CN217204357U - Engineering equipment for channel treatment engineering - Google Patents

Engineering equipment for channel treatment engineering Download PDF

Info

Publication number
CN217204357U
CN217204357U CN202220125716.4U CN202220125716U CN217204357U CN 217204357 U CN217204357 U CN 217204357U CN 202220125716 U CN202220125716 U CN 202220125716U CN 217204357 U CN217204357 U CN 217204357U
Authority
CN
China
Prior art keywords
mud
ship body
piling
movable arm
engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220125716.4U
Other languages
Chinese (zh)
Inventor
姜林
李文斌
杜晓雯
张飞翔
郭洋
程龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Jinhang Engineering Technology Service Co ltd
Original Assignee
Suzhou Jinhang Engineering Technology Service Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Jinhang Engineering Technology Service Co ltd filed Critical Suzhou Jinhang Engineering Technology Service Co ltd
Priority to CN202220125716.4U priority Critical patent/CN217204357U/en
Application granted granted Critical
Publication of CN217204357U publication Critical patent/CN217204357U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

The utility model introduces engineering equipment for channel treatment engineering, which comprises a ship body, a piling device and a mud suction cover component; the piling device and the mud suction cover assembly are fixed at the head of the ship body and are electrically connected with the ship body; the mud suction cover assembly comprises a detachable mud suction cover and a connecting pipeline, an inlet of the connecting pipeline is connected with a mud outlet of the detachable mud suction cover, and an outlet of the connecting pipeline is positioned on a ship; the ship body comprises a storage bin, a control bin and a ceiling plate; the ceiling plate is located the control cabin top, it links to each other with the control cabin to store the storehouse, still be provided with camera and light on the ceiling plate. This application carries on the pile device and inhales the mud cover subassembly through using the hull, uses the pile device in step and inhales the mud cover subassembly, when piling on one side, adsorbs silt on one side, effectively avoids silt to lead to the problem that the scattered influence field of vision all around because pile extrusion and vibration realize the technological effect of accurate pile. Simultaneously, a camera and a photo lamp are arranged, and an indoor observation scheme is provided.

Description

Engineering equipment for channel treatment engineering
Technical Field
The invention belongs to the field of channel improvement, and particularly relates to engineering equipment for channel improvement engineering.
Background
The channel improvement project is that a special improvement building or other engineering measures are built in a riverbed, the shape of the riverbed and a water-sand flow path are adjusted to form a favorable water flow structure, the channel is flushed by using the self force of water flow, the stability of the channel is maintained, and the necessary navigation scale of the channel in the dry period is ensured. The purpose of channel improvement is to adjust the relationship between water flow and the river bed by utilizing an improvement building and locally change the evolution process of the river bed, thereby adjusting the erosion and deposition of the river bed, leading the water flow to be flushed and the sediment to be deposited at the expected deposition place and keeping the river bed relatively stable.
However, the premise for constructing the renovation building is to create a good construction environment for the renovation building, specifically including piling, mud sucking and mattress laying, but at present, few designs in this respect can meet the requirements of actual engineering design.
Chinese patent CN212582676U discloses a pile driving device for river regulation, including the pile driving device main part, the upper end fixedly connected with of pile driving device main part supports the body frame, the upper end of supporting the body frame is provided with No. three movable mechanical arms, one side of No. three movable mechanical arms is provided with No. two movable mechanical arms, one side of No. two movable mechanical arms is provided with a movable mechanical arm, one side of a movable mechanical arm is provided with just lubricated movable frame mechanism, just lubricated movable frame mechanism includes adjustable frame, pivot, oil inlet, bearing, oil-out. Its a pile device for river course renovation be equipped with just tear open commentaries on classics pile driver head mechanism and just lubricate adjustable shelf mechanism, can make things convenient for better fix a position and change the pile driver head, overhaul easier, increase the pile effect, can also make things convenient for better going on moving about, lubricated effect is better, the difficult condition that appears the oil leak brings better use prospect.
Chinese patent CN207944457U discloses a device is put to heavy row of laying of channel renovation engineering, including device main part and unloading slope, the equal fixed mounting in both ends surface of device main part has the extension platform, and the upper end outer fixed surface of device main part installs and stores the storehouse, the one end internal surface of storing the storehouse is equipped with the hatch door, the both sides that the upper end surface of device main part is close to the storehouse all are equipped with prevents guardrail bar, and the lower extreme surface of preventing guardrail bar is equipped with the support column, the one end outer fixed surface of storing the storehouse installs the cockpit, and the upper end outer fixed surface of cockpit installs the ceiling board. Its a channel renovation engineering mattress sinking is put and is put device, be equipped with extension platform, connection support and unloading slope, can increase staff's operating space to can make things convenient for and external equipment to be connected fixedly, and can also be convenient for the staff carries out mattress sinking and puts, is suitable for different working conditions, brings better use prospect.
However, these designs are single in structure, and only can achieve a single function based on the devices, and are not practical in actual channel improvement projects. Moreover, silt is dispersed in water to cause water turbidity, so that the accuracy of piling is influenced. Therefore, the engineering equipment for the channel improvement engineering is designed, so that the problem of sludge scattering is solved while piling is carried out, and the important is particularly important.
Disclosure of Invention
In order to solve the problems, the problem that the visual field is affected by scattered sludge is solved while piling is achieved, and the technical effect of accurately piling is achieved.
In order to achieve the effect, the invention designs the engineering equipment for the channel improvement engineering.
Engineering equipment for channel treatment engineering comprises a ship body, a piling device and a mud suction cover assembly;
the bottom of the piling device is fixedly connected with the head of the ship body; the top of the piling device is positioned outside the ship body;
the mud suction cover assembly is fixedly connected to the head of the ship body;
the piling device and the mud suction cover assembly are electrically connected with the ship body.
Preferably, the piling device comprises a bottom plate, a movable mechanical arm, a support and a conveniently-detached piling head;
the bottom plate is connected to the ship body through bolts;
the bottom of the bracket is fixed on the bottom plate, and the top of the bracket is connected with one end of the movable mechanical arm;
and the other end of the movable mechanical arm is fixedly connected with a conveniently-detached piling head.
Preferably, the mud suction cover assembly comprises a detachable mud suction cover and a connecting pipeline;
the inlet of the connecting pipeline is connected with a mud outlet of the detachable mud suction cover, and the outlet is positioned on the ship.
Preferably, the hull comprises a storage bin, a control bin and a ceiling plate;
the ceiling plate is positioned at the top of the control cabin;
the storage bin is connected with the control bin.
Preferably, the movable mechanical arm comprises a first movable arm, a second movable arm and a third movable arm;
one end of the first movable arm is connected with the bracket, and the other end of the first movable arm is connected with the second movable arm;
one end of the third movable arm is connected with the pile driving head which is convenient to detach, and the other end of the third movable arm is connected with the second movable arm.
Preferably, the piling device further comprises a support frame, one end of the support frame is rotatably connected with the bottom plate, and the other end of the support frame is connected with the second movable arm.
Preferably, a camera and a lighting lamp are further arranged on the ceiling plate.
Preferably, a solar cell panel and a wind driven generator are further arranged on the ceiling plate.
Preferably, the head of the ship body is also provided with a sludge cavity.
Preferably, the engineering equipment for the channel improvement engineering further comprises an additional plate; the additional plates are connected to the two sides of the ship body through rotating shafts.
The application has the advantages and effects as follows:
1. this application carries on the pile device and inhales the mud cover subassembly through using the hull, uses the pile device in step and inhales the mud cover subassembly, when piling on one side, adsorbs silt on one side, effectively avoids silt to lead to the problem that the scattered influence field of vision all around because pile extrusion and vibration realize the technological effect of accurate pile.
2. This application sets up the silt chamber on ship, has made things convenient for and has inhaled the absorbent silt of mud cover subassembly and deposit, has further solved the problem that its silt is scattered.
3. This application is through setting up camera and photo lamp on the ceiling board, avoids providing the scheme of indoor observation because adverse circumstances leads to operating personnel can not go out the problem that control room direct observation is on-the-spot.
4. This application is through setting up solar cell panel and wind driven generator on the ceiling board, on original electric power basis, provides additional clean energy.
5. This application sets up the additional plate through using in hull both sides, when needs, increases the hull and holds the carrying area.
The foregoing description is only an overview of the technical solutions of the present application, so that the technical means of the present application can be more clearly understood and the present application can be implemented according to the content of the description, and in order to make the above and other objects, features and advantages of the present application more clearly understood, the following detailed description is made with reference to the preferred embodiments of the present application and the accompanying drawings.
The above and other objects, advantages and features of the present application will become more apparent to those skilled in the art from the following detailed description of specific embodiments thereof, as illustrated in the accompanying drawings.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings used in the embodiments or the prior art descriptions will be briefly described below, and it is obvious that the drawings in the following descriptions are some embodiments of the present application, and other drawings can be obtained by those skilled in the art without creative efforts. Throughout the drawings, like elements or portions are generally identified by like reference numerals. In the drawings, elements or portions are not necessarily drawn to scale.
FIG. 1 is a right side view of an engineering apparatus for a channel improvement project according to the present invention;
FIG. 2 is a left side view of an engineering apparatus for a channel improvement project according to the present invention;
FIG. 3 is a top view of an engineering facility for a channel improvement project according to the present invention;
reference numerals: 1. a base plate; 2. a support; 3. the pile driving head is convenient to disassemble; 4. the mud suction cover can be disassembled; 5. connecting a pipeline; 6. a storage bin; 7. a control cabin; 8. a ceiling panel; 9. a first movable arm; 10. a second movable arm; 11. a third movable arm; 12. a support frame; 13. a camera; 14. an illuminating lamp; 15. a sludge chamber; 16. an additional plate.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are some embodiments of the present application, but not all embodiments. In the following description, specific details such as specific configurations and components are provided only to facilitate a thorough understanding of embodiments of the present application. Accordingly, it will be apparent to those skilled in the art that various changes and modifications may be made to the embodiments described herein without departing from the scope and spirit of the present application. In addition, descriptions of well-known functions and constructions are omitted in the embodiments for clarity and conciseness.
It should be appreciated that reference throughout this specification to "one embodiment" or "the embodiment" means that a particular feature, structure or characteristic described in connection with the embodiment is included in at least one embodiment of the present application. Thus, the appearances of the phrase "one embodiment" or "the present embodiment" in various places throughout this specification are not necessarily all referring to the same embodiment. Furthermore, the particular features, structures, or characteristics may be combined in any suitable manner in one or more embodiments.
Further, the present application may repeat reference numerals and/or letters in the various examples. This repetition is for the purpose of simplicity and clarity and does not in itself dictate a relationship between the various embodiments and/or configurations discussed.
The term "and/or" herein is merely an association describing an associated object, meaning that three relationships may exist, e.g., a and/or B, may mean: a exists alone, B exists alone, and A and B exist at the same time, and the term "/and" is used herein to describe another association object relationship, which means that two relationships may exist, for example, A/and B, may mean: a alone, and both a and B alone, and further, the character "/" in this document generally means that the former and latter associated objects are in an "or" relationship.
The term "at least one" herein is merely an association relationship describing an associated object, and means that there may be three relationships, for example, at least one of a and B, may mean: a exists alone, A and B exist simultaneously, and B exists alone.
It is further noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion.
Example 1
This embodiment mainly introduces a composition of engineering equipment for a channel improvement project.
Engineering equipment for channel improvement engineering comprises a ship body, a piling device and a mud suction cover assembly;
the bottom of the piling device is fixedly connected with the head of the ship body; the top of the piling device is positioned outside the ship body;
the mud suction cover assembly is fixedly connected to the head of the ship body;
the piling device and the mud suction cover assembly are electrically connected with the ship body.
Further, the pile driving device comprises a base plate 1, a movable mechanical arm, a support 2 and a conveniently-detached pile driving head 3;
the bottom plate 1 is connected to the ship body through bolts;
the bottom of the bracket 2 is fixed on the bottom plate 1, and the top of the bracket is connected with one end of the movable mechanical arm;
the other end of the movable mechanical arm is fixedly connected with a conveniently-detached piling head 3.
Through demolising the bottom plate, can directly dismantle whole pile driving device, the maintenance of being convenient for, the ship of dismantling simultaneously can be used for other states.
Further, the bottom plate can be arranged into a rotatable turntable structure and used for piling the ship body for one circle.
Further, the mud suction cover assembly comprises a detachable mud suction cover 4 and a connecting pipeline 5;
the inlet of the connecting pipeline 5 is connected with the mud outlet of the detachable mud suction cover 4, and the outlet is positioned on the ship.
Further, the movable mechanical arm comprises a first movable arm 9, a second movable arm 10 and a third movable arm 11;
one end of the first movable arm 9 is connected with the bracket 2, and the other end is connected with the second movable arm 10;
one end of the third movable arm 11 is connected with the conveniently-disassembled pile driving head 3, and the other end of the third movable arm is connected with the second movable arm 10.
Furthermore, mechanical arms can be additionally arranged as required for piling remotely.
Further, the piling device further comprises a support frame 12, wherein one end of the support frame 12 is rotatably connected with the base plate 1, and the other end of the support frame 12 is connected with the second movable arm 10.
This application carries on the pile device and inhales the mud cover subassembly through using the hull, uses the pile device in step and inhales the mud cover subassembly, when piling on one side, adsorbs silt on one side, effectively avoids silt to lead to the problem that the scattered influence field of vision all around because pile extrusion and vibration realize the technological effect of accurate pile.
Example 2
Based on the above embodiment 1, the present embodiment mainly introduces a hull structure of engineering equipment for a channel improvement project.
The ship body comprises a storage bin 6, a control bin 7 and a ceiling plate 8;
further, guard rails and life buoys can be arranged around the ship body.
The ceiling plate 8 is positioned at the top of the control cabin 7;
the storage bin 6 is connected with the control bin 7.
Further, still be provided with camera 13 and light 14 on the ceiling board 8, under the night work of being convenient for and adverse circumstances, when the workman can't go out the control room, can carry out indoor control through the help of camera and light.
Furthermore, a solar cell panel and a wind driven generator are further arranged on the ceiling plate 8 and used for generating electricity for the ship body.
Further, the head of the ship body is also provided with a silt cavity 15.
Further, the engineering equipment for the channel improvement engineering further comprises an additional plate 16; the additional plates 16 are connected to both sides of the hull through rotating shafts.
The hull can be replaced by a common flat-bed ship, and is not limited to the ship provided by the device.
This application sets up the silt chamber on ship, has made things convenient for and has inhaled the absorbent silt of mud cover subassembly and deposit, has further solved the problem that its silt is scattered.
This application is through setting up camera and photo lamp on the ceiling board, avoids providing the scheme of indoor observation because adverse circumstances leads to can not go out the problem that control room direct observation is on-the-spot.
This application is through setting up solar cell panel and wind driven generator on the ceiling board, on original electric power basis, provides additional clean energy.
This application sets up the additional plate through using in hull both sides, when needs, increases the hull and holds the carrying area.
Example 3
Based on the above embodiment 2, the present embodiment mainly introduces the working principle and the operation in practical use of the engineering equipment for the channel improvement engineering.
The ship navigating mate drives the ship and gets into the pile area, opens and inhales the mud cover subassembly, inhales mud, uses the pile device to pile simultaneously, inhales the mud cover subassembly and can arouse the mud that pile device pile causes scattered all around to adsorb, subsides absorbent mud in the silt chamber simultaneously. Ensure that the water quality in the piling area is transparent and clear without influencing the accuracy of piling. When the whole engineering equipment is used, the original oil is used for generating electricity, and meanwhile, solar power generation and wind power generation are assisted, so that energy is greatly saved. In adverse circumstances, carry out indoor control through using camera and light, guarantee that the device can be fit for different environment.
The above description is only a preferred embodiment of the present invention, and it is not intended to limit the scope of the present invention, and various modifications and changes may be made by those skilled in the art. Variations, modifications, substitutions, integrations and parameter changes of the embodiments may be made without departing from the principle and spirit of the invention, which may be within the spirit and principle of the invention, by conventional substitution or may realize the same function.

Claims (10)

1. Engineering equipment for channel treatment engineering is characterized by comprising a ship body, a piling device and a mud suction cover assembly;
the bottom of the pile driving device is fixedly connected to the head of the ship body; the top of the piling device is positioned outside the ship body;
the mud suction cover assembly is fixedly connected to the head of the ship body;
the piling device and the mud suction cover assembly are electrically connected with the ship body.
2. A working apparatus for fairway renovation works according to claim 1, characterized in that the piling device comprises a base plate (1), a movable mechanical arm, a support (2) and a removable piling head (3);
the bottom plate (1) is connected to the ship body through bolts;
the bottom of the support (2) is fixed on the bottom plate (1), and the top of the support is connected with one end of the movable mechanical arm;
the other end of the movable mechanical arm is fixedly connected with a conveniently-detached piling head (3).
3. A working apparatus for waterway rehabilitation engineering according to claim 1, wherein the mud-suction hood assembly comprises a detachable mud-suction hood (4) and a connecting pipe (5);
the inlet of the connecting pipeline (5) is connected with the mud outlet of the detachable mud suction cover (4), and the outlet is positioned on the ship.
4. A working apparatus for fairway works according to claim 1, characterized in that said hull comprises a storage tank (6), a control tank (7) and a ceiling plate (8);
the ceiling plate (8) is positioned at the top of the control bin (7);
the storage bin (6) is connected with the control bin (7).
5. A working apparatus for use in channel renovation works according to claim 2, characterized in that the movable robot arm comprises a first movable arm (9), a second movable arm (10) and a third movable arm (11);
one end of the first movable arm (9) is connected with the bracket (2), and the other end of the first movable arm is connected with the second movable arm (10);
one end of the third movable arm (11) is connected with the conveniently-detached piling head (3), and the other end of the third movable arm is connected with the second movable arm (10).
6. A working apparatus for use in channel treatment according to claim 2, characterized in that said piling device further comprises a support frame (12), said support frame (12) being pivotally connected at one end to the base plate (1) and at the other end to the second movable arm (10).
7. A kind of engineering equipment for channel treatment project according to claim 4, characterized by that, there are cameras (13) and lighting lamps (14) on the said ceiling board (8).
8. A construction equipment for use in channel treatment works according to claim 4, characterized in that said ceiling board (8) is further provided with solar panels and wind generators.
9. A working apparatus for fairway works according to claim 4, characterized in that said hull is also provided with a sludge chamber (15) at its head.
10. An engineering equipment for fairway works according to claim 1, characterized in that it further comprises an additional plate (16); the additional plates (16) are connected to the two sides of the ship body through rotating shafts.
CN202220125716.4U 2022-01-18 2022-01-18 Engineering equipment for channel treatment engineering Active CN217204357U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220125716.4U CN217204357U (en) 2022-01-18 2022-01-18 Engineering equipment for channel treatment engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220125716.4U CN217204357U (en) 2022-01-18 2022-01-18 Engineering equipment for channel treatment engineering

Publications (1)

Publication Number Publication Date
CN217204357U true CN217204357U (en) 2022-08-16

Family

ID=82791230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220125716.4U Active CN217204357U (en) 2022-01-18 2022-01-18 Engineering equipment for channel treatment engineering

Country Status (1)

Country Link
CN (1) CN217204357U (en)

Similar Documents

Publication Publication Date Title
CN209446139U (en) A kind of water level monitoring device
CN113776771B (en) Hydraulic tail support system
CN207706104U (en) Solar energy photovoltaic panel faces south self-regulation device
CN212801380U (en) Energy-saving watering dust fall equipment for municipal construction
CN218473279U (en) Novel energy-concerving and environment-protective ocean monitoring is supplementary device
CN215061740U (en) Municipal intelligent energy-saving illuminating lamp
CN115217717A (en) Safety type combined electric energy hydrogen energy supply device for shallow sea area
CN214621382U (en) Water resource liquid level monitoring device
CN212033917U (en) Side-mounted water flow generator fixing frame
CN211366867U (en) A rotating and lifting type air conditioner external unit installation equipment
CN211476344U (en) An urban green energy-saving building
CN203718611U (en) Single-shaft tracking solar street lamp structure
CN108150945A (en) A kind of solar street light adjusted based on Telescopic-cylinder
CN222562206U (en) Navigation clear height marker light for bridge ship
CN216202853U (en) Lighting device for hydraulic engineering who conveniently overhauls
CN208535847U (en) It is a kind of applied to town road and new energy street lamp easy to repair
CN219389230U (en) A convenient and disassembled water level monitoring instrument
CN219640068U (en) Outdoor lighting street lamp convenient to maintain
CN218499038U (en) Complementary photovoltaic power generation device
CN216927982U (en) A layout display device for urban and rural planning
CN219196065U (en) An anti-floating integrated pumping station foundation
CN217522777U (en) Road wind-solar complementary grid-connected solar power generation device
CN221958786U (en) Night lighting device for water conservancy construction
CN222716087U (en) Desilting robot for power plant cooling tower water collecting tank
CN222760555U (en) Mapping instrument positioning equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant