CN217116644U - Construction tunnel operation area personnel management system - Google Patents

Construction tunnel operation area personnel management system Download PDF

Info

Publication number
CN217116644U
CN217116644U CN202220613557.2U CN202220613557U CN217116644U CN 217116644 U CN217116644 U CN 217116644U CN 202220613557 U CN202220613557 U CN 202220613557U CN 217116644 U CN217116644 U CN 217116644U
Authority
CN
China
Prior art keywords
box
water
placing box
fixedly connected
water tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220613557.2U
Other languages
Chinese (zh)
Inventor
刘亚蒙
秦小虎
饶胜龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Kaijin Technology Co ltd
Original Assignee
Chongqing Kaijin Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Kaijin Technology Co ltd filed Critical Chongqing Kaijin Technology Co ltd
Priority to CN202220613557.2U priority Critical patent/CN217116644U/en
Application granted granted Critical
Publication of CN217116644U publication Critical patent/CN217116644U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to the technical field of construction tunnel management, in particular to a personnel management system for a construction tunnel operation area, which comprises a placing box and a heat dissipation assembly; radiator unit includes the water tank, the force pump, the honeycomb duct, the back flow, the water proof membrane, graphite layer and fan, in using, start the force pump, with the water in the water tank through the honeycomb duct extraction to placing the incasement, carry out the water-cooling heat dissipation to the server of placing the incasement, avoid the server overload operation to lead to impairedly after long-time work, place the graphite layer of incasement and can improve water-cooled cooling radiating effect, the water proof membrane can be avoided having rivers to flow out and get into in the server, lead to the server impaired, get into from the honeycomb duct and place the water of incasement and get into in the back flow through the circulation, flow back to the water tank in through the back flow, the completion is to placing the water-cooling heat dissipation of the incasement server circulation water-cooling, solve the inconvenient radiating problem of current server.

Description

Construction tunnel operation area personnel management system
Technical Field
The utility model relates to a construction tunnel management technical field, concretely relates to construction tunnel operation district personnel management system.
Background
The tunnel construction theory and technology in China have been greatly developed in recent years, but because of the particularity of the tunnel, uncertain factors are still many in the construction process, and great risks exist. Meanwhile, the automation level is not high in the tunnel building process in China, and the life safety of constructors is often greatly threatened when danger occurs. At present, zigbee RSSI is realized in the mainstream positioning or ranging in the market, and an ultra-wideband (interrupter) technology is used for pursuing accuracy. The technologies are mature at present, are mostly used for buildings, factory buildings and the like, and realize personnel and equipment management. The technical core of the positioning management system for the tunnel construction personnel still uses an ultra wide band (interrupter) technology, and on the basis, the mature 2.4g technology is combined to realize the accurate positioning of the tunnel working face within the range of 200 meters.
Currently, the prior art (CN204069358U) discloses a tunnel constructor positioning management system, which includes: the system comprises a personnel positioning information card carried by a person entering a tunnel, wherein the personnel positioning information card is provided with a Zigbee-based wireless communication module; the base stations are arranged in the tunnel according to the field condition of the tunnel, each base station is provided with a Zigbee-based wireless communication module to form a wireless positioning network, and the base stations are in wireless communication with the personnel positioning information card to acquire positioning information; the server is through wired or wireless mode connection one or more basic stations, receives the locating information that each basic station uploaded, the utility model discloses a establish Zigbee wireless network in the tunnel, receive the wireless signal that personnel's locating information card in the coverage sent and handle it and send to server analysis processes after obtaining locating information through the basic station, make the outer managers in tunnel can know tunnel construction site personnel, mechanical equipment's position in real time and distribute to carry out personnel's attendance management.
However, by adopting the mode, the server is inconvenient to dissipate heat after working for a long time in the construction tunnel.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction tunnel operation district personnel management system aims at solving the inconvenient radiating problem of current server.
In order to achieve the purpose, the utility model provides a construction tunnel operation area personnel management system, which comprises a placing box and a heat dissipation assembly; the heat dissipation assembly comprises a water tank, a pressure pump, a flow guide pipe, a return pipe, a waterproof membrane, a graphite layer and a fan, wherein the water tank is fixedly connected with the placing box and is positioned on one side of the placing box, the pressure pump is fixedly connected with the placing box and is positioned on one side of the placing box close to the water tank, the flow guide pipe is communicated with the water tank and is communicated with the pressure pump and is communicated with the placing box and is positioned on one side of the water tank, the return pipe is communicated with the placing box and is communicated with the flow guide pipe and is positioned on one side of the water tank far away from the flow guide pipe, the waterproof membrane is fixedly connected with the placing box, the waterproof membrane is positioned on one side of the placing box, the graphite layer is fixedly connected with the waterproof membrane, the graphite layer is positioned on one side of the waterproof membrane, and the fan is fixedly connected with the placing box, and is located at one side of the placing box.
The pressure pump comprises a pump body and a valve, the pump body is fixedly connected with the placing box and is positioned on one side of the placing box, the valve is fixedly connected with the pump body, and the valve is positioned on one side of the pump body.
Wherein, the fan includes connecting rod, rotation cover and a plurality of flabellum, the connecting rod with place case fixed connection, and be located place one side of case, rotate the cover with the connecting rod rotates to be connected, it is located to rotate the cover one side of connecting rod, it is a plurality of the flabellum with rotate cover fixed connection, and be located one side of rotating the cover.
The placing box comprises an outer box body, an inner box body, a box door and a top plate, the outer box body is fixedly connected with the water box, the outer box body is located on one side of the water box, the outer box body is provided with a ventilation opening, the ventilation opening is located on one side of the outer box body, the inner box body is fixedly connected with the waterproof membrane, the inner box body is located on one side of the waterproof membrane, the box door is rotatably connected with the outer box body, the box door is located on one side of the outer box body, the top plate is fixedly connected with the outer box body, and the top plate is located at the top of the outer box body.
The placing box further comprises a handle, and the handle is fixedly connected with the box door and is positioned on one side of the box door.
The utility model discloses a construction tunnel operation area personnel management system, which comprises a placing box and a heat dissipation assembly; the heat dissipation assembly comprises a water tank, a pressure pump, a flow guide pipe, a return pipe, a waterproof membrane, a graphite layer and a fan, wherein the water tank is fixedly connected with the placing box and is positioned on one side of the placing box, the pressure pump is fixedly connected with the placing box and is positioned on one side of the placing box close to the water tank, water in the water tank is extracted into the placing box through the flow guide pipe, water-cooling heat dissipation is carried out on a server in the placing box, the flow guide pipe is communicated with the water tank, communicated with the pressure pump, communicated with the placing box and positioned on one side of the water tank, the return pipe is communicated with the placing box and is positioned on one side of the water tank far away from the flow guide pipe, the water in the water tank enters the placing box from the flow guide pipe and flows back to the water tank after flowing to the return pipe to complete circulation in the water tank, the waterproof membrane is fixedly connected with the placing box, the waterproof membrane is positioned on one side of the placing box, the material of the waterproof membrane is a PE polymer waterproof membrane, the waterproof membrane can avoid entering a water-immersed server in the placing box to cause damage of the server, the graphite layer is fixedly connected with the waterproof membrane and positioned on one side of the waterproof membrane, the graphite layer can improve the cooling and heat-dissipating effect in the placing box, the fan is fixedly connected with the placing box and positioned on one side of the placing box, the fan is started, when the fan is matched with the guide pipe to carry out water cooling on the server, the fan carries out air cooling and heat-dissipating cooling on the server, so that the heat-dissipating speed of the server is higher, the effect is better, when in use, the pressure pump is started to extract water in the water tank into the placing box through the guide pipe, it is right place the incasement server and carry out water-cooling heat dissipation, avoid the server to lead to impaired in long-time work back overload operation, place the graphite layer of incasement and can improve water-cooled cooling radiating effect, the water proof membrane can avoid having rivers to go out to get into in the server, leads to the server impaired, follows the honeycomb duct gets into place the incasement water and get into through circulation in the return duct, through the return duct backward flow extremely in the water tank, it is right to accomplish place the incasement server circulation water-cooling heat dissipation, solve the inconvenient radiating problem of current server.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is the utility model provides a pair of construction tunnel operation district personnel management system's schematic structure diagram.
Fig. 2 is a front view of a construction tunnel operation area personnel management system provided by the utility model.
Fig. 3 is a side view of the utility model provides a construction tunnel operation district personnel management system.
Fig. 4 is a sectional view of a construction tunnel operation area personnel management system provided by the utility model.
Fig. 5 is an enlarged view of a detail a of fig. 4.
1-placing box, 2-heat dissipation component, 11-outer box body, 12-inner box body, 13-box door, 14-top plate, 15-handle, 21-water tank, 22-pressure pump, 23-guide pipe, 24-return pipe, 25-waterproof membrane, 26-graphite layer, 27-fan, 111-ventilation opening, 221-pump body, 222-valve, 271-connecting rod, 272-rotating sleeve and 273-fan blade.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary and intended to be used for explaining the present invention, and should not be construed as limiting the present invention.
In the description of the present invention, it is to be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on those shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. In addition, in the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
Referring to fig. 1 to 5, the utility model provides a construction tunnel operation area personnel management system, which comprises a placing box 1 and a heat dissipation assembly 2; the heat dissipation assembly 2 comprises a water tank 21, a pressure pump 22, a flow guide pipe 23, a return pipe 24, a waterproof membrane 25, a graphite layer 26 and a fan 27, wherein the water tank 21 is fixedly connected with the placement box 1 and is positioned on one side of the placement box 1, the pressure pump 22 is fixedly connected with the placement box 1 and is positioned on one side of the placement box 1 close to the water tank 21, the flow guide pipe 23 is communicated with the water tank 21 and is communicated with the pressure pump 22 and is communicated with the placement box 1 and is positioned on one side of the water tank 21, the return pipe 24 is communicated with the placement box 1 and is communicated with the flow guide pipe 23 and is positioned on one side of the water tank 21 far away from the flow guide pipe 23, the waterproof membrane 25 is fixedly connected with the placement box 1, the waterproof membrane 25 is positioned on one side of the placement box 1, and the graphite layer 26 is fixedly connected with the waterproof membrane 25, the graphite layer 26 is positioned on one side of the waterproof membrane 25, and the fan 27 is fixedly connected with the placing box 1 and positioned on one side of the placing box 1.
In this embodiment, the water tank 21 is fixedly connected to the placing tank 1 and is located on one side of the placing tank 1, the pressure pump 22 is fixedly connected to the placing tank 1 and is located on one side of the placing tank 1 close to the water tank 21, water in the water tank 21 is pumped into the placing tank 1 through the guide pipe 23 to cool down and dissipate heat of a server in the placing tank 1, the guide pipe 23 is communicated with the water tank 21, is communicated with the pressure pump 22, is communicated with the placing tank 1 and is located on one side of the water tank 21, the return pipe 24 is communicated with the placing tank 1, is communicated with the guide pipe 23 and is located on one side of the water tank 21 away from the guide pipe 23, water in the water tank 21 enters the placing tank 1 from the guide pipe 23 and flows to the return pipe 24 and then flows back to the water tank 21 to complete circulation, the waterproof membrane 25 is fixedly connected with the placing box 1, the waterproof membrane 25 is positioned on one side of the placing box 1, the waterproof membrane 25 is made of PE high polymer materials, the waterproof membrane 25 can avoid entering a water-immersed server in the placing box 1 to cause damage of the server, the graphite layer 26 is fixedly connected with the waterproof membrane 25, the graphite layer 26 is positioned on one side of the waterproof membrane 25, the graphite layer 26 can improve the cooling and heat dissipation effect in the placing box 1, the fan 27 is fixedly connected with the placing box 1 and positioned on one side of the placing box 1, the fan 27 is started and can be matched with the guide pipe 23 to carry out air-cooling and heat dissipation on the server when the server is cooled by water, so that the heat dissipation speed of the server is higher, the effect is better, a host station device and a plurality of slave base station devices are arranged, and interaction with an upper computer through the host station and networking is realized, the ultra-wideband (UWB) module realizes algorithm positioning with the label, and host station equipment realizes synchronous data interaction with a plurality of slave base stations and labels through the 2.4G communication module.
During the use, start the force pump 22, will water in the water tank 21 passes through honeycomb duct 23 extracts extremely place the incasement 1, it is right place the server in the incasement 1 and carry out water-cooling heat dissipation, avoid the server to lead to impaired in long-time work back overload operation, place graphite layer 26 in the case 1 and can improve water-cooled cooling radiating effect, water-proof membrane 25 can avoid having rivers to flow out and get into in the server, lead to the server impaired, follow honeycomb duct 23 gets into place the water in the case 1 and get into through the circulation in the back flow 24, through back flow 24 flows back extremely in the water tank 21, the completion is right place the server circulation water-cooling heat dissipation in the case 1, solve the inconvenient radiating problem of current server.
Further, the pressure pump 22 includes a pump body 221 and a valve 222, the pump body 221 is fixedly connected to the placing box 1 and located at one side of the placing box 1, the valve 222 is fixedly connected to the pump body 221, and the valve 222 is located at one side of the pump body 221.
In this embodiment, the water in the water tank 21 can be pumped by activating the pump 221, and the flow rate of the water in the water tank 21 pumped by the pump 221 can be adjusted by rotating the valve 222.
Further, the fan 27 includes a connecting rod 271, a rotating sleeve 272 and a plurality of fan blades 273, the connecting rod 271 is fixedly connected to the placing box 1 and is located at one side of the placing box 1, the rotating sleeve 272 is rotatably connected to the connecting rod 271, the rotating sleeve 272 is located at one side of the connecting rod 271, and the plurality of fan blades 273 is fixedly connected to the rotating sleeve 272 and is located at one side of the rotating sleeve 272.
In this embodiment, the connecting rod 271 can fix the fan 27 on the storage box 1, rotate the rotating sleeve 272 to drive the fan blades 273 to rotate, and thus, the inside of the storage box 1 can be cooled.
Further, it includes outer box 11, interior box 12, chamber door 13 and roof 14 to place case 1, outer box 11 with water tank 21 fixed connection, outer box 11 is located one side of water tank 21, outer box 11 has vent 111, vent 111 is located one side of outer box 11, interior box 12 with water proof membrane 25 fixed connection, interior box 12 is located one side of water proof membrane 25, chamber door 13 with outer box 11 rotates to be connected, chamber door 13 is located one side of outer box 11, roof 14 with outer box 11 fixed connection, roof 14 is located the top of outer box 11, it still includes handle 15 to place case 1, handle 15 with chamber door 13 fixed connection to be located one side of chamber door 13.
In this embodiment, the outer box 11 can support equipment, the inner box 12 can hold a server, the door 13 can be opened or closed by rotating the door, the top plate 14 can cover the outer box 11, so that sundries on the top of the outer box 11 can be prevented from dropping off during construction in a tunnel, and the door 13 can be rotated by holding the handle 15 more easily.
While the invention has been described with reference to a preferred embodiment, it will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention.

Claims (5)

1. A personnel management system for a construction tunnel operation area is characterized in that,
the personnel management system for the construction tunnel operation area comprises a placing box and a heat dissipation assembly; the heat dissipation assembly comprises a water tank, a pressure pump, a flow guide pipe, a return pipe, a waterproof membrane, a graphite layer and a fan, wherein the water tank is fixedly connected with the placing box and is positioned on one side of the placing box, the pressure pump is fixedly connected with the placing box and is positioned on one side of the placing box close to the water tank, the flow guide pipe is communicated with the water tank and is communicated with the pressure pump and is communicated with the placing box and is positioned on one side of the water tank, the return pipe is communicated with the placing box and is communicated with the flow guide pipe and is positioned on one side of the water tank far away from the flow guide pipe, the waterproof membrane is fixedly connected with the placing box, the waterproof membrane is positioned on one side of the placing box, the graphite layer is fixedly connected with the waterproof membrane, the graphite layer is positioned on one side of the waterproof membrane, and the fan is fixedly connected with the placing box, and is located at one side of the placing box.
2. The construction tunnel work area personnel management system according to claim 1,
the pressure pump comprises a pump body and a valve, the pump body is fixedly connected with the placing box and is positioned on one side of the placing box, the valve is fixedly connected with the pump body, and the valve is positioned on one side of the pump body.
3. The construction tunnel work area personnel management system according to claim 1,
the fan includes connecting rod, rotation cover and a plurality of flabellum, the connecting rod with place case fixed connection, and be located place one side of case, rotate the cover with the connecting rod rotates to be connected, it is located to rotate the cover one side of connecting rod, it is a plurality of the flabellum with it fixed connection to rotate the cover, and be located one side of rotating the cover.
4. The construction tunnel work area personnel management system according to claim 1,
the placing box comprises an outer box body, an inner box body, a box door and a top plate, the outer box body is fixedly connected with the water box, the outer box body is located on one side of the water box, the outer box body is provided with a ventilation opening, the ventilation opening is located on one side of the outer box body, the inner box body is fixedly connected with the waterproof membrane, the inner box body is located on one side of the waterproof membrane, the box door is rotatably connected with the outer box body, the box door is located on one side of the outer box body, the top plate is fixedly connected with the outer box body, and the top plate is located at the top of the outer box body.
5. The construction tunnel work area personnel management system according to claim 4,
the placing box further comprises a handle, and the handle is fixedly connected with the box door and is positioned on one side of the box door.
CN202220613557.2U 2022-03-21 2022-03-21 Construction tunnel operation area personnel management system Active CN217116644U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220613557.2U CN217116644U (en) 2022-03-21 2022-03-21 Construction tunnel operation area personnel management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220613557.2U CN217116644U (en) 2022-03-21 2022-03-21 Construction tunnel operation area personnel management system

Publications (1)

Publication Number Publication Date
CN217116644U true CN217116644U (en) 2022-08-02

Family

ID=82601947

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220613557.2U Active CN217116644U (en) 2022-03-21 2022-03-21 Construction tunnel operation area personnel management system

Country Status (1)

Country Link
CN (1) CN217116644U (en)

Similar Documents

Publication Publication Date Title
CN102791107A (en) Sealing and water-cooling method and equipment for cooling electronic equipment
CN217116644U (en) Construction tunnel operation area personnel management system
CN212013413U (en) Encryption communication machine based on data transmission of hydrology station
CN210380822U (en) Novel wireless communication data transmission terminal with low power consumption
CN113811121A (en) Smart city Internet of things prevention and control system and method
CN113160510A (en) Visual early warning method for construction dangerous area
CN114362675A (en) Photovoltaic equipment monitoring system based on Internet of things
CN214536931U (en) Water source heat pump integrated machine
CN215898319U (en) Power amplifier for data transmission based on UWB indoor positioning
CN217363446U (en) Automatic monitoring device for water source well
CN218276905U (en) Building site location base station device based on UWB communication
CN210959277U (en) High heat dissipating enhancement mode cell-phone sign collector
CN209731903U (en) A kind of communication power device of adjustable various modes
CN213509795U (en) Communication base station for wireless data transmission
CN211720681U (en) 5G system installation equipment that heat-sinking capability is strong
CN221305944U (en) Switch convenient to heat dissipation
CN212367452U (en) Non-network management POE switch for security
CN213847453U (en) Heat dissipation type electrical component box
CN215222698U (en) Mobile intelligent energy management control device based on Internet of things
CN219514480U (en) Industrial equipment data centralized collector
CN220043807U (en) Communication cabinet convenient to installation and maintenance
CN218483138U (en) Internet of things transmission equipment of fire alarm system
CN213934182U (en) Unmanned indoor positioning device based on UWB realization
CN212507604U (en) Novel assembled energy-conserving communication base station computer lab
CN214475166U (en) Building efficiency supervision device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant