CN217168327U - Automatic change decoration construction equipment - Google Patents

Automatic change decoration construction equipment Download PDF

Info

Publication number
CN217168327U
CN217168327U CN202220993287.2U CN202220993287U CN217168327U CN 217168327 U CN217168327 U CN 217168327U CN 202220993287 U CN202220993287 U CN 202220993287U CN 217168327 U CN217168327 U CN 217168327U
Authority
CN
China
Prior art keywords
thick bamboo
drum
linking arm
main section
construction equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220993287.2U
Other languages
Chinese (zh)
Inventor
刘洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220993287.2U priority Critical patent/CN217168327U/en
Application granted granted Critical
Publication of CN217168327U publication Critical patent/CN217168327U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Toys (AREA)

Abstract

The utility model discloses an automatic change decoration construction equipment, grip a section of thick bamboo including owner, owner grips a section of thick bamboo left end and rotates and be connected with the drum, the drum is inside to be close to owner and grips a section of thick bamboo end hinged joint and have the linking arm, and the linking arm has about two sets ofly, is the symmetric type and distributes, the linking arm is kept away from owner and is gripped a section of thick bamboo end fixedly connected with joint head, and is two sets of the outside horizontal swing joint of linking arm has the sleeve. The problem of current electric screwdriver can carry out automatic tightening to the bolt, nevertheless all need use the bolt of different size to furniture or article of equidimension not, electric screwdriver then need hand-carry the different change sleeve of multiunit size to find the corresponding size sleeve and change, comparatively loaded down with trivial details and waste time, and most electric screwdriver is bulky, carries comparatively inconvenient scheduling is solved, is fit for being extensively promoted and uses.

Description

Automatic change decoration construction equipment
Technical Field
The utility model relates to a house ornamentation and construction automation equipment field, in particular to change decoration construction equipment.
Background
Bolt: a cylindrical threaded fastener matched with a nut is a fastener consisting of a head part and a screw (a cylinder with external threads), and is matched with the nut to be used for fastening and connecting two parts with through holes.
In the house ornamentation, the use of bolt is extremely frequent, this just leads to the workman to need to spend more time and carry out the installation of bolt, but current electric screwdriver can carry out automatic tightening to the bolt, but still has certain problem, all need to use the bolt of different size to not unidimensional furniture or article, and electric screwdriver then need hand-carry the different change sleeve of multiunit size, and look for the sleeve of corresponding size and change, it is comparatively loaded down with trivial details and waste time, and most electric screwdriver is bulky, it is comparatively inconvenient to carry, so according to above problem, propose an automatic decoration construction equipment.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides an automatic change decoration construction equipment, can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an automatic change decoration construction equipment, includes that the owner grips a section of thick bamboo, the owner grips a section of thick bamboo left end and rotates and be connected with the drum, the drum is inside to be close to the owner and grip a section of thick bamboo end hinged joint and have the linking arm, and the linking arm has upper and lower two sets ofly, is the symmetric form and distributes, the linking arm is kept away from the owner and is gripped a section of thick bamboo end fixedly connected with joint head, and is two sets of the outside horizontal swing joint of linking arm has the sleeve.
Further, the horizontal pole is all installed to the outer lane around the sleeve, the transverse groove has all been seted up to the outer lane around the drum, the draw-in groove has been seted up to the equal horizontal array in front and back outer lane transverse groove top in front and back outer lane transverse groove bottom, and horizontal pole sliding connection in the transverse groove and block in the draw-in groove.
Furthermore, a spring is arranged between the two groups of connecting arms and close to the connecting position.
Further, the motor is installed to the inside drum end that is close to of the section of thick bamboo that grips of owner, and motor power take off end extend to the owner grip a section of thick bamboo left wall outside and fixed connection at drum right side wall, the owner grips a section of thick bamboo inside and keeps away from the drum end and has seted up the power storehouse, the controller is installed to the main outer lane before gripping a section of thick bamboo, and power storehouse electric power take off end electric connection controller, controller electric connection motor.
Further, a clamping plate is arranged at the top of the rear end of the main holding cylinder.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the sleeve can be when carrying out lateral shifting, and two sets of linking arms that will strut extrude to the sleeve is interior, alright drive the block head of linking arm front end and contract to can carry out the block to the bolt that the size is different.
2. Can be better pass the sleeve through the horizontal pole, after the size matching of joint head and bolt, only need to rotate the horizontal pole downwards and pass to the draw-in groove in, alright fix through fixing the sleeve and accomplish the fixed of joint head size, more swiftly convenient.
3. The device body has a simple structure and small volume, and can be clamped at a pocket of clothes through the clamping plate, so that the device body is more convenient to carry.
Drawings
Fig. 1 is the utility model relates to an automatic change overall structure schematic diagram of decoration construction equipment.
Fig. 2 is the utility model relates to an automatic change detailed structure schematic diagram of decoration construction equipment.
In the figure: 1. a primary holding cylinder; 2. a cylinder; 201. a connecting arm; 202. a snap head; 203. a spring; 3. a sleeve; 301. a cross bar; 302. a transverse groove; 303. a card slot; 4. a motor; 5. a power supply bin; 501. a controller; 6. and (4) clamping the plate.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-2, an automatic decoration construction equipment, including a main section of thick bamboo 1 that grips, a main section of thick bamboo 1 left end that grips is rotated and is connected with drum 2, drum 2 is inside to be close to a main section of thick bamboo 1 end hinged joint and is connected with linking arm 201, and linking arm 201 has two sets of from top to bottom, and is the symmetric distribution, linking arm 201 keeps away from a main section of thick bamboo 1 end fixedly connected with joint 202 that grips, and is two sets of linking arm 201 outside transverse swing joint has sleeve 3, and sleeve 3 can be when carrying out lateral shifting, extrudeing two sets of linking arm 201 that strut to sleeve 3 in, alright drive the joint 202 of linking arm 201 front end and contract to can carry out the block to the bolt of size difference.
Wherein, horizontal pole 301 is all installed to the outer lane around sleeve 3, transverse groove 302 has all been seted up to the outer lane around drum 2, draw-in groove 303 has been seted up to preceding outer lane transverse groove 302 bottom and the equal horizontal array in back outer lane transverse groove 302 top, and horizontal pole 301 sliding connection in transverse groove 302 and block in draw-in groove 303, pass sleeve 3 that can be better through horizontal pole 301 to after the size matching of block head 202 and bolt, only need to rotate horizontal pole 301 downwards and pass in to draw-in groove 303, alright fix through fixing sleeve 3 and accomplish the fixed of block head 202 size, it is more convenient.
Wherein, two sets of be close to the junction end between the linking arm 201 and install spring 203, spring 203 can retrieve at sleeve 3 and make two sets of linking arms 201 strut to outside can conveniently putting into the great bolt of size, carry out the secondary and match the bolt size.
Wherein, the owner grips 1 inside drum 2 ends of being close to and installs motor 4, and motor 4 power take off end extends to the owner and grips 1 left wall outer and fixed connection at 2 right side walls of drum, the owner grips 1 inside drum 2 ends of keeping away from and has seted up power supply storehouse 5, the owner grips 1 preceding outer lane of a section of thick bamboo and installs controller 501, and 5 electric power output end electric connection controllers 501 of power supply storehouse, controller 501 electric connection motor 4, put into the battery in the power supply storehouse 5 after, accessible controller 501 transmits the power to motor 4 input to motor 4 can start motor 4, drives drum 2 and rotates, screws up the bolt.
The clamping plate 6 is installed at the top of the rear end of the main holding cylinder 1, and the device body can be clamped at a clothes pocket through the clamping plate 6, so that the device body is more convenient to carry.
It should be noted that the utility model relates to an automatic decoration construction equipment, during operation, first align the fastening head 202 with the bolt, then push the sleeve 3 by pulling the cross rod 301, when the sleeve 3 is pushed, will push the two sets of connecting arms 201 that are opened to the sleeve 3, can drive the fastening head 202 of the front end of the connecting arm 201 to contract, thus can fasten the bolts with different sizes, and after the fastening head 202 is matched with the size of the bolt, only need to rotate the cross rod 301 downwards and push towards the fastening groove 303, can finish the size fixing of the fastening head 202 by fixing the sleeve 3, which is more convenient, then only need to start the motor 4 through the controller 501, can drive the cylinder 2 to rotate, thus tighten the bolt, after the use of the device, the device body can be clamped at the pocket of the clothes through the clamp plate 6, thereby the device body is more convenient to carry.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides an automatic change decoration construction equipment, includes that the owner grips a section of thick bamboo (1), its characterized in that: the utility model discloses a portable electronic device, including a main section of thick bamboo (1), a main section of thick bamboo (1) left end rotation is connected with drum (2) grips, drum (2) inside is close to main section of thick bamboo (1) end hinge joint and is connected with linking arm (201), and linking arm (201) have about two sets ofly, are the symmetric distribution, linking arm (201) are kept away from main section of thick bamboo (1) end fixedly connected with joint head (202), two sets of linking arm (201) outside horizontal swing joint has sleeve (3).
2. The automated finishing construction equipment of claim 1, wherein: horizontal pole (301) are all installed to the outer lane around sleeve (3), transverse groove (302) have all been seted up to the outer lane around drum (2), draw-in groove (303) have all been seted up to preceding outer lane transverse groove (302) bottom and back outer lane transverse groove (302) top horizontal array, and horizontal pole (301) sliding connection in transverse groove (302) and can block in draw-in groove (303).
3. The automated finishing construction equipment of claim 1, wherein: and a spring (203) is arranged between the two groups of connecting arms (201) and close to the connecting position.
4. The automated finishing construction equipment of claim 1, wherein: the utility model discloses a power supply device, including a main section of thick bamboo (1), a main section of thick bamboo (1) is held inside being close to drum (2) end and is installed motor (4), and motor (4) power take off end extend to the main section of thick bamboo (1) left wall outer and fixed connection at drum (2) right side wall, the main section of thick bamboo (1) is held inside keeping away from drum (2) end and has seted up power supply storehouse (5), main section of thick bamboo (1) front outer lane is held and controller (501) are installed, and power supply storehouse (5) power take off end electric connection controller (501), controller (501) electric connection motor (4).
5. The automated finishing construction equipment of claim 1, wherein: a clamping plate (6) is arranged at the top of the rear end of the main holding cylinder (1).
CN202220993287.2U 2022-04-27 2022-04-27 Automatic change decoration construction equipment Expired - Fee Related CN217168327U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220993287.2U CN217168327U (en) 2022-04-27 2022-04-27 Automatic change decoration construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220993287.2U CN217168327U (en) 2022-04-27 2022-04-27 Automatic change decoration construction equipment

Publications (1)

Publication Number Publication Date
CN217168327U true CN217168327U (en) 2022-08-12

Family

ID=82711065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220993287.2U Expired - Fee Related CN217168327U (en) 2022-04-27 2022-04-27 Automatic change decoration construction equipment

Country Status (1)

Country Link
CN (1) CN217168327U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116252270A (en) * 2023-04-24 2023-06-13 国网湖南省电力有限公司 A new type of tool for removing and assembling cage nuts and its using method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116252270A (en) * 2023-04-24 2023-06-13 国网湖南省电力有限公司 A new type of tool for removing and assembling cage nuts and its using method

Similar Documents

Publication Publication Date Title
CN217168327U (en) Automatic change decoration construction equipment
CN203418133U (en) Inner thread elastic clamp
CN201863155U (en) Special inner hexagon spanner for electric cabinet
CN205765870U (en) A kind of converting equipment bolt live clamp device
CN212385389U (en) Device is demolishd to corrosion nut among construction engineering
CN201579503U (en) Novel manual screw tap device
CN221586781U (en) Porous brick is with transport anchor clamps
CN215037122U (en) Pincers cover instrument convenient to buckle dismantlement to rack screw
CN204725484U (en) Automation Simple mechanical pawl
CN211639606U (en) Junction box mounting and positioning device for solar module production
CN210189610U (en) Power battery assembling clamp
CN209615331U (en) Spanner is used in a kind of solar energy photovoltaic panel installation easy to use
CN212044412U (en) Chuck wrench
CN222668260U (en) A cover structure of an expansion tank
CN201816002U (en) Large-diameter screw thread fastening tool
CN221355423U (en) Rod support
CN219254225U (en) Handheld electric tool made of injection mold material
CN215327049U (en) Dry all-in-one of waste water evaporation convenient to installation
CN213165292U (en) Fastener that screws fast for car
CN212311868U (en) Novel adjustable wrench
CN211163996U (en) Novel material taking and clamping structure of three-axis manipulator
CN208710042U (en) A kind of Medical orthopedic nail-fetching device
CN212330997U (en) Pipeline spare arrangement frame for building engineering
CN201505870U (en) Novel movable spanner
CN214087780U (en) Water resource recycling device based on geotechnical engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220812