CN217104743U - Lower beam support of large-inclination-angle tower column - Google Patents
Lower beam support of large-inclination-angle tower column Download PDFInfo
- Publication number
- CN217104743U CN217104743U CN202220576760.7U CN202220576760U CN217104743U CN 217104743 U CN217104743 U CN 217104743U CN 202220576760 U CN202220576760 U CN 202220576760U CN 217104743 U CN217104743 U CN 217104743U
- Authority
- CN
- China
- Prior art keywords
- column
- truss
- support
- tower
- lower beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
Description
技术领域technical field
本申请涉及桥梁工程施工技术领域,具体涉及一种大倾角塔柱的下横梁支架。The application relates to the technical field of bridge engineering construction, and in particular to a lower beam support for a tower column with a large inclination.
背景技术Background technique
索塔指的是悬索桥或斜拉桥支承主索的塔形构造物。索塔结构有多种类型,主要根据拉索的布置要求、桥面宽度以及主梁跨度等因素选用。常用的索塔形式沿桥纵向布置有单柱形、A形和倒Y形。A cable tower refers to a tower-shaped structure that supports the main cables of a suspension bridge or cable-stayed bridge. There are many types of cable tower structures, which are mainly selected according to the arrangement requirements of the cables, the width of the bridge deck and the span of the main beam. Commonly used cable tower forms are single-column, A-shaped and inverted Y-shaped along the longitudinal direction of the bridge.
随着现代桥梁施工技术的不断提高,有限元理论的日益成熟,设计理念及施工设备的不断进步,为了缓解城市交通压力,同时增强桥梁的景观效果,现代桥梁正朝着大跨度、超宽、轻巧的方向发展。各类在传统塔型基础上变异而成的索塔逐渐出现,如曲线塔、花瓶塔等倾角较大的塔柱。With the continuous improvement of modern bridge construction technology, the increasingly mature finite element theory, and the continuous progress of design concepts and construction equipment, in order to relieve the pressure of urban traffic and enhance the landscape effect of bridges, modern bridges are moving towards large-span, ultra-wide, Lightweight direction development. Various types of towers mutated on the basis of traditional towers have gradually appeared, such as curved towers, vase towers and other towers with large inclinations.
为便于下横梁的施工,需要先在下塔柱上安装下横梁支架,在下横梁施工完毕后,再将下横梁支架拆除。相对于传统小角度直线型塔柱的下横梁支架,该桥的大倾角索塔的下塔柱通过横向连接件相连,下横梁支架的支点支撑位置受限;由于索塔下塔柱倾角较大,下塔柱施工时,塔柱外侧模受较大的侧压力,需要在模板外侧设置支撑,施工周期长;且由于索塔下塔柱内侧逐渐向内倾斜、弯曲并与下横梁连接,因此下横梁底部靠近下塔柱的曲线段较长,下横梁支架的桁架机构系统形状制作复杂,成本较高。In order to facilitate the construction of the lower beam, it is necessary to install the lower beam bracket on the lower tower column first, and then remove the lower beam bracket after the construction of the lower beam is completed. Compared with the lower beam bracket of the traditional small-angle linear tower column, the lower tower column of the large-angle cable tower of the bridge is connected by a transverse connector, and the support position of the fulcrum of the lower beam bracket is limited; due to the large inclination angle of the lower tower column of the cable tower, During the construction of the lower tower column, the outer formwork of the tower column is subjected to a large lateral pressure, and it is necessary to provide support on the outer side of the formwork, and the construction period is long; and because the inner side of the lower tower column of the cable tower is gradually inclined inward, bent and connected with the lower beam, so the lower beam The curved section at the bottom close to the lower tower column is long, and the truss mechanism system of the lower beam support is complicated in shape and high in cost.
实用新型内容Utility model content
针对现有技术中存在的缺陷之一,本申请的目的在于提供一种大倾角塔柱的下横梁支架,以解决相关技术中下横梁支架施工不便、施工周期长和施工成本较高的问题。In view of one of the defects in the prior art, the purpose of the present application is to provide a lower beam support for a tower column with a large inclination to solve the problems of inconvenient construction, long construction period and high construction cost of the lower beam support in the related art.
为达到以上目的,本申请提供一种大倾角塔柱的下横梁支架,其包括:In order to achieve the above purpose, the application provides a lower beam support for a tower column with a large inclination, comprising:
支撑机构,其两侧的底部连接于两个下塔柱;a support mechanism, the bottoms of the two sides are connected to the two lower towers;
横向连接机构,其设有两组且相互对称,每组上述横向连接机构的一端连接于上述支撑机构的一侧,其另一端穿过邻近的下塔柱并连接于该下塔柱的外侧壁;Transverse connection mechanism, it is provided with two groups and is symmetrical with each other, one end of each group of the above-mentioned transverse connection mechanism is connected to one side of the above-mentioned support mechanism, and the other end passes through the adjacent lower column and is connected to the outer side wall of the lower column ;
桁架机构,其沿横桥向布置,并连接于上述支撑机构的顶部,上述桁架机构两侧的的底部分别连接于两个上述下塔柱,上述桁架机构的顶面与下横梁的底面契合,用以支撑下横梁施工时的荷载。The truss mechanism is arranged along the transverse bridge direction and is connected to the top of the support mechanism, the bottoms of the two sides of the truss mechanism are respectively connected to the two lower towers, and the top surface of the truss mechanism fits with the bottom surface of the lower beam, It is used to support the load of the lower beam during construction.
一些实施例中,上述支撑机构包括两个钢管柱和连接两个钢管柱的连接部,两个上述钢管柱分别通过埋设于下塔柱内的第一预埋件竖直连接于两个下塔柱,上述钢管柱的顶部连接上述桁架机构。In some embodiments, the above-mentioned support mechanism includes two steel pipe columns and a connecting portion connecting the two steel pipe columns, and the two above-mentioned steel pipe columns are respectively vertically connected to the two lower towers through first embedded parts embedded in the lower tower columns. The top of the steel pipe column is connected to the truss mechanism.
一些实施例中,上述桁架机构通过多个第一连接组件与上述支撑机构连接。In some embodiments, the above-mentioned truss mechanism is connected to the above-mentioned support mechanism through a plurality of first connecting components.
一些实施例中,上述第一连接组件包括:In some embodiments, the above-mentioned first connection component includes:
第一分配梁,其连接于上述桁架机构的底部;a first distribution beam, which is connected to the bottom of the above-mentioned truss mechanism;
第一钢楔块,其连接于上述第一分配梁下端,并连接于上述支撑机构的顶部。The first steel wedge is connected to the lower end of the first distribution beam and is connected to the top of the support mechanism.
一些实施例中,每组的横向连接机构相互平行设立。In some embodiments, the transverse connecting mechanisms of each group are established parallel to each other.
一些实施例中,每个横向连接机构均包括:In some embodiments, each lateral connection mechanism includes:
固定件,其通过垫块连接于钢管柱远离下塔柱的侧壁;a fixing piece, which is connected to the side wall of the steel pipe column away from the lower tower column through the spacer;
对拉杆,其一端穿过下塔柱且连接于下塔柱的外侧壁,另一端穿过钢管柱且与上述固定件连接。For the tie rod, one end of the tie rod passes through the lower column and is connected to the outer side wall of the lower column, and the other end passes through the steel pipe column and is connected with the above-mentioned fixing member.
一些实施例中,上述桁架机构通过多个第二连接组件与埋设于上述下塔柱内的第二预埋件连接。In some embodiments, the above-mentioned truss mechanism is connected to the second embedded part embedded in the above-mentioned lower tower column through a plurality of second connecting components.
一些实施例中,上述第二连接组件包括:In some embodiments, the above-mentioned second connection component includes:
牛腿,其连接上述第二预埋件上端;a corbel, which is connected to the upper end of the second embedded part;
第二钢楔块,其连接于上述牛腿的上端;the second steel wedge, which is connected to the upper end of the above-mentioned corbel;
第二分配梁,其连接于上述第二钢楔块与上述桁架机构之间。The second distribution beam is connected between the second steel wedge and the truss mechanism.
一些实施例中,上述桁架机构包括:In some embodiments, the above-mentioned truss mechanism includes:
上层桁架,其包括多个贝雷片和对称连接于多个贝雷片两侧的第一弧形段;an upper-layer truss, which includes a plurality of beret sheets and a first arc segment symmetrically connected to both sides of the plurality of beret sheets;
下层桁架,其包括多个贝雷片和对称连接于多个贝雷片两侧的第二弧形段;a lower truss, which includes a plurality of beret sheets and a second arc segment symmetrically connected to both sides of the plurality of beret sheets;
上述第一弧形段的顶面,与第二弧形段未与第一弧形段连接的顶面形成曲面。The top surface of the first arc-shaped segment and the top surface of the second arc-shaped segment not connected to the first arc-shaped segment form a curved surface.
一些实施例中,上述下层桁架的贝雷片数量比上层桁架的贝雷片数量多两个。In some embodiments, the number of beret sheets of the lower truss is two more than the number of beret sheets of the upper truss.
本申请提供的技术方案带来的有益效果包括:The beneficial effects brought by the technical solution provided by this application include:
本申请实施例提供了一种大倾角塔柱的下横梁支架,包括支撑机构、横向连接机构和桁架机构,横向连接机构用于连接支撑机构与下塔柱,桁架机构沿横桥向布置并连接于支撑机构的顶部和下塔柱内侧,通过在两个下塔柱上设置支撑机构,并将下塔柱的外侧壁通过横向连接机构与支撑机构牵拉,使得大倾角下塔柱外侧模承受的侧压力交由下横梁支架承受,避免在下塔柱外侧模处设置支撑,缩短了施工工期,降低了施工成本;通过设置桁架机构,并使桁架机构的顶面与下横梁的底面契合,使得下横梁在浇筑时桁架机构的承载力更好,该桁架机构跨度大,仅连接在支撑机构的顶部和两个下塔柱上,使得下横梁支架的支撑点减少,节约了钢结构的用量,降低了施工成本。The embodiment of the present application provides a lower beam support for a tower column with a large inclination, including a support mechanism, a transverse connection mechanism and a truss mechanism. The transverse connection mechanism is used to connect the support mechanism and the lower column, and the truss mechanism is arranged and connected along the transverse bridge direction. At the top of the support mechanism and the inner side of the lower tower, by setting the support mechanism on the two lower towers, and pulling the outer side wall of the lower tower through the lateral connection mechanism and the support mechanism, the outer mold of the lower tower with a large inclination can withstand the The side pressure of the truss is handed over to the lower beam bracket, avoiding the need to set supports at the outer mold of the lower tower column, shortening the construction period and reducing the construction cost; When the lower beam is poured, the bearing capacity of the truss mechanism is better. The truss mechanism has a large span and is only connected to the top of the support mechanism and the two lower towers, which reduces the supporting points of the lower beam bracket and saves the amount of steel structure. Reduced construction costs.
附图说明Description of drawings
为了更清楚地说明本申请实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本申请的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the technical solutions in the embodiments of the present application more clearly, the following briefly introduces the drawings that are used in the description of the embodiments. Obviously, the drawings in the following description are only some embodiments of the present application. For those of ordinary skill in the art, other drawings can also be obtained from these drawings without creative effort.
图1为本申请实施例提供的大倾角塔柱的下横梁支架的安装示意图;Fig. 1 is the installation schematic diagram of the lower beam support of the tower column with large inclination provided by the embodiment of the present application;
图2为图1中支撑机构和横向连接机构的配合示意图;FIG. 2 is a schematic diagram of the cooperation of the support mechanism and the lateral connection mechanism in FIG. 1;
图3为图1中第二连接组件与第二预埋件的配合示意图;FIG. 3 is a schematic diagram of the cooperation between the second connection component and the second embedded part in FIG. 1;
图4为图1中桁架机构的结构示意图;Fig. 4 is the structural schematic diagram of the truss mechanism in Fig. 1;
图5为图4中第一弧形段的结构示意图;Fig. 5 is the structural representation of the first arc segment in Fig. 4;
图6为图4中第二弧形段的结构示意图。FIG. 6 is a schematic structural diagram of the second arc-shaped segment in FIG. 4 .
附图标记:Reference number:
1、下塔柱;1. Lower the tower;
2、支撑机构;21、钢管柱;22、连接部;23、第一预埋件;24、第二预埋件;2. Supporting mechanism; 21. Steel pipe column; 22. Connection part; 23. First embedded part; 24. Second embedded part;
3、横向连接机构;31、对拉杆;32、固定件;33、垫块;3. Transverse connecting mechanism; 31. Tie rod; 32. Fixing part; 33. Spacer;
4、桁架机构;41、上层桁架;411、贝雷片;412、第一弧形段;42、下层桁架;421、第二弧形段;4. Truss mechanism; 41. Upper truss; 411, Bailey sheet; 412, first arc segment; 42, lower truss; 421, second arc segment;
5、第一连接组件;51、第一分配梁;52、第一钢楔块;5. The first connecting assembly; 51. The first distribution beam; 52. The first steel wedge;
6、第二连接组件;61、牛腿;62、第二钢楔块;63、第二分配梁。6. The second connecting assembly; 61, the corbel; 62, the second steel wedge; 63, the second distribution beam.
具体实施方式Detailed ways
为使本申请实施例的目的、技术方案和优点更加清楚,下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本申请的一部分实施例,而不是全部的实施例。基于本申请中的实施例,本领域普通技术人员在没有做出创造性劳动的前提下所获得的所有其他实施例,都属于本申请保护的范围。In order to make the purposes, technical solutions and advantages of the embodiments of the present application more clear, the technical solutions in the embodiments of the present application will be described clearly and completely below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments It is a part of the embodiments of this application, but not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative work shall fall within the protection scope of the present application.
本申请实施例提供了一种大倾角塔柱的下横梁支架,其能解决相关技术中下横梁支架施工不便、施工周期长和施工成本较高的问题。The embodiment of the present application provides a lower beam support for a tower column with a large inclination angle, which can solve the problems of inconvenient construction, long construction period and high construction cost of the lower beam support in the related art.
如图1所示,本申请实施例提供的一种大倾角塔柱的下横梁支架,包括支撑机构2、横向连接机构3和桁架机构4,上述支撑机构2的两侧底部连接在两个下塔柱1上,上述横向连接机构3设有两组且相互对称,每组上述横向连接机构3的一端连接在上述支撑机构2的一侧,横向连接机构3的另一端穿过邻近的下塔柱1并连接在该下塔柱的外侧壁上。As shown in FIG. 1 , a lower beam support of a tower column with a large inclination provided by the embodiment of the present application includes a
由于两个下塔柱1的倾角较大,因此在下塔柱施工时,下塔柱外侧模受到较大的侧压力,需要在模板外侧设置支撑,或将外侧模和下横梁支架对拉。在本实施例中,将下塔柱1通过横向连接机构3与支撑机构2连接,使得下塔柱外侧模承受的侧压力交由下横梁支架上的支撑机构承受,从而避免在下塔柱外侧模处设置支撑,缩短了施工工期,降低了施工成本。Due to the large inclination angle of the two
上述桁架机构4沿横桥向布置,并连接在上述支撑机构2的顶部,上述桁架机构4两侧的底部分别连接在两个下塔柱1上,且上述桁架机构4的顶面与下横梁的底面契合,用以支撑下横梁施工时的荷载。The above-mentioned truss mechanism 4 is arranged along the transverse bridge direction and is connected to the top of the above-mentioned
可以理解,下横梁位于两个下塔柱的顶部,且与两个下塔柱连接,下横梁的下端面包括位于两端的曲线段和位于两个曲线段中间的直线段。由于下塔柱的倾角较大,因此下横梁靠近下塔柱的曲线段较长,将桁架机构4架设在支撑机构2的顶部,并与两个下塔柱1固定连接,减少了桁架机构的支点数量;桁架机构4的顶面与下横梁的底面契合,不仅使下横梁的支撑更稳定,同时便于下横梁的浇筑施工和后期支架的拆除。It can be understood that the lower beam is located at the top of the two lower towers and connected to the two lower towers, and the lower end surface of the lower beam includes curved segments at both ends and a straight segment located in the middle of the two curved segments. Due to the large inclination angle of the lower tower, the curved section of the lower beam close to the lower tower is longer. The truss mechanism 4 is erected on the top of the
进一步地,如图2所示,上述支撑机构2包括两个钢管柱21、连接部22和两个第一预埋件23,两个第一预埋件23分别埋设在两个下塔柱上,两个钢管柱21的底部分别通过第一预埋件23竖直连接在两个下塔柱上,两个钢管柱21的顶部连接在上述桁架机构4上,两个上述钢管柱21通过上述连接部22连接在一起。Further, as shown in FIG. 2 , the above-mentioned
实际施工时,在浇筑下塔柱第二节混凝土前,在第一预埋件23的设置位置安装挡板形成预留空间,以作为后浇段,在后浇段位置安装第一预埋件23并浇筑,再将钢管柱21的底部与第一预埋件23焊接连接,从而使得钢管柱21可稳定连接在下塔柱上。During the actual construction, before pouring the second section of concrete of the lower tower, a baffle plate is installed at the setting position of the first embedded
进一步地,上述桁架机构4通过多个第一连接组件5与上述支撑机构2连接。Further, the above-mentioned truss mechanism 4 is connected to the above-mentioned
在本实施例中,第一连接组件的数量为两个,每个第一连接组件的一端连接在钢管柱21的顶部,每个第一连接组件的另一端连接在桁架机构4的底部。In this embodiment, the number of the first connecting components is two, one end of each first connecting component is connected to the top of the
进一步地,如2所示,上述第一连接组件5包括第一分配梁51和第一钢楔块52,上述第一分配梁51连接在上述桁架机构4的底部,上述第一钢楔块52连接在上述第一分配梁51的下端和支撑机构2的顶部。Further, as shown in 2, the
设置第一钢楔块52和第一分配梁51的作用,不仅使得桁架机构4和支撑机构2的连接更稳定,且第一钢楔块52作为卸落装置,便于后期支架的拆卸。第一分配梁吊装在第一钢楔块上,第一钢楔块通过焊接的方式与支撑机构连接。The function of setting the first steel wedge 52 and the first distribution beam 51 not only makes the connection between the truss mechanism 4 and the
进一步地,如图2所示,每组的横向连接机构3相互平行设立。Further, as shown in FIG. 2 , the
在本实施例中,每组中横向连接机构3的数量为3个,3个横向连接机构相互平行且均水平于地面。可以理解,采取水平的连接方式,使得下塔柱与支撑机构之间的对拉效果更好。In this embodiment, the number of
进一步地,如图2所示,每个横向连接机构3包括对拉杆31、固定件32和垫块33,上述固定件32通过上述垫块33连接在钢管柱21远离下塔柱1的侧壁上,上述对拉杆31的一端穿过下塔柱1且连接在下塔柱1的外侧壁上,对拉杆31的另一端与上述固定件32连接。Further, as shown in FIG. 2 , each
可以理解,钢管柱21为圆柱体结构,因此要使对拉杆31与钢管柱21的连接更稳定且稳固,需要在固定件32与对拉杆31之间增设垫块,以增加钢管柱上的受力面积,提高连接的稳定性。在具体施工时,需要在下塔柱的外侧模板上预留螺栓孔,以使对拉杆31穿过下塔柱预留的螺栓孔与下塔柱外侧模连接。It can be understood that the
在本实施例中,固定件32为双槽钢,通过焊接的方式与垫块33固定连接。In this embodiment, the fixing member 32 is a double channel steel, which is fixedly connected to the spacer block 33 by welding.
进一步地,上述桁架机构4通过多个第二连接组件6与埋设在上述下塔柱1内的第二预埋件24连接。Further, the above-mentioned truss mechanism 4 is connected with the second embedded
实际施工时,在下塔柱与下横梁连接倒角处的预留空间内安装第二预埋件24,将第二连接组件6的底部与第二预埋件24焊接,第二连接组件6的顶部连接上述桁架机构4,从而使桁架机构稳定连接在下塔柱上。During actual construction, install the second embedded
进一步地,如图3所示,上述第二连接组件6包括牛腿61、第二钢楔块62和第二分配梁63,上述牛腿61连接在上述第二预埋件24的上端,上述第二钢楔块62连接在上述牛腿61的上端,上述第二分配梁63连接在第二钢楔块62与桁架机构4之间。Further, as shown in FIG. 3 , the second connecting
可以理解,第二钢楔块62作为卸落装置,便于后期支架的拆卸。第二分配梁63吊装在第二钢楔块62上,第二钢楔块62通过焊接的方式与牛腿61连接。It can be understood that the
进一步地,如图4所示,上述桁架机构4包括上层桁架41和下层桁架42,上述上层桁架41包括多个贝雷片411和对称连接在多个贝雷片两侧的第一弧形段412;上述下层桁架42包括多个贝雷片411和对称连接在多个贝雷片两侧的第二弧形段421;上述第一弧形段412的顶面和上述第二弧形段421未与第一弧形段412连接的顶面形成曲面。Further, as shown in FIG. 4 , the above-mentioned truss mechanism 4 includes an upper-
由于下横梁靠近下塔柱的曲线段较长,且下横梁的跨度较大,因此将桁架机构4设置为包括贝雷片411、第一弧形段412和第二弧形段421构成的双层桁架,在两个曲线段部分均采用第一弧形段412与第二弧形段421组合连接,以使第一弧形段412的顶面和上述第二弧形段421未与第一弧形段412连接的顶面形成曲面,与下横梁的曲线段契合。桁架机构4的上端面整体形成承重曲面,支撑下横梁的下端面。Since the curved section of the lower beam close to the lower tower column is relatively long, and the span of the lower beam is relatively large, the truss mechanism 4 is set as a double-layered structure including the
在本实施例中,如图5和图6所示,采用新制贝雷片作为第一弧形段412和第二弧形段421,制作简单,且与弯曲的曲面段较好契合。多个贝雷片411、第一弧形段412、第二弧形段421之间通过销轴可拆卸连接,便于下横梁施工完成后桁架机构的拆除和倒用。In this embodiment, as shown in FIG. 5 and FIG. 6 , newly-made beret sheets are used as the
实际施工时,将下层桁架42放置在第一分配梁51和第二分配梁63上,并通过限位件将下层桁架42固定,再将下横梁的底膜系统分块吊装至桁架机构4的顶部,并在底膜上焊接限位件使其与上层桁架41固定连接。In actual construction, the
优选的,上述下层桁架42的贝雷片数量比上层桁架41的贝雷片数量多两个。Preferably, the number of beret sheets of the
如图4所示,下层桁架42的两侧分别比上层桁架41多一个贝雷片,从而与上层桁架41组合形成左右对称的双层结构,且该设置方式可以使第一弧形段412与第二弧形段421的数量尽量少,从而减少新制贝雷的数量以降低成本。As shown in FIG. 4 , the two sides of the
本实用新型的工作原理为:在两个下塔柱1的第二节混凝土内分别安装第一预埋件23,将两个钢管柱21的底端分别焊接在两个第一预埋件23的顶端,并通过连接部22将两个钢管柱21连接在一起,在钢管柱21的侧壁上安装垫块33和固定件32,在相邻于该钢管柱的下塔柱的外侧模上开设螺栓孔,将对拉杆31的一端连接在下塔柱的外侧模上,另一端连接固定件32,从而使得下塔柱1与支撑机构2之间形成对拉,降低下塔柱外侧模在下横梁施工时承受的侧压力;在两个下塔柱1与下横梁连接的倒角处安装第二预埋件24,将牛腿61的底部与第二预埋件24的顶部焊接,再将第二钢楔块62与牛腿61的顶部焊接,并将第二分配梁63吊装在第二钢楔块62上,从而形成用于放置桁架机构4的第二连接组件6,将多个贝雷片411和两个第一弧形段412、两个第二弧形段421通过销轴连接,组成双层的桁架机构4,将桁架机构4沿横桥向布置,并通过限位件与第一分配梁51和第二分配梁63连接,使得桁架机构4稳定放置在支撑机构2和下塔柱1上,最后将下横梁的底模系统分块吊装到桁架机构4的顶部,通过限位件与上层桁架41固定,即可开始下横梁的施工;当下横梁施工完成后,通过调低第一钢楔块52和第二钢楔块62的高度来拆除底模系统,进而拆除桁架机构4、横向连接机构3及支撑机构2。The working principle of the utility model is as follows: first embedded
本申请实施例的一种大倾角塔柱的下横梁支架,通过在下塔柱上搭设下横梁支架,并通过多个横向连接机构将支撑机构与下塔柱的外侧连接,从而将大倾角下塔柱的外侧模承受的侧压力交由下横梁支架承受,解决了在下塔柱外侧模处设置支撑,降低了施工成本;通过设置双层的桁架机构,不仅解决了传统单层贝雷片桁架跨度小、支点多从而造成钢结构用量较多、施工复杂的问题外,还与下横梁和下塔柱连接处的曲线段的特殊曲线较好契合,便于下横梁的浇筑施工和后期支架的拆卸;通过设置预埋件来连接下塔柱与下横梁支架,从而解决了在倾斜的下塔柱上安装下横梁支架的安全和精度问题。A lower beam support for a tower column with a large inclination according to an embodiment of the present application, the lower beam bracket is set up on the lower tower column, and the support mechanism is connected to the outer side of the lower tower column through a plurality of transverse connection mechanisms, so as to connect the lower tower column with a large inclination angle. The lateral pressure of the outer formwork of the column is borne by the lower beam bracket, which solves the problem of setting supports at the outer formwork of the lower tower column and reduces the construction cost. It is small and has many fulcrums, which causes the problems of more steel structure consumption and complicated construction. It also fits well with the special curve of the curve section at the connection between the lower beam and the lower tower column, which is convenient for the pouring of the lower beam and the dismantling of the support in the later stage; By arranging embedded parts to connect the lower tower column and the lower beam bracket, the safety and precision problems of installing the lower beam bracket on the inclined lower tower column are solved.
在本申请的描述中,需要说明的是,术语“上”、“下”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本申请和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本申请的限制。除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本申请中的具体含义。In the description of this application, it should be noted that the orientation or positional relationship indicated by the terms "upper", "lower", etc. is based on the orientation or positional relationship shown in the accompanying drawings, and is only for the convenience of describing the application and simplifying the description, Rather than indicating or implying that the referred device or element must have a particular orientation, be constructed and operate in a particular orientation, it should not be construed as a limitation on the application. Unless otherwise expressly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it may be a fixed connection, a detachable connection, or an integral connection; it may be a mechanical connection, It can also be an electrical connection; it can be a direct connection, an indirect connection through an intermediate medium, or an internal connection between two components. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to specific situations.
需要说明的是,在本申请中,诸如“第一”和“第二”等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should be noted that, in this application, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply Any such actual relationship or sequence exists between these entities or operations. Moreover, the terms "comprising", "comprising" or any other variation thereof are intended to encompass non-exclusive inclusion such that a process, method, article or device comprising a list of elements includes not only those elements, but also includes not explicitly listed or other elements inherent to such a process, method, article or apparatus. Without further limitation, an element qualified by the phrase "comprising a..." does not preclude the presence of additional identical elements in a process, method, article or apparatus that includes the element.
以上所述仅是本申请的具体实施方式,使本领域技术人员能够理解或实现本申请。对这些实施例的多种修改对本领域的技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本申请的精神或范围的情况下,在其它实施例中实现。因此,本申请将不会被限制于本文所示的这些实施例,而是要符合与本文所申请的原理和新颖特点相一致的最宽的范围。The above descriptions are only specific embodiments of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, this application is not intended to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features claimed herein.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202220576760.7U CN217104743U (en) | 2022-03-16 | 2022-03-16 | Lower beam support of large-inclination-angle tower column |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202220576760.7U CN217104743U (en) | 2022-03-16 | 2022-03-16 | Lower beam support of large-inclination-angle tower column |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN217104743U true CN217104743U (en) | 2022-08-02 |
Family
ID=82602604
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202220576760.7U Active CN217104743U (en) | 2022-03-16 | 2022-03-16 | Lower beam support of large-inclination-angle tower column |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN217104743U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115323932A (en) * | 2022-08-31 | 2022-11-11 | 四川公路桥梁建设集团有限公司 | Supporting construction and supporting system are used in construction of column bottom end rail |
| CN116905376A (en) * | 2023-08-11 | 2023-10-20 | 中铁大桥局集团有限公司 | High pier large cantilever TY type bent cap bracket system and construction method thereof |
-
2022
- 2022-03-16 CN CN202220576760.7U patent/CN217104743U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115323932A (en) * | 2022-08-31 | 2022-11-11 | 四川公路桥梁建设集团有限公司 | Supporting construction and supporting system are used in construction of column bottom end rail |
| CN116905376A (en) * | 2023-08-11 | 2023-10-20 | 中铁大桥局集团有限公司 | High pier large cantilever TY type bent cap bracket system and construction method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN211947993U (en) | Support for large-span cast-in-situ bridge construction | |
| CN107190647A (en) | A kind of alignment control apparatus and method suitable for the special-shaped tower of steel construction | |
| CN211815595U (en) | Lower tower column tension and compression structure for cable tower | |
| CN105839516A (en) | Transverse anti-drop-beam device for bridge and construction method thereof | |
| CN111188278A (en) | Tire frame structure, tire frame assembly and construction method | |
| CN208039060U (en) | A kind of steel box arch rib bowstring arch bridge binder steel skeleton external wrapping concrete hangs die body system | |
| CN207392053U (en) | A kind of alignment control device suitable for steel construction abnormity tower | |
| CN115387233A (en) | Construction method for large-span and large-volume bent cap of transition pier of composite beam cable-stayed bridge | |
| CN114960452A (en) | Template structure of large-inclination-angle concrete tower column and tower column construction method | |
| CN213358344U (en) | Adjustable bracket for cast-in-situ beam | |
| CN212000638U (en) | Elevated cover beam section steel support structure | |
| CN114398706A (en) | A temperature equivalent simulation method and a construction method for a lower beam | |
| CN201024388Y (en) | Hybrid bent frame for urban viaduct construction | |
| CN221855290U (en) | A steel tower construction adjustment device | |
| CN116289559B (en) | A low lower tower bridge tower and construction method | |
| CN217378583U (en) | Crossbeam support structure with main tower column stull function | |
| CN219280520U (en) | High pier large cantilever bent cap support | |
| CN219175028U (en) | Double-limb pier climbing formwork | |
| CN111705633B (en) | Construction device and construction method for cantilever cast-in-place cap beam of offshore low bridge pier | |
| CN211897808U (en) | Double-layer elevated Y-shaped inclined column support structure | |
| CN116607427A (en) | External hanging bracket for hollow pier top solid section construction and construction method | |
| CN115652816A (en) | Variable-height reinforced concrete composite beam pushing system and construction method | |
| CN209584870U (en) | Pedestal structure for the prefabricated a variety of line style free cantilever erections segment of long line method | |
| CN210917011U (en) | Cable tower structure and bridge | |
| CN222477246U (en) | A large-span top-pushing pier structure without temporary piers |