CN217156738U - Special tester for three-phase inconsistent protection circuit of circuit breaker - Google Patents

Special tester for three-phase inconsistent protection circuit of circuit breaker Download PDF

Info

Publication number
CN217156738U
CN217156738U CN202123075788.7U CN202123075788U CN217156738U CN 217156738 U CN217156738 U CN 217156738U CN 202123075788 U CN202123075788 U CN 202123075788U CN 217156738 U CN217156738 U CN 217156738U
Authority
CN
China
Prior art keywords
phase
circuit breaker
wiring hole
area
switching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123075788.7U
Other languages
Chinese (zh)
Inventor
刘洁波
陈文通
吴雪峰
范旭明
郑晓明
单鑫
黄晓峰
潘铭航
潘仲达
楼坚
吴家俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority to CN202123075788.7U priority Critical patent/CN217156738U/en
Application granted granted Critical
Publication of CN217156738U publication Critical patent/CN217156738U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

本实用新型涉及一种断路器三相不一致保护回路专用测试仪,包括机箱,所述机箱上设有控制器、控制面板、计时器和充电电池,所述控制面板上设有充电插座,所述控制面板包括控制区、信号区、按键区和显示区,所述控制区设有公共端接线孔、合闸接线孔、分闸接线孔和控制开关,所述信号区包括信号公共接线孔、6个相位接线孔和6个相位位置信号指示灯,所述按键区设有急停按键、合闸计时按键和分闸计时按键,所述显示区设有液晶显示屏,所述液晶显示屏用于显示所述计时器所测量的时间,该测试仪可以使测试过程更加简单方便。

Figure 202123075788

The utility model relates to a special tester for a three-phase inconsistent protection circuit of a circuit breaker, comprising a chassis, a controller, a control panel, a timer and a rechargeable battery are arranged on the chassis, a charging socket is arranged on the control panel, and the The control panel includes a control area, a signal area, a key area and a display area. The control area is provided with a common terminal wiring hole, a closing wiring hole, an opening wiring hole and a control switch. The signal area includes a signal common wiring hole, 6 1 phase wiring hole and 6 phase position signal indicators, the button area is provided with emergency stop button, closing timing button and opening timing button, the display area is provided with a liquid crystal display screen, and the liquid crystal display screen is used for Displaying the time measured by the timer, the tester can make the test process more simple and convenient.

Figure 202123075788

Description

一种断路器三相不一致保护回路专用测试仪A special tester for three-phase inconsistent protection circuit of circuit breakers

【技术领域】【Technical field】

本实用新型涉及一种断路器三相不一致保护回路专用测试仪,属于断路器测试仪技术领域。The utility model relates to a special tester for three-phase inconsistent protection circuits of circuit breakers, which belongs to the technical field of circuit breaker testers.

【背景技术】【Background technique】

断路器三相不一致保护回路测试是变电站220kV断路器年检工作中的重点试验项目,在检修现场,检修人员可以使用两个方法完成断路器三相不一致保护二次回路测试,该测试有两个目的,一方面检查断路器是否具备三相不一致保护功能,另方面实测三相不一致保护时间继电器的延时与定值相比是否在误差范围内。The circuit breaker three-phase inconsistent protection circuit test is a key test item in the annual inspection of 220kV circuit breakers in substations. At the maintenance site, maintenance personnel can use two methods to complete the circuit breaker three-phase inconsistent protection secondary circuit test. The test has two purposes , on the one hand, check whether the circuit breaker has the function of three-phase inconsistency protection, and on the other hand, whether the delay of the three-phase inconsistency protection time relay is within the error range compared with the fixed value.

第一个方法,检修人员可以利用综合性继电保护校验装置;The first method, the maintenance personnel can use the comprehensive relay protection verification device;

(1)在户外现场完成试验接线,传输断路器动作命令,接受断路器相关动作信号;(1) Complete the test wiring in the outdoor field, transmit the action command of the circuit breaker, and receive the relevant action signal of the circuit breaker;

(2)按键触发试验,检修人员观察断路器三相不一致保护是否动作正确;(2) The button triggers the test, and the maintenance personnel observe whether the three-phase inconsistent protection of the circuit breaker operates correctly;

(3)对比校验装置所测量的三相不一致时间与定值相比是否在误差范围内容。(3) Compare whether the three-phase inconsistency time measured by the verification device is within the error range compared with the fixed value.

第二个方法,简称“报文法”,利用断路器动作后产生报文的时间完成试验:The second method, referred to as the "message method", uses the time to generate a message after the circuit breaker operates to complete the test:

(1)一个检修人员在户外利用短接线,短接断路器动作接点,断路器动作并处于A、B、C三相不一致状态,经过一定延时,三相不一致保护动作;(1) A maintenance person uses short-circuit wiring outdoors to short-circuit the action contact of the circuit breaker. The circuit breaker operates and is in a state of three-phase inconsistency of A, B, and C. After a certain delay, the three-phase inconsistency protection action;

(2)另一个检修人员在户内主控室后台机上,查找断路器两次的动作报文,计算前后两次报文的时间间隔,即三相不一致时间。(2) Another maintenance personnel searches for the two action messages of the circuit breaker on the background machine of the indoor main control room, and calculates the time interval between the two messages before and after, that is, the three-phase inconsistency time.

利用综合性继电保护装置完成三相不一致保护二次回路测试试验,非常不便捷,工作效率低,原因如下:It is very inconvenient and low in efficiency to use the comprehensive relay protection device to complete the secondary circuit test of the three-phase inconsistent protection. The reasons are as follows:

(1)综合性继电保护装置必须外接220V的交流电,然而变电站户外场地上的动力源箱距离较远,往往需要电源箱的绕线盘放线10几米的远才能给校验装置供电;(1) The comprehensive relay protection device must be connected to 220V AC. However, the power source box on the outdoor site of the substation is far away, and the winding reel of the power box is often required to be 10 meters away to supply power to the calibration device;

(2)综合性的继电保护装置重量达40几斤,需要两个检修人搬运。(2) The weight of the comprehensive relay protection device is 40 kilograms and needs two maintenance personnel to carry it.

利用“报文法”完成三相不一致保护二次回路测试试验,虽无需搬运笨重的校验装置,但同样非常不便捷,原因如下:Using the "message method" to complete the three-phase inconsistency protection secondary circuit test test, although there is no need to carry a cumbersome calibration device, it is also very inconvenient. The reasons are as follows:

(1)无法户外现场完成时间测量,需户内外两个人员通过电话相互配合;(1) It is impossible to complete the time measurement on the outdoor site, and two people indoors and outdoors need to cooperate with each other by telephone;

(2)在年检过程中,往往是多个面同时开展工作,主控室后台会有大量的报文产生,刷新速度快,查找对应的报文非常不便捷。(2) During the annual inspection process, multiple planes often work at the same time, and a large number of messages will be generated in the background of the main control room. The refresh speed is fast, and it is very inconvenient to find the corresponding message.

【实用新型内容】【Content of utility model】

本实用新型所要解决的技术问题在于提供一种断路器三相不一致保护回路专用测试仪,该测试仪可以使测试过程更加简单方便。The technical problem to be solved by the utility model is to provide a special tester for the three-phase inconsistent protection circuit of a circuit breaker, which can make the test process simpler and more convenient.

解决上述技术问题,本实用新型采用如下技术方案:To solve the above-mentioned technical problems, the utility model adopts the following technical solutions:

一种断路器三相不一致保护回路专用测试仪,包括机箱,所述机箱上设有控制器、控制面板、计时器和充电电池,所述控制面板上设有充电插座,所述控制面板包括控制区、信号区、按键区和显示区,所述控制区用于控制所述断路器三相相位的合闸和分闸,所述控制区设有公共端接线孔、合闸接线孔、分闸接线孔和控制开关,所述信号区用于显示所述断路器相位的位置状态,所述信号区包括信号公共接线孔、6个相位接线孔和6个相位位置信号指示灯,所述按键区设有急停按键、合闸计时按键和分闸计时按键,所述急停按键用于终止所述控制器的执行并回到初始状态,所述合闸计时按键用于发出合闸命令,所述分闸计时按键用于发出分闸命令,所述显示区设有液晶显示屏,所述液晶显示屏用于显示所述计时器所测量的时间。A special tester for three-phase inconsistent protection circuits of circuit breakers, comprising a chassis, a controller, a control panel, a timer and a rechargeable battery are arranged on the chassis, a charging socket is arranged on the control panel, and the control panel includes a control panel. area, signal area, key area and display area, the control area is used to control the closing and opening of the three-phase phase of the circuit breaker, and the control area is provided with a common terminal wiring hole, a closing wiring hole, an opening Wiring hole and control switch, the signal area is used to display the position status of the circuit breaker phase, the signal area includes a signal common wiring hole, 6 phase wiring holes and 6 phase position signal indicators, the key area There is an emergency stop button, a closing timing button and an opening timing button. The emergency stop button is used to terminate the execution of the controller and return to the initial state. The closing timing button is used to issue a closing command. The opening timing button is used to issue an opening command, the display area is provided with a liquid crystal display screen, and the liquid crystal display screen is used to display the time measured by the timer.

采用本实用新型的有益效果是:The beneficial effects of adopting the utility model are:

本实用新型使用时,断路器操作机构相位常开触点和常闭触点与所述6个相位接线孔相连接,所述6个相位位置信号指示灯用于显示所述断路器相位位置情况,通过试验线将公共端接线孔接入断路器操作机构箱的控制电源正电端子排,合闸接线孔接入断路器操作机构箱中传递相位合闸命令的端子排,分闸接线孔接入断路器操作机构箱中传递分闸命令的端子排,打开所述控制开关,当断路器三相初始位置均为合位时,按下所述分闸计时按键,本实用新型发出A相分闸命令,使所述断路器A相分闸,当控制器检测到三相的位置状态不一致时,所述计时器启动计时,经过三相不一致保护设定延时后,三相不一致保护动作,发出三相跳闸命令,所述断路器三相跳闸,此时所述计时器停止计时,所述液晶显示屏实现所述计时器测量出的时间,检修人员通过所述液晶显示屏显示的时间与定值进行比较,便可以得出三相不一致保护时间是否在误差范围内,本实用新型通过简单的接线和按键操作便能够检测出所述断路器是否具备三相不一致保护功能,也能够确定三相不一致保护时间是否在误差范围内,本实用新型的操作简单方便,仅需一人便能够完成,可以节省大量人力资源,另外通过液晶显示屏直观的显示所述三相不一致保护时间,使检修人员能够第一时间得到检测结果,提高了检修人员检测效率。When the utility model is used, the phase normally open contacts and normally closed contacts of the circuit breaker operating mechanism are connected with the six phase wiring holes, and the six phase position signal indicators are used to display the phase position of the circuit breaker. , connect the common terminal wiring hole to the control power positive terminal block of the circuit breaker operating mechanism box through the test line, the closing wiring hole is connected to the terminal block transmitting the phase closing command in the circuit breaker operating mechanism box, and the opening wiring hole is connected to the terminal block of the circuit breaker operating mechanism box. Enter the terminal block of the circuit breaker operating mechanism box to transmit the opening command, open the control switch, when the three-phase initial positions of the circuit breaker are all closed, press the opening timing button, the utility model sends out the A-phase separation When the controller detects that the position states of the three phases are inconsistent, the timer starts timing, and after the three-phase inconsistency protection setting delay, the three-phase inconsistency protection acts, A three-phase tripping command is issued, the circuit breaker trips three-phase, and the timer stops timing at this time, the liquid crystal display realizes the time measured by the timer, and the time displayed by the maintenance personnel through the liquid crystal display is the same as By comparing the fixed values, it can be concluded whether the three-phase inconsistency protection time is within the error range. The utility model can detect whether the circuit breaker has the three-phase inconsistency protection function through simple wiring and key operation, and can also determine the three-phase inconsistency protection function. Whether the phase inconsistency protection time is within the error range, the operation of the utility model is simple and convenient, which can be completed by only one person, which can save a lot of human resources. The detection result can be obtained at the first time, and the detection efficiency of the maintenance personnel is improved.

本实用新型中所述机箱内设有充电电池,所述控制面板上设有充电插座,本实用新型可供检修人员手持使用,同时无需外接电源,使本实用新型的接线更加简单,也更加方便检修人员的携带,节省人力资源。In the utility model, the case is provided with a rechargeable battery, and the control panel is provided with a charging socket. The utility model can be used by maintenance personnel by hand, and at the same time, no external power supply is required, so that the wiring of the utility model is simpler and more convenient. It can be carried by maintenance personnel to save human resources.

作为优选,所述相位接线孔包括A相合位接线孔、A相分位接线孔、B相合位接线孔、B相分位接线孔、C相合位接线孔和C相分位接线孔。Preferably, the phase wiring holes include A-phase combined wiring holes, A-phase split wiring holes, B-phase combined wiring holes, B-phase split wiring holes, C-phase combined wiring holes, and C-phase split wiring holes.

作为优选,所述相位位置信号指示灯包括A相合位灯、A相分位灯、B相合位灯、B相分位灯、C相合位灯和C相分位灯。Preferably, the phase position signal indicator lights include A-phase combined position lamps, A-phase split position lamps, B-phase combined position lamps, B-phase split position lamps, C-phase combined position lamps and C-phase split position lamps.

作为优选,所述控制面板上设有电源开关和电源指示灯,所述电源开关打开后所述充电电池为所述测试仪供电,所述电源指示灯亮起。Preferably, the control panel is provided with a power switch and a power indicator, the rechargeable battery supplies power to the tester after the power switch is turned on, and the power indicator lights up.

作为优选,所述控制面板上设有充电指示灯,所述充电电池处于充电状态时,所述充电指示灯亮起,所述充电电池中安装有用于保护所述充电电池的击穿二极管。Preferably, a charging indicator light is provided on the control panel, when the rechargeable battery is in a charging state, the charging indicator light is on, and a breakdown diode for protecting the rechargeable battery is installed in the rechargeable battery.

作为优选,所述控制面板上设有用于保护接地的接地接线孔。Preferably, the control panel is provided with a ground connection hole for protective grounding.

作为优选,所述控制器为PLC。Preferably, the controller is a PLC.

作为优选,所述充电电池为锂电池。Preferably, the rechargeable battery is a lithium battery.

作为优选,所述机箱的尺寸为250*150*100mm,所述机箱的重量为1kg。Preferably, the size of the case is 250*150*100mm, and the weight of the case is 1kg.

本实用新型的其他特点和优点将会在下面的具体实施方式、附图中详细的揭露。Other features and advantages of the present invention will be disclosed in detail in the following specific embodiments and accompanying drawings.

【附图说明】【Description of drawings】

下面结合附图对本实用新型做进一步的说明:The utility model will be further described below in conjunction with the accompanying drawings:

图1为本实用新型实施例中控制面板的结构示意图;1 is a schematic structural diagram of a control panel in an embodiment of the present invention;

图2为本实用新型实施例中充电电池的电路图;2 is a circuit diagram of a rechargeable battery in an embodiment of the present utility model;

图3为本实用新型实施例中控制区的电路图;Fig. 3 is the circuit diagram of the control area in the embodiment of the utility model;

图4为本实用新型实施例中信号区的电路图;4 is a circuit diagram of a signal area in an embodiment of the present invention;

图5为本实用新型实施例中按键区的电路图;5 is a circuit diagram of a key area in an embodiment of the present utility model;

图6为本实用新型实施例中计时器的电路图;6 is a circuit diagram of a timer in an embodiment of the present invention;

图7为本实用新型实施例中控制器的电路图。FIG. 7 is a circuit diagram of a controller in an embodiment of the present invention.

【具体实施方式】【Detailed ways】

下面结合本实用新型实施例的附图对本实用新型实施例的技术方案进行解释和说明,但下述实施例仅为本实用新型的优选实施例,并非全部。基于实施方式中的实施例,本领域技术人员在没有做出创造性劳动的前提下所获得其他实施例,都属于本实用新型的保护范围。The technical solutions of the embodiments of the present utility model will be explained and described below with reference to the accompanying drawings of the embodiments of the present utility model, but the following embodiments are only preferred embodiments of the present utility model, not all. Based on the examples in the implementation manner, other examples obtained by those skilled in the art without creative work, all belong to the protection scope of the present invention.

在本实用新型的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“长度”、“宽度”、“厚度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”“内”、“顺时针”、“逆时针”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", The orientation or positional relationship indicated by "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "clockwise", "counterclockwise", etc. is based on The orientation or positional relationship shown in the accompanying drawings is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood To limit the utility model.

此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本实用新型的描述中,“多个”的含义是两个或两个以上,除非另有明确的限定。In addition, the terms "first" and "second" are only used for descriptive purposes, and should not be construed as indicating or implying relative importance or implying the number of indicated technical features. Thus, a feature defined as "first" or "second" may expressly or implicitly include one or more of that feature. In the description of the present invention, "plurality" means two or more, unless otherwise expressly defined.

在本实用新型中,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本实用新型中的具体含义。In the present utility model, unless otherwise expressly specified and limited, the terms "installation", "connection", "connection", "fixed" and other terms should be understood in a broad sense, for example, it may be a fixed connection or a detachable connection Connection, or integral connection; it can be mechanical connection or electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, and it can be internal communication between two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific situations.

如图1至7所示,本实施例展示了一种断路器三相不一致保护回路专用测试仪,包括机箱,本实施例中所述机箱的尺寸为250*150*100mm,所述机箱的重量为1kg,所述机箱外壳的材质为聚丙烯材料,本实施例整体结构的体积和重量都较小,可供检修人员手持操作,方便检修人员的携带和操作,本实施例中所述机箱上设有控制器、控制面板1、计时器和充电电池,所述控制面板1上设有充电插座17,所述充电插座17为AC220V的充电插座17,所述控制面板1上设有充电指示灯182,如图2所示,当所述充电插座17插入充电线后,从外部输入AC220V电压时,所述控制面板1上的充电指示灯182会亮起,逆变器输出24V直流电不断给本实施例中的充电电池进行充电,本实施例中所述充电电池为锂电池,所述充电电池中安装有用于保护所述充电电池的击穿二极管,当充电电流过大时,所述击穿二极管被击穿,断开充电回路,可以对所述充电电池起到保护作用,所述控制面板1上设有电源开关ZKK1和电源指示灯181,当所述电源开关ZKK1合上后,所述充电电池给本实施例提供电源,并且所述控制面板1上的电源指示灯181亮起。As shown in Figures 1 to 7, this embodiment shows a special tester for three-phase inconsistent protection circuits of circuit breakers, including a chassis. The size of the chassis in this embodiment is 250*150*100mm, and the weight of the chassis It is 1kg, and the material of the case shell is polypropylene material. The overall structure of this embodiment is small in volume and weight, which can be hand-held and operated by maintenance personnel, which is convenient for maintenance personnel to carry and operate. A controller, a control panel 1, a timer and a rechargeable battery are provided, the control panel 1 is provided with a charging socket 17, the charging socket 17 is an AC220V charging socket 17, and a charging indicator light is provided on the control panel 1 182, as shown in FIG. 2, when the charging socket 17 is inserted into the charging cable, and the AC220V voltage is input from the outside, the charging indicator light 182 on the control panel 1 will light up, and the inverter will output 24V DC power to the battery continuously. The rechargeable battery in the embodiment is charged. In this embodiment, the rechargeable battery is a lithium battery, and a breakdown diode for protecting the rechargeable battery is installed in the rechargeable battery. When the charging current is too large, the breakdown diode The diode is broken down and the charging circuit is disconnected, which can protect the rechargeable battery. The control panel 1 is provided with a power switch ZKK1 and a power indicator 181. When the power switch ZKK1 is turned on, the The rechargeable battery provides power for this embodiment, and the power indicator 181 on the control panel 1 lights up.

本实施例中所述控制面板1包括控制区、信号区、按键区和显示区,所述控制区用于控制所述断路器三相相位的合闸和分闸,所述控制区设有公共端接线孔131、合闸接线孔132、分闸接线孔133和控制开关ZKK2,通过试验线将公共端接线孔131接入断路器操作机构箱的控制电源正电端子排,合闸接线孔132接入断路器操作机构箱中传递A相(或B相、C相)合闸命令的端子排,分闸接线孔133接入断路器操作机构箱中传递A相(或B相、C相)分闸命令的端子排,如图3所示,完成试验接线后,当控制面板1上的控制开关ZKK2合上后,如果J1中9和5触点导通,则向所述断路器操作机构箱发出合闸命令,所述断路器A、B、C相中接受命令的一相将合闸。如果J2中9和5触点导通,则向所述断路器操作机构箱发出分闸命令,所述断路器A、B、C相中接受命令的一相将分闸,所述J1和J2触点的导通和断开由所述控制器进行控制,以实现预定功能。In this embodiment, the control panel 1 includes a control area, a signal area, a key area and a display area. The control area is used to control the closing and opening of the three-phase phase of the circuit breaker. The control area is provided with a common Terminal wiring hole 131, closing wiring hole 132, opening wiring hole 133 and control switch ZKK2, connect the common terminal wiring hole 131 to the control power positive terminal block of the circuit breaker operating mechanism box through the test line, and the closing wiring hole 132 It is connected to the terminal block of the circuit breaker operating mechanism box to transmit the closing command of A-phase (or B-phase, C-phase), and the opening wiring hole 133 is connected to the circuit-breaker operating mechanism box to transmit A-phase (or B-phase, C-phase) The terminal block of the opening command is shown in Figure 3. After the test wiring is completed, when the control switch ZKK2 on the control panel 1 is closed, if the contacts 9 and 5 in J1 are turned on, the circuit breaker operating mechanism will be sent to the circuit breaker operating mechanism. The box issues a closing command, and one of the phases A, B, and C of the circuit breaker that receives the command will be closed. If the contacts 9 and 5 in J2 are turned on, an opening command will be issued to the circuit breaker operating mechanism box, and one phase of the circuit breaker A, B, and C phases that receive the command will be opened, and the J1 and J2 The on and off contacts are controlled by the controller to achieve predetermined functions.

所述信号区包括信号公共接线孔117、6个相位接线孔和6个相位位置信号指示灯,所述6个相位接线孔包括A相合位接线孔111、A相分位接线孔112、B相合位接线孔113、B相分位接线孔114、C相合位接线孔115和C相分位接线孔116;所述6个相位位置信号指示灯包括A相合位灯121、A相分位灯122、B相合位灯123、B相分位灯124、C相合位灯125和C相分位灯126;所述信号区用于监视所述断路器A、B、C相的位置状态;如图4所示,A相合位接线孔111接入所述断路器操作机构A相的常开触点,A相分位接线孔112接入断路器操作机构箱A相的常闭触点,信号公共端有+24V的弱电,接入触点另一端,当断路器A相为合位时,A相的常开触点闭合,A相的常闭触点断开,则信号公共端与A相合位接线柱导通,同时信号公共端与A相分位接线柱断开,所述A相合位灯121亮,所述A相分位灯122灭。The signal area includes signal common wiring holes 117, 6 phase wiring holes and 6 phase position signal indicator lights, and the 6 phase wiring holes include A-phase connection hole 111, A-phase sectional connection hole 112, B-phase connection hole 111 Position wiring hole 113, B-phase sectional wiring hole 114, C-phase combined position wiring hole 115, and C-phase sectional wiring hole 116; the six phase position signal indicators include A-phase combined position lamp 121, A-phase split position lamp 122 , B phase combined position lamp 123, B phase split position lamp 124, C phase combined position lamp 125 and C phase split position lamp 126; the signal area is used to monitor the position status of the circuit breaker A, B and C phases; as shown in the figure As shown in 4, the A-phase combined position wiring hole 111 is connected to the normally open contact of the A-phase of the circuit breaker operating mechanism, the A-phase sub-position wiring hole 112 is connected to the normally closed contact of the A-phase of the circuit breaker operating mechanism box, and the signal is common. There is a weak current of +24V at the end, and it is connected to the other end of the contact. When the A phase of the circuit breaker is in the closing position, the normally open contact of the A phase is closed, and the normally closed contact of the A phase is disconnected, then the signal common terminal is connected to the A phase. The bit terminal is turned on, and at the same time, the signal common terminal is disconnected from the A-phase split terminal, the A-phase combined position lamp 121 is on, and the A-phase split position lamp 122 is off.

当断路器A相为分位时,A相的常开触点断开,A相的常闭触点闭合,则同时信号公共端与A相分位接线柱导通,同时信号公共端与A相合位接线柱断开,所述A相分位灯122亮,所述A相合位灯121灭。When the A-phase of the circuit breaker is in the split position, the normally open contact of the A-phase is disconnected, and the normally-closed contact of the A-phase is closed, then the signal common terminal and the A-phase split terminal are connected at the same time, and the signal common terminal is connected to the A-phase terminal at the same time. When the terminal at the conjunctive position is disconnected, the A-phase sub-position lamp 122 is on, and the A-phase conjunctive position lamp 121 is off.

本实施例监视B相和C相位置状态的原理,与上述监视A相位置状态的原理相同,故在此不一一赘述。The principle of monitoring the position state of the B-phase and the C-phase in this embodiment is the same as the above-mentioned principle of monitoring the position state of the A-phase, so it is not repeated here.

本实施例中所述按键区设有急停按键、合闸计时按键和分闸计时按键,所述按键区的电路图如图5所示,所述急停按键用于终止所述控制器的执行并回到初始状态,所述合闸计时按键用于发出合闸命令,所述分闸计时按键用于发出分闸命令。In this embodiment, the button area is provided with an emergency stop button, a closing timing button and an opening timing button. The circuit diagram of the button area is shown in FIG. 5 , and the emergency stop button is used to terminate the execution of the controller. And back to the initial state, the closing timing button is used to issue a closing command, and the opening timing button is used to issue an opening command.

本实施例中所述显示区设有液晶显示屏,所述液晶显示屏用于显示所述计时器所测量的时间,所述控制板面上设有接地接线孔14,所述接地接线孔14用于对本实施例进行接地,属于保护接地,可以防止操作人员触电,提高操作人员的工作安全性;另外本实施例中所述控制器采用PLC控制技术,所述控制器可以通过编写程序,固化到处理器,通过按键触发相应程序,从而控制上述各电路,完成预设功能。In this embodiment, the display area is provided with a liquid crystal display screen, and the liquid crystal display screen is used to display the time measured by the timer. The control panel is provided with a grounding wiring hole 14, and the grounding wiring hole 14 It is used for grounding this embodiment, which belongs to protective grounding, which can prevent the operator from getting electric shock and improve the work safety of the operator; in addition, the controller in this embodiment adopts PLC control technology, and the controller can be cured by writing a program. To the processor, trigger the corresponding program by pressing the button, so as to control the above circuits and complete the preset function.

本实施例的检测方法如下:本实施例以所述控制区接入A相控制端子排为例,所述控制区接入B相、C相的原理与接入A相的原理相同,故不进行一一赘述;The detection method of this embodiment is as follows: In this embodiment, the control area is connected to the A-phase control terminal block as an example, and the principle of connecting the control area to the B-phase and C-phase is the same as that of the A-phase connection, so it is not necessary to to repeat them one by one;

当所述断路器三相初始位置均为合位时,完成所述信号区的试验接线后,所述A相合位灯121、B相合位灯123、C相合位灯125均亮起;本实施例中所述控制板上所述分闸接线孔133接入断路器A相分闸命令端子排,按下所述分闸计时键按钮,本实施例发出A相分闸命令,所述断路器A相分闸;所述断路器A相分闸后,本实施例中所述A相合位灯121灭,而A相分位灯122点亮;此时所述控制器检测到A、B、C三相的位置状态不一致,即所述断路器处于三相不一致状态,此时所述计时器启动计时;所述断路器经过三相不一致保护设定延时后,三相不一致保护动作,发出三相跳闸命令,所述断路器三相跳闸,从而所述A相分位灯122、所述B相分位灯124、所述C相分位灯126均点亮,此时所述计时器停止计时;所述显示屏上显示所述计时器记录的时间,所述显示屏显示的时间即为实测三相不一致时间,检修人员再与定值进行比较,从而判断三相不一致保护时间是否在误差范围内,试验结束。When the initial three-phase positions of the circuit breaker are all closed, after the test wiring in the signal area is completed, the A-phase combined position lamp 121, the B-phase combined position lamp 123, and the C-phase combined position lamp 125 are all on; this implementation In the example, the opening wiring hole 133 on the control board is connected to the A-phase opening command terminal block of the circuit breaker, and the opening timing button is pressed. In this embodiment, the A-phase opening command is issued, and the circuit breaker Phase A is switched off; after phase A of the circuit breaker is switched off, in this embodiment, the A-phase combined position lamp 121 is off, and the A-phase split position lamp 122 is on; at this time, the controller detects that A, B, The position states of the three phases of C are inconsistent, that is, the circuit breaker is in a three-phase inconsistent state. At this time, the timer starts timing; after the circuit breaker has passed the three-phase inconsistent protection setting delay, the three-phase inconsistent protection acts and sends out Three-phase tripping command, the circuit breaker trips three-phase, so that the A-phase splitting lamp 122, the B-phase splitting lamp 124, and the C-phase splitting lamp 126 are all on, and the timer is at this time. Stop timing; the time recorded by the timer is displayed on the display screen, and the time displayed on the display screen is the measured three-phase inconsistency time, and the maintenance personnel will compare it with the fixed value to determine whether the three-phase inconsistency protection time is within Within the error range, the test is over.

当所述断路器三相初始位置均为分为时,完成所述信号区的试验接线后,所述A相分位灯122、B相分位灯124、C相分位灯126均亮起;本实施例中所述控制板上所述合闸接线孔132接入断路器A相合闸命令端子排,按下所述合闸计时键按钮,本实施例发出A相合闸命令,所述断路器A相合闸;所述断路器A相合闸后,本实施例中所述A相分位灯122灭,而A相合位灯121点亮;此时所述控制器检测到A、B、C三相的位置状态不一致,即所述断路器处于三相不一致状态,此时所述计时器启动计时;所述断路器经过三相不一致保护设定延时后,三相不一致保护动作,发出三相跳闸命令,所述断路器三相跳闸,从而所述A相分位灯122、所述B相分位灯124、所述C相分位灯126均点亮,此时所述计时器停止计时;所述显示屏上显示所述计时器记录的时间,所述显示屏显示的时间即为实测三相不一致时间,检修人员再与定值进行比较,从而判断三相不一致保护时间是否在误差范围内,试验结束。When the three-phase initial positions of the circuit breaker are all divided, after the test wiring of the signal area is completed, the A-phase dividing light 122, B-phase dividing light 124, and C-phase dividing light 126 are all on. ; In this embodiment, the closing wiring hole 132 on the control board is connected to the circuit breaker A phase closing command terminal block, and the closing timing button is pressed, and the A phase closing command is issued in this embodiment. A phase of the circuit breaker is closed; after the A phase of the circuit breaker is closed, in this embodiment, the A-phase division light 122 is off, and the A-phase closing light 121 is on; at this time, the controller detects A, B, C The position states of the three phases are inconsistent, that is, the circuit breaker is in a three-phase inconsistent state. At this time, the timer starts timing; after the circuit breaker has passed the three-phase inconsistent protection setting delay, the three-phase inconsistent protection acts, and a three-phase inconsistent protection is issued. Phase trip command, the circuit breaker trips three-phase, so that the A-phase fractional light 122, the B-phase fractional light 124, and the C-phase fractional light 126 are all turned on, and the timer stops at this time. Timing; the time recorded by the timer is displayed on the display screen, and the time displayed on the display screen is the measured three-phase inconsistency time, and the maintenance personnel will compare it with the fixed value to determine whether the three-phase inconsistency protection time is in error. range, the test ends.

本实施例的操作简单方便,仅需一人便能够完成,可以节省大量人力资源,另外通过液晶显示屏直观的显示所述三相不一致保护时间,使检修人员能够第一时间得到检测结果,提高了检修人员检测效率,另外本实施例中所述机箱内设有充电电池,所述控制面板1上设有充电插座17,本实施例可供检修人员手持使用,同时无需外接电源,使本实施例的接线更加简单,也更加方便检修人员的携带,节省人力资源。The operation of this embodiment is simple and convenient, which can be completed by only one person, which can save a lot of human resources. In addition, the three-phase inconsistency protection time is intuitively displayed through the liquid crystal display screen, so that the maintenance personnel can obtain the detection results at the first time, which improves the In addition, in this embodiment, the case is provided with a rechargeable battery, and the control panel 1 is provided with a charging socket 17. This embodiment can be used by maintenance personnel by hand, and an external power supply is not required, so this embodiment The wiring is simpler, and it is more convenient for maintenance personnel to carry, saving human resources.

以上所述,仅为本实用新型的具体实施方式,但本实用新型的保护范围并不局限于此,熟悉该本领域的技术人员应该明白本实用新型包括但不限于附图和上面具体实施方式中描述的内容。任何不偏离本实用新型的功能和结构原理的修改都将包括在权利要求书的范围中。The above are only specific embodiments of the present utility model, but the protection scope of the present utility model is not limited thereto. Those skilled in the art should understand that the present utility model includes but is not limited to the accompanying drawings and the above specific embodiments. content described in. Any modifications that do not depart from the functional and structural principles of the present invention are intended to be included in the scope of the claims.

Claims (9)

1. The utility model provides a special tester of inconsistent protection circuit of circuit breaker three-phase which characterized in that: the intelligent control device comprises a case, wherein a controller, a control panel, a timer and a rechargeable battery are arranged on the case, a rechargeable socket is arranged on the control panel, the control panel comprises a control area, a signal area, a key area and a display area, the control area is used for controlling the switching-on and switching-off of three-phase phases of the circuit breaker, the control area is provided with a public end wiring hole, a switching-on wiring hole, a switching-off wiring hole and a control switch, the signal area is used for displaying the position state of the phases of the circuit breaker, the signal area comprises a signal public wiring hole, 6 phase wiring holes and 6 phase position signal indicating lamps, the key area is provided with an emergency stop key, a switching-on timing key and a switching-off timing key, the emergency stop key is used for stopping the execution of the controller and returning to the initial state, the switching-on timing key is used for sending a switching-on command, and the switching-off timing key is used for sending a switching-off command, the display area is provided with a liquid crystal display screen, and the liquid crystal display screen is used for displaying the time measured by the timer.
2. The special tester for the three-phase inconsistent protection circuit of the circuit breaker according to claim 1, wherein: the phase wiring hole comprises an A-phase joint wiring hole, an A-phase branch wiring hole, a B-phase joint wiring hole, a B-phase branch wiring hole, a C-phase joint wiring hole and a C-phase branch wiring hole.
3. The special tester for the three-phase inconsistent protection circuit of the circuit breaker according to claim 1, wherein: the phase position signal indicator lamp comprises an A phase combination lamp, an A phase split lamp, a B phase combination lamp, a B phase split lamp, a C phase combination lamp and a C phase split lamp.
4. The special tester for the three-phase inconsistent protection circuit of the circuit breaker according to claim 1, wherein: the control panel is provided with a power switch and a power indicator lamp, after the power switch is turned on, the rechargeable battery supplies power to the tester, and the power indicator lamp is turned on.
5. The special tester for the three-phase inconsistent protection circuit of the circuit breaker according to claim 1, wherein: the charging indicating lamp is arranged on the control panel, when the rechargeable battery is in a charging state, the charging indicating lamp is turned on, and a breakdown diode used for protecting the rechargeable battery is installed in the rechargeable battery.
6. The special tester for the three-phase inconsistent protection circuit of the circuit breaker according to claim 1, wherein: and the control panel is provided with a grounding wiring hole for protecting grounding.
7. The special tester for the three-phase inconsistent protection circuit of the circuit breaker according to claim 1, wherein: the controller is a PLC.
8. The special tester for the three-phase inconsistent protection circuit of the circuit breaker according to claim 1, wherein: the rechargeable battery is a lithium battery.
9. The special tester for the three-phase inconsistent protection circuit of the circuit breaker according to claim 1, wherein: the size of the cabinet is 250 x 150 x 100mm, and the weight of the cabinet is 1 kg.
CN202123075788.7U 2021-12-08 2021-12-08 Special tester for three-phase inconsistent protection circuit of circuit breaker Active CN217156738U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123075788.7U CN217156738U (en) 2021-12-08 2021-12-08 Special tester for three-phase inconsistent protection circuit of circuit breaker

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123075788.7U CN217156738U (en) 2021-12-08 2021-12-08 Special tester for three-phase inconsistent protection circuit of circuit breaker

Publications (1)

Publication Number Publication Date
CN217156738U true CN217156738U (en) 2022-08-09

Family

ID=82684090

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123075788.7U Active CN217156738U (en) 2021-12-08 2021-12-08 Special tester for three-phase inconsistent protection circuit of circuit breaker

Country Status (1)

Country Link
CN (1) CN217156738U (en)

Similar Documents

Publication Publication Date Title
CN211859281U (en) Portable low pressure intelligence fast switch-on power supply box
CN102624090B (en) Based on the intelligent high-pressure panel switches of electronic mutual inductor
CN206178056U (en) Distribution automation debugging equipment that does not have a power failure
CN203242926U (en) Low-voltage power distribution cabinet with residual current protection function
CN200941545Y (en) A fire leakage protector
CN112713646B (en) An emergency power supply non-stop access system and access control method thereof
CN217156738U (en) Special tester for three-phase inconsistent protection circuit of circuit breaker
CN206557299U (en) A kind of emergency power supply Quick access device with decompression timing
CN202259066U (en) Multipolar/monopolar low-voltage intelligent circuit breaker
CN112904195A (en) FTU and pole switch on-site detection device
CN114384407A (en) Tester for testing three-phase inconsistency of circuit breaker
CN106353624A (en) A power distribution automation non-power-off debugging device and its working method
CN202888698U (en) An intelligent voltage stabilizing and energy saving power distribution cabinet
CN205881836U (en) Electronic type time relay switching -on device that delays
CN104702915A (en) Intermediate switchgear cabinet handcart contact travel video verification auxiliary device
CN202197115U (en) Power supply cabinet for actuator
CN216847959U (en) A portable tester with no external power supply
CN208350977U (en) Mutual inductor secondary polarity device for fast detecting
CN207380163U (en) New collection terminal test bench
CN207719884U (en) A kind of movable type AC/DC integrated Power supply alteration load transfer device
CN112531909A (en) Multifunctional integrated control device
CN207503344U (en) A kind of high current kilowatt-hour meter auto-power-off control device
CN206672872U (en) It is a kind of can the how many breaker of efficient detection load
CN204886137U (en) An intelligent control instrument for distribution network transformers
CN222750150U (en) Intelligent charging system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant