状态时,再进行二次浇筑,二次浇筑采用细沙浆进行浇筑,浇筑厚度较薄,主要是起到防水效果,然后通过将挂瓦条插入到连接片的内部,然后将固定螺栓向下拧紧,对挂瓦条进行固定,在设置时挂瓦条与横挡条呈间隔状分布,然后将彩钢瓦安装在挂瓦条的外表面进行固定,避免后续进行挂瓦条固定时对浇筑混凝土造成破坏,有效提升屋顶的防水性。2. The sloping roof pouring construction control device, the thickness of the concrete is flush with the top of the cross bar during the first pouring, and then the second pouring is carried out when the first pouring concrete is slightly shaped, and the second pouring is carried out with fine mortar. Pouring, the pouring thickness is thin, mainly for waterproofing effect, and then by inserting the hanging tile into the interior of the connecting piece, and then tightening the fixing bolts down, the hanging tile is fixed, and the hanging tile is installed with the horizontal. The retaining bars are distributed at intervals, and then the color steel tiles are installed on the outer surface of the hanging tile for fixing, so as to avoid damage to the pouring concrete when the tile is fixed in the future, and effectively improve the waterproofness of the roof.

附图说明Description of drawings

图1为本实用新型整体结构示意图;1 is a schematic diagram of the overall structure of the present utility model;

图2为本实用新型竖挡板与连接条外表面结构示意图;2 is a schematic diagram of the structure of the vertical baffle plate and the outer surface of the connecting strip of the present invention;

图3为本实用新型附着网板外表面部分结构爆炸图;3 is an exploded view of the structure of the outer surface of the attached mesh panel of the present invention;

图4为本实用新型竖挡板外表面部分结构示意图。FIG. 4 is a schematic diagram of the structure of the outer surface of the vertical baffle plate of the present invention.

图中:1、竖挡板;2、连接条;201、V形条;202、防脱卡条;3、横挡条;4、挂瓦条;5、附着网板;6、安装条;7、卡柱;8、卡孔;9、上卡槽;10、下卡槽;11、连接片;12、固定螺栓;13、限位槽;14、承重挡杆。In the figure: 1. Vertical baffle; 2. Connecting strip; 201. V-shaped strip; 202. Anti-dropping strip; 3. Horizontal blocking strip; 4. Hanging tile strip; 7. Clamping post; 8. Clamping hole; 9. Upper clamping slot; 10. Lower clamping slot; 11. Connecting piece; 12. Fixing bolt; 13. Limit slot; 14. Load-bearing stop rod.

具体实施方式Detailed ways

本实用新型实施例公开一种坡屋面浇筑施工控制装置,如图1-4所示,包括竖挡板1,竖挡板1的底部固定焊接有承重挡杆14,竖挡板1的内部活动卡接有横挡条3,竖挡板1的顶端活动接有连接条2,竖挡板1的中部活动卡接有附着网板5,竖挡板1的顶部固定安装有挂瓦条4。The embodiment of the present utility model discloses a construction control device for sloping roof pouring, as shown in Figures 1-4, comprising a vertical baffle 1, a load-bearing blocking rod 14 is fixedly welded at the bottom of the vertical baffle 1, and the interior of the vertical baffle 1 is movable The horizontal baffle 3 is clamped, the top of the vertical baffle 1 is movably connected with the connecting strip 2, the middle of the vertical baffle 1 is movably clamped with the attached mesh plate 5, and the top of the vertical baffle 1 is fixedly installed with a hanging tile 4.

参照附图3-4,竖挡板1的侧面固定焊接有安装条6,附着网板5活动卡接在相邻两组竖挡板1侧面的安装条6外表面,安装条6的外表面固定焊接有卡柱7,附着网板5的外表面开设有卡孔8,卡柱7活动插接在卡孔8的内部,方便附着网板5能够快速地安装到相邻两组竖挡板1之间。Referring to the accompanying drawings 3-4, the side of the vertical baffle 1 is fixedly welded with a mounting strip 6, and the attached mesh plate 5 is movably connected to the outer surface of the mounting strip 6 on the side of the adjacent two groups of vertical baffles 1, and the outer surface of the mounting strip 6 Fixed and welded with a clamping column 7, the outer surface of the attached mesh plate 5 is provided with a clamping hole 8, and the clamping column 7 is movably inserted into the interior of the clamping hole 8, so that the attached mesh plate 5 can be quickly installed to the adjacent two sets of vertical baffles between 1.

参照附图3,竖挡板1的上表面开设有上卡槽9,横挡条3的下表面开设有下卡槽10,上卡槽9与下卡槽10相互卡接,防止在浇筑时横挡条3发生滑动。Referring to FIG. 3, the upper surface of the vertical baffle 1 is provided with an upper clamping slot 9, and the lower surface of the horizontal baffle 3 is provided with a lower clamping slot 10. The upper clamping slot 9 and the lower clamping slot 10 are mutually clamped to prevent the pouring The crossbar 3 slides.

参照附图3-4,竖挡板1的顶部固定连接有连接片11,挂瓦条4活动插接在连接片11的内部,连接片11的顶部螺纹连接有固定螺栓12,固定螺栓12的底端活动插接至挂瓦条4的内部,通过将挂瓦条4插入到连接片11的内部,然后将固定螺栓12向下拧紧,对挂瓦条4进行固定,在设置时挂瓦条4与横挡条3呈间隔状分布,然后将彩钢瓦安装在挂瓦条4的外表面进行固定,使得彩钢瓦之间的连接缝隙与横挡条3的安装位置错开,避免雨水溅射进来对横挡条3的位置造成侵蚀渗漏。Referring to Figures 3-4, the top of the vertical baffle 1 is fixedly connected with a connecting piece 11, the tile 4 is movably inserted into the interior of the connecting piece 11, and the top of the connecting piece 11 is threadedly connected with a fixing bolt 12. The bottom end is movably plugged into the interior of the tile hanging bar 4. By inserting the tile hanging bar 4 into the interior of the connecting piece 11, and then tightening the fixing bolts 12 downward, the tile hanging bar 4 is fixed. 4 and the cross bar 3 are spaced apart, and then install the color steel tiles on the outer surface of the hanging tile bar 4 for fixing, so that the connection gap between the color steel tiles and the installation position of the cross bar 3 are staggered to avoid rainwater splashing The incoming shot causes erosion and leakage to the position of the crossbar 3 .

参照附图2-4,连接条2包括V形条201和防脱卡条202,防脱卡条202固定焊接在V形条201的两侧,竖挡板1的顶端侧面开设有限位槽13,V形条201活动插接在限位槽13的内部,限位槽13的末端开设有防脱定位槽,防脱卡条202活动插接在防脱定位槽的内部,便于屋顶两侧的浇筑物之间形成有效连接,进一步提升防水性。2-4, the connecting bar 2 includes a V-shaped bar 201 and an anti-releasing clip 202, the anti-releasing clip 202 is fixedly welded on both sides of the V-shaped bar 201, and the top side of the vertical baffle 1 is provided with a limit slot 13 , the V-shaped strip 201 is movably inserted into the interior of the limit slot 13, the end of the limit slot 13 is provided with an anti-displacement positioning slot, and the anti-displacement clip 202 is movably inserted into the inside of the anti-displacement positioning slot, which is convenient for the two sides of the roof. An effective connection is formed between the pouring objects, which further improves the waterproofness.

工作原理:该装置在使用时,通过将承重挡杆14固定在屋顶上,然后将竖挡板1放置在承重挡杆14的上表面,然后将连接条2插入到竖挡板1顶端的限位槽13内部,对屋顶两侧的竖挡板1进行连接,然后将竖挡板1焊接在承重挡杆14的顶部,然后在竖挡板1的下表面安装模板进行支撑,然后将附着网板5外表面的卡孔8正对卡柱7进行安装,然后将横挡条3安装在竖挡板1的外表面,使得上卡槽9与下卡槽10正对进行卡接,然后将混凝体浇筑到多个竖挡板1之间,使得混凝土与附着网板5进行附着,并且在浇筑时,横挡条3有效防止混凝土向下流,起到限位作用,一次浇筑时混凝土的厚度与横挡条3的顶端齐平;Working principle: When the device is in use, by fixing the load-bearing blocking rod 14 on the roof, then placing the vertical baffle 1 on the upper surface of the load-bearing blocking rod 14, and then inserting the connecting strip 2 into the limit of the top of the vertical baffle 1. Inside the slot 13, connect the vertical baffles 1 on both sides of the roof, then weld the vertical baffle 1 on the top of the load-bearing blocking rod 14, and then install a template on the lower surface of the vertical baffle 1 for support, and then attach the mesh. The card hole 8 on the outer surface of the plate 5 is installed on the card column 7, and then the transverse bar 3 is installed on the outer surface of the vertical baffle 1, so that the upper card slot 9 and the lower card slot 10 are facing each other for card connection, and then The concrete is poured between a plurality of vertical baffles 1, so that the concrete is attached to the attached mesh plate 5, and during pouring, the transverse bar 3 effectively prevents the concrete from flowing down, and plays a limiting role. The thickness is flush with the top of the cross bar 3;

然后等到一次浇筑的混凝土稍有定型状态时,再进行二次浇筑,二次浇筑采用细沙浆进行浇筑,浇筑厚度较薄,主要是起到防水效果,在二次浇筑后,在浇筑物表面再进行防水层涂覆,最后通过将挂瓦条4插入到连接片11的内部,然后将固定螺栓12向下拧紧,对挂瓦条4进行固定,在设置时挂瓦条4与横挡条3呈间隔状分布,然后将彩钢瓦安装在挂瓦条4的外表面进行固定。Then, when the concrete poured in the first pour is slightly shaped, the second pouring is carried out. The second pouring is carried out with fine mortar, and the pouring thickness is thin, which mainly has a waterproof effect. The waterproof layer is coated, and finally, by inserting the tile 4 into the interior of the connecting piece 11, and then tightening the fixing bolts 12 downward, the tile 4 is fixed. When setting, the tile 4 and the cross bar 3 Distributed at intervals, and then install the color steel tiles on the outer surface of the hanging tile 4 for fixing.

以上显示和描述了本实用新型的基本原理和主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定。The basic principles and main features of the present invention and the advantages of the present invention are shown and described above. It should be understood by those skilled in the art that the present invention is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principle of the present invention. Without departing from the spirit and scope of the present invention, the present invention The new model will also have various changes and improvements, which all fall within the scope of the claimed invention. The claimed scope of the present invention is defined by the appended claims and their equivalents.

Claims (7)

1. The utility model provides a slope roofing pouring construction controlling means, its characterized in that, is including erecting baffle (1), the fixed welding in bottom of erecting baffle (1) has bearing pin (14), the inside activity joint of erecting baffle (1) has horizontal blend stop (3), the top activity joint of erecting baffle (1) has connecting strip (2), the middle part activity joint of erecting baffle (1) has attached otter board (5), the top fixed mounting of erecting baffle (1) has hanging battens (4).
2. The sloping roof pouring construction control device according to claim 1, characterized in that: the side face of each vertical baffle (1) is fixedly welded with a mounting bar (6), and the attached net plates (5) are movably clamped on the outer surfaces of the mounting bars (6) on the side faces of the two adjacent vertical baffles (1).
3. The sloping roof pouring construction control device according to claim 2, characterized in that: the outer surface of the mounting bar (6) is fixedly welded with a clamping column (7), the outer surface of the attached net plate (5) is provided with a clamping hole (8), and the clamping column (7) is movably inserted into the clamping hole (8).
4. The sloping roof pouring construction control device according to claim 1, characterized in that: the upper surface of the vertical baffle (1) is provided with an upper clamping groove (9), the lower surface of the transverse barrier strip (3) is provided with a lower clamping groove (10), and the upper clamping groove (9) and the lower clamping groove (10) are mutually clamped.
5. The sloping roof pouring construction control device according to claim 1, characterized in that: the top of the vertical baffle (1) is fixedly connected with a connecting sheet (11), and the tile hanging strip (4) is movably inserted into the connecting sheet (11).
6. The sloping roof pouring construction control device according to claim 5, characterized in that: the top of the connecting piece (11) is in threaded connection with a fixing bolt (12), and the bottom end of the fixing bolt (12) is movably inserted into the tile hanging strip (4).
7. The pitched roof pouring construction control device according to claim 1, characterized in that: the connecting strip (2) comprises a V-shaped strip (201) and an anti-falling clamping strip (202), the anti-falling clamping strip (202) is fixedly welded on two sides of the V-shaped strip (201), a limiting groove (13) is formed in the side face of the top end of the vertical baffle (1), the V-shaped strip (201) is movably inserted into the limiting groove (13), an anti-falling positioning groove is formed in the tail end of the limiting groove (13), and the anti-falling clamping strip (202) is movably inserted into the anti-falling positioning groove.
CN202220021816.2U 2022-01-06 2022-01-06 A construction control device for sloping roof pouring Expired - Fee Related CN217299538U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220021816.2U CN217299538U (en) 2022-01-06 2022-01-06 A construction control device for sloping roof pouring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220021816.2U CN217299538U (en) 2022-01-06 2022-01-06 A construction control device for sloping roof pouring

Publications (1)

Publication Number Publication Date
CN217299538U true CN217299538U (en) 2022-08-26

Family

ID=82921871

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220021816.2U Expired - Fee Related CN217299538U (en) 2022-01-06 2022-01-06 A construction control device for sloping roof pouring

Country Status (1)

Country Link
CN (1) CN217299538U (en)

Similar Documents

Publication Publication Date Title
CN206752676U (en) Assembled architecture agent structure
CN111287467A (en) Integral dry-hanging process of ceramic brick curtain wall
CN217299538U (en) A construction control device for sloping roof pouring
CN106939699B (en) Construction method for galvanized steel sheet waterproof layer on inner side of open type ceramic plate curtain wall
CN209855080U (en) An ancient building roof cornice waterproofing construction structure
CN105019656B (en) Construction method for floor system concrete post-cast strip suspended formwork
CN212053208U (en) Assembled steel construction building
CN210289118U (en) Tower concrete structure sharp roof template system
CN213573249U (en) Novel underground parking system
CN209780071U (en) Building roof heat insulation board
CN204782178U (en) System is just before a battle changed to people's air defence basement
CN209413151U (en) An assembled roof cornice support rod assembly and support unit
CN211286939U (en) Assembled enclosure structure
CN209760889U (en) Can dismantle overhanging type reinforcing bar canopy
CN113789958B (en) Steel construction composite floor hangs mould structure
CN221168324U (en) Steel construction roofing molding structure that encorbelments based on concrete beam cylinder system
CN216973960U (en) A board thickness controller assembly for a multi-water room
CN220598922U (en) Roofing metal tile mounting structure
CN223706831U (en) Roofing structure adopting aluminum archaizing tile
CN111335511A (en) Prefabricated unit wall structure of ceramic brick
CN220666702U (en) Inclined roof tile fixing system
CN217840620U (en) Photovoltaic roofing structure
CN221346096U (en) Hidden drainage gutter of view archaize building roofing
CN218292613U (en) Ancient city wall steel structure dry hanging city wall board
CN221523956U (en) Integrated roof of green building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220826