CN217266973U - Stride high-speed railway road bridge and push away stand for construction - Google Patents

Stride high-speed railway road bridge and push away stand for construction Download PDF

Info

Publication number
CN217266973U
CN217266973U CN202221036212.1U CN202221036212U CN217266973U CN 217266973 U CN217266973 U CN 217266973U CN 202221036212 U CN202221036212 U CN 202221036212U CN 217266973 U CN217266973 U CN 217266973U
Authority
CN
China
Prior art keywords
construction
fixedly connected
stand
main part
fixing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221036212.1U
Other languages
Chinese (zh)
Inventor
陈方常
王江
牛亚峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Construction and Installation Engineering Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Construction and Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, China Railway 11th Bureau Group Construction and Installation Engineering Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN202221036212.1U priority Critical patent/CN217266973U/en
Application granted granted Critical
Publication of CN217266973U publication Critical patent/CN217266973U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a stride high-speed railway road bridge top and push away stand for construction relates to road bridge construction field. This stride high-speed railway road bridge top pushes away stand for construction includes construction stand main part and joint fixed establishment, the first bottom fixed plate of bottom fixedly connected with of construction stand main part, first bottom fixed plate fixed connection is subaerial. This stride high-speed railway bridge top and push away for construction stand when using, the stand main part of will being under construction is conveniently fixed subaerial to the side reinforcing brace who provides the setting realizes the reinforcement to the stand main part of being under construction, guarantees the atress stability of the stand main part of being under construction, and the side direction support nature is good, thereby guarantees that the intensity of the stand main part of being under construction is high, and whole installation is easy operation convenient also, and labour saving and time saving satisfies the user demand.

Description

Stride high-speed railway road bridge and push away stand for construction
Technical Field
The utility model relates to a road bridge construction technical field specifically is a stride high-speed railway road bridge and push away stand for construction.
Background
In recent years, due to rapid domestic economic development, the demand of high-speed railways in various regions continuously rises, and a large number of existing lines are urgently required to be reconstructed and expanded, which results in a large number of construction quantities of high-speed railway crossing facilities.
In prior art, when striding high-speed railway line bridge top push construction, need use the stand to carry out on-the-spot support usually, at present, current stand mostly is simple use expansion bolts and carries out the rigidity, it is spacing that its side does not receive the support mostly, like this in the work progress, if engineering accident appears, can lead to the support nature of stand not enough, take place danger, the stability requirement of stand is very high, how realize the side direction support, and easy to assemble, be the great problem that meets at present, to prior art not enough, the utility model discloses a stride high-speed railway line bridge top push construction and use stand to solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model discloses a stride high-speed railway line bridge top and push away stand for construction to solve the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a cross high-speed railway road bridge top and push away construction and use stand, includes:
the construction column comprises a construction column main body, wherein the bottom of the construction column main body is fixedly connected with a first bottom fixing plate, the first bottom fixing plate is fixedly connected to the ground, side reinforcing support rods are arranged on two sides of the construction column main body, one ends of the side reinforcing support rods, far away from the construction column main body, are rotatably connected with a second bottom fixing plate, and the second bottom fixing plate is fixedly connected to the ground;
the clamping and fixing mechanism is arranged between the construction stand column main body and the side face reinforcing support rod and comprises a positioning bearing column and a butt joint clamping plate, the positioning bearing column is fixedly connected to the side wall of the construction stand column main body, the butt joint clamping plate is rotatably connected to the positioning bearing column, and the butt joint clamping plate is fixedly clamped with the positioning bearing column.
Preferably, the top of the second bottom fixing plate is fixedly connected with a first fixing shaft, and the first fixing shaft is rotatably connected with the side reinforcing support rod.
Preferably, a second fixed shaft is fixedly connected to the side wall of the butt joint clamping plate, and the second fixed shaft is rotatably connected with the side reinforcing support rod.
Preferably, round holes are formed in four corners of the second bottom fixing plate, and inserting reinforcing rods are movably inserted into the round holes of the second bottom fixing plate.
Preferably, the side wall of the construction upright post main body is fixedly connected with a vertical platform, the top of the vertical platform is movably inserted with a locking rod, the side wall of the butt joint clamping plate is fixedly connected with a vertical positioning block, the top of the vertical positioning block is provided with a locking hole, and the locking rod is movably clamped in the locking hole.
Preferably, the top fixedly connected with of perpendicular platform stands the board, the top fixedly connected with top fixed plate of board of standing, the top fixedly connected with nut seat of top fixed plate, the internal thread of nut seat is connected with the lead screw, the bottom of lead screw is rotated and is connected with the lift slider, the bottom and the check lock lever of lift slider are fixed and are linked to each other, the top fixedly connected with of lead screw rotates the handle, the both sides fixedly connected with side slider of lift slider, the spout has been seted up on the board of standing.
The utility model discloses a stride high-speed railway road bridge top and push away stand for construction, its beneficial effect who possesses as follows:
1. this stride high-speed railway road bridge top and push away stand for construction, when using, the stand main part of will being under construction is conveniently fixed subaerial to the side reinforcing brace who provides the setting realizes the reinforcement to the stand main part of being under construction, guarantees the atress stability of the stand main part of being under construction, and side direction support nature is good, thereby guarantees that the intensity of the stand main part of being under construction is high, and whole installation is easy operation convenient also, and labour saving and time saving satisfies the user demand.
2. This stride high-speed railway road bridge top and push away stand for construction, the check lock lever that sets up can be pegged graft in the locking hole, realizes the rigidity to the vertical locating piece for vertical locating piece and butt joint cardboard are fixed convenient in the side of construction stand main part.
Drawings
FIG. 1 is a schematic view of the present invention;
FIG. 2 is a structural diagram of a second bottom fixing plate of the present invention;
FIG. 3 is an exploded view of the docking plate of the present invention;
fig. 4 is an exploded view of the screw rod of the present invention.
In the figure: 1. constructing a column main body; 2. a first bottom dead plate; 3. a side reinforcing brace rod; 4. a second bottom dead plate; 401. a first fixed shaft; 5. inserting a reinforcing rod; 6. positioning the bearing column; 7. butting the clamping plates; 701. a second fixed shaft; 8. a vertical positioning block; 801. a locking hole; 9. a vertical platform; 10. standing the plate; 11. a top fixing plate; 12. a nut seat; 13. a screw rod; 14. a lifting slide block; 15. a locking lever; 16. a side slide block; 17. a chute; 18. the handle is rotated.
Detailed Description
The embodiment of the utility model discloses stride high-speed railway road bridge top and push away stand for construction, as shown in fig. 1-4, include:
the construction column comprises a construction column main body 1, wherein the bottom of the construction column main body 1 is fixedly connected with a first bottom fixing plate 2, the first bottom fixing plate 2 is fixedly connected to the ground, side reinforcing support rods 3 are arranged on two sides of the construction column main body 1, one ends, far away from the construction column main body 1, of the side reinforcing support rods 3 are rotatably connected with a second bottom fixing plate 4, and the second bottom fixing plate 4 is fixedly connected to the ground;
joint fixed establishment, joint fixed establishment sets up between construction stand main part 1 and side reinforcing brace 3, and joint fixed establishment is including location bearer post 6 and butt joint cardboard 7, and 6 fixed connection of location bearer post are on the lateral wall of construction stand main part 1, and butt joint cardboard 7 rotates to be connected on location bearer post 6, and butt joint cardboard 7 is fixed with 6 joints of location bearer post.
According to the attached fig. 1 and 2, the first fixing shaft 401 is fixedly connected to the top of the second bottom fixing plate 4, the first fixing shaft 401 is rotatably connected to the side reinforcing brace 3, and the first fixing shaft 401 is arranged to realize the rotational connection between the side reinforcing brace 3 and the second bottom fixing plate 4, so that the connection is stable.
According to the attached drawings 1 and 3, a second fixing shaft 701 is fixedly connected to the side wall of the butt joint clamping plate 7, the second fixing shaft 701 is rotatably connected with the side reinforcing support rod 3, and the second fixing shaft 701 can be used for rotatably connecting the side reinforcing support rod 3 and the butt joint clamping plate 7 and is stably connected.
According to shown in attached figures 1 and 2, round holes are formed in four corners of the second bottom fixing plate 4, inserting reinforcing rods 5 are movably inserted into the round holes of the second bottom fixing plate 4, and the inserting reinforcing rods 5 can fix the second bottom fixing plate 4 conveniently.
According to the attached drawings 1, 3 and 4, the vertical platform 9 of fixedly connected with on the lateral wall of the construction stand main body 1, the top activity of vertical platform 9 is pegged graft and is had the check lock lever 15, fixedly connected with vertical positioning piece 8 on the lateral wall of butt joint cardboard 7, locking hole 801 has been seted up at the top of vertical positioning piece 8, check lock lever 15 activity joint is in locking hole 801, the check lock lever 15 of setting can be pegged graft in locking hole 801, the realization is fixed to the position of vertical positioning piece 8, make vertical positioning piece 8 and butt joint cardboard 7 fixed convenient in the side of construction stand main body 1.
Referring to fig. 1, 3 and 4, a standing plate 10 is fixedly connected to the top of a vertical platform 9, a top fixing plate 11 is fixedly connected to the top of the standing plate 10, a nut seat 12 is fixedly connected to the top of the top fixing plate 11, a lead screw 13 is connected to the inner thread of the nut seat 12, a lifting slider 14 is rotatably connected to the bottom of the lead screw 13, the bottom of the lifting slider 14 is fixedly connected to a locking rod 15, a rotating handle 18 is fixedly connected to the top of the lead screw 13, side sliders 16 are fixedly connected to both sides of the lifting slider 14, a sliding groove 17 is formed in the standing plate 10, and the lifting slider 14 and the lead screw 13 are arranged to conveniently adjust the position of the locking rod 15, thereby be convenient for realize carrying out the screens to vertical locating piece 8 and butt joint cardboard 7, it is convenient to rotate lead screw 13 to rotate handle 18 can realize, and the side slider 16 sliding connection who sets up provides spacingly in spout 17 to lift slider 14.
The working principle is as follows: the device is when using, and the convenience is fixed stand main part 1 of will being under construction subaerial to the side reinforcing brace 3 that provides the setting realizes the reinforcement to the stand main part 1 of being under construction, guarantees that the atress of the stand main part 1 of being under construction is stable, and the side direction support nature is good, thereby guarantees that the intensity of the stand main part 1 of being under construction is high, and whole installation is easy operation also convenient, and labour saving and time saving satisfies the user demand.
When the construction column body 1 is fixed, firstly, the construction column body 1 is placed on a target ground, then the first bottom fixing plate 2 is driven into the concrete underground by using expansion bolts to form the position fixation of the construction upright post main body 1, the side surface reinforcing support rods 3 are installed, the butt joint clamping plate 7 is clamped on the positioning bearing post 6 during the installation, and the rotating handle 18 is rotated, so that the rotating handle 18 drives the screw rod 13 to rotate, the screw rod 13 drives the lifting slide block 14 to move downwards and the locking rod 15 to move downwards, finally the locking rod 15 is inserted into the locking hole 801 to fix the position of the butt-joint clamping plate 7, at the moment, the side surface reinforcing support rod 3 is rotated, and the second bottom fixing plate 4 is attached to the ground, and then, the inserted reinforcing rod 5 is used for penetrating through the second bottom fixing plate 4 and being inserted into the ground to form the reinforcement of the construction column main body 1.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a stride high-speed railway road bridge top and push away construction and use stand, its characterized in that includes:
the construction column comprises a construction column main body (1), wherein the bottom of the construction column main body (1) is fixedly connected with a first bottom fixing plate (2), the first bottom fixing plate (2) is fixedly connected to the ground, side reinforcing support rods (3) are arranged on two sides of the construction column main body (1), one ends, far away from the construction column main body (1), of the side reinforcing support rods (3) are rotatably connected with a second bottom fixing plate (4), and the second bottom fixing plate (4) is fixedly connected to the ground;
joint fixed establishment, joint fixed establishment sets up between construction stand main part (1) and side reinforcing brace pole (3), joint fixed establishment is including location bearer post (6) and butt joint cardboard (7), location bearer post (6) fixed connection is on the lateral wall of construction stand main part (1), butt joint cardboard (7) rotate to be connected on location bearer post (6), butt joint cardboard (7) are fixed with location bearer post (6) joint.
2. The upright post for high-speed rail crossing bridge jacking construction according to claim 1, wherein: the top of the second bottom fixing plate (4) is fixedly connected with a first fixing shaft (401), and the first fixing shaft (401) is rotatably connected with the side reinforcing support rod (3).
3. The upright post for high-speed rail crossing bridge jacking construction according to claim 1, wherein: and a second fixing shaft (701) is fixedly connected to the side wall of the butt joint clamping plate (7), and the second fixing shaft (701) is rotatably connected with the side reinforcing support rod (3).
4. The upright post for high-speed rail crossing bridge jacking construction according to claim 1, wherein: round holes are formed in the four corners of the second bottom fixing plate (4), and inserting reinforcing rods (5) are movably inserted into the round holes of the second bottom fixing plate (4).
5. The upright post for jacking construction of the high-speed railway crossing bridge as claimed in claim 1, wherein the upright post comprises: the construction column is characterized in that a vertical platform (9) is fixedly connected to the side wall of the construction column main body (1), a locking rod (15) is movably inserted into the top of the vertical platform (9), a vertical positioning block (8) is fixedly connected to the side wall of the butt joint clamping plate (7), a locking hole (801) is formed in the top of the vertical positioning block (8), and the locking rod (15) is movably clamped in the locking hole (801).
6. The upright post for high-speed rail crossing bridge jacking construction according to claim 5, wherein: the top fixedly connected with of perpendicular platform (9) stands board (10), the top fixedly connected with top fixed plate (11) of standing board (10), the top fixedly connected with nut seat (12) of top fixed plate (11), the inside threaded connection of nut seat (12) has lead screw (13), the bottom of lead screw (13) is rotated and is connected with lifting slide (14), the bottom and check lock lever (15) of lifting slide (14) are fixed to be continuous, the top fixedly connected with of lead screw (13) rotates handle (18), the both sides fixedly connected with side slider (16) of lifting slide (14), spout (17) have been seted up on standing board (10).
CN202221036212.1U 2022-05-03 2022-05-03 Stride high-speed railway road bridge and push away stand for construction Active CN217266973U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221036212.1U CN217266973U (en) 2022-05-03 2022-05-03 Stride high-speed railway road bridge and push away stand for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221036212.1U CN217266973U (en) 2022-05-03 2022-05-03 Stride high-speed railway road bridge and push away stand for construction

Publications (1)

Publication Number Publication Date
CN217266973U true CN217266973U (en) 2022-08-23

Family

ID=82881182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221036212.1U Active CN217266973U (en) 2022-05-03 2022-05-03 Stride high-speed railway road bridge and push away stand for construction

Country Status (1)

Country Link
CN (1) CN217266973U (en)

Similar Documents

Publication Publication Date Title
CN211873950U (en) Combined supporting pile for civil engineering
CN211395397U (en) T beam-slab shear rib positioning device
CN217266973U (en) Stride high-speed railway road bridge and push away stand for construction
CN217923623U (en) Inner supporting structure of foundation pit
CN216864748U (en) Road concrete formwork system with adjustable height and verticality
CN207277365U (en) A kind of dismountable retaining wall
CN214144112U (en) Accurate positioning and connecting device for beam column PC component
CN215760022U (en) Concrete pouring separator with different strengths for strong column and weak beam joints
CN212505814U (en) Bridge construction supporting equipment in field of bridge engineering
CN213951990U (en) Pier column reinforcing apparatus is used in road and bridge construction
CN212505888U (en) Jack lifting device
CN210507175U (en) Support template device for reinforcing bridge
CN210397935U (en) Cable support
CN220725163U (en) Cantilever type movable house foundation
CN221072300U (en) Auxiliary mechanism for supporting beam installation
CN220747742U (en) Temporary supporting device for building assembled wall
CN220150723U (en) Concrete prefabricated staircase with strengthening rib structure
CN221348191U (en) Anti-floating device for directly buried pipe
CN221119194U (en) A dish knot support frame structure for subsiding post-cast strip
CN215761730U (en) Adjustable tunnel supporting structure
CN214615614U (en) Building construction support column connecting mechanism with adjustable height
CN221608639U (en) Highway bridge reinforcing apparatus
CN213013953U (en) Small box girder construction reinforced structure
CN214195471U (en) Scaffold for building
CN214150166U (en) Precast concrete component pendant connection structure strength test device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant