CN217087397U - Tunnel cable laying structure - Google Patents

Tunnel cable laying structure Download PDF

Info

Publication number
CN217087397U
CN217087397U CN202220740692.3U CN202220740692U CN217087397U CN 217087397 U CN217087397 U CN 217087397U CN 202220740692 U CN202220740692 U CN 202220740692U CN 217087397 U CN217087397 U CN 217087397U
Authority
CN
China
Prior art keywords
installation
mounting
plate
support
clamping plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220740692.3U
Other languages
Chinese (zh)
Inventor
方野
贺建新
王玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Yuxin Road And Bridge Development Co ltd
Original Assignee
Chongqing Yuxin Road And Bridge Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Yuxin Road And Bridge Development Co ltd filed Critical Chongqing Yuxin Road And Bridge Development Co ltd
Priority to CN202220740692.3U priority Critical patent/CN217087397U/en
Application granted granted Critical
Publication of CN217087397U publication Critical patent/CN217087397U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a tunnel cable laying structure, it is including seting up the mounting groove on ground, wear to be equipped with the installation pipe in the mounting groove, still be equipped with a plurality of backup pads in the mounting groove, it is a plurality of the backup pad distributes along the length direction of installation pipe, the backup pad includes installation frame and a plurality of mounting panels that set up in installation frame inboard, the installation frame is installed in the mounting groove, the mounting panel slides and connects in the installation frame, the mounting panel is equipped with the mounting hole that is used for wearing to establish the installation pipe. This application has the effect that improves the convenience when installation pipe installs in the backup pad.

Description

一种隧道电缆敷设结构A tunnel cable laying structure

技术领域technical field

本申请涉及电缆敷设技术的领域,尤其是涉及一种隧道电缆敷设结构。The present application relates to the field of cable laying technology, and in particular, to a tunnel cable laying structure.

背景技术Background technique

隧道内部分电缆在敷设时,往往采用埋管的形式。安装时,先将地面开挖安装槽,随后在安装槽内放置安装管并同时在安装槽内回填土壤。使得后续敷设电缆时,能够将电缆穿设于安装管内,以使电缆不与土壤直接接触,进而便于电缆后续的安装与取出。When laying some cables in the tunnel, it is often in the form of buried pipes. When installing, first excavate the installation groove on the ground, then place the installation pipe in the installation groove and backfill the soil in the installation groove at the same time. When the cables are subsequently laid, the cables can be passed through the installation pipe, so that the cables do not directly contact the soil, thereby facilitating the subsequent installation and removal of the cables.

此时,为了提高安装管在安装槽内放置时的稳固性,通常会在安装槽内设置多个支撑板,多个支撑板沿安装管的长度方向分布,且支撑板开设有用于穿设安装管的安装孔。安装时,只需将安装管穿设于支撑板上的安装孔即可。At this time, in order to improve the stability of the installation pipe when it is placed in the installation groove, a plurality of support plates are usually arranged in the installation groove. mounting holes for the pipe. When installing, just pass the installation pipe through the installation hole on the support plate.

针对上述相关技术,发明人发现支撑板在穿设于安装槽内后,多个的支撑板上的安装孔存在错位的可能性。进而导致安装管在穿设于多个支撑板上的安装孔时,相对较为不便,进而影响安装管的安装效率。In view of the above-mentioned related art, the inventor found that after the support plate is inserted into the installation groove, the mounting holes on the plurality of support plates may be dislocated. As a result, it is relatively inconvenient for the installation pipe to pass through the installation holes of the plurality of support plates, thereby affecting the installation efficiency of the installation pipe.

实用新型内容Utility model content

为了提高安装管在支撑板上安装时的便捷性,本申请提供一种隧道电缆敷设结构。In order to improve the convenience when the installation pipe is installed on the support plate, the present application provides a tunnel cable laying structure.

本申请提供的一种隧道电缆敷设结构采用如下的技术方案:A tunnel cable laying structure provided by the application adopts the following technical solutions:

一种隧道电缆敷设结构,包括开设于地面的安装槽,所述安装槽内穿设有安装管,所述安装槽内还设有多个支撑板,多个所述支撑板沿安装管的长度方向分布,所述支撑板包括安装框架和若干设置于安装框架内侧的安装板,所述安装框架安装于安装槽内,所述安装板滑移连接于安装框架,所述安装板设有用于穿设安装管的安装孔。A tunnel cable laying structure, comprising an installation groove opened on the ground, an installation pipe is passed through the installation groove, and a plurality of support plates are also arranged in the installation groove, and the plurality of the support plates are along the length of the installation pipe Direction distribution, the support plate includes a mounting frame and a plurality of mounting plates arranged on the inner side of the mounting frame, the mounting frame is installed in the mounting groove, the mounting plate is slidingly connected to the mounting frame, and the mounting plate is provided with Set the mounting holes for the mounting pipes.

通过采用上述技术方案,安装时,先将多个安装框架安装于安装槽内,随后将安装管穿设于多个安装板上的安装孔,最后将电缆穿设于安装管同时在安装槽内回填土壤;在安装框架放置完毕且在穿设安装管的过程中,能够将安装板相对安装框架滑移,以调节多个安装框架中安装孔的相对位置,进而便于安装管的穿设,提高安装管在支撑板上安装的便捷性。By adopting the above technical solution, when installing, first install a plurality of installation frames in the installation groove, then pass the installation pipe through the installation holes on the installation plate, and finally pass the cable through the installation pipe and in the installation groove at the same time. Backfill the soil; after the installation frame is placed and the installation pipe is pierced, the installation plate can be slid relative to the installation frame to adjust the relative positions of the installation holes in the multiple installation frames, thereby facilitating the installation of the installation pipe and improving the The ease of installation of the mounting tube on the support plate.

可选的,所述安装框架固定连接有控制螺杆,所述控制螺杆沿安装板滑移方向延伸,所述安装板转动连接有调节螺母,所述调节螺母套设并螺纹连接于控制螺杆。Optionally, a control screw rod is fixedly connected to the mounting frame, the control screw rod extends along the sliding direction of the mounting plate, and an adjusting nut is rotatably connected to the mounting plate, and the adjusting nut is sleeved and threadedly connected to the control screw rod.

通过采用上述技术方案,在需要调节安装板所在位置时,只需旋转调节螺母,从而牵引安装板沿控制螺杆滑移,进而调节安装孔所在位置,便于安装管的安装。By adopting the above technical solution, when the position of the mounting plate needs to be adjusted, the adjusting nut only needs to be rotated, thereby pulling the mounting plate to slide along the control screw rod, and then adjusting the position of the mounting hole, which is convenient for the installation of the mounting pipe.

可选的,所述安装框架还固定连接有辅助滑杆,所述辅助滑杆沿安装板滑移方向延伸,所述辅助滑杆穿设于安装板且两者相滑移连接。Optionally, the mounting frame is also fixedly connected with an auxiliary sliding rod, the auxiliary sliding rod extends along the sliding direction of the mounting plate, and the auxiliary sliding rod passes through the mounting plate and is connected in a sliding manner.

通过采用上述技术方案,设置的辅助滑杆能够对安装板的滑移做支撑,进而增加安装板滑移时的稳定性。By adopting the above technical solution, the auxiliary sliding bar provided can support the sliding of the mounting plate, thereby increasing the stability of the sliding of the mounting plate.

可选的,所述安装板包括第一夹板和第二夹板且两者分别滑移连接于安装框架相对的两侧壁,所述第一夹板与第二夹板相向端均开设有弧形槽,且第一夹板上的弧形槽与第二夹板上的弧形槽共同组成为安装孔,第一夹板还转动连接于安装框架,所述第一夹板与第二夹板的相向端相可拆卸连接。Optionally, the mounting plate includes a first clamping plate and a second clamping plate, and the two are respectively slidably connected to the opposite two side walls of the installation frame, and the opposite ends of the first clamping plate and the second clamping plate are provided with arc-shaped grooves, And the arc-shaped groove on the first plywood and the arc-shaped groove on the second plywood form a mounting hole, the first plywood is also rotatably connected to the mounting frame, and the opposite ends of the first plywood and the second plywood are detachably connected. .

通过采用上述技术方案,安装时,先将安装管抵接于第二夹板上的弧形槽,随后旋转第一夹板,使得安装管能够同时位于第二夹板上的弧形槽与第一夹板上的弧形槽内,随后将第一夹板与第二夹板相固定,从而将安装管安装于安装板,提高安装管在穿设于安装孔内的便捷性;若安装管需要在安装孔内移动时,能够先将第一夹板旋转,解除对安装管的限制,随后可将安装管抬起并移动,从而减小安装管与安装板之间发生摩擦而造成磨损的可能性。By adopting the above technical solution, during installation, the installation pipe is first abutted on the arc-shaped groove on the second clamping plate, and then the first clamping plate is rotated, so that the installation pipe can be located on the arc-shaped groove on the second clamping plate and the first clamping plate at the same time. Then, the first splint and the second splint are fixed, so that the installation pipe is installed on the installation plate, which improves the convenience of the installation pipe in the installation hole; if the installation pipe needs to be moved in the installation hole When the first clamp plate is rotated, the restriction on the installation pipe can be released, and then the installation pipe can be lifted and moved, thereby reducing the possibility of wear caused by friction between the installation pipe and the installation plate.

可选的,所述第一夹板与第二夹板的弧形槽部均固定连接有由弹性材料支撑的抵接条。Optionally, an abutment bar supported by an elastic material is fixedly connected to the arc-shaped groove portions of the first clamping plate and the second clamping plate.

通过采用上述技术方案,设置的抵接条能够进一步减小安装管安装时受到磨损的可能性。By adopting the above technical solution, the provided abutment strip can further reduce the possibility of the installation pipe being worn during installation.

可选的,所述安装槽相对的两侧壁均开设有用于穿设安装框架的卡槽,所述卡槽竖向延伸设置。Optionally, two opposite side walls of the installation groove are provided with a clamping groove for passing through the installation frame, and the clamping groove is vertically extended.

通过采用上述技术方案,安装时,将安装框架卡设于安装槽侧壁上的卡槽,从而提高安装框架在安装槽内的稳固性,使得安装框架不易发生倾倒或偏移。By adopting the above technical solution, during installation, the installation frame is clamped to the slot on the side wall of the installation slot, thereby improving the stability of the installation frame in the installation slot and making the installation frame less prone to tipping or deviation.

可选的,所述安装框架底部设置有底座,所述底座抵接于安装槽底壁,所述底座与安装框架之间设置有支撑杆,所述支撑杆包括支撑滑杆、支撑套管和支撑螺母,所述支撑滑杆与支撑套管分别一一对应连接于安装框架和底座,所述支撑螺母转动连接于支撑套管,且所述支撑螺母套设并螺纹连接于支撑滑杆。Optionally, the bottom of the installation frame is provided with a base, the base abuts against the bottom wall of the installation groove, and a support rod is arranged between the base and the installation frame, and the support rod includes a support sliding rod, a support sleeve and a support rod. The supporting nut is connected to the mounting frame and the base in a one-to-one correspondence with the supporting sliding rod and the supporting sleeve, the supporting nut is rotatably connected to the supporting sleeve, and the supporting nut is sleeved and threadedly connected to the supporting sliding rod.

通过采用上述技术方案,使用时,旋转支撑螺母能够驱使支撑滑杆相对支撑套管滑移,进而调节安装框架所在高度,从而进一步调节安装板所在位置,进一步便于安装管的安装。By adopting the above technical solution, when in use, rotating the support nut can drive the support slide rod to slide relative to the support sleeve, thereby adjusting the height of the mounting frame, thereby further adjusting the position of the mounting plate, and further facilitating the installation of the mounting pipe.

可选的,所述底座与安装框架之间还设置有若干稳固杆,所述稳固杆包括第一限位杆和第二限位杆,所述第一限位杆穿设并滑移连接于第二限位杆,所述第一限位杆和第二限位杆分别一一对应固定连接于安装框架和底座。Optionally, a number of stabilizing rods are further arranged between the base and the installation frame, the stabilizing rods include a first limit rod and a second limit rod, the first limit rod is penetrated and slidably connected to the The second limit rod, the first limit rod and the second limit rod are respectively fixedly connected to the installation frame and the base in a one-to-one correspondence.

通过采用上述技术方案,在调节安装框架与底座之间相对位置时,第一限位杆能够相对第二限位杆滑移,并且,设置的稳固杆能够在旋转支撑螺母时,减小底座跟随支撑螺母同步旋转的可能性,进而增加安装框架在调节时的稳固性。By adopting the above technical solution, when the relative position between the installation frame and the base is adjusted, the first limit rod can slide relative to the second limit rod, and the provided stabilizing rod can reduce the follow-up of the base when the support nut is rotated Possibility of synchronised rotation of the support nuts, which in turn increases the stability of the mounting frame during adjustment.

综上所述,本申请包括以下至少一种有益技术效果:To sum up, the present application includes at least one of the following beneficial technical effects:

在安装框架放置完毕且在穿设安装管的过程中,能够将安装板相对安装框架滑移,以调节多个安装框架中安装孔的相对位置,进而便于安装管的穿设,提高安装管在支撑板上安装的便捷性;After the installation frame is placed and the installation pipe is pierced, the installation plate can be slid relative to the installation frame to adjust the relative positions of the installation holes in the plurality of installation frames, thereby facilitating the installation of the installation pipe and improving the installation efficiency of the installation pipe. The convenience of installation on the support plate;

将安装板设置为包括第一夹板和第二夹板,使得安装时,先将安装管抵接于第二夹板上的弧形槽,随后旋转第一夹板,并同时将第一夹板与第二夹板相固定,从而将安装管安装于安装板,提高安装管在穿设于安装孔内的便捷性;若安装管需要在安装孔内移动时,能够先将第一夹板旋转,解除对安装管的限制,随后可将安装管抬起并移动,从而减小安装管与安装板之间发生摩擦而造成磨损的可能性。The mounting plate is set to include a first clamping plate and a second clamping plate, so that during installation, the installation pipe is first abutted on the arc-shaped groove on the second clamping plate, and then the first clamping plate is rotated, and the first clamping plate and the second clamping plate are installed at the same time. Therefore, the installation pipe is installed on the installation plate, which improves the convenience of the installation pipe passing through the installation hole; if the installation pipe needs to move in the installation hole, the first clamping plate can be rotated first to release the installation pipe. Restriction, the mounting tube can then be lifted and moved, reducing the possibility of wear due to friction between the mounting tube and the mounting plate.

附图说明Description of drawings

图1是本申请实施例的结构示意图;1 is a schematic structural diagram of an embodiment of the present application;

图2是图1中A部分的放大结构示意图;Fig. 2 is the enlarged structural representation of part A in Fig. 1;

图3是本申请实施例支撑板的结构示意图。FIG. 3 is a schematic structural diagram of a support plate according to an embodiment of the present application.

附图标记说明:1、安装槽;11、卡槽;2、安装管;3、支撑板;31、安装框架;32、安装板;321、第一夹板;322、第二夹板;323、抵接条;33、安装孔;4、控制螺杆;41、调节螺母;42、辅助滑杆;5、底座;6、支撑杆;61、支撑滑杆;62、支撑套管;63、支撑螺母;7、稳固杆;71、第一限位杆;72、第二限位杆。Description of reference numerals: 1, installation slot; 11, card slot; 2, installation pipe; 3, support plate; 31, installation frame; 32, installation plate; 321, first clamp plate; 322, second clamp plate; 323, contact Connection bar; 33, mounting hole; 4, control screw; 41, adjusting nut; 42, auxiliary sliding rod; 5, base; 6, supporting rod; 61, supporting sliding rod; 62, supporting sleeve; 63, supporting nut; 7. Stable rod; 71. The first limit rod; 72, The second limit rod.

具体实施方式Detailed ways

以下结合附图1-3对本申请作进一步详细说明。The present application will be further described in detail below in conjunction with accompanying drawings 1-3.

本申请实施例公开一种隧道电缆敷设结构。参照图1和图2,一种隧道电缆敷设结构包括开设于地面的安装槽1,安装槽1内设置有安装管2。安装槽1内还安装有多个支撑板3,且多个支撑板3沿安装管2的长度方向分布。支撑板3包括安装框架31,安装槽1相对的两侧壁均开设有沿竖向延伸的卡槽11,安装框架31穿设于安装槽1内,且同时卡设于安装槽1相对的两侧壁上的卡槽11。The embodiment of the present application discloses a tunnel cable laying structure. 1 and 2 , a tunnel cable laying structure includes an installation groove 1 opened on the ground, and an installation pipe 2 is arranged in the installation groove 1 . A plurality of support plates 3 are also installed in the installation groove 1 , and the plurality of support plates 3 are distributed along the length direction of the installation pipe 2 . The support plate 3 includes an installation frame 31 . The two opposite side walls of the installation slot 1 are provided with a vertically extending clamping slot 11 . Card slot 11 on the side wall.

参照图3,支撑板3还包括若干安装板32,安装板32设置于安装框架31内侧,且安装板32沿水平方向滑移连接于安装框架31。安装板32开设有安装孔33,安装管2穿设于多个安装板32中的安装孔33。3 , the support plate 3 further includes a plurality of mounting plates 32 . The mounting plates 32 are disposed inside the mounting frame 31 , and the mounting plates 32 are slidably connected to the mounting frame 31 along the horizontal direction. The mounting plate 32 is provided with mounting holes 33 , and the mounting pipes 2 pass through the mounting holes 33 in the plurality of mounting plates 32 .

安装时,将安装框架31卡设于安装槽1侧壁上的卡槽11,随后将安装管2穿设于多个安装板32上的安装孔33;并且,在安装框架31放置完毕且在穿设安装管2的过程中,能够将安装板32相对安装框架31滑移,以调节多个安装框架31中安装孔33的相对位置,进而便于安装管2的穿设,提高安装管2在支撑板3上安装的便捷性。最后将电缆穿设于安装管2内,同时在安装槽1内回填土壤。During installation, the installation frame 31 is clamped to the slot 11 on the side wall of the installation groove 1, and then the installation pipes 2 are passed through the installation holes 33 on the plurality of installation plates 32; During the process of piercing the installation pipe 2, the installation plate 32 can be slid relative to the installation frame 31 to adjust the relative positions of the installation holes 33 in the plurality of installation frames 31, thereby facilitating the piercing of the installation pipe 2 and improving the safety of the installation pipe 2. Ease of installation on the support plate 3. Finally, the cables are put through the installation pipe 2, and the soil is backfilled in the installation groove 1 at the same time.

参照图3,安装框架31固定连接有控制螺杆4和辅助滑杆42,控制螺杆4设置于安装板32下部,辅助滑杆42设置于安装板32上部,且控制螺杆4和辅助滑杆42均沿水平方向延伸。3, the mounting frame 31 is fixedly connected with a control screw 4 and an auxiliary sliding rod 42, the control screw 4 is arranged on the lower part of the mounting plate 32, the auxiliary sliding rod 42 is arranged on the upper part of the mounting plate 32, and the control screw 4 and the auxiliary sliding rod 42 are both Extends horizontally.

参照图3,安装板32包括第一夹板321和第二夹板322,第一夹板321位于第二夹板322上方。第二夹板322卡设并滑移连接于安装框架31下边沿,控制螺杆4穿设于第二夹板322,第二夹板322转动连接有调节螺母41,调节螺母41套设并螺纹连接于控制螺杆4。Referring to FIG. 3 , the mounting plate 32 includes a first clamping plate 321 and a second clamping plate 322 , and the first clamping plate 321 is located above the second clamping plate 322 . The second clamping plate 322 is clamped and slidably connected to the lower edge of the mounting frame 31 , the control screw 4 is passed through the second clamping plate 322 , and the second clamping plate 322 is rotatably connected with an adjusting nut 41 , and the adjusting nut 41 is sleeved and threadedly connected to the control screw 4.

辅助滑杆42穿设于第一夹板321,且两者相滑移连接。并且,第一夹板321还转动连接于辅助滑杆42。The auxiliary sliding rod 42 passes through the first clamping plate 321 and is slidably connected to each other. In addition, the first clamping plate 321 is also rotatably connected to the auxiliary sliding rod 42 .

第一夹板321与第二夹板322相向端均开设有弧形槽,且第一夹板321上弧形槽的凹面与第二夹板322上弧形槽的凹面相向设置,使得第一夹板321上的弧形槽与第二夹板322上的弧形槽共同组成安装孔33。并且,第一夹板321与第二夹板322相向端通过螺栓可拆卸连接。The opposite ends of the first clamp plate 321 and the second clamp plate 322 are both provided with arc-shaped grooves, and the concave surface of the arc-shaped groove on the first clamp plate 321 and the concave surface of the arc-shaped groove on the second clamp plate 322 are arranged opposite to each other, so that the The arc-shaped groove and the arc-shaped groove on the second clamping plate 322 together form the installation hole 33 . In addition, the opposite ends of the first clamping plate 321 and the second clamping plate 322 are detachably connected by bolts.

安装时,先将安装管2抵接于第二夹板322上的弧形槽,随后旋转第一夹板321,使得安装管2能够同时位于第二夹板322上的弧形槽与第一夹板321上的弧形槽内。随后将第一夹板321与第二夹板322相固定,从而将安装管2安装于安装板32,提高安装管2在穿设于安装孔33内的便捷性。若安装管2需要在安装孔33内移动时,能够先将第一夹板321旋转,解除对安装管2的限制。随后可将安装管2抬起并移动,从而减小安装管2与安装板32之间发生摩擦而造成磨损的可能性。When installing, first abut the installation tube 2 against the arc-shaped groove on the second clamping plate 322, and then rotate the first clamping plate 321, so that the installation tube 2 can be positioned on the arc-shaped groove on the second clamping plate 322 and the first clamping plate 321 at the same time. in the arc groove. Then, the first clamping plate 321 and the second clamping plate 322 are fixed, so that the installation pipe 2 is installed on the installation plate 32 , which improves the convenience of the installation pipe 2 passing through the installation hole 33 . If the installation pipe 2 needs to move in the installation hole 33 , the first clamping plate 321 can be rotated first to release the restriction on the installation pipe 2 . The mounting tube 2 can then be lifted and moved, thereby reducing the possibility of wear due to friction between the mounting tube 2 and the mounting plate 32 .

并且,在需要调节安装板32所在位置时,只需旋转调节螺母41,从而牵引安装板32沿控制螺杆4滑移,进而调节安装孔33所在位置,便于安装管2的安装。同时,设置的辅助滑杆42能够对安装板32的滑移做支撑,进而增加安装板32滑移时的稳定性。Moreover, when the position of the mounting plate 32 needs to be adjusted, the adjusting nut 41 only needs to be rotated, so that the mounting plate 32 is pulled to slide along the control screw 4 , and the position of the mounting hole 33 is adjusted to facilitate the installation of the mounting pipe 2 . At the same time, the provided auxiliary sliding rod 42 can support the sliding of the mounting plate 32, thereby increasing the stability of the mounting plate 32 when sliding.

参照图3,为了进一步减小安装管2安装时受到磨损的可能性,第一夹板321的弧形槽部与第二夹板322的弧形槽部均固定连接有抵接条323,抵接条323由弹性材料制成,例如橡胶或硅胶。Referring to FIG. 3 , in order to further reduce the possibility of the mounting pipe 2 being worn during installation, the arc-shaped groove portion of the first clamp plate 321 and the arc-shaped groove portion of the second clamp plate 322 are fixedly connected with abutting strips 323 . The 323 is made of elastic material such as rubber or silicone.

参照图3,安装框架31底部设置有底座5,底座5抵接于安装槽1底壁。底座5与安装框架31之间设置有支撑杆6,支撑杆6包括支撑滑杆61、支撑套管62和支撑螺母63。支撑滑杆61固定连接于安装框架31,支撑套管62固定连接于底座5,且支撑滑杆61同轴穿设于支撑套管62。支撑螺母63转动连接于支撑套管62,且支撑螺母63套设并螺纹连接于支撑滑杆61。Referring to FIG. 3 , the bottom of the mounting frame 31 is provided with a base 5 , and the base 5 abuts against the bottom wall of the mounting groove 1 . A support rod 6 is disposed between the base 5 and the installation frame 31 , and the support rod 6 includes a support sliding rod 61 , a support sleeve 62 and a support nut 63 . The support slide bar 61 is fixedly connected to the mounting frame 31 , the support sleeve 62 is fixedly connected to the base 5 , and the support slide bar 61 is coaxially penetrated through the support sleeve 62 . The support nut 63 is rotatably connected to the support sleeve 62 , and the support nut 63 is sleeved and threadedly connected to the support slide rod 61 .

使用时,旋转支撑螺母63能够驱使支撑滑杆61相对支撑套管62滑移,进而调节安装框架31所在高度,从而调节安装板32所在的竖向位置,进一步便于安装管2的安装。In use, rotating the support nut 63 can drive the support slide bar 61 to slide relative to the support sleeve 62 , thereby adjusting the height of the mounting frame 31 , thereby adjusting the vertical position of the mounting plate 32 , further facilitating the installation of the mounting pipe 2 .

参照图3,为了在旋转支撑螺母63时,底座5跟随支撑螺母63同步旋转的可能性,底座5与安装框架31之间还设置有稳固杆7。稳固杆7包括第一限位杆71和第二限位杆72,第一限位杆71固定连接于安装框架31,第二限位杆72固定连接于底座5,第一限位杆71沿竖向穿设并滑移连接于第二限位杆72。Referring to FIG. 3 , for the possibility that the base 5 rotates synchronously with the support nut 63 when the support nut 63 is rotated, a stabilizing rod 7 is further provided between the base 5 and the mounting frame 31 . The stabilizing rod 7 includes a first limit rod 71 and a second limit rod 72. The first limit rod 71 is fixedly connected to the mounting frame 31, and the second limit rod 72 is fixedly connected to the base 5. The first limit rod 71 is along the It is vertically penetrated and slidably connected to the second limiting rod 72 .

本申请实施例一种隧道电缆敷设结构的实施原理为:安装时,将安装框架31卡设于安装槽1侧壁上的卡槽11。随后将安装管2抵接于第二夹板322上的弧形槽,旋转第一夹板321,使得安装管2能够同时位于第二夹板322上的弧形槽与第一夹板321上的弧形槽内,从而将安装管2穿设于安装孔33。The implementation principle of a tunnel cable laying structure in the embodiment of the present application is as follows: during installation, the installation frame 31 is clamped to the clamping groove 11 on the side wall of the installation groove 1 . Then, the mounting pipe 2 is abutted against the arc-shaped groove on the second clamping plate 322, and the first clamping plate 321 is rotated, so that the mounting pipe 2 can be located in the arc-shaped groove on the second clamping plate 322 and the arc-shaped groove on the first clamping plate 321 at the same time. so that the mounting pipe 2 is inserted into the mounting hole 33 .

并且,在安装过程中,旋转调节螺母41,能够控制安装板32沿水平方向滑移;旋转支撑螺母63,能够控制安装板32沿竖向滑移,进而调节安装孔33所在位置,便于安装管2的安装。In addition, during the installation process, rotating the adjusting nut 41 can control the sliding of the mounting plate 32 in the horizontal direction; rotating the supporting nut 63 can control the sliding of the mounting plate 32 in the vertical direction, and then adjust the position of the installation hole 33 to facilitate the installation of the pipe 2 installation.

以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。The above are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore: all equivalent changes made according to the structure, shape and principle of the present application should be covered within the scope of the present application. Inside.

Claims (8)

1.一种隧道电缆敷设结构,包括开设于地面的安装槽(1),所述安装槽(1)内穿设有安装管(2),所述安装槽(1)内还设有多个支撑板(3),多个所述支撑板(3)沿安装管(2)的长度方向分布,其特征在于:所述支撑板(3)包括安装框架(31)和若干设置于安装框架(31)内侧的安装板(32),所述安装框架(31)安装于安装槽(1)内,所述安装板(32)滑移连接于安装框架(31),所述安装板(32)设有用于穿设安装管(2)的安装孔(33)。1. A tunnel cable laying structure, comprising a mounting groove (1) opened on the ground, a mounting pipe (2) is pierced through the mounting groove (1), and a plurality of A support plate (3), a plurality of the support plates (3) are distributed along the length direction of the installation pipe (2), and it is characterized in that: the support plate (3) comprises an installation frame (31) and a plurality of installation frames ( 31) The inner mounting plate (32), the mounting frame (31) is mounted in the mounting groove (1), the mounting plate (32) is slidably connected to the mounting frame (31), the mounting plate (32) A mounting hole (33) for passing the mounting pipe (2) is provided. 2.根据权利要求1所述的一种隧道电缆敷设结构,其特征在于:所述安装框架(31)固定连接有控制螺杆(4),所述控制螺杆(4)沿安装板(32)滑移方向延伸,所述安装板(32)转动连接有调节螺母(41),所述调节螺母(41)套设并螺纹连接于控制螺杆(4)。2. A tunnel cable laying structure according to claim 1, characterized in that: the mounting frame (31) is fixedly connected with a control screw (4), and the control screw (4) slides along the mounting plate (32). Extending in the moving direction, the mounting plate (32) is rotatably connected with an adjusting nut (41), and the adjusting nut (41) is sleeved and threadedly connected to the control screw (4). 3.根据权利要求2所述的一种隧道电缆敷设结构,其特征在于:所述安装框架(31)还固定连接有辅助滑杆(42),所述辅助滑杆(42)沿安装板(32)滑移方向延伸,所述辅助滑杆(42)穿设于安装板(32)且两者相滑移连接。3 . The tunnel cable laying structure according to claim 2 , wherein the installation frame ( 31 ) is also fixedly connected with an auxiliary sliding rod ( 42 ), and the auxiliary sliding rod ( 42 ) runs along the mounting plate ( 3 . 32) Extending in the sliding direction, the auxiliary sliding rod (42) passes through the mounting plate (32) and is connected in a sliding manner. 4.根据权利要求1所述的一种隧道电缆敷设结构,其特征在于:所述安装板(32)包括第一夹板(321)和第二夹板(322)且两者分别滑移连接于安装框架(31)相对的两侧壁,所述第一夹板(321)与第二夹板(322)相向端均开设有弧形槽,且第一夹板(321)上的弧形槽与第二夹板(322)上的弧形槽共同组成为安装孔(33),第一夹板(321)还转动连接于安装框架(31),所述第一夹板(321)与第二夹板(322)的相向端相可拆卸连接。4. A tunnel cable laying structure according to claim 1, characterized in that: the mounting plate (32) comprises a first clamping plate (321) and a second clamping plate (322), and the two are respectively slidably connected to the installation On the opposite two side walls of the frame (31), arc-shaped grooves are provided at the opposite ends of the first clamping plate (321) and the second clamping plate (322), and the arc-shaped grooves on the first clamping plate (321) are connected to the second clamping plate (321). The arc-shaped grooves on (322) together form a mounting hole (33). The first clamping plate (321) is also rotatably connected to the mounting frame (31). The first clamping plate (321) and the second clamping plate (322) face each other. Detachable end-to-end connections. 5.根据权利要求4所述的一种隧道电缆敷设结构,其特征在于:所述第一夹板(321)与第二夹板(322)的弧形槽部均固定连接有由弹性材料支撑的抵接条(323)。5 . The tunnel cable laying structure according to claim 4 , wherein the arc-shaped grooves of the first clamping plate ( 321 ) and the second clamping plate ( 322 ) are fixedly connected with a bearing supported by an elastic material. 6 . Pickup (323). 6.根据权利要求1所述的一种隧道电缆敷设结构,其特征在于:所述安装槽(1)相对的两侧壁均开设有用于穿设安装框架(31)的卡槽(11),所述卡槽(11)竖向延伸设置。6 . The tunnel cable laying structure according to claim 1 , wherein the opposite side walls of the installation groove ( 1 ) are provided with card grooves ( 11 ) for passing through the installation frame ( 31 ). 7 . The card slot (11) extends vertically. 7.根据权利要求1所述的一种隧道电缆敷设结构,其特征在于:所述安装框架(31)底部设置有底座(5),所述底座(5)抵接于安装槽(1)底壁,所述底座(5)与安装框架(31)之间设置有支撑杆(6),所述支撑杆(6)包括支撑滑杆(61)、支撑套管(62)和支撑螺母(63),所述支撑滑杆(61)与支撑套管(62)分别一一对应连接于安装框架(31)和底座(5),所述支撑螺母(63)转动连接于支撑套管(62),且所述支撑螺母(63)套设并螺纹连接于支撑滑杆(61)。7. A tunnel cable laying structure according to claim 1, characterized in that: a base (5) is provided at the bottom of the installation frame (31), and the base (5) abuts against the bottom of the installation groove (1). A support rod (6) is provided between the base (5) and the mounting frame (31), and the support rod (6) includes a support sliding rod (61), a support sleeve (62) and a support nut (63) ), the support slide bar (61) and the support sleeve (62) are respectively connected to the mounting frame (31) and the base (5) in a one-to-one correspondence, and the support nut (63) is rotatably connected to the support sleeve (62) , and the supporting nut (63) is sleeved and threadedly connected to the supporting sliding rod (61). 8.根据权利要求7所述的一种隧道电缆敷设结构,其特征在于:所述底座(5)与安装框架(31)之间还设置有若干稳固杆(7),所述稳固杆(7)包括第一限位杆(71)和第二限位杆(72),所述第一限位杆(71)穿设并滑移连接于第二限位杆(72),所述第一限位杆(71)和第二限位杆(72)分别一一对应固定连接于安装框架(31)和底座(5)。8 . The tunnel cable laying structure according to claim 7 , wherein a plurality of stabilizing rods ( 7 ) are further arranged between the base ( 5 ) and the mounting frame ( 31 ). ) includes a first limit rod (71) and a second limit rod (72), the first limit rod (71) is penetrated and slidably connected to the second limit rod (72), and the first limit rod (71) is slidably connected to the second limit rod (72). The limit rod (71) and the second limit rod (72) are fixedly connected to the installation frame (31) and the base (5) in a one-to-one correspondence, respectively.
CN202220740692.3U 2022-03-31 2022-03-31 Tunnel cable laying structure Expired - Fee Related CN217087397U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220740692.3U CN217087397U (en) 2022-03-31 2022-03-31 Tunnel cable laying structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220740692.3U CN217087397U (en) 2022-03-31 2022-03-31 Tunnel cable laying structure

Publications (1)

Publication Number Publication Date
CN217087397U true CN217087397U (en) 2022-07-29

Family

ID=82553430

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220740692.3U Expired - Fee Related CN217087397U (en) 2022-03-31 2022-03-31 Tunnel cable laying structure

Country Status (1)

Country Link
CN (1) CN217087397U (en)

Similar Documents

Publication Publication Date Title
CN203092062U (en) Auxiliary supporting device for pipeline welding
CN215928599U (en) Municipal administration rain sewage pipeline laying device
CN217760164U (en) Wall support for building repair
CN210468752U (en) A communication pipeline support device
CN218895065U (en) Water conservancy hydropower pipeline interface auxiliary connection fixing device
CN214789466U (en) Tuber pipe hoist and mount mounting structure
CN218428185U (en) Building engineering pipe strutting arrangement
CN218514061U (en) A cable adapter for electrical engineering
CN216867734U (en) A kind of pipeline positioning bracket for water supply and drainage engineering
CN222163838U (en) A pipeline support for building construction
CN214297984U (en) A kind of laying traction device for water conservancy pipeline
CN212906956U (en) Warning sign for construction
CN220540481U (en) Hydraulic pipeline supporting mechanism for hydraulic engineering
CN221219735U (en) Curtain wall installation mechanism for building construction
CN221856760U (en) A support device
CN212626952U (en) Cable placing rack
CN218972002U (en) Support frame for pipeline installation
CN223924088U (en) A building electromechanical installation support and hanger device
CN219177093U (en) Adjustable finished product support of fire control pipeline
CN223806713U (en) A green installation device for tunnel electromechanical equipment and pipelines
CN221812256U (en) Assembled cable bracket
CN218780867U (en) Firm strutting arrangement of water conservancy pipeline
CN220857523U (en) Cable bracket with positioning structure
CN220144964U (en) Straight flame cutting machine
CN221924945U (en) Pipeline butt joint detection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220729

CF01 Termination of patent right due to non-payment of annual fee