CN217148243U - A steel pipe hoisting device for prefabricated steel structure building construction - Google Patents
A steel pipe hoisting device for prefabricated steel structure building construction Download PDFInfo
- Publication number
- CN217148243U CN217148243U CN202220787519.9U CN202220787519U CN217148243U CN 217148243 U CN217148243 U CN 217148243U CN 202220787519 U CN202220787519 U CN 202220787519U CN 217148243 U CN217148243 U CN 217148243U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- building construction
- threaded
- rack
- fixedly installed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 53
- 239000010959 steel Substances 0.000 title claims abstract description 53
- 238000009435 building construction Methods 0.000 title claims abstract description 15
- 210000005069 ears Anatomy 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 8
- 238000000034 method Methods 0.000 abstract description 7
- 230000000694 effects Effects 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Images
Landscapes
- Jib Cranes (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及钢结构建筑施工技术领域,具体为一种装配式钢结构建筑施工用钢管吊装装置。The utility model relates to the technical field of steel structure building construction, in particular to a steel pipe hoisting device for prefabricated steel structure building construction.
背景技术Background technique
新型建筑工业化是以构件预制化生产、装配式施工为生产方式,以设计标准化、构件部件化为特征,能够整合设计、生产、施工等整个产业链,实现建筑产品节能、环保、全生命周期价值最大化的可持续发展的新型建筑生产方式,钢结构是由钢制材料组成的结构,是主要的建筑结构类型之一,结构主要由型钢和钢板等制成的钢梁、钢柱、钢桁架等构件组成,钢材的特点是强度高、自重轻、整体刚性好和变形能力强,故用于建造大跨度和超高、超重型的建筑物特别适宜。The new building industrialization is based on the prefabricated production of components and prefabricated construction, and is characterized by standardization of design and componentization of components. It can integrate the entire industrial chain of design, production, and construction, and realize energy saving, environmental protection, and full life cycle value of building products. A new type of building production method that maximizes sustainable development. Steel structure is a structure composed of steel materials and is one of the main types of building structures. The structure is mainly made of steel beams, steel columns, steel trusses, etc. The characteristics of steel are high strength, light weight, good overall rigidity and strong deformation ability, so it is especially suitable for the construction of large-span, super-high and super-heavy buildings.
在钢结构建筑装配过程中,通常会使用到钢管进行钢结构架的搭建,在高空搭建的过程中,通常会对钢管进行吊装处理,更好的在高空作业时保证钢管的供应,在钢管吊装时,通常是采用捆绑的方式将批量的钢管进行捆绑,然后通过吊装设备将打捆后的钢管吊起并运送至需求位置,但是在吊装时,通过捆绑的方式吊装时钢管容易向外侧滑脱,影响吊装的稳定性和安全性,吊装防护性不佳。In the assembly process of steel structure buildings, steel pipes are usually used for the construction of steel structure frames. In the process of high-altitude construction, the steel pipes are usually hoisted to better ensure the supply of steel pipes during high-altitude operations. When hoisting, the batch of steel pipes are usually bundled by bundling, and then the bundled steel pipes are hoisted and transported to the required location by hoisting equipment. It affects the stability and safety of the hoisting, and the hoisting protection is not good.
实用新型内容Utility model content
(一)解决的技术问题(1) Technical problems solved
针对现有技术的不足,本实用新型提供了一种装配式钢结构建筑施工用钢管吊装装置,具备吊装防护效果好的优点,解决了吊装防护性不佳的问题。Aiming at the deficiencies of the prior art, the utility model provides a steel pipe hoisting device for prefabricated steel structure building construction, which has the advantages of good hoisting protection effect and solves the problem of poor hoisting protection.
(二)技术方案(2) Technical solutions
本实用新型为解决上述技术问题,提供如下技术方案:一种装配式钢结构建筑施工用钢管吊装装置,包括放置架,所述放置架的左右两侧均放置有侧托架。In order to solve the above-mentioned technical problems, the utility model provides the following technical solutions: a steel pipe hoisting device for prefabricated steel structure building construction, comprising a placing rack, and side brackets are placed on the left and right sides of the placing rack.
所述放置架正面和背面的左右两侧均固定安装有连接块,每个所述连接块内部的下方均开设有导向孔一,每个所述导向孔一的内部均插接有连接柱,每个所述连接柱的内端均固定安装有固定块,每个所述侧托架的前后两侧面均固定安装有导向套,每个所述导向套的内部均开设有导向孔二,且两组连接柱相互远离的一端分别贯穿两组导向孔二并延伸至导向套的外侧,每个所述连接块的外侧均放置有旋杆,每个所述旋杆的内侧面均固定安装有螺纹杆,每个所述连接块内部的上方均镶嵌有轴承一,每个所述固定块的顶端均镶嵌有螺纹管,每个所述螺纹杆的内端分别贯穿轴承一和螺纹管并延伸至固定块的内侧,所述螺纹杆的外表面与轴承一的内圈固定连接,且螺纹杆的外表面与螺纹管的内圈螺纹连接。Connecting blocks are fixedly installed on the left and right sides of the front and back of the placing rack, a
进一步的,所述放置架的正面和背面均固定安装有两个挂耳。Further, two hanging ears are fixedly installed on both the front and the back of the placing rack.
通过采用上述技术方案,更好的通过挂耳将该装置与吊装设备的挂索进行连接。By adopting the above technical solution, it is better to connect the device with the hanging rope of the hoisting device through the hanging lug.
进一步的,所述连接柱的直径值等于导向孔一和导向孔二的直径值。Further, the diameter value of the connecting column is equal to the diameter value of the first guide hole and the second guide hole.
通过采用上述技术方案,更稳定的对侧托架的位置进行滑动调节。By adopting the above technical solution, the position of the side bracket can be slidably adjusted more stably.
进一步的,所述放置架的正面和背面均固定安装有支撑块,每个所述支撑块的左右两侧面均镶嵌有轴承二,且每个螺纹杆内端的外表面分别与每个轴承二的内圈固定连接。Further, support blocks are fixedly installed on the front and back of the placement rack, the left and right sides of each support block are inlaid with bearing two, and the outer surface of the inner end of each threaded rod is respectively connected with the outer surface of each bearing two. Inner ring fixed connection.
通过采用上述技术方案,更好的让螺纹杆进行转动。By adopting the above technical solution, the threaded rod can be better rotated.
进一步的,每个所述连接柱的外端均开设有螺纹槽,且每个螺纹槽的外部均螺纹连接有螺母。Further, a threaded groove is formed on the outer end of each of the connecting posts, and a nut is threadedly connected to the outside of each threaded groove.
通过采用上述技术方案,更好的通过螺母和螺纹槽对侧托架的位置进行限制。By adopting the above technical solution, the position of the side bracket is better limited by the nut and the threaded groove.
(三)有益效果(3) Beneficial effects
与现有技术相比,该装配式钢结构建筑施工用钢管吊装装置具备如下有益效果:Compared with the prior art, the steel pipe hoisting device for prefabricated steel structure building construction has the following beneficial effects:
1、本实用新型通过设置有放置架和挂耳,在使用的过程中,将待吊装的钢管中部放入放置架的内部,并使其两端分别伸入到两个侧托架的内部,通过向内侧推动两个侧托架与钢管两端保持接触,并旋紧螺母,因此将钢管牢牢的放入到放置架和两个侧托架之间,通过挂耳与吊装设备的挂索连接进行起吊,并且在吊装过程中,通过侧托架能够牢牢的限制住钢管的侧滑脱落,因此增加了吊装时的稳定性和安全性。1. The utility model is provided with a placing rack and hanging ears. During the use process, the middle part of the steel pipe to be hoisted is put into the interior of the placing rack, and its two ends are respectively extended into the interior of the two side brackets, Keep the two side brackets in contact with the two ends of the steel pipe by pushing them inwards, and tighten the nuts, so the steel pipe is firmly placed between the placing frame and the two side brackets, and the hanging lugs and the hanging cables of the hoisting equipment are used. It is hoisted by connection, and during the hoisting process, the side sliding and falling off of the steel pipe can be firmly restrained by the side bracket, thus increasing the stability and safety during hoisting.
2、本实用新型通过设置有螺纹杆和螺纹管,在使用过程中,需要对两个侧托架的间距调节时,可以通过左右滑动侧托架在连接柱外部的位置进行调节,并且能够通过旋转旋杆带动螺纹杆在螺纹管内旋转,因此带动固定块的左右位置进行调节,通过固定块带动连接柱进行左右位置调节,从而能够对连接柱伸出放置架的长度进行调节,提高了该吊装装置的调节使用效果。2. The utility model is provided with a threaded rod and a threaded pipe. During use, when the distance between the two side brackets needs to be adjusted, the position of the side bracket outside the connecting column can be adjusted by sliding the left and right side brackets. The rotating rod drives the threaded rod to rotate in the threaded pipe, so it drives the left and right positions of the fixed block to adjust, and the fixed block drives the connecting column to adjust the left and right positions, so that the length of the connecting column extending out of the placing rack can be adjusted, which improves the hoisting The effect of adjusting the use of the device.
附图说明Description of drawings
图1为本实用新型结构示意图;Fig. 1 is the structural representation of the utility model;
图2为本实用新型连接块外部结构示意图;2 is a schematic diagram of the external structure of the connecting block of the present invention;
图3为本实用新型侧托架外部结构示意图;3 is a schematic diagram of the external structure of the side bracket of the present invention;
图4为本实用新型侧托架结构示意图。FIG. 4 is a schematic view of the structure of the side bracket of the present invention.
图中:1-放置架,2-连接块,3-侧托架,4-挂耳,5-连接柱,6-螺纹杆,7-支撑块,8-旋杆,9-轴承一,10-导向孔一,11-轴承二,12-螺纹管,13-螺纹槽,14-导向套,15-螺母,16-导向孔二,17-固定块。In the picture: 1-placement frame, 2-connecting block, 3-side bracket, 4-hanging lug, 5-connecting column, 6-threaded rod, 7-support block, 8-rotating rod, 9-bearing one, 10 - Guide hole one, 11-bearing two, 12-threaded pipe, 13-threaded groove, 14-guide sleeve, 15-nut, 16-guide hole two, 17-fixed block.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.
请参阅图1-4,本实用新型提供一种技术方案:一种装配式钢结构建筑施工用钢管吊装装置,包括放置架1,放置架1的左右两侧均放置有侧托架3,放置架1的正面和背面均固定安装有两个挂耳4,更好的通过挂耳4将该装置与吊装设备的挂索进行连接。1-4, the present utility model provides a technical solution: a steel pipe hoisting device for prefabricated steel structure building construction, comprising a
放置架1正面和背面的左右两侧均固定安装有连接块2,每个连接块2内部的下方均开设有导向孔一10,每个导向孔一10的内部均插接有连接柱5,每个连接柱5的内端均固定安装有固定块17,每个侧托架3的前后两侧面均固定安装有导向套14,每个导向套14的内部均开设有导向孔二16,且两组连接柱5相互远离的一端分别贯穿两组导向孔二16并延伸至导向套14的外侧,连接柱5的直径值等于导向孔一10和导向孔二16的直径值,更稳定的对侧托架3的位置进行滑动调节,每个连接柱5的外端均开设有螺纹槽13,且每个螺纹槽13的外部均螺纹连接有螺母15,更好的通过螺母15和螺纹槽13对侧托架3的位置进行限制,每个连接块2的外侧均放置有旋杆8,每个旋杆8的内侧面均固定安装有螺纹杆6,每个连接块2内部的上方均镶嵌有轴承一9,每个固定块17的顶端均镶嵌有螺纹管12,每个螺纹杆6的内端分别贯穿轴承一9和螺纹管12并延伸至固定块17的内侧,螺纹杆6的外表面与轴承一9的内圈固定连接,且螺纹杆6的外表面与螺纹管12的内圈螺纹连接,放置架1的正面和背面均固定安装有支撑块7,每个支撑块7的左右两侧面均镶嵌有轴承二11,且每个螺纹杆6内端的外表面分别与每个轴承二11的内圈固定连接,更好的让螺纹杆6进行转动。Connecting
工作原理:使用时,将待吊装的钢管中部放入放置架1的内部,并使其两端分别伸入到两个侧托架3的内部,通过向内侧推动两个侧托架3与钢管两端保持接触,并旋紧螺母15,因此将钢管牢牢的放入到放置架1和两个侧托架3之间,通过挂耳4与吊装设备的挂索连接进行起吊,并且在吊装过程中,通过侧托架3能够牢牢的限制住钢管的侧滑脱落,需要对两个侧托架3的间距调节时,可以通过左右滑动侧托架3在连接柱5外部的位置进行调节,并且能够通过旋转旋杆8带动螺纹杆6在螺纹管12内旋转,因此带动固定块17的左右位置进行调节,通过固定块17带动连接柱5进行左右位置调节,从而能够对连接柱5伸出放置架1的长度进行调节,提高了该吊装装置的调节使用效果。Working principle: When in use, put the middle part of the steel pipe to be hoisted into the inside of the placing
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention , alternatives and modifications, the scope of the present invention is defined by the appended claims and their equivalents.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202220787519.9U CN217148243U (en) | 2022-04-02 | 2022-04-02 | A steel pipe hoisting device for prefabricated steel structure building construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202220787519.9U CN217148243U (en) | 2022-04-02 | 2022-04-02 | A steel pipe hoisting device for prefabricated steel structure building construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN217148243U true CN217148243U (en) | 2022-08-09 |
Family
ID=82700841
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202220787519.9U Expired - Fee Related CN217148243U (en) | 2022-04-02 | 2022-04-02 | A steel pipe hoisting device for prefabricated steel structure building construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN217148243U (en) |
-
2022
- 2022-04-02 CN CN202220787519.9U patent/CN217148243U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN119593429B (en) | Suction barrel jacket installation method and device | |
| CN112027901B (en) | A lifting device for large diameter pipe jacking construction | |
| CN204858424U (en) | Cable tunnel inspection shaft pulls cabling composite set | |
| CN205195155U (en) | Insulating platform | |
| CN217148243U (en) | A steel pipe hoisting device for prefabricated steel structure building construction | |
| CN218478472U (en) | Hoisting machine for building construction external wall | |
| CN211682115U (en) | Live work manipulator | |
| CN101294486B (en) | Vertical energy-saving pumping unit | |
| CN219363091U (en) | Multi-angle rope winding device | |
| CN104746540B (en) | A semi-automatic deviation correction and reset device for wooden frame | |
| CN220470817U (en) | Auxiliary butt joint device for heat supply pipeline | |
| CN216193963U (en) | Steel bridge insert block installation and positioning device | |
| CN208008349U (en) | A kind of civil engineering pipeline movable stand | |
| CN118619135B (en) | Self-climbing hoisting mechanism and hoisting method thereof | |
| CN221186272U (en) | Spray tower pipeline elbow mounting tool | |
| CN220116048U (en) | Pipeline installation equipment for building construction | |
| CN207538843U (en) | Waterproof cloth trolley steel cable swelling device | |
| CN222101135U (en) | A steel structure support frame | |
| CN222120289U (en) | A caisson core mold rapid support and dismantling device | |
| CN222229700U (en) | A gallows for high temperature pipeline three-dimensional large displacement | |
| CN218468422U (en) | Water pipe top-mounted frame | |
| CN205935720U (en) | Steel truss frame that slides | |
| CN206359154U (en) | A kind of steel construction secondary member hoisting device | |
| CN220978936U (en) | Building beam reinforcing apparatus | |
| CN221759338U (en) | Prefabricated pipe hoisting tool |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220809 |