CN217267622U - A pipeline structure for urban building underground pipeline network - Google Patents

A pipeline structure for urban building underground pipeline network Download PDF

Info

Publication number
CN217267622U
CN217267622U CN202220337707.1U CN202220337707U CN217267622U CN 217267622 U CN217267622 U CN 217267622U CN 202220337707 U CN202220337707 U CN 202220337707U CN 217267622 U CN217267622 U CN 217267622U
Authority
CN
China
Prior art keywords
wall
wall end
flange
pipe
steel bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220337707.1U
Other languages
Chinese (zh)
Inventor
李骏毅
吴辉
杨乙
何光华
张智
李诗韬
万艳姝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Jiangong No11 Building Engineering Co ltd
Original Assignee
Chongqing Jiangong No11 Building Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Jiangong No11 Building Engineering Co ltd filed Critical Chongqing Jiangong No11 Building Engineering Co ltd
Priority to CN202220337707.1U priority Critical patent/CN217267622U/en
Application granted granted Critical
Publication of CN217267622U publication Critical patent/CN217267622U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model belongs to the technical field of pipe gallery wall penetration seepage prevention structures, in particular to a pipeline structure for underground pipe networks of urban buildings, which comprises a wall penetration assembly and a reinforcing steel bar group, wherein the wall penetration assembly and the reinforcing steel bar group are pre-embedded in a concrete wall body; the reinforcing steel bar group penetrates through the inner side of the inner wall end piece and the inner side of the outer wall end piece; the wall penetrating component consists of an inner wall end head piece, an outer wall end head piece, a sleeve and a wall penetrating pipe; through using the through-wall subassembly for the flexibility of arranging of pipeline is higher, and solitary part can be dismantled under the human action, and subsequent maintenance of being convenient for is administered, if the damage of taking place partial part, can adopt the instrument to realize dismantling of through-wall subassembly and change, and members such as inside and outside wall end piece, through-wall pipe, through-hole pipe bolt all can carry out the size determination of pipe diameter, inside and outside screw diameter according to actual need, with this cable or the pipeline of adaptation different diameters.

Description

一种城市建筑地下管网用管道结构A pipeline structure for urban building underground pipeline network

技术领域technical field

本实用新型属于管廊穿墙防渗结构技术领域,具体的说是一种城市建筑地下管网用管道结构。The utility model belongs to the technical field of the anti-seepage structure through the wall of a pipe gallery, in particular to a pipe structure for an underground pipe network of an urban building.

背景技术Background technique

地下综合管廊包括地下交通设施如隧道和工业与民用建筑地下室等均需要设置供电等管线,管线穿越地下洞室墙板要求埋设穿墙管,使用过程中常有地下水沿穿墙管渗入地下洞室,需要采取措施进行防渗,The underground comprehensive pipe gallery, including underground transportation facilities such as tunnels and basements of industrial and civil buildings, need to be equipped with power supply and other pipelines. The pipelines need to be buried through the wall of the underground cavern. In the process of use, groundwater often seeps into the underground cavern along the through-wall pipe. , it is necessary to take measures to prevent seepage,

目前市面上存在一些防渗方法,但是由于防渗材料使用寿命远少于地下综合管廊等的设计使用年限,需要经常养护维修更换,而维修更换时耗时繁杂不便捷。At present, there are some anti-seepage methods on the market, but since the service life of the anti-seepage material is much shorter than the designed service life of the underground comprehensive pipe gallery, it needs to be maintained and replaced frequently, and the maintenance and replacement are time-consuming and inconvenient.

因此,针对上述问题提出一种城市建筑地下管网用管道结构。Therefore, in view of the above problems, a pipeline structure for the underground pipeline network of urban buildings is proposed.

实用新型内容Utility model content

为了弥补现有技术的不足,解决由于防渗材料使用寿命远少于地下综合管廊等的设计使用年限,需要经常养护维修更换,而维修更换时耗时繁杂不便捷的问题,提出的一种城市建筑地下管网用管道结构。In order to make up for the deficiencies of the existing technology and solve the problem that the service life of the anti-seepage material is much shorter than the designed service life of the underground comprehensive pipe gallery, it needs to be maintained and replaced frequently, and the maintenance and replacement are time-consuming, complicated and inconvenient. Pipe structure for underground pipe network in urban buildings.

本实用新型解决其技术问题所采用的技术方案是:本实用新型所述的一种城市建筑地下管网用管道结构,包括预埋于混凝土墙体中的穿墙组件以及钢筋组;所述钢筋组贯穿在内墙端头件内侧以及外墙端头件的内侧;The technical solution adopted by the present utility model to solve the technical problem is as follows: the utility model describes a pipeline structure for an underground pipe network in urban buildings, which comprises wall-penetrating components and a steel bar group embedded in a concrete wall; the steel bars The group runs through the inner side of the inner wall end piece and the inner side of the outer wall end piece;

所述穿墙组件由内墙端头件、外墙端头件、套管以及穿墙管组成;所述套管卡接在内墙端头件与所述外墙端头件之间,且所述穿墙管贯穿内墙端头件、外墙端头件以及套管;所述内墙端头件与所述外墙端头件的中部均设有中心穿孔,在布置管线或电缆时,可将电缆或是管线经由穿墙管进行穿墙,且由于外墙端头件与内墙端头件之间利用防水胶泥填充,因此,穿墙管的防渗性能较高,避免穿墙管内部的电缆或是管线受到侵蚀。The wall penetration assembly is composed of an inner wall end piece, an outer wall end piece, a sleeve and a wall penetration pipe; the sleeve is clamped between the inner wall end piece and the outer wall end piece, and The wall-penetrating pipe penetrates the inner wall end piece, the outer wall end piece and the casing; the middle part of the inner wall end piece and the outer wall end piece is provided with a central perforation, when arranging pipelines or cables , the cable or pipeline can be passed through the wall through the wall pipe, and since the outer wall end piece and the inner wall end piece are filled with waterproof cement, the seepage resistance of the wall pass pipe is high, and the penetration of the wall is avoided. Corrosion of cables or pipes inside the pipe.

优选的,所述内墙端头件由内墙端头板、内墙外凸缘、一号通孔管螺栓、内墙内凸缘以及内墙钢筋孔板组成;所述内墙外凸缘设置在内墙端头板远离外墙端头件的一端,且所述一号通孔管螺栓螺纹连接在内墙外凸缘的内部;所述内墙内凸缘设置于内墙端头板靠近于外墙端头件的一端;所述内墙钢筋孔板固接在内墙端头板靠近于外墙端头件的一端;同时在内墙端头板与防水卷材的连接处设置防水胶泥,能够进一步提高防渗性能;Preferably, the inner wall end piece is composed of an inner wall end plate, an inner wall outer flange, a No. 1 through-hole pipe bolt, an inner wall inner flange and an inner wall reinforcement orifice plate; the inner wall outer flange It is arranged at one end of the inner wall end plate away from the outer wall end piece, and the No. 1 through-hole pipe bolt is threadedly connected to the inside of the inner wall outer flange; the inner wall inner flange is arranged on the inner wall end plate Close to one end of the outer wall end piece; the inner wall reinforced orifice plate is fixedly connected to one end of the inner wall end plate close to the outer wall end piece; at the same time, it is set at the connection between the inner wall end plate and the waterproof coiled material Waterproof cement can further improve the anti-seepage performance;

优选的,所述外墙端头件由外墙端头板、外墙钢筋孔板、外墙内凸缘、外墙外凸缘、凸缘垫片、压紧环以及二号通孔管螺栓组成;所述外墙钢筋孔板固接在外墙端头板靠近于内墙端头件的一端;所述外墙内凸缘对应固接在外墙端头板靠近于内墙端头件的一端;所述外墙外凸缘固接在外墙端头板远离于内墙端头件的一端;所述凸缘垫片套设在外墙外凸缘外侧,且所述压紧环套设在外墙外凸缘外侧,其底部贴合在凸缘垫片外侧;所述二号通孔管螺栓螺纹连接在外墙外凸缘内部;所述通孔管螺栓螺纹连接在压紧环上,将开孔半垫片、凸缘半垫片环套电缆或管线并将凸缘半垫片环的压紧垫片合成凸缘键插入开孔半垫片的压紧垫片合成孔口内形成合成压紧垫片,压紧垫片合成凸缘键与压紧垫片合成孔口形成紧配合。Preferably, the outer wall end piece is composed of an outer wall end plate, an outer wall steel orifice plate, an outer wall inner flange, an outer wall outer flange, a flange gasket, a compression ring and a No. 2 through-hole pipe bolt The outer wall reinforcement orifice plate is fixed on one end of the outer wall end plate close to the inner wall end piece; the outer wall inner flange is correspondingly fixed at one end of the outer wall end plate close to the inner wall end piece ; the outer wall flange is fixed on the end of the outer wall end plate away from the inner wall end piece; the flange gasket is sleeved on the outside of the outer wall outer flange, and the pressing ring is sleeved on the outer wall The outer side of the outer flange, the bottom of which is attached to the outer side of the flange gasket; the No. 2 through-hole pipe bolts are threadedly connected to the inside of the outer flange of the outer wall; the through-hole pipe bolts are threadedly connected to the compression ring, and Half-gasket, flanged-half-gasket ring wraps cables or pipelines and inserts the compression-gasket synthetic flange key of the flanged-half-gasket ring into the compression-gasket composite hole of the perforated half-gasket to form a composite compression pad Sheet, the compression gasket synthetic flange key forms a tight fit with the compression gasket synthetic aperture.

优选的,所述中心穿孔开设在外墙端头板以及内墙端头板的中部,且所述穿墙管贯穿在中心穿孔内,在外墙外凸缘的外表面设置外螺纹,同时,在外墙端头板的外侧面位于外墙外凸缘侧壁上设置凹槽,用于填充防水胶泥。Preferably, the central through hole is opened in the middle of the outer wall end plate and the inner wall end plate, and the wall penetration pipe is inserted into the central through hole, and the outer surface of the outer flange of the outer wall is provided with external threads. The outer side of the end plate is located on the side wall of the outer flange of the outer wall with a groove for filling with waterproof glue.

优选的,所述外墙钢筋孔板设置两组,且一组所述外墙钢筋孔板为两个;两组所述外墙钢筋孔板圆周对称布置在外墙端头板上;所述内墙钢筋孔板对应设置两组,且一组所述内墙钢筋孔板为两个;所述钢筋组分别贯穿在外墙钢筋孔板以及内墙钢筋孔板内;在钢筋组贯穿在相邻的孔板a或是孔板b上时,能够使得贯穿的钢筋组呈“井”字型布置。Preferably, there are two groups of the outer wall reinforced orifice plates, and one group of the outer wall reinforced orifice plates is two; the two groups of the outer wall reinforced orifice plates are circumferentially symmetrically arranged on the outer wall end plates; the inner Two groups of wall reinforcement orifice plates are correspondingly arranged, and a group of said inner wall reinforcement orifice plates is two; said reinforcement group respectively penetrates in the outer wall reinforcement orifice plate and the inner wall reinforcement orifice plate; the reinforcement group penetrates in the adjacent When on the orifice plate a or the orifice plate b, the penetrating steel bar group can be arranged in a "well" shape.

优选的,所述外墙端头件与所述穿墙管之间注有防水胶泥;所述内墙端头件与所述穿墙管之间注入防水胶泥,防水胶泥的填充能够在一定程度上提供外墙端头件或是内墙端头件与穿墙管之间的密封性。Preferably, waterproof glue is injected between the outer wall end piece and the wall penetration pipe; waterproof glue is injected between the inner wall end piece and the wall penetration pipe, and the filling of the waterproof glue can be to a certain extent Provides sealing between the outer wall end piece or the inner wall end piece and the through-wall pipe.

本实用新型的有益效果:The beneficial effects of the present utility model:

本实用新型提供一种城市建筑地下管网用管道结构,通过使用穿墙组件,使得管道的布置灵活性较高,且单独的零件可在人为作用下拆卸,便于后续的维护治理,若发生部分零件的损坏,可采用工具实现穿墙组件的拆除更换,且内、外墙端头件、穿墙管、通孔管螺栓等构件均可按照实际需要进行管径、内外螺纹径的尺寸确定,以此适应不同直径的电缆或是管线。The utility model provides a pipeline structure for the underground pipeline network of urban buildings. By using wall-penetrating components, the arrangement flexibility of pipelines is high, and individual parts can be disassembled under human action, which is convenient for subsequent maintenance and management. If the parts are damaged, tools can be used to remove and replace the through-wall components, and the inner and outer wall end pieces, through-wall pipes, through-hole pipe bolts and other components can be determined according to the actual needs of the pipe diameter and internal and external thread diameters. This adapts to cables or pipes of different diameters.

本实用新型提供一种城市建筑地下管网用管道结构,通过设置的内、外墙端头件、配合设置在内、外墙端头件之间的套管能够在穿墙管布置时,能够提高穿墙管中的管线以及电缆的密封性,同时在内、外墙端头件安装时,布置的防水胶泥、开口橡胶圈以及合成压紧垫片能够提高穿墙组件的防渗性能。The utility model provides a pipeline structure for an underground pipeline network of urban buildings. When the through-wall pipes are arranged, the inner and outer wall end pieces and the sleeves arranged between the inner and outer wall end pieces can be arranged. Improve the sealing performance of pipelines and cables in the wall-penetrating pipe, and at the same time, when the inner and outer wall end pieces are installed, the waterproof glue, open rubber ring and synthetic compression gasket arranged can improve the seepage resistance of the wall-penetrating components.

附图说明Description of drawings

此处所说明的附图用来提供对本实用新型的进一步理解,构成本申请的一部分,本实用新型的示意性实施例及其说明用于解释本实用新型,并不构成对本实用新型的不当限定。在附图中:The accompanying drawings described here are used to provide further understanding of the present invention and constitute a part of the present application. The schematic embodiments and descriptions of the present invention are used to explain the present invention and do not constitute an improper limitation of the present invention. In the attached image:

图1是实施例一中穿墙组件的排列立体图;Fig. 1 is the arrangement perspective view of the through-wall assembly in the first embodiment;

图2是实施例一中穿墙组件的立体图;2 is a perspective view of the through-wall assembly in the first embodiment;

图3是实施例一中穿墙组件的正视图;3 is a front view of the through-wall assembly in the first embodiment;

图4是实施例一中穿墙组件的局部剖视图;4 is a partial cross-sectional view of the through-wall assembly in the first embodiment;

图5是实施例二中穿墙组件的局部剖视图;5 is a partial cross-sectional view of the through-wall assembly in the second embodiment;

图例说明:illustration:

1、穿墙组件;11、内墙端头件;111、内墙端头板;112、内墙外凸缘;113、一号通孔管螺栓;114、内墙内凸缘;115、内墙钢筋孔板;12、外墙端头件;121、外墙端头板;122、外墙钢筋孔板;123、外墙内凸缘;124、凸缘垫片;125、外墙外凸缘;126、二号通孔管螺栓;127、压紧环;13、套管;14、穿墙管;15、滚珠;2、钢筋组。1. Through-wall assembly; 11. Inner wall end piece; 111, Inner wall end plate; 112, Inner wall outer flange; 113, No. 1 through-hole pipe bolt; 114, Inner wall inner flange; 115, Inner wall Wall reinforcement orifice plate; 12. Exterior wall end piece; 121, Exterior wall end plate; 122, Exterior wall reinforcement orifice plate; 123, Exterior wall inner flange; 124, Flange gasket; edge; 126, No. 2 through-hole pipe bolt; 127, compression ring; 13, casing; 14, wall pipe; 15, ball; 2, steel bar group.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其它实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

下面给出具体实施例。Specific examples are given below.

实施例一:Example 1:

请参阅图1-图4,本实用新型提供一种城市建筑地下管网用管道结构,包括预埋于混凝土墙体中的穿墙组件1以及钢筋组2;所述钢筋组2贯穿在内墙端头件11内侧以及外墙端头件12的内侧;Please refer to FIGS. 1 to 4 , the present utility model provides a pipeline structure for an urban building underground pipeline network, including a wall-penetrating component 1 and a steel bar group 2 pre-buried in a concrete wall; the steel bar group 2 penetrates through the inner wall The inner side of the end piece 11 and the inner side of the outer wall end piece 12;

所述穿墙组件1由内墙端头件11、外墙端头件12、套管13以及穿墙管14组成;所述套管13卡接在内墙端头件11与所述外墙端头件12之间,且所述穿墙管14贯穿内墙端头件11、外墙端头件12以及套管13;所述内墙端头件11与所述外墙端头件12的中部均设有中心穿孔。The wall penetration assembly 1 is composed of an inner wall end piece 11, an outer wall end piece 12, a sleeve 13 and a wall penetration pipe 14; the sleeve 13 is clamped to the inner wall end piece 11 and the outer wall between the end pieces 12, and the through-wall pipe 14 penetrates the inner wall end piece 11, the outer wall end piece 12 and the sleeve 13; the inner wall end piece 11 and the outer wall end piece 12 There are central perforations in the middle.

工作时,内墙端头件11与外墙端头件12的结构类似,其中套管13布置在外墙端头件12与内墙端头件11之间,且套管13的内径大于穿墙管14的外径,而穿墙管14在内墙端头件11以及外墙端头件12均布置完成后,依次贯穿在外墙端头件12、套管13以及内墙端头件11之间;在布置管线或电缆时,可将电缆或是管线经由穿墙管14进行穿墙,且由于外墙端头件12与内墙端头件11之间利用防水胶泥填充,因此,穿墙管14的防渗性能较高,避免穿墙管14内部的电缆或是管线受到侵蚀。During operation, the structure of the inner wall end piece 11 is similar to that of the outer wall end piece 12, wherein the sleeve 13 is arranged between the outer wall end piece 12 and the inner wall end piece 11, and the inner diameter of the sleeve 13 is larger than that of the through wall The outer diameter of the pipe 14, and the through-wall pipe 14, after both the inner wall end piece 11 and the outer wall end piece 12 are arranged, pass through the outer wall end piece 12, the sleeve 13 and the inner wall end piece 11 in turn. When arranging pipelines or cables, the cables or pipelines can be passed through the wall through the wall-penetrating pipe 14, and since the outer wall end piece 12 and the inner wall end piece 11 are filled with waterproof cement, therefore, through the wall The anti-seepage performance of the pipe 14 is high, so that the cables or pipelines inside the wall-penetrating pipe 14 are prevented from being eroded.

进一步的,所述内墙端头件11由内墙端头板111、内墙外凸缘112、一号通孔管螺栓113、内墙内凸缘114以及内墙钢筋孔板115组成;所述内墙外凸缘112设置在内墙端头板111远离外墙端头件12的一端,且所述一号通孔管螺栓113螺纹连接在内墙外凸缘112的内部;所述内墙内凸缘114设置于内墙端头板111靠近于外墙端头件12的一端;所述内墙钢筋孔板115固接在内墙端头板111靠近于外墙端头件12的一端。Further, the inner wall end piece 11 is composed of an inner wall end plate 111, an inner wall outer flange 112, a No. 1 through-hole pipe bolt 113, an inner wall inner flange 114 and an inner wall reinforcement hole plate 115; The inner wall outer flange 112 is disposed at one end of the inner wall end plate 111 away from the outer wall end piece 12, and the No. 1 through-hole pipe bolt 113 is threadedly connected to the inside of the inner wall outer flange 112; The inner wall flange 114 is arranged at one end of the inner wall end plate 111 close to the outer wall end piece 12; one end.

工作时,内墙外凸缘112用于连接一号通孔管螺栓113,而内墙外凸缘112的外侧在安装时,需要敷贴防水卷材,以此增加防渗性,在穿墙管14贯穿在外墙端头件12、内墙端头件11以及套管13内时,于内墙端头件11内螺纹底部与电缆或是管线之间注入防水胶泥,先后依次置入开口橡胶圈以及合成压紧垫片,而后旋入一号通孔螺栓,将开口橡胶圈以及合成压紧垫片压紧;同时在内墙端头板111与防水卷材的连接处设置防水胶泥,能够进一步提高防渗性能;During operation, the outer flange 112 of the inner wall is used to connect the No. 1 through-hole pipe bolt 113, and the outer side of the outer flange 112 of the inner wall needs to be covered with a waterproof membrane during installation to increase the impermeability. When the pipe 14 runs through the outer wall end piece 12, the inner wall end piece 11 and the casing 13, the waterproof cement is injected between the bottom of the inner thread of the inner wall end piece 11 and the cable or pipeline, and the opening rubber is placed in sequence. ring and synthetic compression gasket, and then screw in the No. 1 through-hole bolt to compress the open rubber ring and the synthetic compression gasket; Further improve the anti-seepage performance;

其中,一号通孔管螺栓113由开孔半螺栓和凸缘半螺栓组成,而开孔半螺栓包括第一半螺栓,第一半螺栓的螺栓头两端设置扳钮,且扳钮设置扳钮孔口,凸缘半螺栓包括第二半螺栓,且第二半螺栓的螺栓头两端也设置扳钮,扳钮设置与扳钮孔口相配合的扳钮凸缘键,开孔半螺栓、凸缘半螺栓环套电缆或管线并将凸缘半螺栓的扳钮凸缘键插入对应的开孔半螺栓的扳钮孔口内形成合成通孔管螺栓,扳钮凸缘键与扳钮孔口形成紧配合;同理,二号通孔管螺栓126的结构与一号通孔管螺栓113的结构相同。Among them, the No. 1 through-hole pipe bolt 113 is composed of a half-bolt with a hole and a half-bolt with a flange, and the half-bolt with a hole includes a first half-bolt. The two ends of the bolt head of the first half-bolt are provided with toggles, and the toggles are provided with toggles. The button hole, the flange half-bolt includes the second half-bolt, and the two ends of the bolt head of the second half-bolt are also provided with toggle buttons, and the toggle button is provided with a toggle flange key matched with the toggle hole. The flange half-bolt surrounds the cable or pipeline and inserts the toggle flange key of the flange half-bolt into the toggle hole of the corresponding perforated half-bolt to form a synthetic through-hole pipe bolt, and the toggle flange key and the toggle hole form a tight fit; the same Therefore, the structure of the No. 2 through-hole pipe bolt 126 is the same as that of the No. 1 through-hole pipe bolt 113 .

进一步的,所述外墙端头件12由外墙端头板121、外墙钢筋孔板122、外墙内凸缘123、外墙外凸缘125、凸缘垫片124、压紧环127以及二号通孔管螺栓126组成;所述外墙钢筋孔板122固接在外墙端头板121靠近于内墙端头件11的一端;所述外墙内凸缘123对应固接在外墙端头板121靠近于内墙端头件11的一端;所述外墙外凸缘125固接在外墙端头板121远离于内墙端头件11的一端;所述凸缘垫片124套设在外墙外凸缘125外侧,且所述压紧环127套设在外墙外凸缘125外侧,其底部贴合在凸缘垫片124外侧;所述二号通孔管螺栓126螺纹连接在外墙外凸缘125内部;所述通孔管螺栓螺纹连接在压紧环127上。Further, the outer wall end piece 12 is composed of an outer wall end plate 121 , an outer wall reinforcement orifice plate 122 , an outer wall inner flange 123 , an outer wall outer flange 125 , a flange gasket 124 , and a pressing ring 127 . and No. 2 through-hole pipe bolts 126; the outer wall steel orifice plate 122 is fixed to the end of the outer wall end plate 121 close to the inner wall end piece 11; the outer wall inner flange 123 is correspondingly fixed to the outer wall The end plate 121 is close to one end of the inner wall end piece 11; the outer wall outer flange 125 is fixed on the end of the outer wall end plate 121 away from the inner wall end piece 11; the flange gasket 124 is set It is arranged on the outside of the outer flange 125 of the outer wall, and the pressing ring 127 is sleeved on the outer side of the outer flange 125 of the outer wall, and its bottom is attached to the outer side of the flange gasket 124; the No. 2 through-hole pipe bolt 126 is threaded on the outside Inside the outer wall flange 125 ; the through-hole pipe bolts are screwed on the compression ring 127 .

工作时,外墙内凸缘123与外墙外凸缘125的内部均设置有螺纹,且在外墙外凸缘125的外侧设置螺纹,用于连接压紧环127;而在穿墙管14贯穿在外墙端头件12、内墙端头件11以及套管13内时,于外墙端头件12内螺纹底部与管线或是电缆之间注入防水胶泥,先后依次置入开口橡胶圈、合成压紧垫片而后旋入二号通孔管螺栓126,用于压紧开口橡胶圈以及合成压紧垫片;其中合成压紧垫片由开孔半垫片和凸缘半垫片环组成,开孔半垫片包含一半环形垫片,所述半环形垫片的两端设有上企口,并在所述上企口上设置有压紧垫片合成孔口;凸缘半垫片环包含一半环形垫片,所述半环形垫片的两端设有下企口,所述下企口上设置有与压紧垫片合成孔口相配合的压紧垫片合成凸缘键,将开孔半垫片、凸缘半垫片环套电缆或管线并将凸缘半垫片环的压紧垫片合成凸缘键插入开孔半垫片的压紧垫片合成孔口内形成合成压紧垫片,压紧垫片合成凸缘键与压紧垫片合成孔口形成紧配合。During operation, both the inner flange 123 of the outer wall and the outer flange 125 of the outer wall are provided with threads, and the outer side of the outer flange 125 of the outer wall is provided with threads for connecting the pressing ring 127; When the outer wall end piece 12, the inner wall end piece 11 and the casing 13 are inside, the waterproof glue is injected between the bottom of the inner thread of the outer wall end piece 12 and the pipeline or cable, and the opening rubber ring is placed in sequence, and then the synthetic Compress the gasket and then screw in the No. 2 through-hole pipe bolt 126 to compress the open rubber ring and the synthetic compression gasket; the synthetic compression gasket is composed of an opening half gasket and a flange half gasket ring. The opening half gasket includes a half ring gasket, the two ends of the half ring gasket are provided with an upper groove, and a compression gasket synthetic orifice is arranged on the upper groove; the flange half gasket ring contains A half-ring gasket, the two ends of the half-ring gasket are provided with a lower groove, and the lower groove is provided with a compression gasket synthetic flange key matched with the compression gasket synthetic hole, and the opening is formed. Half-gasket, flanged-half-gasket ring wraps cables or pipelines and inserts the compression-gasket synthetic flange key of the flanged-half-gasket ring into the compression-gasket composite hole of the perforated half-gasket to form a composite compression pad Sheet, the compression gasket synthetic flange key forms a tight fit with the compression gasket synthetic aperture.

进一步的,所述中心穿孔开设在外墙端头板121以及内墙端头板111的中部,且所述穿墙管14贯穿在中心穿孔内。Further, the central through hole is opened in the middle of the outer wall end plate 121 and the inner wall end plate 111 , and the through-wall pipe 14 penetrates through the central through hole.

工作时,在外墙端头板121以及内墙端头板111的中部设置的中心穿孔,其依次连通外墙外凸缘125、外墙端头板121、外墙内凸缘123、内墙外凸缘112、内墙端头板111以及内墙内凸缘114,且在外墙外凸缘125的中心孔内壁设置内螺纹,而外墙外凸缘125的中心孔靠近外墙端头板121处设置锥形连接端,在外墙外凸缘125的外表面设置外螺纹,同时,在外墙端头板121的外侧面位于外墙外凸缘125侧壁上设置凹槽,用于填充防水胶泥。During operation, the central perforation provided in the middle of the outer wall end plate 121 and the inner wall end plate 111 is connected to the outer wall outer flange 125, the outer wall end plate 121, the outer wall inner flange 123, the inner wall outer flange 125 in turn, and the inner wall outer wall. The flange 112, the inner wall end plate 111 and the inner wall inner flange 114, and the inner wall of the central hole of the outer wall outer flange 125 is provided with an inner thread, and the central hole of the outer wall outer flange 125 is close to the outer wall end plate 121 A conical connection end is provided at the outer wall, and an external thread is provided on the outer surface of the outer wall outer flange 125. At the same time, a groove is set on the outer side of the outer wall end plate 121 on the side wall of the outer wall outer flange 125 for filling with waterproof glue. .

进一步的,所述外墙钢筋孔板122设置两组,且一组所述外墙钢筋孔板122为两个;两组所述外墙钢筋孔板122圆周对称布置在外墙端头板121上;所述内墙钢筋孔板115对应设置两组,且一组所述内墙钢筋孔板115为两个;所述钢筋组2分别贯穿在外墙钢筋孔板122以及内墙钢筋孔板115内。Further, two groups of the outer wall reinforcement orifice plates 122 are provided, and one group of the outer wall reinforcement orifice plates 122 is two; the two groups of the outer wall reinforcement orifice plates 122 are circumferentially symmetrically arranged on the outer wall end plate 121 The inner wall reinforcement orifice plate 115 is correspondingly provided with two groups, and a group of the inner wall reinforcement orifice plate 115 is two; the reinforcement group 2 runs through the outer wall reinforcement orifice plate 122 and the inner wall reinforcement orifice plate 115 respectively. .

工作时,外墙钢筋孔板122与内墙钢筋孔板115结构相同,分别记作孔板a与孔板b;孔板a与孔板b圆周对称布置,且在一组外墙端头板121或是内墙端头板111上各设置两组;在钢筋组2贯穿在相邻的孔板a或是孔板b上时,能够使得贯穿的钢筋组2呈“井”字型布置。During operation, the outer wall reinforcement orifice plate 122 and the inner wall reinforcement orifice plate 115 have the same structure, and are respectively denoted as orifice plate a and orifice plate b; orifice plate a and orifice plate b are arranged symmetrically around the circumference, and are in a group of outer wall end plates. 121 or the inner wall end plate 111 are respectively provided with two groups; when the steel bar group 2 penetrates the adjacent orifice plate a or the orifice plate b, the penetrating steel bar group 2 can be arranged in a "well" shape.

进一步的,所述外墙端头件12与所述穿墙管14之间注有防水胶泥;所述内墙端头件11与所述穿墙管14之间注入防水胶泥。Further, waterproof glue is injected between the outer wall end piece 12 and the wall penetration pipe 14 ; waterproof glue is injected between the inner wall end piece 11 and the wall penetration pipe 14 .

工作时,防水胶泥的填充能够在一定程度上提供外墙端头件12或是内墙端头件11与穿墙管14之间的密封性。During operation, the filling of the waterproof cement can provide the sealing between the outer wall end piece 12 or the inner wall end piece 11 and the through-wall pipe 14 to a certain extent.

实施例二:Embodiment 2:

请参阅图5所示,对比实施例一的另一种实施方式,所述实施例一中的套管13内壁还活动连接有滚珠15;工作时,在穿墙管14贯穿外墙端头件12、内墙端头件11以及套管13时,在套管13内壁滚珠15的作用下,使得贯穿进入套管13内部的穿墙管14与滚珠15产生相对的滚动连接,在滚珠15的作用下,实现了对穿墙管14的引导以及支撑作用。Please refer to FIG. 5 , which compares another implementation of the first embodiment. The inner wall of the sleeve 13 in the first embodiment is also movably connected with balls 15; 12. When the inner wall end piece 11 and the sleeve 13 are used, under the action of the balls 15 on the inner wall of the sleeve 13, the through-wall pipe 14 that penetrates into the inside of the sleeve 13 and the balls 15 are connected in relative rolling. Under the action, the guiding and supporting functions of the through-wall pipe 14 are realized.

工作原理:在辅助管道铺设时,于外墙与内墙之间预先埋设穿墙组件1,在后续铺设管线或是电缆时,直接将管线或是电缆贯穿在穿墙管14内,即可实现电缆或是管线的穿墙操作,而在穿墙组件1埋设时,可按照实际需要进行管径、内外螺纹径的尺寸确定,以此适应不同直径的电缆或是管线;在穿墙组件1铺设结束后,通过穿墙组件1,使得管道的布置灵活性较高,且单独的零件可在人为作用下拆卸,便于后续的维护治理,若发生部分零件的损坏,可采用工具实现穿墙组件1的拆除更换;Working principle: When laying auxiliary pipelines, pre-embed the wall penetration component 1 between the outer wall and the inner wall. When laying pipelines or cables later, directly penetrate the pipelines or cables into the wall penetration pipe 14, which can be realized. The cable or pipeline is operated through the wall, and when the through-wall component 1 is buried, the size of the pipe diameter and internal and external thread diameter can be determined according to the actual needs, so as to adapt to cables or pipelines of different diameters; After the completion, through the wall penetration assembly 1, the flexibility of the pipeline arrangement is high, and the individual parts can be disassembled under human action, which is convenient for subsequent maintenance and management. If some parts are damaged, tools can be used to realize the wall penetration assembly 1. removal and replacement;

同时,通过设置的内、外墙端头件12、配合设置在内、外墙端头件12之间的套管13能够在穿墙管14布置时,能够提高穿墙管14中的管线以及电缆的密封性,同时在内、外墙端头件12安装时,布置的防水胶泥、开口橡胶圈以及合成压紧垫片能够提高穿墙组件1的防渗性能。At the same time, through the provided inner and outer wall end pieces 12 and the sleeves 13 arranged between the inner and outer wall end pieces 12, the pipelines in the wall penetrating pipe 14 can be improved when the wall penetrating pipe 14 is arranged. The airtightness of the cable, and at the same time when the inner and outer wall end pieces 12 are installed, the waterproof glue, the open rubber ring and the synthetic compression gasket are arranged to improve the seepage resistance of the wall penetration assembly 1 .

在本说明书的描述中,参考术语“一个实施例”、“示例”、“具体示例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或者特点包含于本实用新型的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不一定指的是相同的实施例或示例。而且,描述的具体特征、结构、材料或者特点可以在任何的一个或多个实施例或示例中以合适的方式结合。In the description of this specification, description with reference to the terms "one embodiment", "example", "specific example", etc. means that a specific feature, structure, material or characteristic described in connection with the embodiment or example is included in the present invention. in at least one embodiment or example. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.

以上显示和描述了本实用新型的基本原理、主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。The basic principles, main features and advantages of the present invention have been shown and described above. It should be understood by those skilled in the art that the present invention is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principle of the present invention. Without departing from the spirit and scope of the present invention, the present invention There will also be various changes and improvements in the new model, which all fall within the scope of the claimed invention.

Claims (6)

1. The utility model provides a pipeline structure for city building underground pipe network which characterized in that: the concrete wall comprises a wall penetrating component (1) and a steel bar group (2) which are pre-embedded in a concrete wall body; the steel bar group (2) penetrates through the inner side of the inner wall end piece (11) and the inner side of the outer wall end piece (12);
the wall penetrating assembly (1) consists of an inner wall end piece (11), an outer wall end piece (12), a sleeve (13) and a wall penetrating pipe (14); the sleeve (13) is clamped between the inner wall end head piece (11) and the outer wall end head piece (12), and the wall penetrating pipe (14) penetrates through the inner wall end head piece (11), the outer wall end head piece (12) and the sleeve (13); the middle parts of the inner wall end piece (11) and the outer wall end piece (12) are provided with central through holes.
2. The pipeline structure for the underground pipe network of the urban building according to claim 1, wherein: the inner wall end head piece (11) consists of an inner wall end head plate (111), an inner wall outer flange (112), a first through hole pipe bolt (113), an inner wall inner flange (114) and an inner wall reinforcing steel bar hole plate (115); the inner wall outer flange (112) is arranged at one end, away from the outer wall end head piece (12), of the inner wall end plate (111), and the first through hole pipe bolt (113) is in threaded connection with the inner part of the inner wall outer flange (112); the inner wall inner flange (114) is arranged at one end of the inner wall end plate (111) close to the outer wall end head piece (12); the inner wall reinforcing steel bar hole plate (115) is fixedly connected to one end of the inner wall end plate (111) close to the outer wall end head piece (12).
3. The pipeline structure for the underground pipe network of the urban building according to claim 2, wherein: the outer wall end head piece (12) consists of an outer wall end head plate (121), an outer wall reinforcing steel bar hole plate (122), an outer wall inner flange (123), an outer wall outer flange (125), a flange gasket (124), a compression ring (127) and a second through hole pipe bolt (126); the outer wall steel bar hole plate (122) is fixedly connected to one end, close to the inner wall end head piece (11), of the outer wall end head plate (121); the outer wall inner flange (123) is correspondingly and fixedly connected to one end, close to the inner wall end head piece (11), of the outer wall end head plate (121); the outer wall outer flange (125) is fixedly connected to one end, far away from the inner wall end head piece (11), of the outer wall end head plate (121); the flange gasket (124) is sleeved on the outer side of the outer wall outer flange (125), the compression ring (127) is sleeved on the outer side of the outer wall outer flange (125), and the bottom of the compression ring is attached to the outer side of the flange gasket (124); and the second through hole pipe bolt (126) is in threaded connection with the inside of the outer wall flange (125).
4. The pipeline structure for the underground pipe network of the urban building according to claim 3, wherein: the central through hole is formed in the middle of the outer wall end plate (121) and the inner wall end plate (111), and the wall penetrating pipe (14) penetrates through the central through hole.
5. The pipeline structure for the underground pipe network of the urban building according to claim 4, wherein: two groups of external wall steel bar hole plates (122) are arranged, and two external wall steel bar hole plates (122) are arranged; the two groups of outer wall steel bar hole plates (122) are circumferentially and symmetrically arranged on the end plates (121) of the outer wall; two groups of the inner wall reinforced pore plates (115) are correspondingly arranged, and two inner wall reinforced pore plates (115) are arranged in one group; the steel bar group (2) penetrates through the outer wall steel bar pore plate (122) and the inner wall steel bar pore plate (115) respectively.
6. The pipeline structure for the underground pipe network of the urban building according to claim 5, wherein: waterproof cement is injected between the outer wall end head piece (12) and the wall penetrating pipe (14); waterproof cement is injected between the inner wall end head piece (11) and the wall penetrating pipe (14).
CN202220337707.1U 2022-02-18 2022-02-18 A pipeline structure for urban building underground pipeline network Expired - Fee Related CN217267622U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220337707.1U CN217267622U (en) 2022-02-18 2022-02-18 A pipeline structure for urban building underground pipeline network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220337707.1U CN217267622U (en) 2022-02-18 2022-02-18 A pipeline structure for urban building underground pipeline network

Publications (1)

Publication Number Publication Date
CN217267622U true CN217267622U (en) 2022-08-23

Family

ID=82854775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220337707.1U Expired - Fee Related CN217267622U (en) 2022-02-18 2022-02-18 A pipeline structure for urban building underground pipeline network

Country Status (1)

Country Link
CN (1) CN217267622U (en)

Similar Documents

Publication Publication Date Title
CN111456196A (en) Grouting structure for repairing sewage pipeline and pipeline grouting repairing method
CN204477493U (en) A kind of waterproof jacking pipe joints bellmouth jointing structure
CN107237329A (en) Grouting device and grouting method
CN205877455U (en) Prestressing force steel cylinder concrete pipe
CN205689219U (en) A kind of grouting device of backfill after bored tunnel two backing
CN210462146U (en) Circular pipeline repairing structure
CN220647236U (en) Leak stopping repair structure of prestressed steel cylinder concrete pipe
CN204781973U (en) Antiseep plugging device in split bolt hole
CN219530098U (en) Pipeline structure
CN201649082U (en) A device for preventing sand gushing at the opening of anchor cable drilling
CN206973074U (en) A kind of spheroidal graphite cast-iron push pipe water fetching device
CN104154369B (en) Lined Prestressed concrete cylinder pipe boring device and boring method
CN212004759U (en) Inside leaking stoppage outside slip casting construction equipment of sewer line
CN212129934U (en) Plastic-steel water stop sleeve and matched counter-pulling screw
CN213236383U (en) Glass fiber reinforced plastic and prestressed steel cylinder concrete composite jacking pipe
CN204004983U (en) Lined Prestressed concrete cylinder pipe boring device
CN212453000U (en) Water stop structure for connecting drainage pipeline and inspection well
CN212537058U (en) Building drainage pipe connects adjusting device
CN108756774A (en) Quick grouting behind shaft or drift lining orifice tube
CN219240598U (en) Dewatering well sealing structure
CN210344573U (en) Tensile-pulling-out-of-torsion-resistant glass fiber reinforced plastic concrete composite pipe
CN109506073B (en) Deformation resetting device for deeply buried underground plastic pipe and use method thereof
CN207392370U (en) A kind of civic building draining is managed with PE
CN217903883U (en) Waterproof flame-retardant cable plastic sealing plug
CN206830966U (en) A kind of flexible water wall bushing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220823

CF01 Termination of patent right due to non-payment of annual fee