CN217299424U - Hoop mounting system for aluminum plate ceiling - Google Patents

Hoop mounting system for aluminum plate ceiling Download PDF

Info

Publication number
CN217299424U
CN217299424U CN202220201296.3U CN202220201296U CN217299424U CN 217299424 U CN217299424 U CN 217299424U CN 202220201296 U CN202220201296 U CN 202220201296U CN 217299424 U CN217299424 U CN 217299424U
Authority
CN
China
Prior art keywords
shaped
hoop
lead screw
sides
full
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220201296.3U
Other languages
Chinese (zh)
Inventor
于科
宫献伟
李国峰
汪丙阳
王亚坤
毕澎浩
纪春明
张传森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202220201296.3U priority Critical patent/CN217299424U/en
Application granted granted Critical
Publication of CN217299424U publication Critical patent/CN217299424U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

本实用新型提供了一种铝板吊顶用抱箍件安装系统,属于建筑工程技术领域。其技术方案为:包括设置在若干结构梁上的若干U形抱箍和设置在U形抱箍上的全丝丝杆吊筋;U形抱箍上开设有通孔,全丝丝杆吊筋穿过通孔后设置有螺母限位固定。本实用新型的有益效果为:本系统施工简便快捷,有利于提高施工效率,降低施工成本。在工字钢梁、结构受力要求不能打孔的钢结构梁建筑中使用由U形抱箍A、U形抱箍B和转换层方管构成的抱箍转换层安装系统,可避免在钢结构上穿孔影响结构受力。本系统可减少现场焊接作业量,提高施工效率的同时提高了现场施工作业安全性,减少因焊渣溅落构成的火灾隐患。

Figure 202220201296

The utility model provides an installation system of a hoop for an aluminum plate ceiling, which belongs to the technical field of construction engineering. The technical scheme is as follows: including a plurality of U-shaped hoops arranged on a plurality of structural beams and a full-wire screw rod suspending bar set on the U-shaped hoops; After passing through the through hole, a nut is provided to limit and fix. The beneficial effects of the utility model are that the construction of the system is simple and quick, which is beneficial to improve the construction efficiency and reduce the construction cost. In the I-beam and steel structure beam buildings where the structural force requires no holes Structural perforations affect structural stress. The system can reduce the amount of on-site welding operations, improve the construction efficiency, improve the safety of on-site construction operations, and reduce the fire hazard caused by welding slag splashing.

Figure 202220201296

Description

Hoop mounting system for aluminum plate ceiling
Technical Field
The utility model relates to a building engineering technical field especially relates to an aluminum plate furred ceiling is with armful hoop installation system.
Background
In the architectural decoration fitment, we are bloated bolt cooperation whole silk commonly used and hang the connecting piece of muscle as building structure and furred ceiling, but in current large-scale public space building, the major structure uses the steel construction more, steel construction building compares reinforced concrete building and says that intensity is higher, anti-seismic performance is better, the factory process preparation is convenient for the field installation and is shortened construction period, steel construction reuse can reduce building rubbish, more green, nevertheless bloated bolt then can't be fixed with the steel construction in the large-scale public space of steel construction main part. At present, the decoration and finishing method in the steel structure building is relatively immature, in the steel structure building, the hanging ribs are connected with the building structure, the construction efficiency can be reduced if a welding process is adopted, the high-temperature welding slag splashes to have fire hazard, and the welding points can be corroded to rust along with the lapse of time to cause falling.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an easy operation, labour saving and time saving's aluminum plate furred ceiling is with embracing hoop mounting system.
The utility model discloses a realize through following measure:
a hoop part mounting system for an aluminum plate ceiling is characterized by comprising a plurality of U-shaped hoops arranged on a plurality of structural beams and full-wire lead screw hanging bars arranged on the U-shaped hoops;
the U-shaped hoop is provided with a through hole, and the full-wire lead screw hanging rib is provided with a nut for limiting and fixing after penetrating through the through hole.
The utility model discloses a concrete characteristics have:
the structural beam is a square tube steel beam, a plurality of groups of fixing holes penetrating through the side face are formed in the square tube steel beam, and each group is provided with at least two fixing holes;
mounting holes corresponding to the corresponding groups of fixing holes are symmetrically formed in the side faces of the two sides of the U-shaped hoop, and the U-shaped hoop is fixedly connected to the square pipe steel beam through bolts A and nuts A which are arranged in the mounting holes and the fixing holes;
the bottom surface of the U-shaped hoop is provided with the through hole, the upper end of the all-wire screw rod hanging rib penetrates through the through hole and then is provided with the nut for limiting and fixing, and the lower end of the all-wire screw rod hanging rib is used for mounting a final surface layer;
the reinforcing steel plate is arranged between the two side faces of the U-shaped hoop, the reinforcing steel plate is located below the square pipe steel beam and far away from one side of the through hole, the reinforcing steel plate is used for reinforcing the bearing and anti-deformation capacity of the U-shaped hoop, and the reinforcing steel plate and the two bolts A form a triangular supporting structure, are not prone to shaking forwards and backwards, and play roles in reinforcing stress and limiting.
The structural beams are I-shaped steel beams and are arranged in parallel, the U-shaped hoop is horizontally clamped on the side faces of the two rear sides of the I-shaped steel beams and is provided with a coaxial through hole, the upper end of the full-wire lead screw lifting rib penetrates through the through hole, the nuts are arranged on the two sides of the U-shaped hoop in a limiting and fixing mode, and the U-shaped hoop cannot move.
The lower end of the hanging bar of the full-wire screw rod is provided with a U-shaped hoop A;
through holes A with symmetrical axes are formed in the side faces of two sides of the U-shaped hoop A, the lower end of the all-wire lead screw lifting rib penetrates through the through holes A on the two sides, and nuts B are arranged on the periphery of the all-wire lead screw lifting rib on the two sides of the U-shaped hoop A for limiting and fixing;
adjacent both sides wear to be equipped with conversion layer side pipe in the U-shaped staple bolt A, conversion layer side pipe is improved level the card and is had a plurality of U-shaped staple bolts B, be provided with the through-hole B of axle center symmetry on U-shaped staple bolt B's the both sides side, both sides wear to be equipped with full silk lead screw in the through-hole B and hang muscle A U-shaped staple bolt B both sides full silk lead screw hangs muscle A periphery and all is provided with the spacing fixed of nut C, guarantees U-shaped staple bolt B can not remove.
And a plurality of angle steels are arranged between the square pipes of the conversion layers on the adjacent two sides to prevent the square pipes of the conversion layers from shaking.
The diameter of the hanging rib of the full-wire screw rod is 20 mm.
The diameter of the hanging bar A of the full-wire screw rod is 10 mm.
The full-wire lead screw hanging rib, the conversion layer square tube, the full-wire lead screw hanging rib A and the surface of the angle steel are provided with a zinc coating.
Rubber gaskets are arranged between the U-shaped anchor ear and the I-shaped steel beam and between the U-shaped anchor ear B and the conversion layer square tube.
When the system is applied, the aluminum plate ceiling system without the conversion layer is installed: firstly, paying off and positioning the mounting position of the U-shaped hoop on the square pipe steel beam according to a scheme. And secondly, punching the square pipe steel beam according to paying-off positioning and the combination of the size of the bolt A and the shape of the U-shaped hoop. And thirdly, fixing the full-wire lead screw lifting rib on the U-shaped hoop in a manner of matching with the nut. Fourthly, fixing the U-shaped hoop fixed with the all-wire lead screw hanging ribs on the square pipe steel beam through the bolts A and the nuts A, wherein the reinforcing steel plate is welded on the U-shaped hoop so as to enhance the bearing and anti-deformation capacity of the U-shaped hoop, and thus, the installation of the aluminum plate base layer is completed;
to the very high space of layer height, there is the anti-wind pressure requirement ceiling surface course apart from the great or interior space of building structure distance, when I-shaped girder steel has the atress requirement and can not perforate the installation, need to do the aluminum plate furred ceiling system installation of conversion layer to the furred ceiling basic unit: firstly, paying off and positioning the mounting position of the U-shaped hoop on the I-shaped steel beam. And secondly, clamping the U-shaped hoop on the I-shaped steel beam in a manner of matching with the rubber gasket, fixing the full-wire lead screw lifting rib on the U-shaped hoop by using the nut, and screwing the nut to ensure that the U-shaped hoop cannot move. Thirdly, the U-shaped hoop A is matched with the two nuts B to fix the conversion layer square tube to the lower end of the full-wire lead screw lifting rib. And fourthly, the U-shaped hoop B is matched with the nut C to fix the all-wire lead screw hanging bar A to the conversion layer square tube, so that the installation of the hoop aluminum plate ceiling base layer with the conversion layer is completed.
The utility model has the advantages that:
1. the system is simple, convenient and quick in construction, and is beneficial to improving the construction efficiency and reducing the construction cost.
2. The hoop conversion layer mounting system consisting of the U-shaped hoop A, U-shaped hoop B and the conversion layer square tube is used in the steel structure beam building with the I-shaped steel beam and the steel structure beam which cannot be perforated under the structural stress requirement, so that the structural stress can be prevented from being influenced by the perforation on the steel structure.
3. The system can reduce the field welding workload, improve the construction efficiency, improve the safety of field construction operation and reduce the fire hazard caused by spattering of welding slag.
4. The system is simple and convenient to construct, the components of the system are common materials, the system is easy to process and realize, and construction operators can more easily operate the system.
5. The full-wire screw rod hanging rib used in the system can be cut at will according to the length of the suspended ceiling structure, construction and installation are facilitated, and the strength of the suspended ceiling structure meets the requirement.
6. This system all uses the steel material to install, and material strength is high, and the later stage is torn open and is changed and to recycle, and the feature of environmental protection is strong.
Drawings
Fig. 1 is a schematic diagram of an overall structure of a conversion layer-free layer according to an embodiment of the present invention.
Fig. 2 is a schematic diagram of an overall structure with a conversion layer according to an embodiment of the present invention.
Wherein the reference numbers are: 1. hanging bars by using the full-wire screw rod; 2. a nut; 3. a U-shaped hoop; 4. a square tube steel beam; 5. a bolt A; 6. a nut A; 7. an I-shaped steel beam; 8. a U-shaped hoop A; 9. a U-shaped hoop B; 10. converting the square tube of the layer; 11. angle steel; 12. and (4) hanging a rib A by the full-wire screw rod.
Detailed Description
In order to clearly explain the technical features of the present solution, the present solution is explained by the following detailed description.
Referring to fig. 1-2, a hoop member mounting system for an aluminum plate ceiling comprises a plurality of U-shaped hoops 3 arranged on a plurality of structural beams and full-wire lead screw hanging bars 1 arranged on the U-shaped hoops 3;
the U-shaped hoop 3 is provided with a through hole, and the full-wire screw rod hanging rib 1 is provided with a nut 2 for limiting and fixing after penetrating through the through hole.
The structural beam is a square tube steel beam 4, a plurality of groups of fixing holes penetrating through the side face are formed in the square tube steel beam 4, and each group is provided with at least two fixing holes;
mounting holes corresponding to the corresponding groups of fixing holes are symmetrically formed in the side faces of two sides of the U-shaped hoop 3, and the U-shaped hoop 3 is fixedly connected to the square pipe steel beam 4 through bolts A5 and nuts A6 which are arranged in the mounting holes and the fixing holes;
the bottom surface of the U-shaped hoop 3 is provided with a through hole, the upper end of the all-wire lead screw hanging rib 1 penetrates through the through hole and is then provided with a nut 2 for limiting and fixing, and the lower end of the all-wire lead screw hanging rib 1 is used for mounting a final surface layer;
be provided with the reinforcement steel sheet between the 3 both sides of U-shaped staple bolt, consolidate the steel sheet and be located square pipe girder steel 4 below, keep away from one side of through-hole, consolidate the steel sheet and be used for strengthening U-shaped staple bolt 3 bear and the anti deformability to consolidate the steel sheet and form triangular supports structure with two bolts A5, rock around being difficult for, play reinforcing atress, spacing effect.
A plurality of structure roof beams are I-shaped girder steel 7 and a plurality of I-shaped girder steel 7 parallel arrangement, and the through-hole with the axle center is seted up on the both sides side behind a plurality of U-shaped staple bolts 3 horizontal card on I-shaped girder steel 7, and it is spacing fixed that all be provided with nut 2 in U-shaped staple bolt 3 both sides after the through-hole is passed to full silk lead screw hanger 1 upper end, guarantees that U-shaped staple bolt 3 can not remove.
The lower end of the full-wire screw rod hanging bar 1 is provided with a U-shaped hoop A8;
through holes A with symmetrical axes are arranged on the side surfaces of two sides of the U-shaped hoop A8, the lower end of the all-wire screw rod hanging rib 1 penetrates through the through holes A of the two sides, and nuts B are arranged on the periphery of the all-wire screw rod hanging rib 1 on the two sides of the U-shaped hoop A8 for limiting and fixing;
wear to be equipped with conversion layer square pipe 10 in the U-shaped staple bolt A8 of adjacent both sides, conversion layer square pipe 10 is improved level the card and is had a plurality of U-shaped staple bolts B9, be provided with the through-hole B of axle center symmetry on the both sides side of U-shaped staple bolt B9, wear to be equipped with full silk lead screw in the through-hole B of both sides and hang muscle A12, it is spacing fixed all to be provided with nut C in the full silk lead screw of U-shaped staple bolt B9 both sides hangs muscle A12 periphery, guarantee that U-shaped staple bolt B9 can not remove.
A plurality of angle steels 11 are arranged between the conversion layer square pipes 10 on the two adjacent sides, so that the conversion layer square pipes 10 are prevented from shaking.
The diameter of the hanging bar 1 of the full-wire screw rod is 20 mm.
The diameter of the hanging bar A12 of the full-wire screw rod is 10 mm.
The surfaces of the full-wire screw rod hanging rib 1, the conversion layer square tube 10, the full-wire screw rod hanging rib A12 and the angle steel 11 are all provided with a zinc coating.
Rubber gaskets are arranged between the U-shaped anchor ear 3 and the I-shaped steel beam 7 and between the U-shaped anchor ear B9 and the conversion layer square tube 10.
When this system application, to the aluminum plate furred ceiling system installation that does not need the conversion layer: firstly, paying off and positioning the installation position of the U-shaped hoop 3 on the square pipe steel beam 4 according to a scheme. And secondly, punching the square pipe steel beam 4 according to the paying-off positioning and the size of the bolt A5 and the shape of the U-shaped anchor ear 3. And thirdly, fixing the full-wire screw rod lifting rib 1 on a U-shaped hoop 3 by matching with a nut 2. Fourthly, fixing the U-shaped hoop 3 fixed with the all-wire lead screw hanging rib 1 on the square pipe steel beam 4 through a bolt A5 and a nut A6, wherein a reinforcing steel plate is welded on the U-shaped hoop 3 to enhance the bearing and anti-deformation capacity of the U-shaped hoop 3, and thus, the installation of the aluminum plate base layer is completed;
to the very high space of layer height, there is the anti-wind pressure requirement ceiling surface course apart from building structure distance great or interior space, when I-shaped girder steel 7 has the atress requirement and can not perforate the installation, need to do the aluminum plate furred ceiling system installation of conversion layer to the furred ceiling basic unit: firstly, paying off and positioning the installation position of the U-shaped hoop 3 on the I-shaped steel beam 7. And secondly, clamping the U-shaped hoop 3 on the I-shaped steel beam 7 by matching with a rubber gasket, fixing the full-wire screw rod lifting rib 1 on the U-shaped hoop 3 by using a nut 2, and tightening the nut 2 to ensure that the U-shaped hoop 3 cannot move. Thirdly, the conversion layer square tube 10 is fixed to the lower end of the full-wire lead screw lifting rib 1 by using a U-shaped hoop A8 and matching two nuts B. Fourthly, the U-shaped hoop B9 is matched with the nut C to fix the full-wire lead screw hanging bar A12 on the conversion layer square tube 10, so that the installation of the hoop aluminum plate ceiling base layer with the conversion layer is completed.
The technical features of the present invention that are not described can be realized through or by the prior art, and are not described herein again, and certainly, the above description is not a limitation of the present invention, the present invention is not limited to the above examples, and the changes, modifications, additions or replacements made by the ordinary skilled person in the art in the essential scope of the present invention should also belong to the protection scope of the present invention.

Claims (8)

1. A hoop part mounting system for an aluminum plate ceiling is characterized by comprising a plurality of U-shaped hoops (3) arranged on a plurality of structural beams and full-wire lead screw hanging ribs (1) arranged on the U-shaped hoops (3);
a through hole is formed in the U-shaped hoop (3), and the full-wire lead screw hanging bar (1) is provided with a nut (2) for limiting and fixing after penetrating through the through hole;
the structural beam is a square tube steel beam (4), and a plurality of groups of fixing holes penetrating through the side face are formed in the square tube steel beam (4);
mounting holes corresponding to the corresponding groups of fixing holes are symmetrically formed in the side faces of the two sides of the U-shaped hoop (3), and the U-shaped hoop (3) is fixedly connected to the square pipe steel beam (4) through bolts A (5) and nuts A (6) arranged in the mounting holes and the fixing holes;
the bottom surface of the U-shaped hoop (3) is provided with the through hole, and the upper end of the full-wire lead screw hanging bar (1) is provided with the nut (2) for limiting and fixing after penetrating through the through hole;
and a reinforcing steel plate is arranged between the side faces of the two sides of the U-shaped hoop (3), and the reinforcing steel plate is positioned below the square pipe steel beam (4) and is far away from one side of the through hole.
2. The hoop member mounting system for the aluminum plate ceiling as claimed in claim 1, wherein a plurality of the structural beams are i-shaped steel beams (7) and a plurality of the i-shaped steel beams (7) are arranged in parallel, a plurality of the U-shaped hoops (3) are horizontally clamped on the i-shaped steel beams (7) and are provided with coaxial through holes on the side surfaces of the two sides of the rear side, and the nuts (2) are arranged on the two sides of the U-shaped hoops (3) for limiting and fixing after the upper ends of the all-wire lead screw hanging bars (1) pass through the through holes.
3. The hoop mounting system for the aluminum plate ceiling is characterized in that the lower end of the all-wire lead screw hanging bar (1) is provided with a U-shaped hoop A (8);
through holes A with symmetrical axes are formed in the side faces of two sides of the U-shaped hoop A (8), the lower end of the all-wire lead screw lifting rib (1) penetrates through the through holes A, and nuts B are arranged on the periphery of the all-wire lead screw lifting rib (1) on two sides of the U-shaped hoop A (8) for limiting and fixing;
adjacent both sides wear to be equipped with conversion layer side pipe (10) in the U-shaped staple bolt A (8), conversion layer side pipe (10) are gone up the horizontal card and are had a plurality of U-shaped staple bolts B (9), be provided with the through-hole B of axle center symmetry on the both sides side of U-shaped staple bolt B (9), both sides wear to be equipped with full silk lead screw in the through-hole B and hang muscle A (12) U-shaped staple bolt B (9) both sides full silk lead screw hangs muscle A (12) periphery and all is provided with the spacing fixed of nut C.
4. The hoop mounting system for the aluminum plate ceiling as claimed in claim 3, wherein a plurality of angle steels (11) are arranged between the conversion layer square tubes (10) on two adjacent sides.
5. The hoop mounting system for an aluminum plate ceiling as claimed in claim 1, wherein the full wire lead screw hanger bar (1) has a diameter of 20 mm.
6. The hoop mounting system for an aluminum plate ceiling as claimed in claim 3, wherein the all-wire lead screw hanger bar A (12) has a diameter of 10 mm.
7. The hoop mounting system for the aluminum plate ceiling as claimed in claim 4, wherein the full wire lead screw hanging rib (1), the conversion layer square tube (10), the full wire lead screw hanging rib A (12) and the angle steel (11) are provided with zinc plating layers on the surfaces.
8. The hoop member mounting system for the aluminum plate ceiling as claimed in claim 3, wherein rubber gaskets are arranged between the U-shaped hoop (3) and the I-shaped steel beam (7) and between the U-shaped hoop B (9) and the conversion layer square tube (10).
CN202220201296.3U 2022-01-25 2022-01-25 Hoop mounting system for aluminum plate ceiling Active CN217299424U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220201296.3U CN217299424U (en) 2022-01-25 2022-01-25 Hoop mounting system for aluminum plate ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220201296.3U CN217299424U (en) 2022-01-25 2022-01-25 Hoop mounting system for aluminum plate ceiling

Publications (1)

Publication Number Publication Date
CN217299424U true CN217299424U (en) 2022-08-26

Family

ID=82926401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220201296.3U Active CN217299424U (en) 2022-01-25 2022-01-25 Hoop mounting system for aluminum plate ceiling

Country Status (1)

Country Link
CN (1) CN217299424U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116928448A (en) * 2023-07-03 2023-10-24 中国建筑第四工程局有限公司 Method for installing slide bar of high-altitude air duct of steel truss system building
CN119083601A (en) * 2024-09-30 2024-12-06 上海市建筑装饰工程集团有限公司 A kind of inclined truss steel structure transfer layer structure and installation method thereof
CN119102323A (en) * 2024-10-09 2024-12-10 中建八局第二建设有限公司 An adjustable building indoor ceiling hoop system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116928448A (en) * 2023-07-03 2023-10-24 中国建筑第四工程局有限公司 Method for installing slide bar of high-altitude air duct of steel truss system building
CN119083601A (en) * 2024-09-30 2024-12-06 上海市建筑装饰工程集团有限公司 A kind of inclined truss steel structure transfer layer structure and installation method thereof
CN119083601B (en) * 2024-09-30 2025-10-03 上海市建筑装饰工程集团有限公司 A tilted truss steel structure transfer layer structure and installation method thereof
CN119102323A (en) * 2024-10-09 2024-12-10 中建八局第二建设有限公司 An adjustable building indoor ceiling hoop system

Similar Documents

Publication Publication Date Title
CN217299424U (en) Hoop mounting system for aluminum plate ceiling
CN212478241U (en) A new type of steel structure spherical grid suspended ceiling transition layer connection structure
CN208009911U (en) A kind of pre-buried dismountable Combined type sling in part
CN106499201A (en) A kind of dismountable safety rope tool-type holding clamp and its using method
CN211369489U (en) Hanging basket hanging mechanism used on inclined roof
CN211172708U (en) Column foot structure of channel steel column
CN218990875U (en) Assembled triangular truss cantilever support frame system
CN216428547U (en) Tool type fixing device for suspender of lower suspended ceiling structure of spherical net rack
CN216516786U (en) Flexible structure of encorbelmenting of dismantling of peripheral protection circulation of superelevation layer
CN212773459U (en) Wall pouring template applied to expansion joint side
CN211229455U (en) Support type external overhanging scaffold
CN217581332U (en) Adaptor of steel structure beam
CN209907222U (en) Novel reinforcing bar installation appurtenance
CN110212843B (en) Reinforcing device of photovoltaic support template and positioning method thereof
CN112942777A (en) Ultrahigh-layer periphery protection cyclic telescopic detachable cantilever structure and mounting method
CN102328737A (en) Sectional scaffold apparatus for hull
CN201771199U (en) Fixture for mounting safety ropes
CN113417269A (en) Method for mounting rib plate of combined beam structure
CN106012844A (en) Positioning adjustment method for inclined steel web plates
CN206318603U (en) A kind of special hanger of large-sized water turbine field ring integral hoisting
CN214460463U (en) Bracket for supporting and installing foundation pit engineering steel pipe
CN222375932U (en) Adjustable girder steel hangs operation platform
CN219933170U (en) Detachable fixed hanger
CN219863612U (en) Suspended ceiling conversion layer system of truss structure building