CN217105507U - An easy-to-install prefabricated building main structure - Google Patents

An easy-to-install prefabricated building main structure Download PDF

Info

Publication number
CN217105507U
CN217105507U CN202220465701.2U CN202220465701U CN217105507U CN 217105507 U CN217105507 U CN 217105507U CN 202220465701 U CN202220465701 U CN 202220465701U CN 217105507 U CN217105507 U CN 217105507U
Authority
CN
China
Prior art keywords
plate
easy
stand
column
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220465701.2U
Other languages
Chinese (zh)
Inventor
李庆新
赵洪旭
隋岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Jiuzhou Construction Group Co ltd
Original Assignee
Dalian Jiuzhou Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Jiuzhou Construction Group Co ltd filed Critical Dalian Jiuzhou Construction Group Co ltd
Priority to CN202220465701.2U priority Critical patent/CN217105507U/en
Application granted granted Critical
Publication of CN217105507U publication Critical patent/CN217105507U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

本实用新型涉及一种方便安装的装配式建筑主体结构,包括建筑基础,建筑基础上设有立柱,立柱设置有多根,立柱与立柱之间设有竖梁,立柱与建筑基础上设置有稳定机构,立柱与立柱之间设置有支撑装置,竖梁与竖梁之间设置有连接机构,稳定机构包括第一安装板和第二安装板,第一安装板与第二安装板之间设有阻尼器,立柱底端固定设有垫板,立柱四周固定设有支撑脚架,通过在建筑基础上设置第一安装板、第二安装板和阻尼器,可以在振动时将振动减弱,提高建筑整体的稳定性和安全性,通过设置连接机构,便于对竖梁之间进行连接,提高了工作效率。

Figure 202220465701

The utility model relates to a prefabricated building main structure that is convenient to install, comprising a building foundation, a building foundation is provided with upright columns, a plurality of upright columns are arranged, a vertical beam is arranged between the upright column and the upright column, and a stabilizer is arranged on the upright column and the building foundation. Mechanism, a support device is arranged between the column and the column, a connection mechanism is arranged between the vertical beam and the vertical beam, and the stabilization mechanism includes a first mounting plate and a second mounting plate, and there is a The damper, the bottom end of the column is fixed with a backing plate, and the supporting legs are fixed around the column. By setting the first mounting plate, the second mounting plate and the damper on the building foundation, the vibration can be weakened during vibration and the building can be improved. For overall stability and safety, the connection mechanism is provided to facilitate the connection between the vertical beams, and the work efficiency is improved.

Figure 202220465701

Description

一种方便安装的装配式建筑主体结构An easy-to-install prefabricated building main structure

技术领域technical field

本实用新型涉及装配式施工技术领域,具体为一种方便安装的装配式建筑主体结构。The utility model relates to the technical field of prefabricated construction, in particular to a prefabricated building main structure which is convenient for installation.

背景技术Background technique

由预制部品部件在工地装配而成的建筑,称为装配式建筑,按预制构件的形式和施工方法分为砌块建筑、板材建筑、盒式建筑、骨架板材建筑及升板升层建筑等五种类型,其大量的建筑部品由车间生产加工完成,在现场完成大量的装配作业,比原始现浇作业大大减少。Buildings assembled from prefabricated parts at the construction site are called prefabricated buildings. According to the form and construction method of prefabricated components, they are divided into five types: block buildings, plate buildings, box buildings, skeleton plate buildings, and lift-up buildings. A large number of building parts are produced and processed in the workshop, and a large number of assembly operations are completed on site, which is greatly reduced compared with the original cast-in-place operation.

中国专利CN211735785U公开了一种方便安装的装配式建筑主体结构,该专利公开的装配式建筑主体结构,连接结构与竖梁之间直接连接,缺乏相应的缓冲措施,反而不利于将竖梁之间紧密连接,同时对于易发生振动的区域,缺乏必要的相应的减震措施,同时在竖梁和立柱在连接时,所设置的立柱和竖梁的整体稳固效果较低,容易出现位置偏移活动,导致后续进行装配活动时无法很好地进行装配活动,影响整体装配式建筑的装配效率。Chinese patent CN211735785U discloses a prefabricated building main structure that is easy to install. The prefabricated building main structure disclosed in the patent is directly connected between the connecting structure and the vertical beams, and lacks corresponding buffer measures, which is not conducive to connecting the vertical beams. Tightly connected, and at the same time, for areas prone to vibration, there is a lack of necessary corresponding shock absorption measures. At the same time, when the vertical beam and the vertical column are connected, the overall stabilization effect of the installed vertical column and vertical beam is low, and it is prone to position shift activities. , resulting in the inability to perform assembly activities well in subsequent assembly activities, affecting the assembly efficiency of the overall prefabricated building.

实用新型内容Utility model content

针对现有技术中存在的问题,本实用新型提供了一种方便安装的装配式建筑主体结构,以解决背景技术中提到的技术问题。Aiming at the problems existing in the prior art, the utility model provides a prefabricated building main structure that is easy to install, so as to solve the technical problems mentioned in the background art.

为实现上述目的,本实用新型提供如下技术方案:一种方便安装的装配式建筑主体结构,包括建筑基础,所述建筑基础上设有立柱,所述立柱设置有多根,所述立柱与立柱之间设有竖梁,所述立柱和竖梁与建筑基础之间设置有稳定机构,所述立柱与立柱之间设置有支撑装置,所述竖梁与竖梁之间设置有连接机构,所述稳定机构包括第一安装板和第二安装板,所述第一安装板与第二安装板之间设有阻尼器,所述立柱底端固定设有垫板,所述第一安装板与建筑基础之间通过螺钉可拆卸连接,所述第二安装板与垫板之间通过螺栓与螺母的配合可拆卸连接,所述立柱四周固定设有支撑脚架,所述支撑脚架设置有四个,通过在建筑基础上设置第一安装板、第二安装板和阻尼器,可以在轻微振动时减少振动感,将振动减弱,提高建筑整体的稳定性和安全性。In order to achieve the above purpose, the present invention provides the following technical solutions: a prefabricated building main structure that is easy to install, including a building foundation, the building foundation is provided with uprights, the uprights are provided with multiple, the uprights and the uprights A vertical beam is arranged between the vertical beams, a stabilization mechanism is arranged between the vertical column and the vertical beam and the building foundation, a support device is arranged between the vertical column and the vertical column, and a connecting mechanism is arranged between the vertical beam and the vertical beam, so The stabilizing mechanism includes a first mounting plate and a second mounting plate, a damper is arranged between the first mounting plate and the second mounting plate, a backing plate is fixed at the bottom end of the column, and the first mounting plate is connected to the second mounting plate. The building foundations are detachably connected by screws, the second mounting plate and the backing plate are detachably connected by the cooperation of bolts and nuts, and a supporting leg is fixed around the column, and the supporting leg is provided with four One, by arranging the first mounting plate, the second mounting plate and the damper on the building foundation, the vibration sensation can be reduced when there is slight vibration, the vibration can be weakened, and the overall stability and safety of the building can be improved.

优选的是,所述支撑装置包括承接座,所述承接座顶部固定设有支撑板,所述支撑板顶部固定设有连接板,所述连接板两侧滑动设有连接块,通过连接块进行支撑,防止立柱发生偏移。Preferably, the supporting device includes a receiving seat, a supporting plate is fixedly arranged on the top of the receiving seat, a connecting plate is fixedly arranged on the top of the supporting plate, and connecting blocks are slidably provided on both sides of the connecting plate, and the Support to prevent the column from shifting.

进一步优选的是,所述承接座两侧转动设有导杆,所述导杆顶部转动设有固定块,所述导杆和固定块转动设有两个,所述导杆与承接座之间设置有扭簧,通过设置扭簧,使导杆和固定块具有向两侧的推力,使立柱受力平衡维持稳定。It is further preferred that guide rods are provided on both sides of the receiving seat, a fixed block is provided on the top of the guide rod, and two guide rods and fixed blocks are rotated. A torsion spring is provided, and by setting the torsion spring, the guide rod and the fixed block have a thrust to both sides, so that the force balance of the column is maintained stable.

进一步优选的是,所述连接板内部开设有滑动腔,所述滑动腔内设有滑动弹簧,所述滑动腔、滑动弹簧和连接块均设置有两个,通过设置滑动弹簧,使连接块具有向两侧持续不断的推力,维持立柱稳定。It is further preferred that a sliding cavity is provided inside the connecting plate, a sliding spring is arranged in the sliding cavity, and two sliding cavities, two sliding springs and two connecting blocks are provided. Continuous thrust to both sides to maintain the stability of the column.

进一步优选的是,所述连接机构包括第一固定板和第二固定板,所述第一固定板和第二固定板设置在竖梁两侧,所述第一固定板上设有连接杆,所述连接杆穿过第一固定板和竖梁与第二固定板固定连接,所述连接杆设置有两个,通过连接杆与第一固定板和第二固定板的配合对竖梁进行连接,不需要过多辅助工具,简单方便。Further preferably, the connection mechanism includes a first fixing plate and a second fixing plate, the first fixing plate and the second fixing plate are arranged on both sides of the vertical beam, and the first fixing plate is provided with a connecting rod, The connecting rod passes through the first fixing plate and the vertical beam and is fixedly connected to the second fixing plate. There are two connecting rods, and the vertical beam is connected through the cooperation between the connecting rod and the first fixing plate and the second fixing plate. , do not need too many auxiliary tools, simple and convenient.

进一步优选的是,所述连接杆上设有定位槽,所述第一固定板上设有支撑杆,所述支撑杆上设有紧固螺栓,通过紧固螺栓和定位槽的配合便于对第一固定板和第二固定板进行固定。It is further preferred that the connecting rod is provided with a positioning groove, the first fixing plate is provided with a support rod, and the support rod is provided with a fastening bolt, and the cooperation of the fastening bolt and the positioning groove facilitates the alignment of the first fixing plate. A fixing plate and a second fixing plate are fixed.

进一步优选的是,所述第一固定板和第二固定板与竖梁之间设有缓冲块,通过设置缓冲块便于提高第一固定板与第二固定板对竖梁的夹持连接效果。It is further preferred that a buffer block is arranged between the first fixing plate and the second fixing plate and the vertical beam, so that the clamping and connecting effect of the first fixing plate and the second fixing plate on the vertical beam can be improved by setting the buffer block.

与现有技术相比,本实用新型具备以下有益效果:Compared with the prior art, the utility model has the following beneficial effects:

1、本实用新型中,在建筑基础上设置第一安装板、第二安装板和阻尼器,提高了建筑整体的稳定性和安全性,同时减震装置可以在工厂快速建造,提高了现场工作效率。1. In this utility model, the first mounting plate, the second mounting plate and the damper are arranged on the building foundation, which improves the overall stability and safety of the building, and at the same time, the shock absorbing device can be quickly constructed in the factory, which improves the on-site work. efficiency.

2、本实用新型中设置承接板,并在承接板上设置扭簧、导杆和固定块,在连接板上设置滑动腔和滑动弹簧,使连接块和固定块对立柱具有持续稳定的推力,从而实现对立柱的支撑效果,避免位置偏移。2. The utility model is provided with a receiving plate, and a torsion spring, a guide rod and a fixed block are arranged on the receiving plate, and a sliding cavity and a sliding spring are arranged on the connecting plate, so that the connecting block and the fixed block have a continuous and stable thrust to the column, Thereby, the supporting effect of the upright column is realized, and the position deviation is avoided.

3、本实用新型中设置第一固定块和第二固定块并通过连接杆进行紧固连接,通过紧固螺栓和定位槽的配合,使第一固定块和第二固定块与竖梁紧靠连接,在安装装配式建筑主体时,不需要过多的辅助工具,能非常方便快捷的对装配式建筑主体进行安装,节省了装配式建筑主体的安装时间,很大程度上提高了安装效率。3. In the present invention, the first fixing block and the second fixing block are arranged and connected by connecting rods, and the first fixing block and the second fixing block are closely abutted with the vertical beam through the cooperation of the tightening bolt and the positioning groove. Connection, when installing the main body of the prefabricated building, there is no need for too many auxiliary tools, and the main body of the prefabricated building can be installed very conveniently and quickly, which saves the installation time of the main body of the prefabricated building, and greatly improves the installation efficiency.

附图说明Description of drawings

图1为本实用新型中一种方便安装的装配式建筑主体结构的整体结构示意图;Fig. 1 is a kind of overall structure schematic diagram of the prefabricated building main structure of a kind of convenient installation in the utility model;

图2为图1中A的局部结构放大图;Fig. 2 is the partial structure enlarged view of A in Fig. 1;

图3为本实用新型中支撑装置剖面结构示意图;Fig. 3 is the cross-sectional structure schematic diagram of the support device in the utility model;

图4为本实用新型中连接机构剖面结构示意图。FIG. 4 is a schematic cross-sectional structure diagram of the connecting mechanism in the utility model.

图中:1、建筑基础;2、立柱;3、竖梁;4、第一安装板;5、第二安装板;6、阻尼器;7、垫板;8、支撑脚架;9、承接座;10、支撑板;11、连接板;12、连接块;13、导杆;14、固定块;15、滑动腔;16、滑动弹簧;17、第一固定板;18、第二固定板;19、连接杆;20、定位槽;21、支撑杆;22、紧固螺栓;23、缓冲块。In the picture: 1. Building foundation; 2. Upright column; 3. Vertical beam; 4. First mounting plate; 5. Second mounting plate; 6. Damper; 7. Backing plate; seat; 10, supporting plate; 11, connecting plate; 12, connecting block; 13, guide rod; 14, fixing block; 15, sliding cavity; 16, sliding spring; 17, first fixing plate; 18, second fixing plate ; 19, connecting rod; 20, positioning groove; 21, support rod; 22, fastening bolt; 23, buffer block.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

实施例1:Example 1:

请参阅图1-4,一种方便安装的装配式建筑主体结构,包括建筑基础1,建筑基础1上设有立柱2,立柱2设置有多根,立柱2与立柱2之间设有竖梁3,立柱2和竖梁3与建筑基础1之间设置有稳定机构,立柱2与立柱2之间设置有支撑装置,竖梁3与竖梁3之间设置有连接机构,稳定机构包括第一安装板4和第二安装板5,第一安装板4与第二安装板5之间设有阻尼器6,立柱2底端固定设有垫板7,第一安装板4与建筑基础1之间通过螺钉可拆卸连接,第二安装板5与垫板7之间通过螺栓与螺母的配合可拆卸连接,立柱2四周固定设有支撑脚架8,支撑脚架8设置有四个,在安装时,将第一安装板4和第二安装板5固定安装在阻尼器6的顶部和底部,将第一安装板4通过螺栓安装在建筑基础1上,将第二安装板5通过螺栓和螺母的配合与垫板7可拆卸连接,阻尼器6为现有技术,其工作原理在此不再赘述,在发生振动时,阻尼器6减少垫板7以上装配主体结构的振动幅度,从而提高装配主体结构的稳定性和安全性。Please refer to Figures 1-4, a prefabricated building main structure that is easy to install, including a building foundation 1, the building foundation 1 is provided with uprights 2, a plurality of uprights 2 are arranged, and vertical beams are arranged between the uprights 2 and the uprights 2 3. A stabilization mechanism is provided between the upright column 2 and the vertical beam 3 and the building foundation 1, a support device is provided between the upright column 2 and the upright column 2, and a connecting mechanism is provided between the upright beam 3 and the upright beam 3, and the stabilization mechanism includes a first The mounting plate 4 and the second mounting plate 5, a damper 6 is arranged between the first mounting plate 4 and the second mounting plate 5, a backing plate 7 is fixed at the bottom end of the column 2, and the first mounting plate 4 is connected to the building foundation 1. They are detachably connected by screws, the second mounting plate 5 and the backing plate 7 are detachably connected by the cooperation of bolts and nuts, and there are supporting legs 8 fixed around the column 2, and four supporting legs 8 are provided. When the first mounting plate 4 and the second mounting plate 5 are fixedly installed on the top and bottom of the damper 6, the first mounting plate 4 is mounted on the building foundation 1 by bolts, and the second mounting plate 5 is mounted on the building foundation 1 by bolts and nuts. The mating and the backing plate 7 are detachably connected, and the damper 6 is the prior art, and its working principle is not repeated here. When vibration occurs, the damper 6 reduces the vibration amplitude of the assembly main structure above the backing plate 7, thereby improving the assembly The stability and safety of the main structure.

在本实施例中,支撑装置包括承接座9,承接座9顶部固定设有支撑板10,支撑板10顶部固定设有连接板11,连接板11两侧滑动设有连接块12,承接座9两侧转动设有导杆13,导杆13顶部转动设有固定块14,导杆13和固定块14转动设有两个,导杆13与承接座9之间设置有扭簧,连接板11内部开设有滑动腔15,滑动腔15内设有滑动弹簧16,滑动腔15、滑动弹簧16和连接块12均设置有两个,在使用时,将承接座9设置在立柱2之间,挤压连接块12,连接块12在滑动腔15内挤压滑动弹簧16,将连接板11设置在两立柱2之间时,释放连接块12,连接块12在滑动弹簧16的弹力作用下,向两侧挤压立柱2,调整导杆13的转动角度,导杆13带动扭簧转动,扭簧使导杆13具有向下转动的趋势,使固定块14可以抵触到立柱2,通过固定块14和连接块12的作用使立柱2受力均匀,维持立柱2的稳定。In this embodiment, the support device includes a receiving seat 9 , a supporting plate 10 is fixed on the top of the receiving seat 9 , a connecting plate 11 is fixed on the top of the supporting plate 10 , and connecting blocks 12 are slidably provided on both sides of the connecting plate 11 , and the receiving seat 9 Guide rods 13 are provided on both sides to rotate, a fixed block 14 is provided on the top of the guide rod 13, and two guide rods 13 and fixed blocks 14 are rotated. There is a sliding cavity 15 inside, and there is a sliding spring 16 in the sliding cavity 15. There are two sliding cavity 15, two sliding springs 16 and two connecting blocks 12. Press the connecting block 12, the connecting block 12 squeezes the sliding spring 16 in the sliding cavity 15, when the connecting plate 11 is set between the two uprights 2, the connecting block 12 is released, and the connecting block 12 is under the elastic force of the sliding spring 16. Squeeze the column 2 on both sides, adjust the rotation angle of the guide rod 13, the guide rod 13 drives the torsion spring to rotate, and the torsion spring makes the guide rod 13 have a downward rotation tendency, so that the fixed block 14 can interfere with the column 2, and the fixed block 14 can pass through the fixed block 14. The action of the connection block 12 makes the column 2 evenly stressed and maintains the stability of the column 2 .

在本实施例中,连接机构包括第一固定板17和第二固定板18,第一固定板17和第二固定板18设置在竖梁3两侧,第一固定板17上设有连接杆19,连接杆19穿过第一固定板17和竖梁3与第二固定板18固定连接,连接杆19设置有两个,连接杆19上设有定位槽20,第一固定板17上设有支撑杆21,支撑杆21上设有紧固螺栓22,第一固定板17和第二固定板18与竖梁3之间设有缓冲块23,在使用时,将缓冲块23设置在竖梁3的两侧,将第一固定板17和第二固定板18设置夹持在缓冲块23的两侧,将连接杆19穿过第一固定板17和竖梁3,第一固定板17上设置有支撑杆21,支撑杆21上设置有紧固螺栓22,紧固螺栓22穿过支撑杆21,旋转紧固螺栓22将紧固螺栓22插入到定位槽20中,进而将第一固定板17和第二固定板18与竖梁3紧密结合。In this embodiment, the connection mechanism includes a first fixing plate 17 and a second fixing plate 18 , the first fixing plate 17 and the second fixing plate 18 are arranged on both sides of the vertical beam 3 , and a connecting rod is arranged on the first fixing plate 17 19. The connecting rod 19 passes through the first fixing plate 17 and the vertical beam 3 and is fixedly connected to the second fixing plate 18. There are two connecting rods 19. There is a support rod 21, the support rod 21 is provided with fastening bolts 22, and a buffer block 23 is provided between the first fixing plate 17 and the second fixing plate 18 and the vertical beam 3. When in use, the buffer block 23 is arranged on the vertical On both sides of the beam 3, the first fixing plate 17 and the second fixing plate 18 are arranged and clamped on both sides of the buffer block 23, and the connecting rod 19 is passed through the first fixing plate 17 and the vertical beam 3, and the first fixing plate 17 A support rod 21 is provided on the support rod 21, and a fastening bolt 22 is provided on the support rod 21. The fastening bolt 22 passes through the supporting rod 21, and the fastening bolt 22 is rotated to insert the fastening bolt 22 into the positioning groove 20, thereby fixing the first The plate 17 and the second fixing plate 18 are tightly combined with the vertical beam 3 .

实施例2:Example 2:

在实施例1的基础上,在安装时,将第一安装板4和第二安装板5固定安装在阻尼器6的顶部和底部,将第一安装板4通过螺栓安装在建筑基础1上,将第二安装板5通过螺栓和螺母的配合与垫板7可拆卸连接,阻尼器6为现有技术,其工作原理在此不再赘述,将承接座9设置在立柱2之间,挤压连接块12,连接块12在滑动腔15内挤压滑动弹簧16,将连接板11设置在两立柱2之间时,释放连接块12,连接块12在滑动弹簧16的弹力作用下,向两侧挤压立柱2,调整导杆13的转动角度,导杆13带动扭簧转动,扭簧使导杆13具有向下转动的趋势,使固定块14可以抵触到立柱2,通过固定块14和连接块12的作用使立柱2受力均匀,维持立柱2的稳定。On the basis of Embodiment 1, during installation, the first installation plate 4 and the second installation plate 5 are fixedly installed on the top and bottom of the damper 6, and the first installation plate 4 is installed on the building foundation 1 by bolts, The second mounting plate 5 is detachably connected to the backing plate 7 through the cooperation of bolts and nuts. The damper 6 is in the prior art, and its working principle will not be repeated here. The connecting block 12, the connecting block 12 squeezes the sliding spring 16 in the sliding cavity 15, when the connecting plate 11 is set between the two uprights 2, the connecting block 12 is released, and the connecting block 12 is under the elastic force of the sliding spring 16. Side squeeze the column 2, adjust the rotation angle of the guide rod 13, the guide rod 13 drives the torsion spring to rotate, and the torsion spring makes the guide rod 13 have a downward tendency to rotate, so that the fixed block 14 can interfere with the column 2, through the fixed block 14 and The action of the connecting block 12 makes the column 2 evenly stressed and maintains the stability of the column 2 .

实施例3:Example 3:

在实施例2的基础上,在使用时,将缓冲块23设置在竖梁3的两侧,将第一固定板17和第二固定板18设置夹持在缓冲块23的两侧,将连接杆19穿过第一固定板17和竖梁3,第一固定板17上设置有支撑杆21,支撑杆21上设置有紧固螺栓22,紧固螺栓22穿过支撑杆21,旋转紧固螺栓22将紧固螺栓22插入到定位槽20中,进而将第一固定板17和第二固定板18与竖梁3紧密结合。On the basis of Embodiment 2, in use, the buffer blocks 23 are arranged on both sides of the vertical beam 3, the first fixing plate 17 and the second fixing plate 18 are arranged and clamped on both sides of the buffer block 23, and the connection The rod 19 passes through the first fixing plate 17 and the vertical beam 3. The first fixing plate 17 is provided with a supporting rod 21, and the supporting rod 21 is provided with a fastening bolt 22. The fastening bolt 22 passes through the supporting rod 21 and is rotated and fastened. The bolts 22 insert the fastening bolts 22 into the positioning grooves 20 , so as to tightly couple the first fixing plate 17 and the second fixing plate 18 with the vertical beam 3 .

上文中提到的全部方案中,涉及两个部件之间连接的可以根据实际情况选择焊接、螺栓和螺母配合连接、螺栓或螺钉连接或者其它公知的连接方式,在此不一一赘述,上文中凡是涉及有写固定连接的,优选考虑是焊接,尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。In all the solutions mentioned above, the connection between the two components can be selected according to the actual situation by welding, bolt and nut matching connection, bolt or screw connection or other well-known connection methods, which will not be repeated here. Wherever a fixed connection with writing is involved, it is preferable to consider welding. Although the embodiments of the present invention have been shown and described, those of ordinary skill in the art can Various changes, modifications, substitutions and alterations may be made to these embodiments under circumstances, and the scope of the present invention is defined by the appended claims and their equivalents.

Claims (7)

1. The utility model provides an easy to assemble's assembled building major structure, includes building foundation (1), be equipped with stand (2) on building foundation (1), stand (2) are provided with many, be equipped with between stand (2) and erect roof beam (3), its characterized in that: be provided with stabilizing mean between stand (2) and perpendicular roof beam (3) and building foundation (1), be provided with strutting arrangement between stand (2) and stand (2), erect roof beam (3) and be provided with coupling mechanism between perpendicular roof beam (3), stabilizing mean includes first mounting panel (4) and second mounting panel (5), be equipped with attenuator (6) between first mounting panel (4) and second mounting panel (5), stand (2) bottom mounting is equipped with backing plate (7), can dismantle through the screw between first mounting panel (4) and building foundation (1) and be connected, can dismantle through the cooperation of bolt and nut between second mounting panel (5) and backing plate (7) and be connected, stand (2) are fixed all around and are equipped with supporting leg (8), supporting leg (8) are provided with four.
2. An easy-to-install fabricated building body structure according to claim 1, wherein: the supporting device comprises a bearing seat (9), a supporting plate (10) is fixedly arranged at the top of the bearing seat (9), a connecting plate (11) is fixedly arranged at the top of the supporting plate (10), and connecting blocks (12) are arranged on two sides of the connecting plate (11) in a sliding mode.
3. An easy-to-install fabricated building body structure according to claim 2, wherein: the bearing seat is characterized in that guide rods (13) are rotatably arranged on two sides of the bearing seat (9), fixed blocks (14) are rotatably arranged at the tops of the guide rods (13), two guide rods (13) and two fixed blocks (14) are rotatably arranged, and torsion springs are arranged between the guide rods (13) and the bearing seat (9).
4. An easy-to-install fabricated building body structure according to claim 2, wherein: a sliding cavity (15) is formed in the connecting plate (11), a sliding spring (16) is arranged in the sliding cavity (15), and two sliding cavities (15), two sliding springs (16) and two connecting blocks (12) are arranged.
5. An easy-to-install fabricated building body structure according to claim 1, wherein: coupling mechanism includes first fixed plate (17) and second fixed plate (18), first fixed plate (17) and second fixed plate (18) set up and are erecting roof beam (3) both sides, be equipped with connecting rod (19) on first fixed plate (17), connecting rod (19) pass first fixed plate (17) and erect roof beam (3) and second fixed plate (18) fixed connection, connecting rod (19) are provided with two.
6. An easy-to-install fabricated building body structure according to claim 5, wherein: be equipped with constant head tank (20) on connecting rod (19), be equipped with bracing piece (21) on first fixed plate (17), be equipped with fastening bolt (22) on bracing piece (21), constant head tank (20) are provided with a plurality ofly and with fastening bolt (22) adaptation connection.
7. An easy-to-install fabricated building body structure according to claim 5, wherein: and a buffer block (23) is arranged between the first fixing plate (17) and the vertical beam (3) and between the second fixing plate (18) and the vertical beam (3).
CN202220465701.2U 2022-03-05 2022-03-05 An easy-to-install prefabricated building main structure Expired - Fee Related CN217105507U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220465701.2U CN217105507U (en) 2022-03-05 2022-03-05 An easy-to-install prefabricated building main structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220465701.2U CN217105507U (en) 2022-03-05 2022-03-05 An easy-to-install prefabricated building main structure

Publications (1)

Publication Number Publication Date
CN217105507U true CN217105507U (en) 2022-08-02

Family

ID=82600618

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220465701.2U Expired - Fee Related CN217105507U (en) 2022-03-05 2022-03-05 An easy-to-install prefabricated building main structure

Country Status (1)

Country Link
CN (1) CN217105507U (en)

Similar Documents

Publication Publication Date Title
CN111021572A (en) Metal damping type energy consumption K-bracing module type anti-side unit
CN213204586U (en) Wood structure wall connection structure
CN112323982A (en) Temporary building beam column connection supporting structure
CN113123632B (en) Reinforced structure of wind-resistant steel column and steel column comprising reinforced structure
CN219033731U (en) Roof steel structure of assembled board house building
CN220058844U (en) Beam template support structure of building main body
CN218092273U (en) Steel construction factory building supporting mechanism
CN216196847U (en) Replaceable superplastic buckling restrained brace device for historic building timber frame
CN116905664A (en) Assembled building bearing connecting piece
CN213421059U (en) Steel structure fastening support suitable for boiler
CN222009172U (en) Building frame strutting arrangement
CN222227733U (en) Baffle assembly device in case post
CN222796707U (en) A steel beam-column structure
CN223853551U (en) A steel structure support frame that is easy to assemble and disassemble
CN222990900U (en) A butt joint assembly structure
CN217517811U (en) Quick mounting structure of H steel
CN221168861U (en) A prefabricated building support device based on BIM
CN222456350U (en) Building steel structure with good shock resistance
CN214885461U (en) Anti-seismic support template for building
CN222894778U (en) A pipe load-bearing support structure for prisms
CN217711115U (en) Beam column connecting structure
CN221956935U (en) Reinforced structure for bearing member of steel structure factory building
CN219012064U (en) Novel adjustable bracket
CN223951933U (en) An easy-to-install concrete-steel structure connector
CN219117976U (en) Auxiliary foot rest for bridge cantilever construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220802