CN217148243U - A steel pipe hoisting device for prefabricated steel structure building construction - Google Patents

A steel pipe hoisting device for prefabricated steel structure building construction Download PDF

Info

Publication number
CN217148243U
CN217148243U CN202220787519.9U CN202220787519U CN217148243U CN 217148243 U CN217148243 U CN 217148243U CN 202220787519 U CN202220787519 U CN 202220787519U CN 217148243 U CN217148243 U CN 217148243U
Authority
CN
China
Prior art keywords
steel pipe
building construction
threaded
rack
fixedly installed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220787519.9U
Other languages
Chinese (zh)
Inventor
付学斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Zhonglian Construction Co ltd
Original Assignee
Guangdong Zhonglian Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Zhonglian Construction Co ltd filed Critical Guangdong Zhonglian Construction Co ltd
Priority to CN202220787519.9U priority Critical patent/CN217148243U/en
Application granted granted Critical
Publication of CN217148243U publication Critical patent/CN217148243U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a steel pipe hoist device for assembly type steel construction building construction relates to steel construction building construction technical field, including the rack, the side bracket has all been placed to the left and right sides of rack. This assembled steel construction is steel pipe hoist device for building construction, put into the inside of rack with the steel pipe middle part, and make its both ends stretch into the inside of two side brackets, promote two side brackets and steel pipe both ends and keep in contact to the inboard, and the nut of screwing, consequently with the steel pipe firmly put into between rack and two side brackets, at the hoist and mount in-process, can firmly restrict sideslip of steel pipe through the side bracket and drop, stability and security when having increased the hoist and mount, drive the threaded rod at the screwed pipe internal rotation through rotatory swing arm, the position is adjusted about driving the fixed block, drive the spliced pole through the fixed block and control position adjustment, stretch out the length of rack and adjust the spliced pole, the regulation result of use of this hoist device has been improved.

Description

一种装配式钢结构建筑施工用钢管吊装装置A steel pipe hoisting device for prefabricated steel structure building construction

技术领域technical field

本实用新型涉及钢结构建筑施工技术领域,具体为一种装配式钢结构建筑施工用钢管吊装装置。The utility model relates to the technical field of steel structure building construction, in particular to a steel pipe hoisting device for prefabricated steel structure building construction.

背景技术Background technique

新型建筑工业化是以构件预制化生产、装配式施工为生产方式,以设计标准化、构件部件化为特征,能够整合设计、生产、施工等整个产业链,实现建筑产品节能、环保、全生命周期价值最大化的可持续发展的新型建筑生产方式,钢结构是由钢制材料组成的结构,是主要的建筑结构类型之一,结构主要由型钢和钢板等制成的钢梁、钢柱、钢桁架等构件组成,钢材的特点是强度高、自重轻、整体刚性好和变形能力强,故用于建造大跨度和超高、超重型的建筑物特别适宜。The new building industrialization is based on the prefabricated production of components and prefabricated construction, and is characterized by standardization of design and componentization of components. It can integrate the entire industrial chain of design, production, and construction, and realize energy saving, environmental protection, and full life cycle value of building products. A new type of building production method that maximizes sustainable development. Steel structure is a structure composed of steel materials and is one of the main types of building structures. The structure is mainly made of steel beams, steel columns, steel trusses, etc. The characteristics of steel are high strength, light weight, good overall rigidity and strong deformation ability, so it is especially suitable for the construction of large-span, super-high and super-heavy buildings.

在钢结构建筑装配过程中,通常会使用到钢管进行钢结构架的搭建,在高空搭建的过程中,通常会对钢管进行吊装处理,更好的在高空作业时保证钢管的供应,在钢管吊装时,通常是采用捆绑的方式将批量的钢管进行捆绑,然后通过吊装设备将打捆后的钢管吊起并运送至需求位置,但是在吊装时,通过捆绑的方式吊装时钢管容易向外侧滑脱,影响吊装的稳定性和安全性,吊装防护性不佳。In the assembly process of steel structure buildings, steel pipes are usually used for the construction of steel structure frames. In the process of high-altitude construction, the steel pipes are usually hoisted to better ensure the supply of steel pipes during high-altitude operations. When hoisting, the batch of steel pipes are usually bundled by bundling, and then the bundled steel pipes are hoisted and transported to the required location by hoisting equipment. It affects the stability and safety of the hoisting, and the hoisting protection is not good.

实用新型内容Utility model content

(一)解决的技术问题(1) Technical problems solved

针对现有技术的不足,本实用新型提供了一种装配式钢结构建筑施工用钢管吊装装置,具备吊装防护效果好的优点,解决了吊装防护性不佳的问题。Aiming at the deficiencies of the prior art, the utility model provides a steel pipe hoisting device for prefabricated steel structure building construction, which has the advantages of good hoisting protection effect and solves the problem of poor hoisting protection.

(二)技术方案(2) Technical solutions

本实用新型为解决上述技术问题,提供如下技术方案:一种装配式钢结构建筑施工用钢管吊装装置,包括放置架,所述放置架的左右两侧均放置有侧托架。In order to solve the above-mentioned technical problems, the utility model provides the following technical solutions: a steel pipe hoisting device for prefabricated steel structure building construction, comprising a placing rack, and side brackets are placed on the left and right sides of the placing rack.

所述放置架正面和背面的左右两侧均固定安装有连接块,每个所述连接块内部的下方均开设有导向孔一,每个所述导向孔一的内部均插接有连接柱,每个所述连接柱的内端均固定安装有固定块,每个所述侧托架的前后两侧面均固定安装有导向套,每个所述导向套的内部均开设有导向孔二,且两组连接柱相互远离的一端分别贯穿两组导向孔二并延伸至导向套的外侧,每个所述连接块的外侧均放置有旋杆,每个所述旋杆的内侧面均固定安装有螺纹杆,每个所述连接块内部的上方均镶嵌有轴承一,每个所述固定块的顶端均镶嵌有螺纹管,每个所述螺纹杆的内端分别贯穿轴承一和螺纹管并延伸至固定块的内侧,所述螺纹杆的外表面与轴承一的内圈固定连接,且螺纹杆的外表面与螺纹管的内圈螺纹连接。Connecting blocks are fixedly installed on the left and right sides of the front and back of the placing rack, a guide hole 1 is opened under each of the connecting blocks, and a connecting column is inserted into the inside of each of the guide holes 1. A fixing block is fixedly installed on the inner end of each of the connecting columns, guide sleeves are fixedly installed on the front and rear sides of each of the side brackets, and two guide holes are opened inside each of the guide sleeves, and The ends of the two groups of connecting columns away from each other respectively penetrate through the two groups of guide holes and extend to the outside of the guide sleeve. The outside of each of the connecting blocks is placed with a rotating rod, and the inner side of each of the rotating rods is fixedly installed with a rotating rod. Threaded rods, each of the connecting blocks is inlaid with the first bearing, the top of each of the fixing blocks is inlaid with a threaded pipe, and the inner end of each of the threaded rods respectively penetrates the first bearing and the threaded pipe and extends To the inner side of the fixing block, the outer surface of the threaded rod is fixedly connected with the inner ring of the first bearing, and the outer surface of the threaded rod is threadedly connected with the inner ring of the threaded pipe.

进一步的,所述放置架的正面和背面均固定安装有两个挂耳。Further, two hanging ears are fixedly installed on both the front and the back of the placing rack.

通过采用上述技术方案,更好的通过挂耳将该装置与吊装设备的挂索进行连接。By adopting the above technical solution, it is better to connect the device with the hanging rope of the hoisting device through the hanging lug.

进一步的,所述连接柱的直径值等于导向孔一和导向孔二的直径值。Further, the diameter value of the connecting column is equal to the diameter value of the first guide hole and the second guide hole.

通过采用上述技术方案,更稳定的对侧托架的位置进行滑动调节。By adopting the above technical solution, the position of the side bracket can be slidably adjusted more stably.

进一步的,所述放置架的正面和背面均固定安装有支撑块,每个所述支撑块的左右两侧面均镶嵌有轴承二,且每个螺纹杆内端的外表面分别与每个轴承二的内圈固定连接。Further, support blocks are fixedly installed on the front and back of the placement rack, the left and right sides of each support block are inlaid with bearing two, and the outer surface of the inner end of each threaded rod is respectively connected with the outer surface of each bearing two. Inner ring fixed connection.

通过采用上述技术方案,更好的让螺纹杆进行转动。By adopting the above technical solution, the threaded rod can be better rotated.

进一步的,每个所述连接柱的外端均开设有螺纹槽,且每个螺纹槽的外部均螺纹连接有螺母。Further, a threaded groove is formed on the outer end of each of the connecting posts, and a nut is threadedly connected to the outside of each threaded groove.

通过采用上述技术方案,更好的通过螺母和螺纹槽对侧托架的位置进行限制。By adopting the above technical solution, the position of the side bracket is better limited by the nut and the threaded groove.

(三)有益效果(3) Beneficial effects

与现有技术相比,该装配式钢结构建筑施工用钢管吊装装置具备如下有益效果:Compared with the prior art, the steel pipe hoisting device for prefabricated steel structure building construction has the following beneficial effects:

1、本实用新型通过设置有放置架和挂耳,在使用的过程中,将待吊装的钢管中部放入放置架的内部,并使其两端分别伸入到两个侧托架的内部,通过向内侧推动两个侧托架与钢管两端保持接触,并旋紧螺母,因此将钢管牢牢的放入到放置架和两个侧托架之间,通过挂耳与吊装设备的挂索连接进行起吊,并且在吊装过程中,通过侧托架能够牢牢的限制住钢管的侧滑脱落,因此增加了吊装时的稳定性和安全性。1. The utility model is provided with a placing rack and hanging ears. During the use process, the middle part of the steel pipe to be hoisted is put into the interior of the placing rack, and its two ends are respectively extended into the interior of the two side brackets, Keep the two side brackets in contact with the two ends of the steel pipe by pushing them inwards, and tighten the nuts, so the steel pipe is firmly placed between the placing frame and the two side brackets, and the hanging lugs and the hanging cables of the hoisting equipment are used. It is hoisted by connection, and during the hoisting process, the side sliding and falling off of the steel pipe can be firmly restrained by the side bracket, thus increasing the stability and safety during hoisting.

2、本实用新型通过设置有螺纹杆和螺纹管,在使用过程中,需要对两个侧托架的间距调节时,可以通过左右滑动侧托架在连接柱外部的位置进行调节,并且能够通过旋转旋杆带动螺纹杆在螺纹管内旋转,因此带动固定块的左右位置进行调节,通过固定块带动连接柱进行左右位置调节,从而能够对连接柱伸出放置架的长度进行调节,提高了该吊装装置的调节使用效果。2. The utility model is provided with a threaded rod and a threaded pipe. During use, when the distance between the two side brackets needs to be adjusted, the position of the side bracket outside the connecting column can be adjusted by sliding the left and right side brackets. The rotating rod drives the threaded rod to rotate in the threaded pipe, so it drives the left and right positions of the fixed block to adjust, and the fixed block drives the connecting column to adjust the left and right positions, so that the length of the connecting column extending out of the placing rack can be adjusted, which improves the hoisting The effect of adjusting the use of the device.

附图说明Description of drawings

图1为本实用新型结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型连接块外部结构示意图;2 is a schematic diagram of the external structure of the connecting block of the present invention;

图3为本实用新型侧托架外部结构示意图;3 is a schematic diagram of the external structure of the side bracket of the present invention;

图4为本实用新型侧托架结构示意图。FIG. 4 is a schematic view of the structure of the side bracket of the present invention.

图中:1-放置架,2-连接块,3-侧托架,4-挂耳,5-连接柱,6-螺纹杆,7-支撑块,8-旋杆,9-轴承一,10-导向孔一,11-轴承二,12-螺纹管,13-螺纹槽,14-导向套,15-螺母,16-导向孔二,17-固定块。In the picture: 1-placement frame, 2-connecting block, 3-side bracket, 4-hanging lug, 5-connecting column, 6-threaded rod, 7-support block, 8-rotating rod, 9-bearing one, 10 - Guide hole one, 11-bearing two, 12-threaded pipe, 13-threaded groove, 14-guide sleeve, 15-nut, 16-guide hole two, 17-fixed block.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

请参阅图1-4,本实用新型提供一种技术方案:一种装配式钢结构建筑施工用钢管吊装装置,包括放置架1,放置架1的左右两侧均放置有侧托架3,放置架1的正面和背面均固定安装有两个挂耳4,更好的通过挂耳4将该装置与吊装设备的挂索进行连接。1-4, the present utility model provides a technical solution: a steel pipe hoisting device for prefabricated steel structure building construction, comprising a placement rack 1, and side brackets 3 are placed on the left and right sides of the placement rack 1, which are placed Two hanging lugs 4 are fixedly installed on both the front and the back of the rack 1 , and it is better to connect the device to the hanging rope of the hoisting equipment through the hanging lugs 4 .

放置架1正面和背面的左右两侧均固定安装有连接块2,每个连接块2内部的下方均开设有导向孔一10,每个导向孔一10的内部均插接有连接柱5,每个连接柱5的内端均固定安装有固定块17,每个侧托架3的前后两侧面均固定安装有导向套14,每个导向套14的内部均开设有导向孔二16,且两组连接柱5相互远离的一端分别贯穿两组导向孔二16并延伸至导向套14的外侧,连接柱5的直径值等于导向孔一10和导向孔二16的直径值,更稳定的对侧托架3的位置进行滑动调节,每个连接柱5的外端均开设有螺纹槽13,且每个螺纹槽13的外部均螺纹连接有螺母15,更好的通过螺母15和螺纹槽13对侧托架3的位置进行限制,每个连接块2的外侧均放置有旋杆8,每个旋杆8的内侧面均固定安装有螺纹杆6,每个连接块2内部的上方均镶嵌有轴承一9,每个固定块17的顶端均镶嵌有螺纹管12,每个螺纹杆6的内端分别贯穿轴承一9和螺纹管12并延伸至固定块17的内侧,螺纹杆6的外表面与轴承一9的内圈固定连接,且螺纹杆6的外表面与螺纹管12的内圈螺纹连接,放置架1的正面和背面均固定安装有支撑块7,每个支撑块7的左右两侧面均镶嵌有轴承二11,且每个螺纹杆6内端的外表面分别与每个轴承二11的内圈固定连接,更好的让螺纹杆6进行转动。Connecting blocks 2 are fixedly installed on the left and right sides of the front and back of the placing rack 1, and a guide hole 10 is opened under each connecting block 2, and a connecting column 5 is inserted into the interior of each guide hole 10. The inner end of each connecting column 5 is fixedly installed with a fixing block 17 , the front and rear sides of each side bracket 3 are fixedly installed with a guide sleeve 14 , and the interior of each guide sleeve 14 is provided with a guide hole 2 16 , and The ends of the two sets of connecting posts 5 away from each other penetrate through the two sets of guide holes 16 and extend to the outside of the guide sleeve 14 respectively. The position of the side bracket 3 is slidably adjusted. The outer end of each connecting column 5 is provided with a threaded groove 13, and the outside of each threaded groove 13 is threadedly connected with a nut 15, preferably through the nut 15 and the threaded groove 13. The position of the side bracket 3 is limited, a rotating rod 8 is placed on the outside of each connecting block 2, a threaded rod 6 is fixedly installed on the inner side of each rotating rod 8, and the upper part of each connecting block 2 is inlaid There is bearing one 9, the top of each fixing block 17 is inlaid with a threaded pipe 12, the inner end of each threaded rod 6 penetrates the bearing one 9 and the threaded pipe 12 and extends to the inner side of the fixed block 17, and the outer end of the threaded rod 6 The surface is fixedly connected with the inner ring of the bearing one 9, and the outer surface of the threaded rod 6 is threadedly connected with the inner ring of the threaded pipe 12. The front and back of the placement rack 1 are fixedly installed with support blocks 7. The left and right sides of each support block 7 Both sides are inlaid with the second bearing 11, and the outer surface of the inner end of each threaded rod 6 is respectively fixedly connected with the inner ring of each bearing two 11, so that the threaded rod 6 can be rotated better.

工作原理:使用时,将待吊装的钢管中部放入放置架1的内部,并使其两端分别伸入到两个侧托架3的内部,通过向内侧推动两个侧托架3与钢管两端保持接触,并旋紧螺母15,因此将钢管牢牢的放入到放置架1和两个侧托架3之间,通过挂耳4与吊装设备的挂索连接进行起吊,并且在吊装过程中,通过侧托架3能够牢牢的限制住钢管的侧滑脱落,需要对两个侧托架3的间距调节时,可以通过左右滑动侧托架3在连接柱5外部的位置进行调节,并且能够通过旋转旋杆8带动螺纹杆6在螺纹管12内旋转,因此带动固定块17的左右位置进行调节,通过固定块17带动连接柱5进行左右位置调节,从而能够对连接柱5伸出放置架1的长度进行调节,提高了该吊装装置的调节使用效果。Working principle: When in use, put the middle part of the steel pipe to be hoisted into the inside of the placing rack 1, and make its two ends extend into the inside of the two side brackets 3 respectively. By pushing the two side brackets 3 and the steel pipe inwards Keep the two ends in contact, and tighten the nut 15, so the steel pipe is firmly placed between the placing frame 1 and the two side brackets 3, and the hanging lug 4 is connected with the hanging cable of the hoisting equipment for hoisting, and after hoisting During the process, the side bracket 3 can firmly restrict the side sliding and falling off of the steel pipe. When the distance between the two side brackets 3 needs to be adjusted, the position outside the connecting column 5 can be adjusted by sliding the side bracket 3 left and right. , and can drive the threaded rod 6 to rotate in the threaded pipe 12 by rotating the rotating rod 8, thus driving the left and right positions of the fixing block 17 to adjust, and driving the connecting column 5 to adjust the left and right positions through the fixing block 17, so that the connecting column 5 can be extended. The length of the placing rack 1 can be adjusted to improve the adjustment and use effect of the hoisting device.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention , alternatives and modifications, the scope of the present invention is defined by the appended claims and their equivalents.

Claims (5)

1.一种装配式钢结构建筑施工用钢管吊装装置,包括放置架(1),其特征在于:所述放置架(1)的左右两侧均放置有侧托架(3);1. A steel pipe hoisting device for prefabricated steel structure building construction, comprising a placement rack (1), characterized in that: the left and right sides of the placement rack (1) are placed with side brackets (3); 所述放置架(1)正面和背面的左右两侧均固定安装有连接块(2),每个所述连接块(2)内部的下方均开设有导向孔一(10),每个所述导向孔一(10)的内部均插接有连接柱(5),每个所述连接柱(5)的内端均固定安装有固定块(17),每个所述侧托架(3)的前后两侧面均固定安装有导向套(14),每个所述导向套(14)的内部均开设有导向孔二(16),且两组连接柱(5)相互远离的一端分别贯穿两组导向孔二(16)并延伸至导向套(14)的外侧,每个所述连接块(2)的外侧均放置有旋杆(8),每个所述旋杆(8)的内侧面均固定安装有螺纹杆(6),每个所述连接块(2)内部的上方均镶嵌有轴承一(9),每个所述固定块(17)的顶端均镶嵌有螺纹管(12),每个所述螺纹杆(6)的内端分别贯穿轴承一(9)和螺纹管(12)并延伸至固定块(17)的内侧,所述螺纹杆(6)的外表面与轴承一(9)的内圈固定连接,且螺纹杆(6)的外表面与螺纹管(12)的内圈螺纹连接。Connecting blocks (2) are fixedly installed on the left and right sides of the front and the back of the placing rack (1), and a guide hole (10) is provided in the lower part of each connecting block (2). A connecting column (5) is inserted into the interior of the first guide hole (10), a fixing block (17) is fixedly installed on the inner end of each of the connecting columns (5), and each of the side brackets (3) Guide sleeves (14) are fixedly installed on the front and rear sides of the two guide sleeves (14), and two guide holes (16) are opened inside each of the guide sleeves (14), and the ends of the two groups of connecting posts (5) that are far away from each other respectively penetrate through the two guide sleeves (14). Two guide holes (16) are formed and extend to the outside of the guide sleeve (14), a rotating rod (8) is placed on the outside of each of the connecting blocks (2), and the inner side of each of the rotating rods (8) A threaded rod (6) is fixedly installed, a bearing (9) is embedded above the interior of each of the connecting blocks (2), and a threaded pipe (12) is embedded on the top of each of the fixing blocks (17). , the inner end of each of the threaded rods (6) respectively penetrates the bearing one (9) and the threaded pipe (12) and extends to the inner side of the fixing block (17), the outer surface of the threaded rod (6) and the bearing one The inner ring of (9) is fixedly connected, and the outer surface of the threaded rod (6) is threadedly connected to the inner ring of the threaded pipe (12). 2.根据权利要求1所述的一种装配式钢结构建筑施工用钢管吊装装置,其特征在于:所述放置架(1)的正面和背面均固定安装有两个挂耳(4)。2 . A steel pipe hoisting device for prefabricated steel structure building construction according to claim 1 , wherein two hanging ears ( 4 ) are fixedly installed on both the front and the back of the placing rack ( 1 ). 3 . 3.根据权利要求1所述的一种装配式钢结构建筑施工用钢管吊装装置,其特征在于:所述连接柱(5)的直径值等于导向孔一(10)和导向孔二(16)的直径值。3. A steel pipe hoisting device for prefabricated steel structure building construction according to claim 1, characterized in that: the diameter value of the connecting column (5) is equal to the guide hole one (10) and the guide hole two (16) diameter value. 4.根据权利要求1所述的一种装配式钢结构建筑施工用钢管吊装装置,其特征在于:所述放置架(1)的正面和背面均固定安装有支撑块(7),每个所述支撑块(7)的左右两侧面均镶嵌有轴承二(11),且每个螺纹杆(6)内端的外表面分别与每个轴承二(11)的内圈固定连接。4. A steel pipe hoisting device for prefabricated steel structure building construction according to claim 1, characterized in that: the front and back of the placing rack (1) are fixedly installed with support blocks (7), and each Two bearings (11) are embedded in the left and right sides of the support block (7), and the outer surface of the inner end of each threaded rod (6) is respectively fixedly connected with the inner ring of each bearing two (11). 5.根据权利要求1所述的一种装配式钢结构建筑施工用钢管吊装装置,其特征在于:每个所述连接柱(5)的外端均开设有螺纹槽(13),且每个螺纹槽(13)的外部均螺纹连接有螺母(15)。5. A steel pipe hoisting device for prefabricated steel structure building construction according to claim 1, wherein the outer end of each of the connecting columns (5) is provided with a threaded groove (13), and each Nuts (15) are threadedly connected to the outside of the threaded grooves (13).
CN202220787519.9U 2022-04-02 2022-04-02 A steel pipe hoisting device for prefabricated steel structure building construction Expired - Fee Related CN217148243U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220787519.9U CN217148243U (en) 2022-04-02 2022-04-02 A steel pipe hoisting device for prefabricated steel structure building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220787519.9U CN217148243U (en) 2022-04-02 2022-04-02 A steel pipe hoisting device for prefabricated steel structure building construction

Publications (1)

Publication Number Publication Date
CN217148243U true CN217148243U (en) 2022-08-09

Family

ID=82700841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220787519.9U Expired - Fee Related CN217148243U (en) 2022-04-02 2022-04-02 A steel pipe hoisting device for prefabricated steel structure building construction

Country Status (1)

Country Link
CN (1) CN217148243U (en)

Similar Documents

Publication Publication Date Title
CN119593429B (en) Suction barrel jacket installation method and device
CN112027901B (en) A lifting device for large diameter pipe jacking construction
CN204858424U (en) Cable tunnel inspection shaft pulls cabling composite set
CN205195155U (en) Insulating platform
CN217148243U (en) A steel pipe hoisting device for prefabricated steel structure building construction
CN218478472U (en) Hoisting machine for building construction external wall
CN211682115U (en) Live work manipulator
CN101294486B (en) Vertical energy-saving pumping unit
CN219363091U (en) Multi-angle rope winding device
CN104746540B (en) A semi-automatic deviation correction and reset device for wooden frame
CN220470817U (en) Auxiliary butt joint device for heat supply pipeline
CN216193963U (en) Steel bridge insert block installation and positioning device
CN208008349U (en) A kind of civil engineering pipeline movable stand
CN118619135B (en) Self-climbing hoisting mechanism and hoisting method thereof
CN221186272U (en) Spray tower pipeline elbow mounting tool
CN220116048U (en) Pipeline installation equipment for building construction
CN207538843U (en) Waterproof cloth trolley steel cable swelling device
CN222101135U (en) A steel structure support frame
CN222120289U (en) A caisson core mold rapid support and dismantling device
CN222229700U (en) A gallows for high temperature pipeline three-dimensional large displacement
CN218468422U (en) Water pipe top-mounted frame
CN205935720U (en) Steel truss frame that slides
CN206359154U (en) A kind of steel construction secondary member hoisting device
CN220978936U (en) Building beam reinforcing apparatus
CN221759338U (en) Prefabricated pipe hoisting tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220809